HomeMy WebLinkAbout20240340 Ver 1_More Info Received_20240418 (2)Baker, Caroline D
From:
Brown, Devynne M
Sent:
Thursday, April 18, 2024 2:07 PM
To:
TAMARA HAGER
Cc:
Burkhard, Michael; Hoy, Amie
Subject:
Re: [External] DWR #20240340 Smith
Good afternoon all,
Michael and I just got back from being in the field and wanted to follow up on details discussed during
the onsite meeting regarding the above mentioned DWR project:
1. The proposed retaining walls in the 30 and 50 foot buffer are not necessary. For the homeowners
purpose, it is feasible to place a single retaining wall outside of the 50 foot buffer and still
effectively work for their purposes (erosion of their yard).
2. There is a set of old stone steps down to the water/dock through the buffer, they have been there
for a longtime.
3. No trees need to be removed from the buffer, especially now since the retaining wall can easily be
moved back out of the buffer.
Arnie - Tamara said she would work on a resubmittal, including a new drawing reflecting the single
retaining wall OUTSIDE of the buffer as well as the dimensions of such. I think that covers it, let me know
if there are any further questions!
Thanks everyone!
Devynne Brown
Environmental Specialist
Water Quality Regional Operations Section
Division of Water Resources
Mobile: (704)-430-8834
Office: (704)-235-2200
610 East Center Avenue
Suite 301
Mooresville, NC 28115
From: TAMARA HAGER <hager@lakepermit.com>
Sent: Tuesday, April 16, 2024 6:38 PM
To: Brown, Devynne M <devynne.brown @deq.nc.gov>
Subject: Re: [External] DWR #20240340 Smith
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Okay on thursday 10:00
Thankyou
Lake Permit LLC
Tamara Hager
(704)575-2227
hager@lakepermit.com
The information contained in this message is confidential and is intended solely for the recipient(s) identified above. If
you are not the intended recipient or there are any problems, please notify the sender immediately. The unauthorized
use, disclosure, or copying of this message is strictly forbidden any may subject you to legal action .
On Apr 16, 2024, at 3:36 PM, Brown, Devynne M <devynne.brown @deq.nc.gov> wrote:
Yes, that works. Thank you! We will see you then.
Devynne Brown
Environmental Specialist
Water Quality Regional Operations Section
Division of Water Resources
Mobile: (704)-430-8834
Office: (704)-235-2200
610 East Center Avenue
Suite 301
Mooresville, NC 28115
From: TAMARA HAGER <hager@lakepermit.com>
Sent: Tuesday, April 16, 2024 3:35 PM
To: Brown, Devynne M <devynne.brown @deg.nc.gov>
Subject: Re: [External] Re: DWR #20240340 Smith
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the
Report Message button located on your Outlook menu bar on the Home tab.
10:00 am?
Tamara Hager
704-575-2227
Lake Permit LLC
hager@lakepermit.com
On Apr 16, 2024, at 2:54 PM, Brown, Devynne M
<devynne.brown @deq.nc.gov> wrote:
Do you have any time earlier in the day? if not we can do another day no
worries!
Devynne Brown
Environmental Specialist
Water Quality Regional Operations Section
Division of Water Resources
Mobile: (704)-430-8834
Office: (704)-235-2200
610 East Center Avenue
Suite 301
Mooresville, NC 28115
From: TAMARA HAGER <hager@lakepermit.com>
Sent: Tuesday, April 16, 2024 2:51 PM
To: Brown, Devynne M <devynne.brown@deq.nc.gov>
Subject: Re: [External] Re: DWR #20240340 Smith
CAUTION: External email. Do not click links or open attachments unless verified. Report
suspicious emails with the Report Message button located on your Outlook menu bar on the
Home tab.
I have meeting with contractor till 1:30 Thursday.
It takes me 30 minutes to drive job site.
Tamara Hager
704-575-2227
Lake Permit LLC
hager@lakepermit.com
On Apr 16, 2024, at 2:49 PM, Brown, Devynne M
<devynne.brown @deq.nc.gov> wrote:
is 1 pm possible for you?
Devynne Brown
3
Environmental Specialist
Water Quality Regional Operations Section
Division of Water Resources
Mobile: (704)-430-8834
Office: (704)-235-2200
610 East Center Avenue
Suite 301
Mooresville, NC 28115
From: TAMARA HAGER <hager@lakepermit.com>
Sent: Tuesday, April 16, 2024 2:48 PM
To: Brown, Devynne M <devynne.brown@deq.nc.gov>
Cc: Hoy, Amie <amie.hoy@deq.nc.gov>
Subject: Re: [External] Re: DWR #20240340 Smith
CAUTION: External email. Do not click links or open attachments unless
verified. Report suspicious emails with the Report Message button located on
your Outlook menu bar on the Home tab.
Hi Devynne-
The retaining wall is to hold land so doesn't keep
going into the lake.
Yes I can meet Thursday in the afternoon 2:00?
Tamara Hager
704-575-2227
Lake Permit LLC
hager@lakepermit.com
On Apr 16, 2024, at 2:37 PM, Brown,
Devynne M
<devynne.brown @deq.nc.gov> wrote:
Hey Tamara,
Would you be available for an onsite meeting to
go over the purpose/need for the retaining walls
in the buffer this Thursday (4/18)?
Devynne Brown
Environmental Specialist
4
Water Quality Regional Operations
Section
Division of Water Resources
Mobile: (704)-430-8834
Office: (704)-235-2200
610 East Center Avenue
Suite 301
Mooresville, NC 28115
From: TAMARA HAGER <hager@lakepermit.com>
Sent: Tuesday, April 16, 2024 1:30 PM
To: Hoy, Amie <amie.hoy@deq.nc.gov>
Cc: Brown, Devynne M <devynne.brown@deq.nc.gov>
Subject: [External] Re: DWR #20240340 Smith
CAUTION: External email. Do not click links or open
attachments unless verified. Report suspicious emails with
the Report Message button located on your Outlook menu
bar on the Home tab.
Hi Am ie-
My sketch had cart path, however I only
need two retaining walls. No Cart Path.
Thank you
Please let me know if I need to meet
Devynne at job site since no cart path is
needed.
They have existing stepping stones from
house to pier that have been there for 20
years.
Lake Permit LLC
Tamara Hager
(704)575-2227
hager@lakepermit.com
The information contained in this
message is confidential and is intended
solely for the recipient(s) identified
above. If you are not the intended
recipient or there are any problems,
5
please notify the
sender immediately. The unauthorized
use, disclosure, or copying of this
message is strictly forbidden any may
subject you to legal action .
On Apr 16, 2024, at
10:08 AM, Hoy, Amie
<amie.hoy@deq.nc.gov>
wrote:
Good morning,
I'm reviewing the above mentioned
project and the numbers are not lining
up again. You are asking for 630sgft of
above water impacts which would
cover you for the shoreline
stabilization, but you are also asking
for a cart path and two retaining
walls. You provided measurements of
28.25' for Zone 1 and 25.50' for Zone
2 but I'm not sure if that is for the cart
path or the retaining wall. There is no
mention of a cart path in your
application but there seems to be one
in your drawing, can you clarify. We
will need to meet with you on -site for
clarification on the purpose of these
retaining walls. I also need Mr.
Smith's signature on the Agent Form.
Please let Devynne know when you
are able to meet on -site.
Your project will be considered "ON -
HOLD" until we can meet on -site and
you provide the requested
information that will allow me to
complete my review.
Best,
Amie Hoy
Environmental Specialist II
Division of Water Resources
amie.hoy(cbdeq.nc.gov
DWR
website: https://www.deg.nc.gov/abou
t/divisions/water-resources
6
<image001.png>
Email correspondence to and from this address may
be subject to the North Carolina Public Records Law
and may be disclosed to third parties by an authorized
state official.