Loading...
HomeMy WebLinkAbout20240340 Ver 1_More Info Received_20240418 (3)S. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): 7. Will work be conducted from land? 0 From water? 1�9 8. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: A 2,0' Temporary impacts in square feet: 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land- ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: Temporary impacts (temporary clearing,ppnstruction corridor) in square feet: LA' 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): nIQ `f� .4ez.r 11. Signature By signing below,1, as the project proponent, certify to the following: ® The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief © The project proponent hereby requests that the certifying authority review and take action on this 6WA 401 certification requestywitliethe applicable reasonable period of time I---- ?/ 5ature° 115ANC—A-CO211.M02Date is valid only if an authorization letter from the owner is provided. 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining wails, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation i aii:iE02r_, of %aLS mtlls: i& 3.11 Ncrt3 biWdubu SLeaE WA, eiatE 4+�of>a: V: vn�r S [B.^,�cs�:.. icauf37, G::ecvlins..'.7ts'3u:.4hC7' s ml UT Full Pnn,417 (At Pall POW®NUffibaal WazeyLovel) i t, -T?—, 2WA4 1AkXAIVA*L Disrup. Ta au Z &4-4o Please approximately sketch the following IU��r�l�r� Kin °�Ful tlr� �����?de d! it", such as 10, ftx 100 ftj' menyjons, fcreach . All proposed vegetation clearing 2. Location of rip rep or fill to be placed above the Fui9 �©U� ° 3• Location of rlp rap or flit to be placed below tl�e ��ll P@n ®N O msl Water Level elevation 4. Location of any proposed structures such as buildings, P, retaining al Wetter Level elevation 5. Location of any excavation or dredging belaw °kh Full Pond/ Normal docks.. etc. 6. Location of construction Recagg corrid® Water Level elevation FORM: SSGP 10-2019 page of a