HomeMy WebLinkAbout20071473 Ver 1_Staff Report_20071109Staff Report
Project Num: 20071473 Version: 1
Name: Duke Energy: Mission Canoe Portage
County: Clay
Location: Hawassee River HIW Hayesville
Latitude: +35°03'60"
Status: Received
Project Type: Boat Ramps
Region: Asheville
Longitude: -83°55'36"
SW Plan Location:
Owner: Carriker, Joseph W.
Contact Person: Carriker, Joseph W
Title:
Phone: 704-382-8849
Inspection Date: 11/09/2007
Reason for Inspection: Routine
On-Site Representative(s):
Primary Inspector: Kevin H Barnett
Secondary Inspector(s):
Question Areas:
Site Visit
Inspection Summary:
Entry Time: 01:30 PM
Exit Time: 01:45 PM
Inspection Type: Staff Report
Phone: 828-296-4500 Ext.4657
ARO has reveiwed. Issued as requested with the following: Sediment and erosion control measures must be implemented prior to
construction and maintained on the sites to minimize sediment in downstream areas. Seeding for a temporary cover of wheat, millet,
or similar annual grain or permanent herbaceous cover should occur on all bare soil within five (15) days of ground disturbing activities
to provide long-term erosion control. Erosion control matting should be used in conjunction with appropriate seeding on disturbed
soils in steep slope and riparian areas. Matting should be secured in place with staples, stakes, or, wherever possible, live stakes of
native trees. Straw mulch and tall fescue should not be used in riparian areas. 7. Under no circumstances should river rock, sand or
other materials be dredged from the stream channel under authorization of this permit except, if necessary, in the immediate vicinity of
the canoe access area. Streambed materials are unstable in flowing-water situations and are unsuitable for bank stabilization. In-
stream dredging has catastrophic effects on aquatic life and disturbance of the natural form of the stream channel can cause
downstream erosion problems. The natural dimension, pattern, and profile of the stream upstream and downstream of the permitted
area should not be modified by widening the stream channel or changing its depth. 8. Stabilization measures should only be
applied on or near new disturbed sites, leaving other stable stream bank areas in a natural condition. Grading and
backfilling should be minimized and tree and shrub growth should be retained where possible to ensure long-term availability of
stream bank cover for aquatic life and wildlife. Backfill materials should be obtained from upland sites except in cases where excess
streambed materials are available. Berms shall not be constructed because they block the floodplain, constrict and accelerate flood
flows, and often fail and sometimes impede drainage during large
Page: 1
Project Num: 20071473 Owner: Carriker, Joseph W.
Inspection Date: 11/09/2007 Inspection Type: Staff Report Reason for Visit: Routine
Site Visit Yes No NA NE
Do impacts described in the application differ those seen in the field? ^ ^ ^ ^
If yes, please describe differences:
Are the IntermittenUPerennial calls different in the application? ^ ^ ^ ^
If yes, please describe differences, and how mitigation ratios are affected:
Are there additional impacts not described in the application? ^ ^ ^ ^
If yes, please describe and quantify:
Were the impacts in place prior to the application for the 401 Certification? ^ ^ ^ ^
Additional conditions recommended for the Certification:
Recommended project modifications:
Is this a modification request to an existing Certification? ^ ^ ^ ^
Are there additional stromwater conditions that should be required due to the following classifications: ^ ^ ^ ^
# 303(d)list, Class WS, NSW, ORW, HQW
Describe:
Is this a subdivision or otherwise part of a larger project? ^ ^ ^ ^
# If yes, what phase is this?
Are there prior impacts from prior phases? ^ ^ ^ ^
If yes, what are the cumulative imacts for this project?
Possible secondary impacts noted:
Comment:
Page: 2