Loading...
HomeMy WebLinkAboutSennebogen Operation and Maint Agreement 04.2024Operation & Maintenance Agreement Project Name: Project Location: Sennebogen Expansion 1957Sennebogen Trail Stanley, NC 28164 Cover Page Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). The SCM(s) on this project include (check all that apply & corresponding O&M sheets will Infiltration Basin Quantity: Location(s): Infiltration Trench Quantity: Location(s): Bioretention Cell Quantity: Location(s): Wet Pond Quantity: Location(s): Stormwater Wetland Quantity: Location(s): Permeable Pavement Quantitv: Location(s): Sand Filter Quantity: Rainwater Harvesting Quantity: Green Roof Quantity: Level Spreader - Filter Strip Quantity: Proprietary System Quantity: Treatment Swale Quantity: Dry Pond Quantity: Disconnected Impervious Surface Present: User Defined SCM Present: Low Density Present: 1 Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Type: No No No I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: Signature: -LlLvv Constantino Lannes CEO/President 1957 Sennebo en Trail Stanl , NC 28164 704-347-4910 clan nes sennebo enllc.com Date: &VVk V202J, Li Sa 1k —22 rS, a Notary Public for the State of h1 G County of do hereby certify that C ri C. W • RoS S personally appeared before me this day of AA0rri 1 0�l O'a-( and acknowledge the due execution of the Operations and Maintenance Agreement. Witness my hand and official seal, N� Seal '1111r11W, My commission expires iTORM-EZ (ersion 1.5 3 -M-2Z O&M Agreement 4/9/2024 Page 1 of 3 Sand Filter Maintenance Requirements Important operation and maintenance procedures: - Manage the drainage area to reduce the sediment load to the sand filter. - Clean out the sedimentation chamber or forebay whenever sediment depth exceeds six inches. - At least once a year, skim the sand media - Replace the sand filter media whenever it fails to function properly after maintenance. After the sand filter is established, it shall be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance shall be kept in; known set location and shall be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: Entire sand filter Trash/debris is present. Remove the trash/debris. Adjacent pavement (if Sediment is present on the Sweep or vacuum the sediment as soon as possible. applicable) pavement surface. Areas of bare soil and/or Regrade the soil if necessary to remove the gully, plant ground erosive gullies have cover and water until it is established. Provide lime and a one-time The perimeter of the sand formed. fertilizer application. filter Vegetation is too short or Maintain vegetation at an appropriate height. too long. The structure is clogged. Unclog the structure and dispose of sediment in a location where The flow diversion it will not cause impacts to streams or the SCM. structure (if applicable) The structure is damaged. Make any necessary repairs or replace if the damage is too much for repair. The inlet pipe is clogged (if Unclog the pipe and dispose of sediment in a location where it will applicable). not cause impacts to streams or the SCM. The inlet pipe is cracked or otherwise damaged (if Repair or replace the pipe. applicable). The inlet device Erosion is occurring in the Regrade the swale if necessary and provide erosion control Swale (if applicable). devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and clogged stone and replace with clean covered in sediment (if stone. applicable). Sediment has accumulated Search for the source of the sediment and remedy the problem if to a depth of greater than possible. Remove the sediment and dispose of it in a location six inches. where it will not cause impacts to streams or the SCM. Sediment chamber (forebay) Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the plants rather than spraying. Sand Filter Maintenance Requirements (continued) SCM element: Potential problem: How to remediate the problem: Sand chamber and Water is ponding on the Check to see if the collector system is clogged and flush if underdrain collection surface for more than 24 necessary. If water still ponds, remove the top few inches of filter system hours after a storm. bed media and replace. If water still ponds, then consult an appropriate professional. Clogging has occurred. gg g Clean out the outlet device and dispose of sediment in a location where it will not cause impacts to streams or the SCM. The outlet device The outlet device is Repair or replace the outlet device. damaged. Erosion or other signs of damage have occurred at Repair the damage and improve the flow dissipation structure. the outlet. Discharges from the sand The receiving water filter are causing erosion or Contact the local NCDEQ Regional Office. sedimentation in the receiving water.