HomeMy WebLinkAbout310200_Compliance Evaluation Inspection_202401220 Division of Water Resources
❑ Division of Soil and Water Conservation
❑ Other Agency
Facility Number: 310200 Facility Status: Active Permit: AWS310200 ❑ Denied Access
Inspection Type: Compliance Inspection Inactive Or Closed Date:
Reason for Visit: Routine County: Duplin Region: Wilmington
Date of Visit: 01/22/2024 Entry Time: 09:00 am Exit Time: 10:15 am Incident #:
Farm Name: Hairr I Sow Farm Owner Email:
Owner: Crusader Farm LLC Phone: 910-293-3036
Mailing Address: 1188 Veach's Mill Rd Warsaw NC 28398
Physical Address: 1188 Veach's Mill Rd Warsaw NC 28398
Facility Status: 0 Compliant ❑ Not Compliant Integrator: Murphy -Brown LLC
Location of Farm: Latitude: 35' 04' Longitude: 78' 01' 00"
West of Westbrook Crossroads. On North side of SR 1307 approx. 3 miles West of SR 1004. Farm is on left at end of the path.
Question Areas:
Dischrge & Stream Impacts Waste Col, Stor, & Treat Waste Application
Records and Documents Other Issues
Certified Operator: Operator Certification Number:
Secondary OIC(s):
On -Site Representative(s): Name Title Phone
24 hour contact name Wesley Hairr
Primary Inspector: Brian S West Phone:
Inspector Signature: Date:
Secondary Inspector(s):
Inspection Summary:
Soil samples due 2024. Continuing to work on additional design/plans to remove lagoon sludge
Page 1 of 5
Permit: AWS31020( Owner: Crusader Farm LLC Facility Number: 310200
Inspection Date:01/22/24 Inspection TypeCompliance Inspection Reason for Visit:Routine
Regulated Operations
Swine
Design Capacity Current promotions
Swine - Farrow to Wean
3,500
3,000
Swine - Feeder to Finish
1,000
0
Swine - Wean to Feeder
400
0
Total Design Capacity: 4,900
Total SSLW: 1,662,500
Waste Structures
Effective Built Closed Designated Observed
Type Identifier Date Date Date Freeboard Freeboard
Lagoon
1
03/24/2005
02/11/1993
19.50
36.00
Lagoon
2
03/24/2005
01/22/1993
19.50
24.00
Page 2 of 5
Permit: AWS31020( Owner: Crusader Farm LLC Facility Number: 310200
Inspection Date:01/22/24 Inspection TypeCompliance Inspection Reason for Visit:Routine
Discharges & Stream Impacts
Yes
No NA NE
1. Is any discharge observed from any part of the operation?
❑
MEIEI
Discharge originated at:
Structure
❑
Application Field
❑
Other
❑
a. Was conveyance man-made?
❑
❑ 0
❑
b. Did discharge reach Waters of the State? (if yes, notify DWQ)
❑
❑ 0
❑
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does discharge bypass the waste management system? (if yes, notify DWQ)
❑
❑ 0
❑
2. Is there evidence of a past discharge from any part of the operation?
❑
0 ❑
❑
3. Were there any observable adverse impacts or potential adverse impacts to Waters of the
❑
0 ❑
❑
State other than from a discharge?
Waste Collection, Storage & Treatment
Yes
No NA NE
4. Is storage capacity less than adequate?
❑
0 ❑
❑
If yes, is waste level into structural freeboard?
❑
5. Are there any immediate threats to the integrity of any of the structures observed (I.e./ larc
❑
0 ❑
❑
trees, severe erosion, seepage, etc.)?
6. Are there structures on -site that are not properly addressed and/or managed through a
❑
MEI
❑
waste management or closure plan?
7. Do any of the structures need maintenance or improvement?
❑
MEI
❑
8. Do any of the structures lack adequate markers as required by the permit? (Not applicablE
❑
0 ❑
❑
to roofed pits, dry stacks and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑
❑
❑
maintenance or improvement?
Waste Application
Yes No NA NE
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ 0 ❑ ❑
maintenance or improvement?
11. Is there evidence of incorrect application?
❑ 0 ❑ ❑
If yes, check the appropriate box below.
Excessive Ponding?
❑
Hydraulic Overload?
❑
Frozen Ground?
❑
Heavy metals (Cu, Zn, etc)?
❑
PAN?
❑
Is PAN > 10%/10 lbs.?
❑
Total Phosphorus?
❑
Failure to incorporate manure/sludge into bare soil?
❑
Outside of acceptable crop window?
❑
Evidence of wind drift?
❑
Application outside of application area?
❑
Crop Type 1
Page 3 of 5
Permit: AWS31020( Owner: Crusader Farm LLC Facility Number: 310200
Inspection Date:01/22/24 Inspection TypeCompliance Inspection Reason for Visit:Routine
Waste Application Yes No NA NE
Crop Type 2
Crop Type 3
Crop Type 4
Crop Type 5
Crop Type 6
Soil Type 1
Soil Type 2
Soil Type 3
Soil Type 4
Soil Type 5
Soil Type 6
14. Do the receiving crops differ from those designated in the Certified Animal Waste
❑
0 ❑
❑
Management Plan(CAWMP)?
15. Does the receiving crop and/or land application site need improvement?
❑
0 ❑
❑
16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre
❑
0 ❑
❑
determination?
17. Does the facility lack adequate acreage for land application?
❑
0 ❑
❑
18. Is there a lack of properly operating waste application equipment?
❑
0 ❑
❑
Records and Documents
Yes
No NA NE
19. Did the facility fail to have Certificate of Coverage and Permit readily available?
❑
❑ ❑
20. Does the facility fail to have all components of the CAWMP readily available?
❑
0 ❑ ❑
If yes, check the appropriate box below.
WUP?
❑
Checklists?
❑
Design?
❑
Maps?
❑
Lease Agreements?
❑
Other?
❑
If Other, please specify
21. Does record keeping need improvement?
❑
❑ ❑
If yes, check the appropriate box below.
Waste Application?
❑
Weekly Freeboard?
❑
Waste Analysis?
❑
Soil analysis?
❑
Waste Transfers?
❑
Weather code?
❑
Rainfall?
❑
Stocking?
❑
Crop yields?
❑
Page 4 of 5
Permit: AWS31020( Owner: Crusader Farm LLC Facility Number: 310200
Inspection Date:01/22/24 Inspection TypeCompliance Inspection Reason for Visit:Routine
Records and Documents
120 Minute inspections?
Monthly and 1" Rainfall Inspections
Sludge Survey
22. Did the facility fail to install and maintain a rain gauge?
23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipmen
(NPDES only)?
24. Did the facility fail to calibrate waste application equipment as required by the permit?
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the
appropriate box(es) below:
Failure to complete annual sludge survey
Failure to develop a POA for sludge levels
Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge?
27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification?
Other Issues
28. Did the facility fail to properly dispose of dead animals within 24 hours and/or document
and report mortality rates that exceed normal rates?
29. At the time of the inspection did the facility pose an odor or air quality concern? If yes,
contact a regional Air Quality representative immediately.
30. Did the facility fail to notify regional DWQ of emergency situations as required by Permit
(i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility?
If yes, check the appropriate box below.
Application Field
Lagoon / Storage Pond
Other
If Other, please specify
32. Were any additional problems noted which cause non-compliance of the Permit or
CAW M P?
33. Did the Reviewer/Inspector fail to discuss review/inspection with on -site representative?
34. Does the facility require a follow-up visit by same agency?
Yes No NA NE
EJ
Both lagoons POA in file
Yes No NA NE
❑■❑❑
❑■❑❑
❑■❑❑
❑ ❑ ❑
01
❑■❑❑
Page 5 of 5