Loading...
HomeMy WebLinkAbout20240279 Ver 1_Design/Maps/Site Plans Revised_20240326NO ANTICIPATED 'PROPOSED IMPACTS -7 MOA OLTROA (S.,,2312) jo'PUBLI�� OVERALL BUFFER IMPACT SUMMARY: PERMANENT STREAM IMPACT: 7 jr-_ &INV� PS 1 114 LF 684 SF (.016 AC) w RIP -RAP 300 SF (0.007 AC) LINEAR IMPACT 28' L�To _j 17— 13 �_ �, N PERMANENT BUFFER IMPACT: 1 9 RE"E' ZONE 1: PZ 1 A: 3784 SF (0.087 AC) PZ 1 B: 4083 SF (0.094 AC) m ZONE 2: A CBU PZ 2A: 1737 SF (0.040 AC) E) PZ 2B: 2304 SF (0.053 AC) 173 E) OVERALL ZONE 1 TOTAL: 7867 SF 18 AC) (126) 172 G - OVERALL ZONE 2 TOTAL: 4041 (.093 AC) E) E) E) 7 E (1171 �C.�o G) 116 A QY E) Q155 4 E) U P_ A E) U4 EXISTING DRY DE ­­N P 4�, 1114 §A ........ . p 185 E) E) 136) X U134 V�A G 18 PEET 133 tp 30' STREAM BUFFER ZONE 1 20' STREAM BUFFER ZONE 2 150, 0 150' 300' 450' 600' SCALE: 1" = 150' JU _3� @U 4 pq E) 56 __j 0 U) 5 V V G) @44 137 E) (9 R (D 65 60 L 'T25) 64 SAP C N :A pA;E CULLENS D ?IVE 50PUBLI- 3 '�V =::T=ss 4. 20' Q7 US (Z) Gj I STREAM BUFFER L ZONE 2 6 r 30 STREAM BUFFER z ZONE 1 > F 1 Civil Engineers and Land Surveyors r SHAMROCK PHASE 5 + 7 8518 Triad Drive, Colfax, NC 27235 www.felconsulting.com STREAM IMPACT MAP (336) 852-9797 FEI License No. C-0950 PROJECT LOCATION: OWNER INFORMATION: TOWNSHIP: GRAHAM CONCEPT BUILDERS COUNTY: ALAMANCE PO BOX 2507 STATE: NORTH CAROLINA BURLINGTON, NC 27217 336-228-0490 SHAMROCK GOLF COURSE iT RD, (SR 2312) �:t �PSE 5 & 7 DR �A�ULLEINSDR VICINITY MAP 1 "=2000' DATE REVISION NOTE DRAWN BY: CAH EXHIBIT CHECKED BY: RB DATE: 03/26/2024 PROJECT NO.: 03070.041 REF. NO.: - SCALE: 1 = 100' A OF2 A EADmwIngs & Projects\PROJ\03070.035 Shamrock\DrawIngs\Sheets\Phase 5,7 570 565 PROPI 560 EXISTING GRADE 555 550 -0+30 C> C) ro — C) C0 It (_0 J Co 00 Lo LL 0 0 J"- Lq 00 L0 In I- t 't lzt r1_ + LC) -t Lq Lr) G c) ILI CD V) 00 CN V) . L0 I CO < L6 Lo Lo U)Zzzo CIL CUL NS DRIVE— T C)__ _. �6_ Lq 'CID C) C:)-+ 00 La— `0 — r-- Lo LO um W — J J Ip L M ITS 0 51J 8" SEWER DI SEP 36" RAT \AIN. ION (TYJ - )SED GRADE 81, DI W4 CD CD C+D,6 CD CD co -� It U) C) 15" J --Co LID L(j__ J Al 0__� r0ro) -,,of 4T RIP 28'L CLASS RAP APRON X 10.5'W 1 STONE X 24"D 0+00 1+00 Civil Engineers and Land Surveyor 8518 Triad Drive, Colfax, NC 27235 www.fe I consulfing.com (336) 852-9797 FE License No. C-0950 SKIMMER BASIN #1 `�o ILLI 00 I'* ZT) C4 0 C:) 01 -0 C:11 00 M W U I ) ,IIJ * �* I C1 PERMANENT FILL TEMPORARY DISCHARGE DURING CONSTRUCTION TO SEDIMENT TRAP LIMITS OF PERMANENT FILL 101, 41p —0/2 4IJ PERMANENTSTREAM IMPACT PS 1: 684 SIF (.016 AC) 40* RIP -RAP APRON 281 X 1IJ X 24" D CLASS 1 RIP -RAP TO BE KEYEDINTO 0000 CHANNEL 00 4/0" d' 'IJ 4 6 to 0 all C PERMANENT STREAM/CULVERT IMPACT 40 0 20 40 80 160 1" = 40' rSHAMROCK PHASE 5 + 7 STREAM IMPACT MAP PROJECT LOCATION: OWNER INFORMATION: TOWNSHIP: GRAHAM CONCEPT BUILDERS COUNTY: ALAMANCE PO BOX 2507 STATE: NORTH CAROLINA BURLINGTON, INC 27217 336-228-0490 4 5-7 !;7 �_57' 6 6 DIMEN TRAP�#2 46 5 DL—AIIJ PERMANENT BUFFER IMPACT PZ 2A: 1737 SF (.040 AC) PERMANENT BUFFER IMPACT PZ 1A: 3784 SIF (.087 AC) 30' STREAM BUFFER ZONE 1 L S 20' STREAM BUFFE ZONE 2 75 SIF PUMP AROUND PERMANENT BUFFER TEMPORARY IMPACTS IMPACT PZ 1 B: 4083 SIF (.094 AC) V � \ BA�SN $3 IMPACT PZ 2B: 2304 SIF (.053 AC) TEMPORARY DISCHARGE DURING CONSTRUCTION TO )> SEDIMENT TRAP OD SS TEMPORARY STREAM/CULVERT IMPACT NOTES: 1. UTILITY INSTALLATION AND IMPACTS SHALL FOLLOW ALL APPROVED PERMITS BUFFER IMPACT SUMMARY: PERMAINIENTSTREAMIMPACT: PS 1 114 LF 684 SF (.016 AC) RIP -RAP 300 SF (0.007 AC) LINEAR IMPACT 28' PERMANENT BUFFER IMPACT: ZONE 1: PZ 1A: 3784 SF (0.087 AC) PZ 1 B: 4083 SF (0.094 AC) TOTAL: 7867 S F (0. 18 AC) ZONE 2: PZ 2A: 1737 SF (0.040 AC) PZ 2B: 2304 SF (0.053 AC) TOTAL: 4041 SF (0.093 AC) R, 6 MIL. PLASTIC STREAM *SHAMROCK GOLF COURSE SHAMROCK GOLF COURSE MONRO OLT RD, SIR 2312) 312) P SE 5 & 7 MACKENNA DR, C .LLENS C R. ULLENS DR. VICINITY MAP 1 "=2000' TEMPORARY CREEK CROSSING PUMP AROUND DETAIL (NTS) �XISDTING RA E H GEOMEMBRANE ,q q�� I f SANDBAGS DISTURBED /0 AREA PI_AN VIEW SECTION A -A 1. DESCRIPTION THE WORK SHALL CONSIST OF INSTALLING A PUMP AROUND WHEN CONSTRUCTION ACTIVITIES TAKE PLACE WITHIN THE STREAM CHANNEL 11. MATERIAL SPECIFICATIONS SANDBAGS: SANDBAGS SHALL CONSIST OF MATERIALS WHICH ARE RESISTANT TO ULTRAVIOLET RADIATION, TEARING AND PUNCTURE, AND WOVEN TIGHTLY ENOUGH TO PREVENT LEAKAGE OF FILL MATERIAL (i.e. SAND, FINE GRAVEL, ETC.) III. CONSTRUCTION REQUIREMENTS 1. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE INSTALLED AS THE FIRST ORDER OF WORK. 2. THE HEIGHT OF THE SANDBAGS SHALL BE AS INDICATED IN SECTION A -A. THE SANDBAGS SHALL BE PLACED ON A SMOOTH PREPARED SURFACE. 3. ALL EXCAVATED MATERIALS SHALL BE DISPOSED OF OUTSIDE THE 100 YEAR FLOOD PLAIN UNLESS APPROVED ON THE PLANS. 4. ALL DIEWATERING OF THE CONSTRUCTION AREA SHALL BE PUMPED TO A DIEWATERING PUMP DISCHARGE FILTER BAG OR SILT BASIN. 5. THE PUMP SHALL BE OF SUFFICIENT SIZE TO CONVEY NORMAL STREAM FLOW. 6 ' SEDIMENT CONTROL DEVICES ARE TO REMAIN IN PLACE UNTIL ALL DISTURBED AREAS ARE STABILIZED AND THE CITY ENGINEERING DEPT APPROVES THEIR REMOVAL. PUMP EXCESS WATER TO APPROVED DEWATERING DEVICE DRY WORK AREA SAND OR GRAVEL BAG COFFERDAM FOR BYPASS PUMP AROUND NOT TO SCALE DATE REVISION NOTE DRAWN BY: CAH EXHIBIT CHECKED BY: RB DATE: 03/26/2024 PROJECT NO.: 03070.041 REF. NO.: - SCALE: 1 40' 2 OF 2 I Dirawings & Projects\P ROJ\03070.035 Shamrock\DrawIngs\Sheets\Phase 5,7