Loading...
HomeMy WebLinkAboutNC0075027_Authorization to Construct_19910208r State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor George T. Everett, Ph.D. William W. Cobey, Jr., Secretary Director February 8, 1991 Mr. R. Don Cain Post Office Box 846 Walkertown, North Carolina 27051 Subject: Permit No. NCO075027 . Authorization to Construct R. Don Cain Property Wastewater Treatment Facility Forsyth County Dear Mr. Cain: A letter of request for an Authorization to Construct was received November 9, 1990 by the Division and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of a 43,200 gpd wastewater treatment facility consisting of a 10,985 gallon aerated flow equalization tank with dual 2 hp grinder pumps and a 50 cfm blower, a 28,472 gallon aeration tank and a 19,026 gallon aeration tank each with fine bubble diffusers, two 300 cfm blowers, two (2) 7,340 gallon clarifiers each with a diameter of 12.5 ft, a 9,843 gallon aerated sludge holding tank, two (2) dual filter tertiary filter unit consisting of two 8 sf filters, a 1,212 gallon clearwell with dual 120 gpm backwash pumps, a 1,350 gallon mudwell with dual 30 gpm backwash return pumps, a 1,090 gallon tablet type chlorinator, a continuous recording effluent flow meter, a 1,000 gallon post aeration tank, approximately 89 linear feet of 8 inch gravity sewer with discharge of treated wastewater into Ader Creek classified "C" waters. This Authorization to Construct is issued in accordance with Part III paragraph B of NPDES Permit No. NCO075027 issued January 3, 1989, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0075027. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Environmental Management. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. Pollution Prevention Pays P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-7015 An Equal Opportunity Affirmative Action Employer Mr. Cain February 8, 1991 Page Two The Winston-Salem Regional Office, phone no. (919) 761-2351 be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an in -place inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to the Permits and Engineering Unit, P.O. Box 27687, Raleigh, NC 27611. The Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge of the wastewater treatment facilities. The operator must hold a certificate of the grade at least equivalent to the classification assigned to the wastewater treatment facilities by the Certification Commission. Within thirty days after the wastewater treatment facilities are 50% complete, the Permittee must submit a letter to the Certification Commission which designates the operator in responsible charge. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. The sand media of the tertiary filter unit must comply with the Division's sand specifications. The engineers certification will be evidence that this certification has been met. 1 Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Environmental Management in accordance with North Carolina General Statute 143-215.6. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. Please be advised that at such time as the surface loading rate to the first clarifier reaches 80% of the maximum loading rate of 300 gpd/sf then the second clarifier and tertiary filter unit shall be installed. One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Mr. Mark Hawes, telephone number 919/733-5083. Si ereelly^,_ o j� George T. Everel cc: Forsyth County Health Department Winston-Salem Regional Office ^ Training and Certification Unit