Loading...
HomeMy WebLinkAbout2024.04.03-Sennebogen Expansion Plans-Signed1111 11 20 ' C L A S S C B U F F E R W I T H SC R E E N I N G F E N C E 20' CLASS C BUFFER WITH WALL 40' CLASS C BUFFER 40' CLASS C B U F F E R 50' SIDE SETBACK (ABUTTING RESIDENTIAL) 20' SIDE SETBACK (INTERIOR) 20 ' S I D E S E T B A C K ( I N T E R I O R ) 20 ' S I D E S E T B A C K ( I N T E R I O R ) 20 ' S I D E S E T B A C K ( I N T E R I O R ) 30' REAR S E T B A C K 30' REAR S E T B A C K 50' REAR S E T B A C K ( A B U T T I N G R E S I D E N T I A L ) 50 ' S I D E S E T B A C K (A B U T T I N G R E S I D E N T I A L ) 20 ' S I D E S E T B A C K ( I N T E R I O R ) 20 ' S I D E S E T B A C K ( I N T E R I O R ) 20' SIDE SETBACK (INTERIOR) 1111 Old Plank Road AERIAL VIEW OF SITE NOT TO SCALE CITY GIS / ZONING MAP NOT TO SCALE VICINITY MAP NOT TO SCALE CIVIL ENGINEER CES GROUP ENGINEERS, LLP. FIRM LICENSE #: F-1240 3525 WHITEHALL PARK DR, SUITE 150 CHARLOTTE, NC 28273 PH: 704.489.1500 LAND SURVEYOR CORNERSTONE PROFESSIONAL LAND SURVEYING FIRM LICENSE #: P-2533 P.O. BOX 1296 MONROE, NC 28111 PH: 704.956.5611 LANDSCAPE ARCHITECT CES GROUP ENGINEERS, LLP. FIRM LICENSE #: C-394 3525 WHITEHALL PARK DR, SUITE 150 CHARLOTTE, NC 28273 PH: 704.489.1500 S: \ E N G I N E E R \ P R O J E C T S \ 8 1 8 9 . 0 8 2 3 C D - S E N N E B O G E N E X P A N S I O N \ D R A W I N G S \ S H E E T S \ 8 1 8 9 - S - C O V E R . D W G , Ap r i l 8 , 2 0 2 4 SC O L D R E N C0.0 COVER SHEET JM JT CB JM OWNER / APPLICANT OWNER: SENNEBOGEN REAL ESTATE, LLC. ADDRESS: 1957 SENNEBOGEN TRAIL STANLEY, NC 28164 APPLICANT: S.C. HONDROS & ASSOCIATES, INC. ADDRESS: P.O. BOX 220456 CHARLOTTE, NC 28222-0456 SITE SITE SITE OW N E R / D E V E L O P E R DRAWN BY: CHECKED BY: PROJECT NO: DRAWING TITLE: DRAWING NUMBER: SEAL: DATE:NO:REVISION DESC. DRAWING REVISIONS Copyright 2024 CES Group Engineers, LLP PR O J E C T D E S C R I P T I O N : REVISED BY: ISSUED BY: CES Group Engineers, LLP 3525 Whitehall Park Drive, Suite 150 Charlotte, NC 28273 PH: 704.489.1500 www.ces-group.net ENGINEERS PLANNERS SURVEYORS SCIENTISTS CO. SEAL: ISSUE DATE: 1 - - - - - - DESIGN REVISIONS 4/3/2024 - - - - - - - - - - - - 02/22/2024 8189.0823 SE N N E B O G E N E X P A N S I O N S. C . H O N D R O S & A S S O C I A T E S , I N C . P. O . B O X 2 2 0 4 5 6 , C H A R L O T T E , N C 2 8 2 2 2 - 0 4 5 6 19 5 7 S E N N E B O G E N T R A I L ST A N L E Y , N C 2 8 1 6 4 1957 SENNEBOGEN TRAIL LINCOLN COUNTY, NC SENNEBOGEN EXPANSION PRELIMINARY PLANS PIN NUMBER/PARCEL ID: 3691941330/54664 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 200 100 200 400200 PLAN REFERENCES THIS PLAN SET REFERENCES THE FOLLOWING DOCUMENTS INCLUDING, BUT NOT LIMITED TO: ·TOPOGRAPHICAL SURVEY BY CORNERSTONE PROFESSIONAL LAND SURVEYING DATED 08/15/2023 ·AERIAL MAP RETRIEVED FROM LINCOLN COUNTY GIS DATED 2021 ·PROPOSED ORIGINAL FACILITY DESIGN DRAWINGS FROM S.C. HONDROS & ASSOCIATES, INC. DATED 2008 ·PROPOSED BUILDING EXPANSION DRAWINGS FROM S.C. HONDROS & ASSOCIATES, INC. DATED 2012 ALL REFERENCE MATERIAL LISTED ABOVE SHALL BE CONSIDERED A PART OF THIS PLAN SET AND ALL INFORMATION CONTAINED WITHIN THESE MATERIALS SHALL BE UTILIZED IN CONJUNCTION WITH THIS PLAN SET. THE CONTRACTOR IS RESPONSIBLE TO OBTAIN A COPY OF EACH REFERENCE AND REVIEW IT THOROUGHLY PRIOR TO THE START OF CONSTRUCTION. SHEET LIST TABLE SHEET NUMBER SHEET TITLE C0.0 COVER SHEET C1.0 EXISTING CONDITIONS PLAN C2.0 DEMOLITION PLAN C3.0 OVERALL SITE PLAN C3.1 SITE PLAN C3.2 TURNING MOVEMENT PLAN C4.0 GRADING PLAN C4.1 STORM DRAINAGE PLAN C4.2 STORM DRAINAGE PROFILE C4.3 STORM DRAINAGE PROFILE C4.4 STORM DRAINAGE PROFILE C4.5 STORM DRAINAGE PROFILE C5.0 UTILITY PLAN C6.0 LANDSCAPE PLAN C6.1 LANDSCAPE DETAILS C7.0 EROSION CONTROL PLAN PHASE 1 C7.1 EROSION CONTROL PLAN PHASE 2 C7.2 EROSION CONTROL PLAN PHASE 3 C8.0 SCM PLAN AND DETAILS C8.1 SCM PLAN AND DETAILS C8.2 INLET DRAINAGE AREAS C9.0 EROSION CONTROL DETAILS C9.1 EROSION CONTROL DETAILS C10.0 SITE DETAILS C11.0 DRAINAGE DETAILS C11.1 DRAINAGE DETAILS C12.0 UTILITY DETAILS Sennebogen Real Estate LLC SLT Enterprises, LLC SLT Enterprises, LLC Curtis Phillips Pamela W. Phillips Mishelle S. Dean Catherleen H. Sherrill SE N N E B O G E N T R A I L Pond Pond Old Old HEAVY DUTY PAVEMENT OVERLAY HEAVY DUTY PAVEMENT OVERLAY EXISTING BUILDING ± 48,000 SF EXISTING BUILDING ADDITION ± 45,840 SF S: \ E N G I N E E R \ P R O J E C T S \ 8 1 8 9 . 0 8 2 3 C D - S E N N E B O G E N E X P A N S I O N \ D R A W I N G S \ S H E E T S \ 8 1 8 9 - S - E X C O N D . D W G , Ap r i l 8 , 2 0 2 4 SC O L D R E N 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 50 25 50 10050 C1.0 EXISTING CONDITIONS PLAN JM MK SC SC R Know what's below. Call before you dig. NORTH CAROLINA ONE-CALL CENTER INC. DIAL 811 or 1-800-632-4949 2 BUSINESS DAYS BEFORE DIGGING www.ncocc.org SE N N E B O G E N E X P A N S I O N 19 5 7 S E N N E B O G E N T R A I L OW N E R / D E V E L O P E R DRAWN BY: CHECKED BY: PROJECT NO: DRAWING TITLE: DRAWING NUMBER: SEAL: DATE:NO:REVISION DESC. DRAWING REVISIONS Copyright 2024 CES Group Engineers, LLP PR O J E C T D E S C R I P T I O N : REVISED BY: ISSUED BY: CES Group Engineers, LLP 3525 Whitehall Park Drive, Suite 150 Charlotte, NC 28273 PH: 704.489.1500 www.ces-group.net ENGINEERS PLANNERS SURVEYORS SCIENTISTS CO. SEAL: ISSUE DATE: 1 - - - - - - DESIGN REVISIONS 4/3/2024 - - - - - - - - - - - - 02/22/2024 8189.0823 SE N N E B O G E N E X P A N S I O N S. C . H O N D R O S & A S S O C I A T E S , I N C . P. O . B O X 2 2 0 4 5 6 , C H A R L O T T E , N C 2 8 2 2 2 - 0 4 5 6 19 5 7 S E N N E B O G E N T R A I L ST A N L E Y , N C 2 8 1 6 4 PLAN REFERENCES THIS PLAN SET REFERENCES THE FOLLOWING DOCUMENTS INCLUDING, BUT NOT LIMITED TO: ·TOPOGRAPHICAL SURVEY BY CORNERSTONE PROFESSIONAL LAND SURVEYING DATED 08/15/2023 ·AERIAL MAP RETRIEVED FROM LINCOLN COUNTY GIS DATED 2021 ·PROPOSED ORIGINAL FACILITY DESIGN DRAWINGS FROM S.C. HONDROS & ASSOCIATES, INC. DATED 2008 ·PROPOSED BUILDING EXPANSION DRAWINGS FROM S.C. HONDROS & ASSOCIATES, INC. DATED 2012 ·THE STREAM DELINEATION BY ATLAS ENVIRONMENTAL DATED 05/10/2023 IF EXISTING CONDITIONS AS SHOWN DO NOT MATCH FIELD CONDITIONS AT THE START OF CONSTRUCTION, THE CONTRACTOR SHALL INFORM CES GROUP PRIOR TO THE START OF CONSTRUCTION. > Sennebogen Real Estate LLC SLT Enterprises, LLC Curtis Phillips Pamela W. Phillips Mishelle S. Dean Catherleen H. Sherrill SE N N E B O G E N T R A I L Pond Old HEAVY DUTY PAVEMENT OVERLAY HEAVY DUTY PAVEMENT OVERLAY EXISTING BUILDING ± 48,000 SF EXISTING BUILDING ADDITION ± 45,840 SF REMOVE AND DISPOSE 6.3 SY OF CONCRETE FLUME REMOVE AND DISPOSE 6.8 SY OF RIPRAP REMOVE AND DISPOSE 6.2 SY OF CONCRETE FLUME REMOVE AND DISPOSE 14.7 SY OF RIPRAP REMOVE AND DISPOSE 37.5 SY OF RIPRAP REMOVE AND DISPOSE 132 LF 18" RCP REMOVE AND DISPOSE 28 LF OF CONCRETE CURB AND GUTTER REMOVE AND DISPOSE 774.7 SY OF CONCRETE PAD EXISTING LIGHT TO BE REMOVED EXISTING UNDERGROUND UTILITIES TO REMAIN AND BE PROTECTED. CONTRACTOR SHALL FIELD VERIFY PRIOR TO THE START OF CONSTRUCTION EXISTING WELL TO REMAIN AND BE PROTECTED EXISTING POND DO BE FILLED AND PROPERLY BACKFILLED EXISTING STREAM TO BE FILLED PER NCDEQ PERMITTING PLANS. REFER TO PERMIT PRIOR TO THE START OF CONSTRUCTION. EXISTING FIRE PUMP BUILDING TO REMAIN AND BE PROTECTED EXISTING LIGHT TO BE REMOVED TREES WITHIN THE LOD AREA TO BE REMOVED AND DISPOSED L O D L O D L O D L O D LOD LOD L O D L O D LOD L O D L OD L O D L O D LOD LOD LOD LOD LOD LO D L O D L O D L O D L O D L OD LOD LOD LOD LOD L O D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD L OD L O D L O D LODLODLODLODLOD L O D L O D L O D LOD LODLODLODLODLODLOD LOD LOD L O D L O D S: \ E N G I N E E R \ P R O J E C T S \ 8 1 8 9 . 0 8 2 3 C D - S E N N E B O G E N E X P A N S I O N \ D R A W I N G S \ S H E E T S \ 8 1 8 9 - S - D E M O . D W G , Ap r i l 8 , 2 0 2 4 SC O L D R E N 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 40 20 40 8040 C2.0 DEMOLITION PLAN JM MK SC SC R Know what's below. Call before you dig. NORTH CAROLINA ONE-CALL CENTER INC. DIAL 811 or 1-800-632-4949 2 BUSINESS DAYS BEFORE DIGGING www.ncocc.org SE N N E B O G E N E X P A N S I O N 19 5 7 S E N N E B O G E N T R A I L OW N E R / D E V E L O P E R DRAWN BY: CHECKED BY: PROJECT NO: DRAWING TITLE: DRAWING NUMBER: SEAL: DATE:NO:REVISION DESC. DRAWING REVISIONS Copyright 2024 CES Group Engineers, LLP PR O J E C T D E S C R I P T I O N : REVISED BY: ISSUED BY: CES Group Engineers, LLP 3525 Whitehall Park Drive, Suite 150 Charlotte, NC 28273 PH: 704.489.1500 www.ces-group.net ENGINEERS PLANNERS SURVEYORS SCIENTISTS CO. SEAL: ISSUE DATE: 1 - - - - - - DESIGN REVISIONS 4/3/2024 - - - - - - - - - - - - 02/22/2024 8189.0823 SE N N E B O G E N E X P A N S I O N S. C . H O N D R O S & A S S O C I A T E S , I N C . P. O . B O X 2 2 0 4 5 6 , C H A R L O T T E , N C 2 8 2 2 2 - 0 4 5 6 19 5 7 S E N N E B O G E N T R A I L ST A N L E Y , N C 2 8 1 6 4 LEGEND PROPERTY LINE PROPOSED DEMOLITION RIGHT-OF-WAY LINE PROPOSED DEMOLITION/CLEARING NOTES: 1.CONTRACTOR SHALL REMOVE ALL ABOVE GROUND FEATURES WITHIN BUILDING FOOTPRINT. 2.THE LOCATION OF EXISTING UTILITIES AS PRESENTED ARE APPROXIMATE. CONTRACTOR SHALL LOCATE ALL UTILITIES PRIOR TO START OF CONSTRUCTION, AND NOTIFY ENGINEER OF ANY DISCREPANCIES. CONTRACTOR IS FULLY RESPONSIBLE FOR ALL UNDERGROUND UTILITIES AND SHALL REPAIR ANY DAMAGE AS A RESULT OF THIS CONTRACT. 3.ALL MATERIAL GENERATED BY THE DEMOLITION WILL BE HAULED FROM THE SITE AND DISPOSED OF PER LOCAL ORDINANCES UNLESS OTHERWISE NOTED. 1111 11 20 ' C L A S S C B U F F E R W I T H SC R E E N I N G F E N C E 20' CLASS C BUFFER WITH WALL 40' CLASS C BUFFER 40' CLAS S C B U F F E R 50' SIDE SETBACK (ABUTTING RESI D E N T I A L ) 20' SIDE SETBACK (INTERIOR) 2 0 ' S I D E S E T B A C K ( I N T E R I O R ) 20 ' S I D E S E T B A C K ( I N T E R I O R ) 20 ' S I D E S E T B A C K ( I N T E R I O R ) 30' REAR S E T B A C K 30' REAR S E T B A C K 50' REAR S E T B A C K ( A B U T T I N G R E S I D E N T I A L ) 50 ' S I D E S E T B A C K (A B U T T I N G R E S I D E N T I A L ) 20 ' S I D E S E T B A C K ( I N T E R I O R ) 20 ' S I D E S E T B A C K ( I N T E R I O R ) 20' SIDE SETBACK (INTERIOR) 1111 Sennebogen Real Estate LLC Jason Reece Kimberly Reece Vincent Santus Elaine Santus Marvin A. Grigg, Jr. Julius Blum Inc. Julius Blum Inc. SLT Enterprises, LLC SLT Enterprises, LLC Davacomm, LLC Curtis Phillips Pamela W. Phillips Curtis Phillips Pamela W. Phillips Mishelle S. Dean Catherleen H. Sherrill Annie R. Johnston EDPH, LLC B.V. Hedrick Gravel & Sand Company Old Plank R o a d SE N N E B O G E N T R A I L Pond Old ADDITION 45,840-sf WAREHOUSEPROPOSED 48,000 SF BUILDING 400' X 120' EXISTING BUILDING ± 48,000 SF EXISTING BUILDING ADDITION ± 45,840 SF S: \ E N G I N E E R \ P R O J E C T S \ 8 1 8 9 . 0 8 2 3 C D - S E N N E B O G E N E X P A N S I O N \ D R A W I N G S \ S H E E T S \ 8 1 8 9 - S - S I T E P L A N . D W G , Ap r i l 8 , 2 0 2 4 SC O L D R E N 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 100 50 100 200100 C3.0 OVERALL SITE PLAN JM JT CB JM R Know what's below. Call before you dig. NORTH CAROLINA ONE-CALL CENTER INC. DIAL 811 or 1-800-632-4949 2 BUSINESS DAYS BEFORE DIGGING www.ncocc.org 19 5 7 S E N N E B O G E N T R A I L OW N E R / D E V E L O P E R DRAWN BY: CHECKED BY: PROJECT NO: DRAWING TITLE: DRAWING NUMBER: SEAL: DATE:NO:REVISION DESC. DRAWING REVISIONS Copyright 2024 CES Group Engineers, LLP PR O J E C T D E S C R I P T I O N : REVISED BY: ISSUED BY: CES Group Engineers, LLP 3525 Whitehall Park Drive, Suite 150 Charlotte, NC 28273 PH: 704.489.1500 www.ces-group.net ENGINEERS PLANNERS SURVEYORS SCIENTISTS CO. SEAL: ISSUE DATE: 1 - - - - - - DESIGN REVISIONS 4/3/2024 - - - - - - - - - - - - 02/22/2024 8189.0823 SE N N E B O G E N E X P A N S I O N S. C . H O N D R O S & A S S O C I A T E S , I N C . P. O . B O X 2 2 0 4 5 6 , C H A R L O T T E , N C 2 8 2 2 2 - 0 4 5 6 19 5 7 S E N N E B O G E N T R A I L ST A N L E Y , N C 2 8 1 6 4 LEGEND PROPERTY LINE RIGHT-OF-WAY LINE PROPOSED CURB AND GUTTER PROPOSED SETBACK LINE PROPOSED BUFFER LINE PROPOSED CONCRETE PROPOSED STANDARD DUTY ASPHALT PROPOSED HEAVY DUTY ASPHALT PROPOSED DEMONSTRATION PAD 1111 11 20 ' C L A S S C B U F F E R W I T H SC R E E N I N G F E N C E 20' CLASS C BUFFER WITH WALL 40' CLASS C BUFFER 50' SIDE SETBACK (ABUTTING RE S I D E N T I A L ) 20' SIDE SETBACK (INTERIOR) 30' REAR S E T B A C K 50 ' S I D E S E T B A C K (A B U T T I N G R E S I D E N T I A L ) 20 ' S I D E S E T B A C K ( I N T E R I O R ) 20 ' S I D E S E T B A C K ( I N T E R I O R ) 20' SIDE SETBACK (INTERIOR) 1111 Sennebogen Real Estate LLC Mishelle S. Dean Catherleen H. Sherrill SE N N E B O G E N T R A I L Pond Old ADDITION 45,840-sf WAREHOUSE 120' 57.5' 12 0 ' 16 0 ' 24 0 ' 180' 20' 7'15' 48 ' 50 ' 50 ' 40 0 ' 155' 15 0 ' 25' 20' 20' PROPOSED GRAVEL DEMONSTRATION PAD PROPOSED GRASS AREA (SET 8 INCHES LOWER THAN DEMONSTRATION PAD) PROPOSED 26,943 SF (0.62 AC) OF STREAM BUFFER TO BE REMOVED EXISTING INTERMITTENT STREAM PROPOSED 716 LF SEGMENTAL BLOCK RETAINING WALL WITH MIN. 4' HIGH SAFETY RAILING HEIGHT VARIES FROM 1' TO 12'. WALL SHALL BE DESIGNED BY A LICENSED NORTH CAROLINA STRUCTURAL ENGINEER. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS. PROPOSED PARKING AREA PROPOSED PARKING AREA PROPOSED 12" THICK, 4,000 PSI CONCRETE SLAB-ON-GRADE, ONE (1) LAYER OF #4 @ 4’-0” O.C. & #3 REBAR @ 4’-0” O.C. TRANSVERSE, ON 4" CABC W/ 10MIL POLYETHYLENE VAPOR BARRIER PROPOSED 12" THICK, 4,000 PSI CONCRETE SLAB-ON-GRADE, TWO (2) LAYERS OF #5'S @ 1’-0” O.C. &#4 REBAR @ 1’-0” O.C. TRANSVERSE, ON 4" CABC EXISTING WATER STORAGE TANKS FOR FIRE SYSTEM EXISTING PUMP HOUSE PROPOSED 12" THICK, 4,000 PSI CONCRETE DRIVE, TWO (2) LAYERS OF #5'S @ 1’-0” O.C. &#4 REBAR @ 1’-0” O.C. TRANSVERSE, ON 4" CABC 276 LF (416 SF / 0.01 AC) OF EXISTING INTERMITTENT STREAM TO BE FILLED APPROXIMATELY 3,260 SF (0.07 AC) OF EXISTING STREAMSIDE BUFFER DISTURBANCE PROPOSED STREAM BUFFER PROPOSED 50' STREAMSIDE BUFFER PROPOSED 48,000 SF BUILDING 400' X 120' 14 . 9 ' 29 ' 10 6 . 9 6 ' 19' (TYP) 9' ( T Y P ) 24' 32.05' PROPOSED STAIRWAY PROPOSED STAIRWAY 3 6 9 . 4 ' 177.42' PROPOSED FIRE ACCESS ROAD PROPOSED STAIRWAY 80 ' PROPOSED CONCRETE OBSERVATION PATIO 9' ( T Y P ) 17.49' 12 0 ' 43' 3 0 . 2 7 ' 9 1 5 . 4 8 ' T O F R O N T P R O P E R T Y L I N E 13 0 ' 50.5 ' LIMIT OF STREAM TO BE FILLED 15 0 ' EXISTING BUILDING ± 48,000 SF EXISTING BUILDING ADDITION ± 45,840 SF PROPOSED FIRE TRUCK TURNAROUND R2 8 ' R 2 8 ' PROPOSED 48,000 SF BUILDING 400' X 120' 26 ' 60' PROPOSED 669 LF RETAINING WALL 20 ' 8. 5 ' 5' 5' PROPOSED SCREENING FENCE PROPOSED 144 LF SEGMENTAL BLOCK RETAINING WALL WITH MIN. 4' HIGH SAFETY RAILING HEIGHT VARIES FROM 1' TO 8.5'. WALL SHALL BE DESIGNED BY A LICENSED NORTH CAROLINA STRUCTURAL ENGINEER. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS. PROPOSED 300 LF SEGMENTAL BLOCK RETAINING WALL WITH MIN. 4' HIGH SAFETY RAILING HEIGHT VARIES FROM 1' TO 5.5'. WALL SHALL BE DESIGNED BY A LICENSED NORTH CAROLINA STRUCTURAL ENGINEER. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS. PROPOSED STORMWATER MAINTENANCE EASEMENT R Know what's below. Call before you dig. NORTH CAROLINA ONE-CALL CENTER INC. DIAL 811 or 1-800-632-4949 2 BUSINESS DAYS BEFORE DIGGING www.ncocc.org 19 5 7 S E N N E B O G E N T R A I L OW N E R / D E V E L O P E R DRAWN BY: CHECKED BY: PROJECT NO: DRAWING TITLE: DRAWING NUMBER: SEAL: DATE:NO:REVISION DESC. DRAWING REVISIONS Copyright 2024 CES Group Engineers, LLP PR O J E C T D E S C R I P T I O N : REVISED BY: ISSUED BY: CES Group Engineers, LLP 3525 Whitehall Park Drive, Suite 150 Charlotte, NC 28273 PH: 704.489.1500 www.ces-group.net ENGINEERS PLANNERS SURVEYORS SCIENTISTS CO. SEAL: ISSUE DATE: 1 - - - - - - DESIGN REVISIONS 4/3/2024 - - - - - - - - - - - - 02/22/2024 8189.0823 SE N N E B O G E N E X P A N S I O N S. C . H O N D R O S & A S S O C I A T E S , I N C . P. O . B O X 2 2 0 4 5 6 , C H A R L O T T E , N C 2 8 2 2 2 - 0 4 5 6 19 5 7 S E N N E B O G E N T R A I L ST A N L E Y , N C 2 8 1 6 4 SITE DATA TABLE PIN # 3691941330 - TAX PARCEL ID # 54664 1957 SENNEBOGEN TRAIL STANLEY, NC, 28164 ZONING: ELDD- EASTERN LINCOLN DEVELOPMENT DISTRICT I-G- INDUSTRIAL GENERAL DISTRICT EXISTING USE PROPOSED USE VEHICLE SERVICES VEHICLE SERVICES ZONING REQUIREMENT REQUIRED EXISTING PROPOSED MINIMUM PARCEL AREA 1 AC 32.5 AC 32.5 AC MINIMUM PARCEL WIDTH 100 FT 60 FT (EN)60 FT (EN) MINIMUM FRONT YARD SETBACK 50 FT 50 FT 915.48 FT MINIMUM SIDE YARD SETBACK-INTERIOR 20 FT 20 FT 106.96 FT MINIMUM SIDE YARD SETBACK - ABUTTING RESIDENTIAL DISTRICT 50 FT 50 FT 106.96 FT MINIMUM SIDE YARD SETBACK-ROAD 30 FT 30 FT N/A MINIMUM REAR YARD SETBACK 30 FT 30 FT 369.4 FT MINIMUM REAR YARD SETBACK- ABUTTING RESIDENTIAL DISTRICT 50 FT 50 FT 369.4 FT BUILDING SEPARATION 20 FT N/A 177.42 FT PERIMETER BUFFER 40 FT N/A VARIES DEPENDING ON ALTERNATIVE 40 FT / 20 FT OFF STREET PARKING REQUIREMENTS CODE SECTION REQUIRED PROPOSED § 3.6.3 - B-1 REQUIRED PARKING: - TRANSPORTATION AND WAREHOUSING: 1 PER EMPLOYEE ON SHIFT OF GREATEST EMPLOYMENT IN ADDITION TO SPACES USED FOR VEHICLES IN OPERATION TOTAL REQUIRED SPACES: 50 SPACES ( INCLUDING 2 ADA SPACES) 55 SPACES ( INCLUDING 3 ADA SPACES) § 3.6.3 - C-1 PARKING SPACE DIMENSIONS: MINIMUM WIDTH: 9 FT MINIMUM LENGTH: 19 FT 9 FT X 19 FT § 3.6.3 - C-1 MINIMUM DRIVE AISLE WIDTH: TWO-WAY: 24 FT 24 FT LANDSCAPING REQUIREMENTS CODE SECTION REQUIRED PROPOSED § 3.4.5 FOUNDATION PLANTINGS REQUIRED 5 FT 15 FT § 3.4.6 BUFFER TYPE C-(R-T) REQUIRED 40 FT OR 20 FT ALTERNATIVE 40 FT / 20 FT STREAMSIDE BUFFER REQUIREMENTS CODE SECTION REQUIRED PROPOSED § 7.5.2 STREAMSIDE BUFFER REQUIRED 50 FT TOTAL WIDTH 0 FT (V) § 7.5.2 ZONE 1 REQUIRED 30 FT UNDISTURBED 0 FT (V) § 7.5.2 ZONE 2 REQUIRED 20 FT MANAGED 0 FT (V) S: \ E N G I N E E R \ P R O J E C T S \ 8 1 8 9 . 0 8 2 3 C D - S E N N E B O G E N E X P A N S I O N \ D R A W I N G S \ S H E E T S \ 8 1 8 9 - S - S I T E P L A N . D W G , Ap r i l 8 , 2 0 2 4 SC O L D R E N 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 40 20 40 8040 C3.1 SITE PLAN JM JT CB JM (V) : VARIANCE (EN): EXISTING NON-CONFORMITY LEGEND PROPERTY LINE RIGHT-OF-WAY LINE PROPOSED CURB AND GUTTER PROPOSED SETBACK LINE PROPOSED BUFFER LINE PROPOSED CONCRETE PROPOSED STANDARD DUTY ASPHALT PROPOSED HEAVY DUTY ASPHALT PROPOSED DEMONSTRATION PAD SITE NOTES: 1.DIMENSIONS AND COORDINATE POINTS ARE TO THE FACE OF CURB, EDGE OF PAVEMENT, OR CORNER OF BUILDING UNLESS OTHERWISE NOTED. 2.ALL IMPROVEMENTS AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH STATE AND LOCAL STANDARDS. 3.ANY DISCREPANCIES FOUND IN THE FIELD SHALL BE CALLED TO THE ATTENTION OF THE OWNER OR ENGINEER PRIOR TO PROCEEDING WITH WORK. 4.PRIOR TO BEGINNING CONSTRUCTION, THE GENERAL CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS AND APPROVALS FROM ALL REGULATORY AUTHORITIES. 5.THE GENERAL CONTRACTOR SHALL CONTACT ALL OWNERS OF EASEMENTS, UTILITIES AND RIGHT-OF-WAYS, PUBLIC AND PRIVATE, PRIOR TO WORKING IN THESE AREAS. 6.GENERAL CONTRACTOR SHALL MAINTAIN THE SITE IN A MANNER SO THAT WORKMAN AND THE PUBLIC SHALL BE PROTECTED FROM INJURY. 7.MAINTENANCE OF TRAFFIC DURING CONSTRUCTION SHALL BE IN ACCORDANCE WITH NCDOT STANDARDS AND SPECIFICATIONS. 8.DO NOT SCALE DRAWINGS FOR ACTUAL DIMENSIONS, AS IT IS A REPRODUCTION AND SUBJECT TO DISTORTION. 9.ALL SIGNS, PAVEMENT MARKINGS, AND OTHER TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), LATEST EDITION. 10.ALL PAVEMENT MARKERS SHALL BE FOUR (4) INCHES WIDE UNLESS INDICATED OTHERWISE ON DRAWINGS. 11.CONTRACTOR SHALL FURNISH AND INSTALL ALL PAVEMENT MARKINGS AS SHOWN ON THE PLANS. 12.CONTRACTOR SHALL SAW-CUT EXISTING ASPHALT PAVEMENT AREAS TO TIE IN SMOOTHLY TO PROPOSED PAVEMENT AT DRIVEWAY ENTRANCE. 13.REFER TO ARCHITECTURAL PLANS FOR ACTUAL BUILDING DIMENSIONS, TRASH ENCLOSURE DETAILS, FENCING DETAILS, SIGNAGE DETAILS. 14.CONTRACTOR SHALL COORDINATE CONSTRUCTION AND LOCATION OF SIDEWALKS, STOOPS, STEPS, HANDRAIL, AND ACCESS DOORS WITH ARCHITECTURAL PLANS. 15.COORDINATE SIDEWALK AND SCORING PATTERNS ADJACENT TO THE BUILDING WITH THE ARCHITECTURAL PLANS. 16.CONTRACTOR SHALL PROVIDE NECESSARY TRASH COLLECTION AND DISPOSE TO A LEGALLY APPROVED LANDFILL. 17.STOP BEFORE YOU DIG. CALL NC ONE-CALL CENTER AT 811 OR 1-800-632-4949. 1111 11 20 ' C L A S S C B U F F E R W I T H SC R E E N I N G F E N C E 20' CLASS C BUFFER WITH WALL 40' CLASS C BUFFER 50' SIDE SETBACK (ABUTTING RE S I D E N T I A L ) 20' SIDE SETBACK (INTERIOR) 30' REAR S E T B A C K 50 ' S I D E S E T B A C K (A B U T T I N G R E S I D E N T I A L ) 20 ' S I D E S E T B A C K ( I N T E R I O R ) 20 ' S I D E S E T B A C K ( I N T E R I O R ) 20' SIDE SETBACK (INTERIOR) 1111 Sennebogen Real Estate LLC Mishelle S. Dean Catherleen H. Sherrill SE N N E B O G E N T R A I L Pond Old EXISTING BUILDING ± 48,000 SF EXISTING BUILDING ADDITION ± 45,840 SF PROPOSED FIRE TRUCK TURNAROUND R2 8 ' R 2 8 ' PROPOSED 48,000 SF BUILDING 400' X 120' 26 ' 60' 150' 96' 137' 136' 138' 138' 120' 124' 150'127' R Know what's below. Call before you dig. NORTH CAROLINA ONE-CALL CENTER INC. DIAL 811 or 1-800-632-4949 2 BUSINESS DAYS BEFORE DIGGING www.ncocc.org 19 5 7 S E N N E B O G E N T R A I L OW N E R / D E V E L O P E R DRAWN BY: CHECKED BY: PROJECT NO: DRAWING TITLE: DRAWING NUMBER: SEAL: DATE:NO:REVISION DESC. DRAWING REVISIONS Copyright 2024 CES Group Engineers, LLP PR O J E C T D E S C R I P T I O N : REVISED BY: ISSUED BY: CES Group Engineers, LLP 3525 Whitehall Park Drive, Suite 150 Charlotte, NC 28273 PH: 704.489.1500 www.ces-group.net ENGINEERS PLANNERS SURVEYORS SCIENTISTS CO. SEAL: ISSUE DATE: 1 - - - - - - DESIGN REVISIONS 4/3/2024 - - - - - - - - - - - - 02/22/2024 8189.0823 SE N N E B O G E N E X P A N S I O N S. C . H O N D R O S & A S S O C I A T E S , I N C . P. O . B O X 2 2 0 4 5 6 , C H A R L O T T E , N C 2 8 2 2 2 - 0 4 5 6 19 5 7 S E N N E B O G E N T R A I L ST A N L E Y , N C 2 8 1 6 4 S: \ E N G I N E E R \ P R O J E C T S \ 8 1 8 9 . 0 8 2 3 C D - S E N N E B O G E N E X P A N S I O N \ D R A W I N G S \ S H E E T S \ 8 1 8 9 - S - S I T E P L A N . D W G , Ap r i l 8 , 2 0 2 4 SC O L D R E N 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 40 20 40 8040 C3.2 TURNING MOVEMENT PLAN JM MK SC JM LEGEND PROPERTY LINE RIGHT-OF-WAY LINE PROPOSED CURB AND GUTTER PROPOSED SETBACK LINE PROPOSED BUFFER LINE PROPOSED CONCRETE PROPOSED STANDARD DUTY ASPHALT PROPOSED HEAVY DUTY ASPHALT PROPOSED DEMONSTRATION PAD 30 ° 6 0 ° 90 ° 12 0 ° 150° 180°37 . 0 8 8 f t M i n R a d i u s (O u t e r W h e e l ) 21.592ftMin Radius (Inner Wheel) 42 . 2 5 6 f t M i n R a d i u s (O u t e r B o d y ) 21. 4 0 7 f t Max Kickout 1.159ft Vehicle Tracking V23.00.2518(20220215) (c) Autodesk, Inc. www.Autodesk.com Title: Pumper Fire Truck Notes: Turn(s) based upon a design speed of 5.00mph. 1111 11 20 ' C L A S S C B U F F E R W I T H SC R E E N I N G F E N C E 20' CLASS C BUFFER WITH WALL 40' CLASS C BUFFER 50' SIDE SETBACK (ABUTTING RE S I D E N T I A L ) 20' SIDE SETBACK (INTERIOR) 50 ' S I D E S E T B A C K (A B U T T I N G R E S I D E N T I A L ) 20 ' S I D E S E T B A C K ( I N T E R I O R ) 20 ' S I D E S E T B A C K ( I N T E R I O R ) 20' SIDE SETBACK (INTERIOR) 1111 Sennebogen Real Estate LLC SLT Enterprises, LLC Curtis Phillips Pamela W. Phillips Mishelle S. Dean Catherleen H. Sherrill SE N N E B O G E N T R A I L HEAVY DUTY PAVEMENT OVERLAY HEAVY DUTY PAVEMENT OVERLAY SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SDSD PROPOSED 400' X 120' BUILDING FFE = 773.00 PROPOSED POST CONSTRUCTION BMP 8''F SS SS SS 2''W G 767.47 G 767.58 G 768.03 G 766.65 G 766.37 TC 764.52 BC 764.02 G 765.53 G 766.30 G 765.33 G 765.29 G 765.33 G 761.92 G 773.00 G 773.00 G 773.00 G 772.25 G 772.61 G 773.00 G 773.29 G 773.77 G 771.98 G 772.42 G 771.90 G 771.18 G 771.90 G 770.55 G 753.62 TC 755.32 BC 754.82 G 754.82 G 754.82 G 754.32 G 751.22 G 753.66 G 754.15G 750.37 G 773.00TW 773.00 G 773.00 TW 772.60 G 751.09 G 751.21 G 753.65 G 752.45 G 752.45 G 753.09 G 753.09 G 753.55 G 754.15 BW 771.52 TW 772.60 TW 772.60 BW 767.00 BW 770.00 TW 773.00 BW 770.00 TW 773.00 BW 769.99 TW 773.00 BW 769.43 BW 769.00 TW 773.00 BW 765.00 BW 772.60 TW 772.60 G 766.73 G 767.57 G 767.62 G 767.46 G 770.14 G 769.51 G 769.59 G 769.45 G 770.25 G 770.25 G 769.60 G 768.78 G 768.67 G 769.70 G 764.96 G 767.17 G 770.25 MH-508 DI-400 DI-112 DI-111 DI-106 DI-105 DI-401 MH-506 CB-103 MH-102MH-504 FES-500 DI-402 DI-113 DI-107 G 773.00 G 770.64 G ??? TC 760.87 BC 760.37 TC 774.98 BC 774.48 TC 774.14 BC 773.64 G 758.48 G 774.78 MATCH EX ±776.25 -9.1 % - 9 . 0 % -26.4% -29.5% PROPOSED 26,943 SF OF STREAM BUFFER TO BE REMOVED EXISTING INTERMITTENT STREAM 276 LF (416 SF) OF EXISTING INTERMITTENT STREAM TO BE FILLED APPROXIMATELY 3,219 SF OF EXISTING STREAM DISTURBANCE LIMIT OF STREAM TO BE FILLED DI-110 DI-109 DI-108 MH-505 MH-507 DI-403 FES-100 YI-101 YI-200 YI-201 YI-202 YI-203 OS-600 MH-503 MH-502 MH-501 G 772.04 G 772.69 HP 772.89 G 772.90 G 772.70 HP 772.89 G 772.02 HP 772.50 G 772.01 HP 772.50 G 772.01 HP 772.50 G 772.01 HP 772.50 G 772.00 HP 772.50 G 772.00 TC 764.84 BC 764.34 TC 766.50 BC 766.00 HP 748.98 HP 748.94 HP 748.98 755 760 76 5 77 0 775 76 5 77 0 76 6 76 7 76 8 76 9 75 5 76 0 76 5 75 5 75 2 75 3 75 4 75 1 75 2 75 3 75 4 750 75 5 760 75 5 76 0 76 5 76 0 76 5 755 760 765 770 7 3 0 735 740 740 745 750 750 755 74 0 74 5 750 755 760 73 9 739 743 74 9 75 0 74 9 7 5 0 75 1 74 9 75 0 TW 767.00 TW 769.00 TW 777.48 TW 776.53 TW 774.00 TW 775.00 BW 772.50 BW 774.00 BW 772.05 BW 772.11BW 767.00 BW 767.00 TW 749.50 TW 749.50 TW 749.50 TW 749.50 BW 749.50 BW 743.50 BW 741.00 BW 746.22 BW 749.50 TW 749.50 PROPOSED STORMWATER MAINTENANCE EASEMENT 7 4 0 7 4 5 750 75074 9 749 751 751 S: \ E N G I N E E R \ P R O J E C T S \ 8 1 8 9 . 0 8 2 3 C D - S E N N E B O G E N E X P A N S I O N \ D R A W I N G S \ S H E E T S \ 8 1 8 9 - S - G R A D I N G P L A N . D W G , Ap r i l 8 , 2 0 2 4 SC O L D R E N 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 40 20 40 8040 C4.0 GRADING PLAN JM JT CB JM R Know what's below. Call before you dig. NORTH CAROLINA ONE-CALL CENTER INC. DIAL 811 or 1-800-632-4949 2 BUSINESS DAYS BEFORE DIGGING www.ncocc.org OW N E R / D E V E L O P E R DRAWN BY: CHECKED BY: PROJECT NO: DRAWING TITLE: DRAWING NUMBER: SEAL: DATE:NO:REVISION DESC. DRAWING REVISIONS Copyright 2024 CES Group Engineers, LLP PR O J E C T D E S C R I P T I O N : REVISED BY: ISSUED BY: CES Group Engineers, LLP 3525 Whitehall Park Drive, Suite 150 Charlotte, NC 28273 PH: 704.489.1500 www.ces-group.net ENGINEERS PLANNERS SURVEYORS SCIENTISTS CO. SEAL: ISSUE DATE: 1 - - - - - - DESIGN REVISIONS 4/3/2024 - - - - - - - - - - - - 02/22/2024 8189.0823 SE N N E B O G E N E X P A N S I O N S. C . H O N D R O S & A S S O C I A T E S , I N C . P. O . B O X 2 2 0 4 5 6 , C H A R L O T T E , N C 2 8 2 2 2 - 0 4 5 6 19 5 7 S E N N E B O G E N T R A I L ST A N L E Y , N C 2 8 1 6 4 BW 874.50 PROPOSED LEGEND 722 720 HP 874.50 MATCH EX ±874.50 SD SD G 874.50 BC 874.50 TC 874.50 TW 874.50 TC 874.50 BC 874.00 GRADE SPOT ELEVATION BOTTOM OF CURB SPOT ELEVATION TOP OF CURB SPOT ELEVATION TOP/BOTTOM OF CURB SPOT ELEVATION TOP OF WALL SPOT ELEVATION BOTTOM OF WALL SPOT ELEVATION HIGH POINT SPOT ELEVATION MATCH EXISTING SPOT ELEVATION PROPERTY LINE RIGHT-OF-WAY LINE MINOR CONTOUR MAJOR CONTOUR STORM PIPE CATCH BASIN STORM MANHOLE OPEN THROAT CATCH BASIN FLARED END SECTION GRADING AND DRAINAGE NOTES: 1.EARTHWORK QUANTITIES HAVE NOT BEEN ESTIMATED AND SITE AS SHOWN IS NOT ASSUMED TO REPRESENT A BALANCED CUT / FILL CONDITION. 2.CONTRACTOR SHALL PERFORM HIS OWN ESTIMATE AND SHALL PROVIDE ALL EARTHWORK NECESSARY TO ACHIEVE THE DESIGN GRADE, INCLUDING ANY OFFSITE BORROW OR SPOILS REQUIRED. 3.CONTRACTOR SHALL PROVIDE POSITIVE DRAINAGE IN ALL GRADED AREAS, INCLUDING PAVING, LAWN AND LANDSCAPE AREAS. 4.THE CONTRACTOR SHALL IMMEDIATELY REPORT TO THE OWNER ANY DISCREPANCIES FOUND BETWEEN ACTUAL FIELD CONDITIONS AND CONSTRUCTION DOCUMENTS AND SHALL WAIT FOR INSTRUCTIONS PRIOR TO PROCEEDING. 5.CONTRACTOR SHALL VERIFY LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TO BEGINNING WORK, BOTH PUBLIC AND PRIVATE. CONTRACTOR IS FULLY RESPONSIBLE FOR ALL UNDERGROUND UTILITIES AND SHALL REPAIR ANY DAMAGE AS A RESULT OF THIS CONTRACT. 6.CONTRACTOR SHALL BLEND NEW EARTHWORK SMOOTHLY TO TRANSITION BACK TO EXISTING GRADE. 7.THE PROPOSED CONTOURS AND SPOT ELEVATIONS SHOWN IN DRIVES, PARKING LOTS AND SIDEWALKS ARE FINISHED ELEVATIONS INCLUDING ASPHALT. REFER TO PAVEMENT CROSS SECTION DATA TO ESTABLISH CORRECT SUBBASE OR AGGREGATE BASE COURSE ELEVATIONS TO BE COMPLETED UNDER THIS CONTRACT. 8.ALL "STD." NUMBERS REFER TO THE NCDOT STANDARDS. 9.ON-SITE BURIAL PITS REQUIRE AN ON-SITE DEMOLITION LANDFILL PERMIT FROM THE ZONING ADMINISTRATOR. 10.PIPE LENGTHS SHOWN ARE THE ENGINEER'S ESTIMATE USED TO COMPUTE PIPE SLOPE AND INVERTS AND SHALL NOT BE CONSTRUED BY THE CONTRACTOR TO REPRESENT THE ACTUAL QUANTITY OF PIPE REQUIRED. 11.MAXIMUM CROSS SLOPE OF SIDEWALKS SHALL BE 1/4" /FT. 12.SLOPES SHALL BE GRADED NO STEEPER THAN 3:1 WITHOUT ADDITIONAL STABILIZATION MEASURES AND PRIOR APPROVAL. 13.APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFF-SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNERS. 14.ALL STORM PIPE ENTERING STRUCTURES SHALL BE GROUTED TO ASSURE CONNECTION AT STRUCTURE IS WATERTIGHT. 15.ALL STORM SEWER MANHOLES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT, AND SHALL HAVE TRAFFIC BEARING RING AND COVERS. MANHOLES IN UNPAVED AREAS SHALL BE 6" ABOVE FINISH GRADE. LIDS SHALL BE LABELED "STORM SEWER". 16.RIM ELEVATIONS OF CURB INLET EQUALS THE FLOW LINE OF GUTTER PAN, NOT THE DEPRESSED ELEVATION AT THE INLET. 17.ALL PROPOSED CONTOURS IN ALL "FILL" AREAS SHOWN ON THIS PLAN REPRESENT COMPACTED STRUCTURAL FILL AND SHALL BE CONSTRUCTED WITH SATISFACTORY MATERIAL COMPACTED TO THE STANDARDS OUTLINED IN THE SPECIFICATIONS. 18.RCP PIPES SHALL BE CLASS III RCP UNLESS OTHERWISE NOTED. 19.ALL STRUCTURES AND GRATES SHALL BE COMPLIANT WITH THE MOST RECENT NCDOT STANDARDS AND BE TRAFFIC BEARING AND RATED HEAVY DUTY, UNLESS LOCATED OUTSIDE OF A PAVED AREA. 20.ALL HDPE PIPE SHALL BE ADS N12 TYPE S OR APPROVED EQUAL. 21.ALL FILL SHALL BE PLACED IN MAXIMUM 8-INCH LIFTS AND COMPACTED. ALL FILL WITHIN LIMITS OF BUILDING AND PAVEMENT AREAS SHALL BE COMPACTED TO 100% STD. PROCTOR DENSITY WITHIN THE TOP 24 INCHES AND A MINIMUM 98% STD. PROCTOR DENSITY BELOW 24-INCH DEPTH. FILL WITHIN LANDSCAPED AREAS SHALL BE COMPACTED TO MINIMUM 90% STD. PROCTOR DENSITY. REFER TO GEOTECHNICAL ENGINEER'S REPORT FOR ADDITIONAL EARTHWORK SPECIFICATIONS AND REQUIREMENTS. Cut/Fill Summary Name EG-COMBINED VS. PG Totals Cut Factor 1.000 Fill Factor 1.150 2d Area 322379.65 Sq. Ft. 322379.65 Sq. Ft. Cut 43187.54 Cu. Yd. 43187.54 Cu. Yd. Fill 46958.70 Cu. Yd. 46958.70 Cu. Yd. Net 3771.17 Cu. Yd.<Fill> 3771.17 Cu. Yd.<Fill> 1111 11 20 ' C L A S S C B U F F E R W I T H SC R E E N I N G F E N C E 20' CLASS C BUFFER WITH WALL 40' CLASS C BUFFER 50' SIDE SETBACK (ABUTTING RE S I D E N T I A L ) 20' SIDE SETBACK (INTERIOR) 50 ' S I D E S E T B A C K (A B U T T I N G R E S I D E N T I A L ) 20 ' S I D E S E T B A C K ( I N T E R I O R ) 20 ' S I D E S E T B A C K ( I N T E R I O R ) 20' SIDE SETBACK (INTERIOR) 1111 Sennebogen Real Estate LLC SLT Enterprises, LLC Curtis Phillips Pamela W. Phillips Mishelle S. Dean Catherleen H. Sherrill SE N N E B O G E N T R A I L HEAVY DUTY PAVEMENT OVERLAY HEAVY DUTY PAVEMENT OVERLAY 0+00 1+00 2+00 3+00 4+ 0 0 5+ 0 0 6+ 0 0 7+ 0 0 7+ 2 6 . 3 9 0+ 0 0 1+ 0 0 1+ 0 5 . 9 6 SD SD SD SD 0+00 1+00 2+00 3+ 0 0 4+ 0 0 5+ 0 0 6+ 0 0 6+ 1 5 . 9 6 SD SD 0+ 0 0 0+ 5 4 . 1 4 0 + 0 0 1 + 0 0 2+ 0 0 3+00 4+00 5+00 6+00 7+00 7+34.77SD SD SD SD SD SD SD SD SD 0+ 0 0 1+ 0 0 2+ 0 0 3+ 0 0 3+ 8 9 ALIGNMENT=STORM 400 STATION=5+12.83 OFFSET=1.05L NORTHING=614160.40 EASTING=1399229.90 SDSD PROPOSED 400' X 120' BUILDING FFE = 773.00 755 760 765 770 7 3 0 730 735 740 74 0 740 745 74 5 745 7 5 0 7 5 0 75 0 75 0 750 750 750 750 75 0 75 0 755 75 5 75 5 76 0 76 0 76 5 76 5 77 0 77 0 770755 76 0 75 3 754 756 757 75 8 75 9 PROPOSED POST CONSTRUCTION BMP MH-508 DI-400 DI-112 DI-111 DI-106 DI-105 DI-401 MH-506 CB-103 MH-102MH-504 FES-500 DI-402 DI-113 DI-107 50 LF 15" HDPE @ 1.00% 50 LF 15" HDPE @ 1.00% 50 LF 18" HDPE @ 1.00% 40 LF 18" HDPE @ 1.00% 81 LF 18" HDPE @ 2.00% 37 LF 18" CLASS IV RCP @ 4.00% 70 LF 30" CLASS IV RCP @ 2.00% 119 LF 18" CLASS IV RCP @ 1.00% 171 LF 18" CLASS IV RCP @ 1.00% 37 LF 24" CLASS IV RCP @ 3.60% 47 LF 24" CLASS IV RCP @ 4.00% 59 LF 24" CLASS IV RCP @ 5.00% 46 LF 15" CLASS IV RCP @ 3.00% CB-300 CB-301 76 5 77 0 76 6 76 7 76 8 76 9 770775 8''F SS SS SS 2''W 120 LF 18" CLASS IV RCP @ 1.00% DI-403 MH-503 49 LF 30" RCP @ 5.00% 54 LF 30" RCP @ 1.00% OS-600 MH-501 20 LF 30" RCP @ 2.00% 205 LF 24" CLASS IV RCP @ 3.58% 124 LF 30" HDPE @ 3.47% FES-100 MH-507 206 LF 24" CLASS IV RCP @ 3.60% YI-203 97 LF 15" HDPE @ 1.00% YI-202 98 LF 18" HDPE @ 1.00% YI-201 99 LF 24" HDPE @ 1.00% YI-200 YI-101 158 LF 24" HDPE @ 2.35% 52 LF 36" HDPE @ 2.00% MH-502 20 LF 30" RCP @ 5.00% 95 LF 24" HDPE @ 1.00% 168 LF 24" HDPE @ 4.00% MH-505 CB-602CB-601 DI-110 DI-109 DI-108 29 LF 18" HDPE @ 1.00% 50 LF 18" HDPE @ 1.00% 50 LF 18" HDPE @ 1.00% STORM STRUCTURE TABLE STR. NAME CB-103 CB-300 CB-301 CB-601 CB-602 DI-105 DI-106 DI-107 DI-108 DI-109 DI-110 DI-111 DI-112 DI-113 DI-400 DI-401 DI-402 DI-403 FES-100 FES-500 MH-102 MH-104 MH-501 MH-502 MH-503 MH-504 MH-505 MH-506 MH-507 MH-508 OS-600 YI-101 YI-200 YI-201 YI-202 YI-203 RIM / INVERTS RIM = 755.10 18" INV IN = 749.65 (FROM MH-104) 24" INV IN = 749.55 (FROM CB-300) 30" INV OUT = 746.34 (TO MH-102) RIM = 760.30 15" INV IN = 755.33 (FROM CB-301) 24" INV IN = 755.05 (FROM DI-400) 24" INV OUT = 752.50 (TO CB-103) RIM = 764.06 15" INV OUT = 756.71 (TO CB-300) RIM = 773.21 18" INV IN = 771.50 (FROM CB-602) 18" INV OUT = 771.50 (TO ) RIM = 773.42 18" INV IN = 771.71 (FROM ) 18" INV OUT = 771.71 (TO CB-601) RIM = 772.01 18" INV IN = 762.26 (FROM DI-106) 18" INV OUT = 757.90 (TO MH-104) RIM = 772.69 18" INV IN = 763.97 (FROM DI-107) 18" INV OUT = 763.87 (TO DI-105) RIM = 772.70 18" INV IN = 764.47 (FROM DI-108) 18" INV OUT = 764.37 (TO DI-106) RIM = 772.00 18" INV IN = 764.86 (FROM DI-109) 18" INV OUT = 764.76 (TO DI-107) RIM = 772.00 18" INV IN = 765.46 (FROM DI-110) 18" INV OUT = 765.36 (TO DI-108) RIM = 772.00 18" INV IN = 766.04 (FROM DI-111) 18" INV OUT = 765.96 (TO DI-109) RIM = 772.00 15" INV IN = 766.79 (FROM DI-112) 18" INV OUT = 766.54 (TO DI-110) RIM = 772.00 15" INV IN = 767.39 (FROM DI-113) 15" INV OUT = 767.29 (TO DI-111) RIM = 772.00 15" INV OUT = 767.89 (TO DI-112) RIM = 774.27 18" INV IN = 762.89 (FROM DI-401) 24" INV OUT = 762.39 (TO CB-300) RIM = 770.15 18" INV IN = 764.70 (FROM DI-402) 18" INV OUT = 764.60 (TO DI-400) RIM = 770.23 18" INV IN = 765.99 (FROM DI-403) 18" INV OUT = 765.89 (TO DI-401) RIM = 771.75 18" INV OUT = 767.19 (TO DI-402) RIM = 742.30 36" INV IN = 739.00 (FROM YI-101) RIM = 728.88 30" INV IN = 726.00 (FROM MH-501) RIM = 750.39 30" INV IN = 744.94 (FROM CB-103) 30" INV OUT = 744.84 (TO YI-101) RIM = 762.38 18" INV IN = 756.42 (FROM DI-105) 18" INV OUT = 751.15 (TO CB-103) RIM = 734.52 30" INV IN = 728.74 (FROM MH-502) 30" INV OUT = 726.40 (TO FES-500) RIM = 741.07 30" INV IN = 733.46 (FROM MH-503) 30" INV IN = 736.46 (FROM OS-600) 30" INV OUT = 729.74 (TO MH-501) RIM = 749.78 24" INV IN = 737.92 (FROM MH-504) 30" INV OUT = 735.90 (TO MH-502) RIM = 748.89 24" INV IN = 741.74 (FROM MH-505) 24" INV OUT = 741.64 (TO MH-503) RIM = 757.38 24" INV IN = 748.58 (FROM MH-506) 24" INV OUT = 748.48 (TO MH-504) RIM = 759.61 24" INV IN = 750.54 (FROM MH-507) 24" INV OUT = 750.44 (TO MH-505) RIM = 773.67 24" INV IN = 759.27 (FROM MH-508) 24" INV OUT = 757.97 (TO MH-506) RIM = 775.30 24" INV OUT = 760.58 (TO MH-507) RIM = 741.50 30" INV OUT = 737.00 (TO MH-502) RIM = 747.81 30" INV IN = 740.54 (FROM MH-102) 24" INV IN = 741.04 (FROM YI-200) 36" INV OUT = 740.04 (TO FES-100) RIM = 748.03 24" INV IN = 742.09 (FROM YI-201) 24" INV OUT = 741.99 (TO YI-101) RIM = 748.00 18" INV IN = 743.58 (FROM YI-202) 24" INV OUT = 743.08 (TO YI-200) RIM = 748.00 15" INV IN = 744.81 (FROM YI-203) 18" INV OUT = 744.56 (TO YI-201) RIM = 748.00 15" INV OUT = 745.78 (TO YI-202) PIPES IN P-104, 18" CLASS IV RCP INV IN =749.65 P-300, 24" CLASS IV RCP INV IN =749.55 P-301, 15" CLASS IV RCP INV IN =755.33 P-400, 24" CLASS IV RCP INV IN =755.05 P-602, 18" EX RCP INV IN =771.50 P-603, 18" EX RCP INV IN =771.71 P-106, 18" HDPE INV IN =762.26 P-107, 18" HDPE INV IN =763.97 P-108, 18" HDPE INV IN =764.47 P-109, 18" HDPE INV IN =764.86 P-110, 18" HDPE INV IN =765.46 P-111, 18" HDPE INV IN =766.04 P-112, 15" HDPE INV IN =766.79 P-113, 15" HDPE INV IN =767.39 P-401, 18" CLASS IV RCP INV IN =762.89 P-402, 18" CLASS IV RCP INV IN =764.70 P-403, 18" CLASS IV RCP INV IN =765.99 P-101, 36" HDPE INV IN =739.00 P-501, 30" RCP INV IN =726.00 P-103, 30" CLASS IV RCP INV IN =744.94 P-105, 18" CLASS IV RCP INV IN =756.42 P-502, 30" RCP INV IN =728.74 P-503, 30" RCP INV IN =733.46 P-600, 30" RCP INV IN =736.46 P-504, 24" HDPE INV IN =737.92 P-505, 24" HDPE INV IN =741.74 P-506, 24" CLASS IV RCP INV IN =748.58 P-507, 24" CLASS IV RCP INV IN =750.54 P-508, 24" CLASS IV RCP INV IN =759.27 P-102, 30" HDPE INV IN =740.54 P-200, 24" HDPE INV IN =741.04 P-201, 24" HDPE INV IN =742.09 P-202, 18" HDPE INV IN =743.58 P-203, 15" HDPE INV IN =744.81 PIPES OUT P-103, 30" CLASS IV RCP INV OUT =746.34 P-300, 24" CLASS IV RCP INV OUT =752.50 P-301, 15" CLASS IV RCP INV OUT =756.71 P-601, 18" EX RCP INV OUT =771.50 P-602, 18" EX RCP INV OUT =771.71 P-105, 18" CLASS IV RCP INV OUT =757.90 P-106, 18" HDPE INV OUT =763.87 P-107, 18" HDPE INV OUT =764.37 P-108, 18" HDPE INV OUT =764.76 P-109, 18" HDPE INV OUT =765.36 P-110, 18" HDPE INV OUT =765.96 P-111, 18" HDPE INV OUT =766.54 P-112, 15" HDPE INV OUT =767.29 P-113, 15" HDPE INV OUT =767.89 P-400, 24" CLASS IV RCP INV OUT =762.39 P-401, 18" CLASS IV RCP INV OUT =764.60 P-402, 18" CLASS IV RCP INV OUT =765.89 P-403, 18" CLASS IV RCP INV OUT =767.19 P-102, 30" HDPE INV OUT =744.84 P-104, 18" CLASS IV RCP INV OUT =751.15 P-501, 30" RCP INV OUT =726.40 P-502, 30" RCP INV OUT =729.74 P-503, 30" RCP INV OUT =735.90 P-504, 24" HDPE INV OUT =741.64 P-505, 24" HDPE INV OUT =748.48 P-506, 24" CLASS IV RCP INV OUT =750.44 P-507, 24" CLASS IV RCP INV OUT =757.97 P-508, 24" CLASS IV RCP INV OUT =760.58 P-600, 30" RCP INV OUT =737.00 P-101, 36" HDPE INV OUT =740.04 P-200, 24" HDPE INV OUT =741.99 P-201, 24" HDPE INV OUT =743.08 P-202, 18" HDPE INV OUT =744.56 P-203, 15" HDPE INV OUT =745.78 DETAIL NCDOT 840.02 NCDOT 840.02 NCDOT 840.02 NCDOT 840.02 NCDOT 840.02 NCDOT 840.14 NCDOT 840.14 NCDOT 840.14 NCDOT 840.14 NCDOT 840.14 NCDOT 840.14 NCDOT 840.14 NCDOT 840.14 NCDOT 840.14 NCDOT 840.14 NCDOT 840.14 NCDOT 840.14 NCDOT 840.14 SEE DETAILS SEE DETAILS NCDOT 840.52 NCDOT 840.52 NCDOT 840.52 NCDOT 840.52 NCDOT 840.52 NCDOT 840.52 NCDOT 840.52 NCDOT 840.52 NCDOT 840.52 NCDOT 840.52 SEE RISER DETAIL - C8.0 NCDOT 840.02 NCDOT 840.02 NCDOT 840.02 NCDOT 840.02 NCDOT 840.02 S: \ E N G I N E E R \ P R O J E C T S \ 8 1 8 9 . 0 8 2 3 C D - S E N N E B O G E N E X P A N S I O N \ D R A W I N G S \ S H E E T S \ 8 1 8 9 - S - S T O R M D R A I N A G E . D W G , Ap r i l 8 , 2 0 2 4 SC O L D R E N 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 40 20 40 8040 C4.1 STORM DRAINAGE PLAN JM MK SC SC R Know what's below. Call before you dig. NORTH CAROLINA ONE-CALL CENTER INC. DIAL 811 or 1-800-632-4949 2 BUSINESS DAYS BEFORE DIGGING www.ncocc.org OW N E R / D E V E L O P E R DRAWN BY: CHECKED BY: PROJECT NO: DRAWING TITLE: DRAWING NUMBER: SEAL: DATE:NO:REVISION DESC. DRAWING REVISIONS Copyright 2024 CES Group Engineers, LLP PR O J E C T D E S C R I P T I O N : REVISED BY: ISSUED BY: CES Group Engineers, LLP 3525 Whitehall Park Drive, Suite 150 Charlotte, NC 28273 PH: 704.489.1500 www.ces-group.net ENGINEERS PLANNERS SURVEYORS SCIENTISTS CO. SEAL: ISSUE DATE: 1 - - - - - - DESIGN REVISIONS 4/3/2024 - - - - - - - - - - - - 02/22/2024 8189.0823 SE N N E B O G E N E X P A N S I O N S. C . H O N D R O S & A S S O C I A T E S , I N C . P. O . B O X 2 2 0 4 5 6 , C H A R L O T T E , N C 2 8 2 2 2 - 0 4 5 6 19 5 7 S E N N E B O G E N T R A I L ST A N L E Y , N C 2 8 1 6 4 BW 874.50 PROPOSED LEGEND 722 720 HP 874.50 MATCH EX ±874.50 SD SD G 874.50 BC 874.50 TC 874.50 TW 874.50 TC 874.50 BC 874.00 GRADE SPOT ELEVATION BOTTOM OF CURB SPOT ELEVATION TOP OF CURB SPOT ELEVATION TOP/BOTTOM OF CURB SPOT ELEVATION TOP OF WALL SPOT ELEVATION BOTTOM OF WALL SPOT ELEVATION HIGH POINT SPOT ELEVATION MATCH EXISTING SPOT ELEVATION PROPERTY LINE RIGHT-OF-WAY LINE MINOR CONTOUR MAJOR CONTOUR STORM PIPE CATCH BASIN STORM MANHOLE OPEN THROAT CATCH BASIN FLARED END SECTION FES-100 TO B-113 (STORM 100 PROFILE -0+25 TO 8+00) 731 732 733 734 735 736 737 738 739 740 741 742 743 744 745 746 747 748 749 750 751 752 753 754 755 756 757 758 759 760 761 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 777 778 779 780 781 782 783 784 785 786 787 788 789 790 791 730 731 732 733 734 735 736 737 738 739 740 741 742 743 744 745 746 747 748 749 750 751 752 753 754 755 756 757 758 759 760 761 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 777 778 779 780 781 782 783 784 785 786 787 788 789 790 791 -0+25 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 40.0 LF 18" HDPE @ 1.00% 80.7 LF 18" HDPE @ 2.00% 37.1 LF 18" CLASS IV RCP @ 4.00% 70.2 LF 30" CLASS IV RCP @ 2.00% IN V O U T : 7 6 7 . 8 9 1 5 " H D P E ( T O D I - 1 1 2 ) DI - 1 1 3 ST A : 7 + 2 6 . 3 9 RI M : 7 7 2 . 0 0 IN V O U T : 7 6 7 . 2 9 1 5 " H D P E ( T O D I - 1 1 1 ) IN V I N : 7 6 7 . 3 9 1 5 " H D P E ( F R O M D I - 1 1 3 ) DI - 1 1 2 ST A : 6 + 7 6 . 3 9 RI M : 7 7 2 . 0 0 IN V O U T : 7 6 6 . 5 4 1 8 " H D P E ( T O D I - 1 1 0 ) IN V I N : 7 6 6 . 7 9 1 5 " H D P E ( F R O M D I - 1 1 2 ) DI - 1 1 1 ST A : 6 + 2 6 . 3 9 RI M : 7 7 2 . 0 0 IN V O U T : 7 5 7 . 9 0 1 8 " C L A S S I V R C P ( T O M H - 1 0 4 ) IN V I N : 7 6 2 . 2 6 1 8 " H D P E ( F R O M D I - 1 0 6 ) DI - 1 0 5 ST A : 3 + 2 6 . 9 6 RI M : 7 7 2 . 0 1 50.0 LF 15" HDPE @ 1.00% 50.0 LF 15" HDPE @ 1.00% 50.0 LF 18" HDPE @ 1.00% PROPOSED GRADE EXISTING GRADE IN V I N : 7 3 9 . 0 0 3 6 " H D P E ( F R O M Y I - 1 0 1 ) FE S - 1 0 0 ST A : 0 + 1 3 . 6 1 RI M : 7 4 2 . 3 0 124.0 LF 30" HDPE @ 3.47% IN V O U T : 7 4 0 . 0 4 3 6 " H D P E ( T O F E S - 1 0 0 ) IN V I N : 7 4 0 . 5 4 3 0 " H D P E ( F R O M M H - 1 0 2 ) IN V I N : 7 4 1 . 0 4 2 4 " H D P E ( F R O M Y I - 2 0 0 ) YI - 1 0 1 ST A : 0 + 6 5 . 6 5 RI M : 7 4 7 . 8 1 IN V O U T : 7 6 4 . 7 6 1 8 " H D P E ( T O D I - 1 0 7 ) IN V I N : 7 6 4 . 8 6 1 8 " H D P E ( F R O M D I - 1 0 9 ) DI - 1 0 8 ST A : 4 + 7 6 . 3 9 RI M : 7 7 2 . 0 0 IN V O U T : 7 6 4 . 7 6 1 8 " H D P E ( T O D I - 1 0 7 ) IN V I N : 7 6 4 . 8 6 1 8 " H D P E ( F R O M D I - 1 0 9 ) DI - 1 0 8 ST A : 4 + 7 6 . 3 9 RI M : 7 7 2 . 0 0 IN V O U T : 7 6 5 . 3 6 1 8 " H D P E ( T O D I - 1 0 8 ) IN V I N : 7 6 5 . 4 6 1 8 " H D P E ( F R O M D I - 1 1 0 ) DI - 1 0 9 ST A : 5 + 2 6 . 3 9 RI M : 7 7 2 . 0 0 IN V O U T : 7 6 4 . 7 6 1 8 " H D P E ( T O D I - 1 0 7 ) IN V I N : 7 6 4 . 8 6 1 8 " H D P E ( F R O M D I - 1 0 9 ) DI - 1 0 8 ST A : 4 + 7 6 . 3 9 RI M : 7 7 2 . 0 0 IN V O U T : 7 6 5 . 3 6 1 8 " H D P E ( T O D I - 1 0 8 ) IN V I N : 7 6 5 . 4 6 1 8 " H D P E ( F R O M D I - 1 1 0 ) DI - 1 0 9 ST A : 5 + 2 6 . 3 9 RI M : 7 7 2 . 0 0 IN V O U T : 7 6 5 . 9 6 1 8 " H D P E ( T O D I - 1 0 9 ) IN V I N : 7 6 6 . 0 4 1 8 " H D P E ( F R O M D I - 1 1 1 ) DI - 1 1 0 ST A : 5 + 7 6 . 3 9 RI M : 7 7 2 . 0 0 52.0 LF 36" HDPE @ 2.00% 29.9 LF 18" CLASS IV RCP @ 5.00% 28.7 LF 18" HDPE @ 1.00% 50.0 LF 18" HDPE @ 1.00% 50.0 LF 18" HDPE @ 1.00% IN V O U T : 7 6 3 . 8 7 1 8 " H D P E ( T O D I - 1 0 5 ) IN V I N : 7 6 3 . 9 7 1 8 " H D P E ( F R O M D I - 1 0 7 ) DI - 1 0 6 ST A : 4 + 0 7 . 6 4 RI M : 7 7 2 . 6 9 IN V O U T : 7 5 1 . 1 5 1 8 " C L A S S I V R C P ( T O C B - 1 0 3 ) IN V I N : 7 5 6 . 4 2 1 8 " C L A S S I V R C P ( F R O M D I - 1 0 5 ) MH - 1 0 4 ST A : 2 + 8 9 . 8 5 RI M : 7 6 2 . 3 8 IN V O U T : 7 4 6 . 3 4 3 0 " C L A S S I V R C P ( T O M H - 1 0 2 ) IN V I N : 7 4 9 . 6 5 1 8 " C L A S S I V R C P ( F R O M M H - 1 0 4 ) IN V I N : 7 4 9 . 5 5 2 4 " C L A S S I V R C P ( F R O M C B - 3 0 0 ) CB - 1 0 3 ST A : 2 + 5 9 . 9 3 RI M : 7 5 5 . 1 0 IN V O U T : 7 4 4 . 8 4 3 0 " H D P E ( T O Y I - 1 0 1 ) IN V I N : 7 4 4 . 9 4 3 0 " C L A S S I V R C P ( F R O M C B - 1 0 3 ) MH - 1 0 2 ST A : 1 + 8 9 . 6 9 RI M : 7 5 0 . 3 9 STORM PIPE TABLE PIPE NAME P-101 P-102 P-103 P-104 P-105 P-106 P-107 P-108 P-109 P-110 P-111 P-112 P-113 P-200 P-201 P-202 P-203 P-300 P-301 P-400 P-401 P-402 P-403 P-501 P-502 P-503 P-504 P-505 P-506 P-507 P-508 P-600 P-601 P-602 P-603 FROM YI-101 MH-102 CB-103 MH-104 DI-105 DI-106 DI-107 DI-108 DI-109 DI-110 DI-111 DI-112 DI-113 YI-200 YI-201 YI-202 YI-203 CB-300 CB-301 DI-400 DI-401 DI-402 DI-403 MH-501 MH-502 MH-503 MH-504 MH-505 MH-506 MH-507 MH-508 OS-600 CB-601 CB-602 TO FES-100 YI-101 MH-102 CB-103 MH-104 DI-105 DI-106 DI-107 DI-108 DI-109 DI-110 DI-111 DI-112 YI-101 YI-200 YI-201 YI-202 CB-103 CB-300 CB-300 DI-400 DI-401 DI-402 FES-500 MH-501 MH-502 MH-503 MH-504 MH-505 MH-506 MH-507 MH-502 CB-601 CB-602 SIZE 36" 30" 30" 18" 18" 18" 18" 18" 18" 18" 18" 15" 15" 24" 24" 18" 15" 24" 15" 24" 18" 18" 18" 30" 30" 30" 24" 24" 24" 24" 24" 30" 18" 18" 18" LENGTH 52' 124' 70' 30' 37' 81' 40' 29' 50' 50' 50' 50' 50' 95' 99' 98' 97' 59' 46' 205' 171' 119' 120' 20' 20' 49' 158' 168' 47' 206' 37' 54' 9' 29' 40' SLOPE 2.00% 3.47% 2.00% 5.00% 4.00% 2.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 5.00% 3.00% 3.58% 1.00% 1.00% 1.00% 2.00% 5.00% 5.00% 2.35% 4.00% 4.00% 3.60% 3.60% 1.00% 0.71% 0.71% 0.71% MATERIAL HDPE HDPE CLASS IV RCP CLASS IV RCP CLASS IV RCP HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE CLASS IV RCP CLASS IV RCP CLASS IV RCP CLASS IV RCP CLASS IV RCP CLASS IV RCP RCP RCP RCP HDPE HDPE CLASS IV RCP CLASS IV RCP CLASS IV RCP RCP EX RCP EX RCP EX RCP S: \ E N G I N E E R \ P R O J E C T S \ 8 1 8 9 . 0 8 2 3 C D - S E N N E B O G E N E X P A N S I O N \ D R A W I N G S \ S H E E T S \ 8 1 8 9 - S - S T O R M D R A I N A G E . D W G , Ap r i l 8 , 2 0 2 4 SC O L D R E N 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 40 20 40 8040 C4.2 STORM DRAINAGE PROFILE R Know what's below. Call before you dig. NORTH CAROLINA ONE-CALL CENTER INC. DIAL 811 or 1-800-632-4949 2 BUSINESS DAYS BEFORE DIGGING www.ncocc.org OW N E R / D E V E L O P E R DRAWN BY: CHECKED BY: PROJECT NO: DRAWING TITLE: DRAWING NUMBER: SEAL: DATE:NO:REVISION DESC. DRAWING REVISIONS Copyright 2024 CES Group Engineers, LLP PR O J E C T D E S C R I P T I O N : REVISED BY: ISSUED BY: CES Group Engineers, LLP 3525 Whitehall Park Drive, Suite 150 Charlotte, NC 28273 PH: 704.489.1500 www.ces-group.net ENGINEERS PLANNERS SURVEYORS SCIENTISTS CO. SEAL: ISSUE DATE: 1 - - - - - - DESIGN REVISIONS 4/3/2024 - - - - - - - - - - - - 02/22/2024 8189.0823 SE N N E B O G E N E X P A N S I O N S. C . H O N D R O S & A S S O C I A T E S , I N C . P. O . B O X 2 2 0 4 5 6 , C H A R L O T T E , N C 2 8 2 2 2 - 0 4 5 6 19 5 7 S E N N E B O G E N T R A I L ST A N L E Y , N C 2 8 1 6 4 VERTICAL: 1 inch = 4 ft JM MK SC SC YI-101 TO YI-202 (STORM 200 PROFILE -0+25 TO 3+75) 730 731 732 733 734 735 736 737 738 739 740 741 742 743 744 745 746 747 748 749 750 751 752 753 754 755 756 757 758 759 760 761 762 729 730 731 732 733 734 735 736 737 738 739 740 741 742 743 744 745 746 747 748 749 750 751 752 753 754 755 756 757 758 759 760 761 762 -0+25 0+00 1+00 2+00 3+00 3+75 0+00 1+00 2+00 3+00 3+75 97.5 LF 18" HDPE @ 1.00% IN V O U T : 7 4 4 . 5 6 1 8 " H D P E ( T O Y I - 2 0 1 ) IN V I N : 7 4 4 . 8 1 1 5 " H D P E ( F R O M Y I - 2 0 3 ) YI - 2 0 2 ST A : 2 + 9 1 . 5 0 RI M : 7 4 8 . 0 0 IN V O U T : 7 4 3 . 0 8 2 4 " H D P E ( T O Y I - 2 0 0 ) IN V I N : 7 4 3 . 5 8 1 8 " H D P E ( F R O M Y I - 2 0 2 ) YI - 2 0 1 ST A : 1 + 9 4 . 0 0 RI M : 7 4 8 . 0 0 99.0 LF 24" HDPE @ 1.00% IN V O U T : 7 4 1 . 9 9 2 4 " H D P E ( T O Y I - 1 0 1 ) IN V I N : 7 4 2 . 0 9 2 4 " H D P E ( F R O M Y I - 2 0 1 ) YI - 2 0 0 ST A : 0 + 9 5 . 0 0 RI M : 7 4 8 . 0 3 95.0 LF 24" HDPE @ 1.00% IN V O U T : 7 4 0 . 0 4 3 6 " H D P E ( T O F E S - 1 0 0 ) IN V I N : 7 4 0 . 5 4 3 0 " H D P E ( F R O M M H - 1 0 2 ) IN V I N : 7 4 1 . 0 4 2 4 " H D P E ( F R O M Y I - 2 0 0 ) YI - 1 0 1 ST A : 0 + 0 0 . 0 0 RI M : 7 4 7 . 8 1 PROPOSED GRADE EXISTING GRADE CB-101 TO CB-201 (STORM 300 PROFILE -0+50 TO 2+00) 741 742 743 744 745 746 747 748 749 750 751 752 753 754 755 756 757 758 759 760 761 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 777 778 779 780 781 740 741 742 743 744 745 746 747 748 749 750 751 752 753 754 755 756 757 758 759 760 761 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 777 778 779 780 781 -0+50 0+00 1+00 2+00 0+00 1+00 2+00 59.1 LF 24" CLASS IV RCP @ 5.00% 45.9 LF 15" CLASS IV RCP @ 3.00% PROPOSED GRADE EXISTING GRADE 24" CLASS IV RCP STORM IN V O U T : 7 5 2 . 5 0 2 4 " C L A S S I V R C P ( T O C B - 1 0 3 ) IN V I N : 7 5 5 . 3 3 1 5 " C L A S S I V R C P ( F R O M C B - 3 0 1 ) IN V I N : 7 5 5 . 0 5 2 4 " C L A S S I V R C P ( F R O M D I - 4 0 0 ) CB - 3 0 0 ST A : 0 + 5 9 . 0 7 RI M : 7 6 0 . 3 0 IN V O U T : 7 4 6 . 3 4 3 0 " C L A S S I V R C P ( T O M H - 1 0 2 ) IN V I N : 7 4 9 . 6 5 1 8 " C L A S S I V R C P ( F R O M M H - 1 0 4 ) IN V I N : 7 4 9 . 5 5 2 4 " C L A S S I V R C P ( F R O M C B - 3 0 0 ) CB - 1 0 3 ST A : 0 + 0 0 . 0 0 RI M : 7 5 5 . 1 0 IN V O U T : 7 5 6 . 7 1 1 5 " C L A S S I V R C P ( T O C B - 3 0 0 ) CB - 3 0 1 ST A : ? ? ? RI M : 7 6 4 . 0 6 S: \ E N G I N E E R \ P R O J E C T S \ 8 1 8 9 . 0 8 2 3 C D - S E N N E B O G E N E X P A N S I O N \ D R A W I N G S \ S H E E T S \ 8 1 8 9 - S - S T O R M D R A I N A G E . D W G , Ap r i l 8 , 2 0 2 4 SC O L D R E N 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 40 20 40 8040 C4.3 STORM DRAINAGE PROFILE R Know what's below. Call before you dig. NORTH CAROLINA ONE-CALL CENTER INC. DIAL 811 or 1-800-632-4949 2 BUSINESS DAYS BEFORE DIGGING www.ncocc.org OW N E R / D E V E L O P E R DRAWN BY: CHECKED BY: PROJECT NO: DRAWING TITLE: DRAWING NUMBER: SEAL: DATE:NO:REVISION DESC. DRAWING REVISIONS Copyright 2024 CES Group Engineers, LLP PR O J E C T D E S C R I P T I O N : REVISED BY: ISSUED BY: CES Group Engineers, LLP 3525 Whitehall Park Drive, Suite 150 Charlotte, NC 28273 PH: 704.489.1500 www.ces-group.net ENGINEERS PLANNERS SURVEYORS SCIENTISTS CO. SEAL: ISSUE DATE: 1 - - - - - - DESIGN REVISIONS 4/3/2024 - - - - - - - - - - - - 02/22/2024 8189.0823 SE N N E B O G E N E X P A N S I O N S. C . H O N D R O S & A S S O C I A T E S , I N C . P. O . B O X 2 2 0 4 5 6 , C H A R L O T T E , N C 2 8 2 2 2 - 0 4 5 6 19 5 7 S E N N E B O G E N T R A I L ST A N L E Y , N C 2 8 1 6 4 VERTICAL: 1 inch = 4 ft JM MK SC SC CB-300 TO DI-403 (STORM 400 PROFILE -0+50 TO 6+50) 746 747 748 749 750 751 752 753 754 755 756 757 758 759 760 761 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 777 778 779 780 781 782 783 784 785 786 787 788 789 790 791 792 745 746 747 748 749 750 751 752 753 754 755 756 757 758 759 760 761 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 777 778 779 780 781 782 783 784 785 786 787 788 789 790 791 792 -0+50 0+00 1+00 2+00 3+00 4+00 5+00 6+00 6+50 0+00 1+00 2+00 3+00 4+00 5+00 6+00 6+50 119.1 LF 18" CLASS IV RCP @ 1.00% 170.7 LF 18" CLASS IV RCP @ 1.00% IN V O U T : 7 6 2 . 3 9 2 4 " C L A S S I V R C P ( T O C B - 3 0 0 ) IN V I N : 7 6 2 . 8 9 1 8 " C L A S S I V R C P ( F R O M D I - 4 0 1 ) DI - 4 0 0 ST A : 2 + 0 5 . 8 5 RI M : 7 7 4 . 2 7 IN V O U T : 7 6 5 . 8 9 1 8 " C L A S S I V R C P ( T O D I - 4 0 1 ) IN V I N : 7 6 5 . 9 9 1 8 " C L A S S I V R C P ( F R O M D I - 4 0 3 ) DI - 4 0 2 ST A : 4 + 9 5 . 9 7 RI M : 7 7 0 . 2 3 IN V O U T : 7 6 4 . 6 0 1 8 " C L A S S I V R C P ( T O D I - 4 0 0 ) IN V I N : 7 6 4 . 7 0 1 8 " C L A S S I V R C P ( F R O M D I - 4 0 2 ) DI - 4 0 1 ST A : 3 + 7 6 . 8 5 RI M : 7 7 0 . 1 5 PROPOSED GRADE EXISTING GRADE 204.9 LF 24" CLASS IV RCP @ 3.58% 120.0 LF 18" CLASS IV RCP @ 1.00% IN V O U T : 7 6 7 . 1 9 1 8 " C L A S S I V R C P ( T O D I - 4 0 2 ) DI - 4 0 3 ST A : 7 + 0 6 . 5 2 RI M : 7 7 1 . 7 5 EXISTING FIBER OPTIC LINE CROSSING IN V O U T : 7 5 2 . 5 0 2 4 " C L A S S I V R C P ( T O C B - 1 0 3 ) IN V I N : 7 5 5 . 3 3 1 5 " C L A S S I V R C P ( F R O M C B - 3 0 1 ) IN V I N : 7 5 5 . 0 5 2 4 " C L A S S I V R C P ( F R O M D I - 4 0 0 ) CB - 3 0 0 ST A : 0 + 0 0 . 9 6 RI M : 7 6 0 . 3 0 EXISTING 8" FIRE LINE CROSSING EXISTING UGE LINE CROSSING EXISTING FIBER OPTIC LINE CROSSING EXISTING UGE LINE CROSSING EXISTING 8" FIRE LINE CROSSING PROPOSED SEWER CROSSING MH-503 TO FES-600 (STORM 600 PROFILE -0+25 TO 1+50) 729 730 731 732 733 734 735 736 737 738 739 740 741 742 743 744 745 746 747 748 749 750 751 752 753 754 755 756 757 758 759 760 761 762 763 764 728 729 730 731 732 733 734 735 736 737 738 739 740 741 742 743 744 745 746 747 748 749 750 751 752 753 754 755 756 757 758 759 760 761 762 763 764 -0+25 0+00 1+00 1+50 0+00 1+00 1+50 54.1 LF 30" RCP @ 1.00% PROPOSED GRADE EXISTING GRADE IN V O U T : 7 3 7 . 0 0 3 0 " R C P ( T O M H - 5 0 2 ) OS - 6 0 0 ST A : 0 + 5 4 . 1 4 RI M : 7 4 1 . 5 0 IN V O U T : 7 2 9 . 7 4 3 0 " R C P ( T O M H - 5 0 1 ) IN V I N : 7 3 3 . 4 6 3 0 " R C P ( F R O M M H - 5 0 3 ) IN V I N : 7 3 6 . 4 6 3 0 " R C P ( F R O M O S - 6 0 0 ) MH - 5 0 2 ST A : 0 + 7 0 . 0 0 RI M : 7 4 1 . 0 7 S: \ E N G I N E E R \ P R O J E C T S \ 8 1 8 9 . 0 8 2 3 C D - S E N N E B O G E N E X P A N S I O N \ D R A W I N G S \ S H E E T S \ 8 1 8 9 - S - S T O R M D R A I N A G E . D W G , Ap r i l 8 , 2 0 2 4 SC O L D R E N 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 40 20 40 8040 C4.4 STORM DRAINAGE PROFILE R Know what's below. Call before you dig. NORTH CAROLINA ONE-CALL CENTER INC. DIAL 811 or 1-800-632-4949 2 BUSINESS DAYS BEFORE DIGGING www.ncocc.org OW N E R / D E V E L O P E R DRAWN BY: CHECKED BY: PROJECT NO: DRAWING TITLE: DRAWING NUMBER: SEAL: DATE:NO:REVISION DESC. DRAWING REVISIONS Copyright 2024 CES Group Engineers, LLP PR O J E C T D E S C R I P T I O N : REVISED BY: ISSUED BY: CES Group Engineers, LLP 3525 Whitehall Park Drive, Suite 150 Charlotte, NC 28273 PH: 704.489.1500 www.ces-group.net ENGINEERS PLANNERS SURVEYORS SCIENTISTS CO. SEAL: ISSUE DATE: 1 - - - - - - DESIGN REVISIONS 4/3/2024 - - - - - - - - - - - - 02/22/2024 8189.0823 SE N N E B O G E N E X P A N S I O N S. C . H O N D R O S & A S S O C I A T E S , I N C . P. O . B O X 2 2 0 4 5 6 , C H A R L O T T E , N C 2 8 2 2 2 - 0 4 5 6 19 5 7 S E N N E B O G E N T R A I L ST A N L E Y , N C 2 8 1 6 4 VERTICAL: 1 inch = 4 ft JM MK SC SC FES-500 TO MH-508 (STORM 500 PROFILE -1+00 TO 8+50) 716 717 718 719 720 721 722 723 724 725 726 727 728 729 730 731 732 733 734 735 736 737 738 739 740 741 742 743 744 745 746 747 748 749 750 751 752 753 754 755 756 757 758 759 760 761 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 777 778 779 780 781 782 783 784 785 786 787 788 789 790 715 716 717 718 719 720 721 722 723 724 725 726 727 728 729 730 731 732 733 734 735 736 737 738 739 740 741 742 743 744 745 746 747 748 749 750 751 752 753 754 755 756 757 758 759 760 761 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 777 778 779 780 781 782 783 784 785 786 787 788 789 790 -1+00 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 8+50 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 8+50 IN V O U T : 7 6 0 . 5 8 2 4 " C L A S S I V R C P ( T O M H - 5 0 7 ) MH - 5 0 8 ST A : 7 + 3 4 . 7 7 RI M : 7 7 5 . 3 0 IN V O U T : 7 5 0 . 4 4 2 4 " C L A S S I V R C P ( T O M H - 5 0 5 ) IN V I N : 7 5 0 . 5 4 2 4 " C L A S S I V R C P ( F R O M M H - 5 0 7 ) MH - 5 0 6 ST A : 4 + 9 1 . 9 9 RI M : 7 5 9 . 6 1 36.5 LF 24" CLASS IV RCP @ 3.60% 46.6 LF 24" CLASS IV RCP @ 4.00% IN V O U T : 7 4 1 . 6 4 2 4 " H D P E ( T O M H - 5 0 3 ) IN V I N : 7 4 1 . 7 4 2 4 " H D P E ( F R O M M H - 5 0 5 ) MH - 5 0 4 ST A : 2 + 7 6 . 9 6 RI M : 7 4 8 . 8 9 158.2 LF 24" HDPE @ 2.35% IN V O U T : 7 3 5 . 9 0 3 0 " R C P ( T O M H - 5 0 2 ) IN V I N : 7 3 7 . 9 2 2 4 " H D P E ( F R O M M H - 5 0 4 ) MH - 5 0 3 ST A : 1 + 1 8 . 7 6 RI M : 7 4 9 . 7 8 48.8 LF 30" RCP @ 5.00% 20.0 LF 30" RCP @ 2.00% PROPOSED GRADE EXISTING GRADE 206.2 LF 24" CLASS IV RCP @ 3.60% IN V O U T : 7 5 7 . 9 7 2 4 " C L A S S I V R C P ( T O M H - 5 0 6 ) IN V I N : 7 5 9 . 2 7 2 4 " C L A S S I V R C P ( F R O M M H - 5 0 8 ) MH - 5 0 7 ST A : 6 + 9 8 . 2 2 RI M : 7 7 3 . 6 7 EXISTING UGE LINE CROSSING EXISTING FIBER OPTIC LINE CROSSING 15" CLASS IV RCP STORM 20.0 LF 30" RCP @ 5.00% 168.5 LF 24" HDPE @ 4.00% IN V O U T : 7 4 8 . 4 8 2 4 " H D P E ( T O M H - 5 0 4 ) IN V I N : 7 4 8 . 5 8 2 4 " C L A S S I V R C P ( F R O M M H - 5 0 6 ) MH - 5 0 5 ST A : 4 + 4 5 . 4 4 RI M : 7 5 7 . 3 8 IN V O U T : 7 2 6 . 4 0 3 0 " R C P ( T O F E S - 5 0 0 ) IN V I N : 7 2 8 . 7 4 3 0 " R C P ( F R O M M H - 5 0 2 ) MH - 5 0 1 ST A : 0 + 5 0 . 0 0 RI M : 7 3 4 . 5 2 IN V O U T : 7 2 9 . 7 4 3 0 " R C P ( T O M H - 5 0 1 ) IN V I N : 7 3 3 . 4 6 3 0 " R C P ( F R O M M H - 5 0 3 ) IN V I N : 7 3 6 . 4 6 3 0 " R C P ( F R O M O S - 6 0 0 ) MH - 5 0 2 ST A : 0 + 7 0 . 0 0 RI M : 7 4 1 . 0 7 IN V I N : 7 2 6 . 0 0 3 0 " R C P ( F R O M M H - 5 0 1 ) FE S - 5 0 0 ST A : 0 + 3 0 . 0 0 RI M : 7 2 8 . 8 8 S: \ E N G I N E E R \ P R O J E C T S \ 8 1 8 9 . 0 8 2 3 C D - S E N N E B O G E N E X P A N S I O N \ D R A W I N G S \ S H E E T S \ 8 1 8 9 - S - S T O R M D R A I N A G E . D W G , Ap r i l 8 , 2 0 2 4 SC O L D R E N 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 40 20 40 8040 C4.5 STORM DRAINAGE PROFILE R Know what's below. Call before you dig. NORTH CAROLINA ONE-CALL CENTER INC. DIAL 811 or 1-800-632-4949 2 BUSINESS DAYS BEFORE DIGGING www.ncocc.org OW N E R / D E V E L O P E R DRAWN BY: CHECKED BY: PROJECT NO: DRAWING TITLE: DRAWING NUMBER: SEAL: DATE:NO:REVISION DESC. DRAWING REVISIONS Copyright 2024 CES Group Engineers, LLP PR O J E C T D E S C R I P T I O N : REVISED BY: ISSUED BY: CES Group Engineers, LLP 3525 Whitehall Park Drive, Suite 150 Charlotte, NC 28273 PH: 704.489.1500 www.ces-group.net ENGINEERS PLANNERS SURVEYORS SCIENTISTS CO. SEAL: ISSUE DATE: 1 - - - - - - DESIGN REVISIONS 4/3/2024 - - - - - - - - - - - - 02/22/2024 8189.0823 SE N N E B O G E N E X P A N S I O N S. C . H O N D R O S & A S S O C I A T E S , I N C . P. O . B O X 2 2 0 4 5 6 , C H A R L O T T E , N C 2 8 2 2 2 - 0 4 5 6 19 5 7 S E N N E B O G E N T R A I L ST A N L E Y , N C 2 8 1 6 4 VERTICAL: 1 inch = 4 ft JM MK SC SC Sennebogen Real Estate LLC SLT Enterprises, LLC Curtis Phillips Pamela W. Phillips Mishelle S. Dean Catherleen H. Sherrill SE N N E B O G E N T R A I L HEAVY DUTY PAVEMENT OVERLAY HEAVY DUTY PAVEMENT OVERLAY 1111 11 20 ' C L A S S C B U F F E R W I T H SC R E E N I N G F E N C E 20' CLASS C BUFFER WITH WALL 40' CLASS C BUFFER 50' SIDE SETBACK (ABUTTING RE S I D E N T I A L ) 20' SIDE SETBACK (INTERIOR) 50 ' S I D E S E T B A C K (A B U T T I N G R E S I D E N T I A L ) 20 ' S I D E S E T B A C K ( I N T E R I O R ) 20 ' S I D E S E T B A C K ( I N T E R I O R ) 20' SIDE SETBACK (INTERIOR) 1111 8''F SS SS SS 2''W 0+00 1+00 2+00 3+00 4+ 0 0 5+ 0 0 6+ 0 0 7+ 0 0 7+ 2 6 . 3 9 0+ 0 0 1+ 0 0 1+ 0 5 . 9 6 SD SD SD SD 0+00 1+00 2+00 3+ 0 0 4+ 0 0 5+ 0 0 6+ 0 0 6+ 1 5 . 9 6 SD SD 0+ 0 0 0+ 5 4 . 1 4 0 + 0 0 1 + 0 0 2+ 0 0 3+00 4+00 5+00 6+00 7+00 7+34.77SD SD SD SD SD SD SD SD SD 0+ 0 0 1+ 0 0 2+ 0 0 3+ 0 0 3+ 8 9 ALIGNMENT=STORM 400 STATION=5+12.83 OFFSET=1.05L NORTHING=614160.40 EASTING=1399229.90 SDSD PROPOSED THRUST BLOCKING PER LCPU STANDARDS PROPOSED 8"X8" TAPPING SLEEVE AND VALVE PROPOSED 53 LF 8" PC350 RJ DIP FIRE LINE SEE BUILDING PLANS FOR CONTINUATION PROPOSED DUPLEX LIFT STATION PROPOSED 121 LF 2" SCH. 40 PVC FORCE MAIN PROPOSED TAPPING TO EXISTING FORCE MAIN PROPOSED 53 LF 2" WATER LINE PROPOSED CONNECTION PROPOSED 400' X 120' BUILDING FFE = 773.00 PROPOSED 8" GATE VALVE PROPOSED FIRE HYDRANT ASSEMBLY PROPOSED CONNECTION PROPOSED FDC LOCATION OW N E R / D E V E L O P E R DRAWN BY: CHECKED BY: PROJECT NO: DRAWING TITLE: DRAWING NUMBER: SEAL: DATE:NO:REVISION DESC. DRAWING REVISIONS Copyright 2024 CES Group Engineers, LLP PR O J E C T D E S C R I P T I O N : REVISED BY: ISSUED BY: CES Group Engineers, LLP 3525 Whitehall Park Drive, Suite 150 Charlotte, NC 28273 PH: 704.489.1500 www.ces-group.net ENGINEERS PLANNERS SURVEYORS SCIENTISTS CO. SEAL: ISSUE DATE: 1 - - - - - - DESIGN REVISIONS 4/3/2024 - - - - - - - - - - - - 02/22/2024 8189.0823 SE N N E B O G E N E X P A N S I O N S. C . H O N D R O S & A S S O C I A T E S , I N C . P. O . B O X 2 2 0 4 5 6 , C H A R L O T T E , N C 2 8 2 2 2 - 0 4 5 6 19 5 7 S E N N E B O G E N T R A I L ST A N L E Y , N C 2 8 1 6 4 S: \ E N G I N E E R \ P R O J E C T S \ 8 1 8 9 . 0 8 2 3 C D - S E N N E B O G E N E X P A N S I O N \ D R A W I N G S \ S H E E T S \ 8 1 8 9 - S - U T I L I T Y P L A N . D W G , Ap r i l 8 , 2 0 2 4 SC O L D R E N 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 40 20 40 8040 C5.0 UTILITY PLANR Know what's below. Call before you dig. NORTH CAROLINA ONE-CALL CENTER INC. DIAL 811 or 1-800-632-4949 2 BUSINESS DAYS BEFORE DIGGING www.ncocc.org PROPOSED LEGEND WATER METER WATER LINE STORM PIPE SANITARY SEWER PIPE GATE VALVE FIRE HYDRANT SANITARY SEWER MANHOLE UNDERGROUND CABLE OVERHEAD UTILITY LINE UNDERGROUND ELECTRIC FIBER OPTIC CABLE GAS MAIN FENCE UTILITY POLE W W SS SS S CATV OH UGE FO G G WATER AND SEWER GENERAL NOTES: 1.ALL WORK SHALL CONFORM TO LATEST REVISION OF THE LCPW OPERATIONAL MANUAL WHICH IS ON FILE AT THE DIVISION OF LINCOLN COUNTY PUBLIC WORKS OFFICE (115 W MAIN STREET, LINCOLNTON, NORTH CAROLINA 28092). 2.ANY QUANTITIES SHOWN ON PLANS ARE NOT VERIFIED BY LCPW. 3.A PRE-CONSTRUCTION MEETING IS REQUIRED BEFORE WORK MAY BEGIN. LINCOLN COUNTY PUBLIC WORKS SHALL BE NOTIFIED 48 HOURS PRIOR TO PROJECT MOBILIZATION. 4.ALL WORK AND MATERIALS, WHICH DO NOT CONFORM TO LCPW SPECIFICATIONS, ARE SUBJECT TO REMOVAL AND REPLACEMENT AT THE CONTRACTOR'S EXPENSE. 5.ANY WORK PERFORMED WITHOUT THE KNOWLEDGE OF LCPW IS SUBJECT TO RE-EXCAVATION, REMOVAL AND REPLACEMENT OF SAME TO BE DONE AT THE CONTRACTOR'S EXPENSE. 6.THE CONTRACTOR SHALL PROVIDE SUFFICIENT PERSONNEL AND EQUIPMENT ON THE JOB AT ALL TIMES DURING CONSTRUCTION TO SATISFY THE SPECIFICATIONS AND TO COMPLETE WORK. 7.LCPW INSPECTION STAFF MAY OBSERVE PROJECT CONSTRUCTION. 8.THE CONTRACTOR IS TO UNCOVER ALL EXISTING LINES BEING TIED INTO AND VERIFY GRADES BEFORE BEGINNING CONSTRUCTION. 9.IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE AND TAKE ALL POSSIBLE PRECAUTIONS TO AVOID ANY DAMAGE TO ALL UNDERGROUND PIPELINES, TELEPHONE, CABLE TV, ELECTRIC LINES/CONDUITS AND STRUCTURES IN ADVANCE OF ANY CONSTRUCTION. LCPW WILL NOT GUARANTEE ANY LOCATIONS AS SHOWN ON THESE PLANS OR THOSE OMITTED FROM THESE PLANS. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MAY OCCUR BY HIS FAILURE TO EXACTLY LOCATE AND PROTECT EXISTING UTILITIES AND STRUCTURES. 10.CONTRACTOR SHALL VERIFY ALL QUANTITIES SHOWN ON THE PLANS. IF ANY DISCREPANCIES IN QUANTITIES ARE FOUND, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER AND LCPW. 11.ALL REGULATORY AND PERMITTING AGENCIES' REQUIREMENTS SHALL BE COMPLIED WITH. 12.APPROPRIATE TURBIDITY CONTROL DEVICES (E.G. SILT FENCES, HAY BAILS) WILL BE UTILIZED DURING ALL PHASES OF INSTALLATION AND GRADING. CONTRACTOR IS RESPONSIBLE FOR CONTACTING LINCOLN COUNTY SOIL AND CONSERVATION DEPARTMENT TO DETERMINE THE REQUIREMENTS FOR PERMITTING, DEVELOPING AND MAINTAINING AN EFFECTIVE STORM WATER POLLUTION PREVENTION PLAN. 13.LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES AND OTHER FEATURES ARE SHOWN ACCORDING TO THE BEST INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF THESE PLANS, BUT DO NOT PURPORT TO BE ABSOLUTELY CORRECT. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL VERIFY AND BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES AFFECTING HIS WORK. ANYTHING NOT SHOWN ON THESE DRAWINGS SHOULD BE BROUGHT TO THE ATTENTION OF THE ENGINEER AND SHALL NOT CONSTITUTE AN EXTRA, UNLESS APPROVED BY THE ENGINEER. 14.THE CONTRACTOR SHALL CONTACT THE ENGINEER AND LCPW IMMEDIATELY CONCERNING ANY CONFLICTS WITH LCPW UTILITIES/STRUCTURES ARISING DURING CONSTRUCTION OF ANY FACILITIES SHOWN ON THESE DRAWINGS. 15.TRAFFIC MUST BE MAINTAINED AT ALL TIMES AS PER NORTH CAROLINA COUNTY DEPARTMENT OF TRANSPORTATION (NCDOT). 16.THE CONTRACTOR SHALL NOTIFY UTILITIES UTILIZING THE 811 SERVICE PRIOR TO STARTING CONSTRUCTION. 17.THE CONTRACTOR SHALL REPLACE ALL PAVEMENT, CURBS, DRIVEWAYS, SIDEWALKS, FENCES, ETC., WITH THE SAME TYPE OF MATERIAL THAT WAS REMOVED DURING CONSTRUCTION OR AS DIRECTED BY THE ENGINEER. THE CONTRACTOR SHALL RESTORE ALL AREAS AFFECTED BY THE CONSTRUCTION TO ITS ORIGINAL CONDITION, OR BETTER. 18.WITHIN THE NCDOT RIGHT-OF-WAY, ALL DISTURBED AREAS SHALL RECEIVE GRASSING (SEEDING) OR SODDING MATERIALS IN ACCORDANCE WITH NCDOT SPECIFICATIONS. 19.THE INFORMATION PROVIDED IN THESE PLANS IS SOLELY TO ASSIST THE CONTRACTOR IN ASSESSING THE NATURE AND EXTENT OF CONDITIONS WHICH MAY BE ENCOUNTERED DURING THE COURSE OF WORK. ALL CONTRACTORS ARE DIRECTED, PRIOR TO BIDDING, TO CONDUCT WHATEVER INVESTIGATIONS THEY MAY DEEM NECESSARY TO ARRIVE AT THEIR OWN CONCLUSION REGARDING THE ACTUAL CONDITIONS THAT WILL BE ENCOUNTERED, AND UPON WHICH THEIR BIDS WILL BE BASED. 20.ALL FRAMES, COVERS VALVE BOXES, METER BOXES AND MANHOLES SHALL BE ADJUSTED TO FINISHED GRADE UPON COMPLETION OF PAVING OR RELATED CONSTRUCTION. JM MK SC SC 1111 11 20 ' C L A S S C B U F F E R W I T H SC R E E N I N G F E N C E 20' CLASS C BUFFER WITH WALL 40' CLASS C BUFFER 50' SIDE SETBACK (ABUTTING RE S I D E N T I A L ) 20' SIDE SETBACK (INTERIOR) 50 ' S I D E S E T B A C K (A B U T T I N G R E S I D E N T I A L ) 20 ' S I D E S E T B A C K ( I N T E R I O R ) 20 ' S I D E S E T B A C K ( I N T E R I O R ) 20' SIDE SETBACK (INTERIOR) 1111 Sennebogen Real Estate LLC SLT Enterprises, LLC Curtis Phillips Pamela W. Phillips Mishelle S. Dean Catherleen H. Sherrill SE N N E B O G E N T R A I L HEAVY DUTY PAVEMENT OVERLAY HEAVY DUTY PAVEMENT OVERLAY 0+00 1+00 2+00 3+00 4+ 0 0 5+ 0 0 6+ 0 0 7+ 0 0 7+ 2 6 . 3 9 0+ 0 0 1+ 0 0 1+ 0 5 . 9 6 SD SD SD SD 0+00 1+00 2+00 3+ 0 0 4+ 0 0 5+ 0 0 6+ 0 0 6+ 1 5 . 9 6 SD SD 0+ 0 0 0+ 5 4 . 1 4 0 + 0 0 1 + 0 0 2+ 0 0 3+00 4+00 5+00 6+00 7+00 7+34.77SD SD SD SD SD SD SD SD SD 0+ 0 0 1+ 0 0 2+ 0 0 3+ 0 0 3+ 8 9 ALIGNMENT=STORM 400 STATION=5+12.83 OFFSET=1.05L NORTHING=614160.40 EASTING=1399229.90 SDSD 755 760 765 770 8''F SS SS SS 2''W PROPOSED CANOPY TREE (TYP OF 3) PROPOSED SMALL SHRUBS (TYP OF 6) PROPOSED 6' HIGH WOODEN SCREENING FENCE PROPOSED MEDIUM SIZE SHRUBS (TYP OF 3) PROPOSED SMALL SHRUBS (TYP OF 9) PROPOSED MEDIUM SIZE SHRUBS (TYP OF 4) PROPOSED LARGE EVERGREEN SHRUBS (TYP OF 2) PROPOSED MEDIUM SIZE SHRUBS (TYP OF 8) PROPOSED MEDIUM SIZE SHRUBS (TYP OF 4) PROPOSED MEDIUM SIZE SHRUBS (TYP OF 4) PROPOSED EVERGREEN TREES (TYP OF 2) PROPOSED MEDIUM SIZE SHRUBS (TYP OF 3) PROPOSED MEDIUM SIZE SHRUBS (TYP OF 4) PROPOSED MEDIUM SIZE SHRUBS (TYP OF 3) PROPOSED UNDERSTORY TREE (TYP OF 1) PROPOSED UNDERSTORY TREE (TYP OF 1) PROPOSED CANOPY TREE (TYP OF 1) PROPOSED UNDERSTORY TREE (TYP OF 1) PROPOSED EVERGREEN TREES (TYP OF 8) THIS AREA TO BE SEEDED AND MATTED WITH NAG SC 150 OR APPROVED EQUAL THIS AREA TO BE SEEDED AND MATTED WITH NAG SC 150 OR APPROVED EQUAL PROPOSED POST BMP OUTLINE S: \ E N G I N E E R \ P R O J E C T S \ 8 1 8 9 . 0 8 2 3 C D - S E N N E B O G E N E X P A N S I O N \ D R A W I N G S \ S H E E T S \ 8 1 8 9 - S - L A N D S C A P E P L A N . D W G , Ap r i l 8 , 2 0 2 4 SC O L D R E N 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 40 20 40 8040 C6.0 LANDSCAPE PLAN R Know what's below. Call before you dig. NORTH CAROLINA ONE-CALL CENTER INC. DIAL 811 or 1-800-632-4949 2 BUSINESS DAYS BEFORE DIGGING www.ncocc.org OW N E R / D E V E L O P E R DRAWN BY: CHECKED BY: PROJECT NO: DRAWING TITLE: DRAWING NUMBER: SEAL: DATE:NO:REVISION DESC. DRAWING REVISIONS Copyright 2024 CES Group Engineers, LLP PR O J E C T D E S C R I P T I O N : REVISED BY: ISSUED BY: CES Group Engineers, LLP 3525 Whitehall Park Drive, Suite 150 Charlotte, NC 28273 PH: 704.489.1500 www.ces-group.net ENGINEERS PLANNERS SURVEYORS SCIENTISTS CO. SEAL: ISSUE DATE: 1 - - - - - - DESIGN REVISIONS 4/3/2024 - - - - - - - - - - - - 02/22/2024 8189.0823 SE N N E B O G E N E X P A N S I O N S. C . H O N D R O S & A S S O C I A T E S , I N C . P. O . B O X 2 2 0 4 5 6 , C H A R L O T T E , N C 2 8 2 2 2 - 0 4 5 6 19 5 7 S E N N E B O G E N T R A I L ST A N L E Y , N C 2 8 1 6 4 PLANTING NOTES: 1.ALL PLANT MATERIALS SHALL BE IN ACCORDANCE WITH THE AMERICAN STANDARDS FOR NURSERY STOCK (ANSI Z60.1-2004). 2.FOR SHRUBS AND TREES DIG PLANTING HOLE A MINIMUM OF 2X THE WIDTH OF THE ROOTBALL. SCARIFY THE SUBGRADE AND SIDES OF PLANTING HOLE WHEN IN CLAY SOILS. 3.PROVIDE A COMPACTED BASE UNDER ROOTBALL AS SHOWN; PLACE TOP OF ROOTBALL 1” ABOVE FINISH GRADE. 4.LIFT AND SET TREE BY ROOTBALL ONLY. DO NOT LIFT USING THE TREE TRUNK AND DO NOT USE TRUNK AS A LEVER. 5.FOR BALLED AND BURLAPED TREES AND SHRUBS; REMOVE TOP 1/3 OF BURLAP, STRAPS AND WIRE. FOR CONTAINER PLANTS; REMOVE CONTAINER AND UNTWIST ANY GIRDLING ROOTS. 6.BACKFILL AROUND ROOTBALL WITH PLANTING SOIL MIX OR STRUCTURAL SOIL AS SPECIFIED. 7.PLANTING SOIL BACKFILL SHALL CONSIST OF: 1/3 BY VOLUME (33%) PASTEURIZED, PH BALANCED COMPOSTED COW MANURE; 1/3 BY VOLUME (33%) TOPSOIL OR MANUFACTURED TOPSOIL; 1/3 BY VOLUME (33%) NATIVE SUBSOIL. 8.STRUCTURAL SOIL BACKFILL SHALL CONSIST OF: 4/5 BY VOLUME (80%) CRUSH ANGULAR STONE (GRANITE) GRADED FROM ¾” - 1 ½” DIAMETER; AND 1/5 BY VOLUME (20%) PH BALANCED HEAVY CLAY LOAM; THOROUGHLY MIXED AND COMPACTED IN PLACE TO 85% MODIFIED PROCTOR MAXIMUM DRY DENSITY. (STRUCTURAL SOIL VOLUME MAY BE USED FOR STORMWATER DETENTION FOLLOWING DHEC CALCULATIONS). 9.CONSTRUCT AN EARTH SAUCER AROUND ROOTBALL AS A WATER RETENTION BASIN. 10.WATER PLANT HOLE THROUGHLY TO SETTLE PLANTING SOIL BACKFILL AND REMOVE VOIDS. 11.STAKE TREES WITH 2” X 2” WOOD STAKES SUFFICIENT IN LENGTH TO BE DRIVEN INTO UNDISTURBED SOIL A MINIMUM OF 18” AND TO GUY TO TREE TRUNK BELOW THE FIRST BRANCHES. STAKES SHOULD BE SPACED EQUALLY ACROSS FROM AND IN LINE WITH THE TRUNK PARALLEL TO THE PREVAILING WIND. 12.APPLY 3” MULCH AS SPECIFIED. LEAVE A 2”SPACE AROUND THE TRUNK FOR AIR CIRCULATION. 13.DO NOT PRUNE TREES OR LARGE SHRUBS UNLESS DIRECTED BY ARBORIST. 14.PRUNING SHALL BE LIMITED TO DEAD, DISEASED OR BROKEN BRANCHES; AND BE IN ACCORDANCE WITH ANSI A300 SPECIFICATIONS. 15.REMOVE IMMEDIATELY FROM SITE ANY DEAD OR REJECTED PLANT MATERIALS. LANDSCAPING REQUIREMENTS CODE SECTION REQUIRED PROPOSED § 3.4.5 FOUNDATION PLANTINGS REQUIRED 5 FT 15 FT § 3.4.6 BUFFER TYPE C-(R-T) REQUIRED 40 FT OR 20 FT ALTERNATIVE 40FT / 20 FT WITH SCREENING FENCE CANOPY TREES UNDERSTORY TREES MEDIUM SHRUBS PROPOSED LEGEND LARGE EVERGREEN SHRUBS SMALL SHRUBS JM MK SC DR S: \ E N G I N E E R \ P R O J E C T S \ 8 1 8 9 . 0 8 2 3 C D - S E N N E B O G E N E X P A N S I O N \ D R A W I N G S \ S H E E T S \ 8 1 8 9 - S - L A N D S C A P E D E T A I L S . D W G , Ap r i l 8 , 2 0 2 4 SC O L D R E N OW N E R / D E V E L O P E R DRAWN BY: CHECKED BY: PROJECT NO: DRAWING TITLE: DRAWING NUMBER: SEAL: DATE:NO:REVISION DESC. DRAWING REVISIONS Copyright 2024 CES Group Engineers, LLP PR O J E C T D E S C R I P T I O N : REVISED BY: ISSUED BY: CES Group Engineers, LLP 3525 Whitehall Park Drive, Suite 150 Charlotte, NC 28273 PH: 704.489.1500 www.ces-group.net ENGINEERS PLANNERS SURVEYORS SCIENTISTS CO. SEAL: ISSUE DATE: 1 - - - - - - DESIGN REVISIONS 4/3/2024 - - - - - - - - - - - - 02/22/2024 8189.0823 SE N N E B O G E N E X P A N S I O N S. C . H O N D R O S & A S S O C I A T E S , I N C . P. O . B O X 2 2 0 4 5 6 , C H A R L O T T E , N C 2 8 2 2 2 - 0 4 5 6 19 5 7 S E N N E B O G E N T R A I L ST A N L E Y , N C 2 8 1 6 4 C6.1 LANDSCAPE DETAILS JM MK SC SC SET 1" OF ROOTBALL ABOVE FINISHED GRADE OR ACCORDING TO SPECIES AND DRAINAGE CONDITIONS. NO SOIL OVER ROOTBALL. RIPPED SUBSOIL TO A DEPTH OF 12" MIN. FOR SHRUBS (3" FOR GROUNDCOVER) - RETAMP TO PREVENT SETTLING CUT AND REMOVE BURLAP FROM TOP 1/3 OF ROOTBALL FINISHED GRADE SPACE PLANTS AS SHOWN ON PLAN OR PLANT LIST ROTOTILL NATIVE SOIL - AMEND WITH COMPOST - BACKFILL IN 9" LAYERS WATERING EACH BUILD 3"-4" SAUCER AROUND PIT - INVERT OF SAUCER TO MATCH FINISH GRADE OR AS DIRECTED BY LANDSCAPE ARCHITECT - (DELETE SAUCER IF IRRIGATED) TWICE ROOTBALL DIA. 3" MULCH (1"-2" MAX. OVER ROOTBALL), PULL BACK 3" FROM TRUNK - INSTALL WEED CONTROL FABRIC FOR GROUNDCOVERS PLANTINGS) SHRUB PLANTING AND GROUNDCOVER PLANTINGS NOT TO SCALE Sennebogen Real Estate LLC SLT Enterprises, LLC Curtis Phillips Pamela W. Phillips Mishelle S. Dean Catherleen H. Sherrill SE N N E B O G E N T R A I L Pond Old HEAVY DUTY PAVEMENT OVERLAY HEAVY DUTY PAVEMENT OVERLAY LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD L O D L O D LOD LOD LOD LOD LOD LOD LODLO D LODLODLODLODLODLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD L OD LOD L O D L O D L O D L O D L O D L O D L O D LOD LOD LOD LOD LOD LOD LOD SD SD SD SDSD SD PROPOSED LIMIT OF DISTURBANCE = 0.74 AC TEMPORARY SILT FENCE (TYP) SEE DETAIL MH-504 FES-1 (TEMPORARY) MH-506 MH-507 MH-508MH-505 OW N E R / D E V E L O P E R DRAWN BY: CHECKED BY: PROJECT NO: DRAWING TITLE: DRAWING NUMBER: SEAL: DATE:NO:REVISION DESC. DRAWING REVISIONS Copyright 2024 CES Group Engineers, LLP PR O J E C T D E S C R I P T I O N : REVISED BY: ISSUED BY: CES Group Engineers, LLP 3525 Whitehall Park Drive, Suite 150 Charlotte, NC 28273 PH: 704.489.1500 www.ces-group.net ENGINEERS PLANNERS SURVEYORS SCIENTISTS CO. SEAL: ISSUE DATE: 1 - - - - - - DESIGN REVISIONS 4/3/2024 - - - - - - - - - - - - 02/22/2024 8189.0823 SE N N E B O G E N E X P A N S I O N S. C . H O N D R O S & A S S O C I A T E S , I N C . P. O . B O X 2 2 0 4 5 6 , C H A R L O T T E , N C 2 8 2 2 2 - 0 4 5 6 19 5 7 S E N N E B O G E N T R A I L ST A N L E Y , N C 2 8 1 6 4 S: \ E N G I N E E R \ P R O J E C T S \ 8 1 8 9 . 0 8 2 3 C D - S E N N E B O G E N E X P A N S I O N \ D R A W I N G S \ S H E E T S \ S - E C - P H 1 . D W G , Ap r i l 8 , 2 0 2 4 SC O L D R E N 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 40 20 40 8040 C7.0 EROSION CONTROL PLAN PHASE 1 R Know what's below. Call before you dig. NORTH CAROLINA ONE-CALL CENTER INC. DIAL 811 or 1-800-632-4949 2 BUSINESS DAYS BEFORE DIGGING www.ncocc.org EROSION CONTROL LEGEND TEMPORARY HARDWARE CLOTH AND GRAVEL INLET PROTECTION TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY CONCRETE WASHOUT TEMPORARY SILT SACK INLET PROTECTION TEMPORARY CURB INLET FILTER TEMPORARY ROCK CHECK DAM TEMPORARY SILT FENCE OUTLET TEMPORARY ROCK PIPE INLET PROTECTION LOD TEMPORARY SILT FENCE LIMITS OF DISTURBANCE TEMPORARY BAFFLES TEMPORARY ROCK SEDIMENT DIKE TEMPORARY DIVERSION CONSTRUCTION SEQUENCE (PHASE 1): 1.AFTER OBTAINING APPROVAL OF EROSION CONTROL PLAN APPLY FOR NCG01 CERTIFICATE OF COVERAGE (COC) BEFORE ANY LAND DISTURBING ACTIVITIES CAN OCCUR. THE CERTIFICATE OF COVERAGE CAN BE OBTAINED BY FILLING OUT THE ELECTRONIC NOTICE OF INTENT (E-NOI) FORM AT DEQ.NC.GOV/NCG01. PLEASE NOTE, THE E-NOI FORM MAY ONLY BE FILLED OUT ONCE THE SEDIMENT AND EROSION CONTROL PLAN HAS BEEN APPROVED. 2.ONCE COC HAS BEEN RECEIVED PROVIDE A COPY TO THE LINCOLN COUNTY NATURAL RESOURCES DEPARTMENT AND SCHEDULE AN ONSITE PRE-CONSTRUCTION CONFERENCE AT LEAST 48 HOURS PRIOR TO BEGINNING ANY LAND DISTURBING ACTIVITY. 3.INSTALL A RAIN GAUGE ON THE SITE AND MAINTAIN A WRITTEN RECORD OF AMOUNTS OF ALL RAINFALL AND DATES. 4.MARK CONSTRUCTION LIMITS. 5.INSTALL SILT FENCE, SILT FENCE OUTLETS AND CONSTRUCTION ENTRANCE. 6.CALL LINCOLN COUNTY NATURAL RESOURCES FOR FIRST INSPECTION. 7.INSTALL TEMPORARY DIVERSION DITCHES, SKIMMER BASIN AND TEMPORARY ROCK CHECK DAMS. 8.CALL FOR ON-SITE INSPECTION BY EROSION CONTROL INSPECTOR. WHEN EROSION CONTROL MEASURES ARE APPROVED, BEGIN CONSTRUCTION. 9.ALL EROSION CONTROL MEASURES MUST BE INSTALLED BEFORE CONSTRUCTION BEGINS. 10.CLEAR AND GRUB SITE, DISPOSE OF ANY TREES, TRIMMING, STUMPS AND BRUSH. 11.ALLOW FOR RUNOFF TO ENTER DROP INLETS AND MAINTAIN INLET PROTECTION. 12.COMPLETE SITE CONSTRUCTION WITHIN THE PROJECT LIMITS AND STABILIZE SITE. 13.SKIMMER BASIN MUST REMAIN IN PLACE UNTIL ALL CONTRIBUTING DRAINAGE AREA IS STABILIZED AND APPROVAL IS RECEIVED FROM LINCOLN COUNTY NATURAL RESOURCES TO CLOSE THE SKIMMER BASIN. 14.MAINTAIN AND RECORD SELF INSPECTIONS PER 15A NCAC 04B.0131 OF NCDEQ FOR EACH PHASE OF PROJECT TO ENSURE EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. 15.MAINTAIN STORM WATER INSPECTION LOG PER NPDES PERMIT. 16.EROSION AND SEDIMENTATION CONTROL MEASURES MUST BE INSPECTED AT LEAST ONCE PER 7 CALENDAR DAYS AND WITHIN 24 HOURS OF A RAINFALL EVENT GREATER THAN 0.5 INCHES PER 24 HOUR PERIOD. 17.AFTER THE SITE IS STABILIZED, INSTALL PERMANENT VEGETATION ON THE DISTURBED AREAS AND REMOVE TEMPORARY EROSION CONTROL DEVICES. SPOT SEED AND MULCH ALL RESULTING BARE AREAS. 18.REQUEST PRE-FINAL INSPECTION FOR "PUNCH LIST" ITEMS. 19.REMOVE ALL EROSION CONTROL DEVICES, SPREADING AND SEEDING ACCUMULATED SEDIMENT. REMOVAL OF EROSION CONTROL MEASURES SHALL BE APPROVED BY EROSION CONTROL INSPECTOR. 20.REQUEST FINAL INSPECTION FROM LINCOLN COUNTY NATURAL RESOURCES. 21.ONCE THE SITE IS COMPLETE AND STABILIZED WITH THE ESTABLISHMENT OF PERMANENT GROUNDCOVER AND APPROVAL FROM LINCOLN COUNTY NATURAL RESOURCES HAS BEEN GIVEN TO CLOSE OUT THE EROSION AND SEDIMENT CONTROL PLAN, THE PERMITTEES SHALL VISIT DEQ.NC.GOV/NCG01 TO SUBMIT AN ELECTRONIC NOTICE OF TERMINATION (E-NOT). A $100 ANNUAL GENERAL PERMIT FEE WILL BE CHARGED UNTIL THE E-NOT HAS BEEN FILLED OUT. EROSION CONTROL NOTES: 1.ALL PRACTICES ARE REFERENCED TO NCDEQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. IT IS THE CONTRACTORS RESPONSIBILITY TO HAVE THE LATEST VERSION. 2.ALL DISTURBED AREAS SHALL BE STABILIZED PER THE TABLE ON THIS SHEET. 3.ANY BORROW OR WASTE MATERIAL SHALL BE TAKEN / PLACED ON A SITE THAT HAS AN ACTIVE APPROVED GRADING PERMIT. IF THIS IS NOT OBTAINABLE, THEN CONTRACTOR MAY SUBMIT PLAN FOR APPROVAL TO NCDEQ PRIOR TO ANY OFF-SITE BORROW / WASTE AREAS BEING DENUDED AND ANY GRADING OPERATIONS STARTED ON THIS SITE. 4.ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THIS PLAN IS IN VIOLATION OF THE NCDEQ EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 5.GRADING MORE THAN ONE (1) ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF THE NCDEQ EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 6.SLOPES SHALL BE GRADED NO STEEPER THAN 2.5:1. FILL SLOPES GREATER THAN 10' REQUIRE ADEQUATE TERRACING. 7.DETERMINATION OF AREA AND CALCULATIONS FOR ACREAGE OF LAND BEING DISTURBED: AUTOCAD CIVIL 3D. 8.SOILS:CeB2 - CECIL SANDY CLAY LOAM, 2 TO 8 PERCENT SLOPES WyC - PACOLET SANDY CLAY LOAM, 8 TO 15 PERCENT SLOPES PeC2 - WYNOTT-WINNSBORO-ROWAN COMPLEX, 8 TO 15 PERCENT SLOPES 9.RECEIVING WATERSHED:KILLIAN CREEK MAINTENANCE OF EROSION CONTROL MEASURES: 1.INSPECT SEDIMENT FENCE PERIODICALLY & AFTER EACH RAINFALL EVENT & REPLACE DAMAGED FABRIC IMMEDIATELY. REMOVE EXCESS SEDIMENT DEPOSITS PROMPTLY. UPON STABILIZATION & APPROVAL OF DRAINAGE AREA, REMOVE FENCING & RESTORE AREA TO GRADE. 2.SEDIMENT SHALL BE REMOVED FROM BEHIND THE SILT FENCE WHEN THE SEDIMENT DEPTH EQUALS 0.5 FEET DEPTH AT THE FENCE. SILT FENCE WILL BE REPAIRED OR REPLACED AS NECESSARY TO ENSURE EFFECTIVENESS. 3.INSPECT INLET AND PIPE PROTECTION AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT RAINFALL (1 2 INCH OR GREATER). CLEAR THE MESH WIRE OF ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. TAKE CARE NOT TO DAMAGE OR UNDERCUT THE WIRE MESH DURING SEDIMENT REMOVAL. REPLACE STONE AS NEEDED. 4.INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1 2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. CLEAN OUT SEDIMENT, STRAW, LIMBS, OR OTHER DEBRIS THAT COULD CLOG THE CHANNEL WHEN NEEDED. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE WADDLE AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL DAMAGE IMMEDIATELY. ADD STONES TO DAMS AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION. 5.INSPECT TEMPORARY SEEDED AREAS WITHIN 6 WEEKS OF PLANTING TO VERIFY ADEQUATE STANDS. FERTILIZE, RESEED & REMULCH DAMAGED & SPARSE AREAS IMMEDIATELY. TACK MULCH & REPLACE AS NECESSARY. CONTINUE INSPECTIONS UNTIL VEGETATION IS WELL ESTABLISHED. 6.INSPECT RIPRAP OUTLET STRUCTURES AFTER HEAVY RAINS FOR EROSION AROUND APRON & FOR STONE DISPLACEMENT. REPAIR IMMEDIATELY WITH SIMILAR SIZED STONES. 7.INSPECT PERMANENT SEEDED AREAS FOR EROSION OR DIE-OUT FOR 1 YEAR. REPAIR DAMAGED, BARE, OR SPARSE AREAS BY FILLING GULLIES, REFERTILIZING, RESEEDING, MULCHING & TACKING. 8.THE CONTRACTOR IS RESPONSIBLE FOR THE PERFORMANCE OF THE EROSION CONTROL MEASURES AND SHALL ADD ADDITIONAL MEASURES AS NEEDED TO COMPLY WITH THE NORTH CAROLINA SEDIMENT CONTROL LAW AND LOCAL AUTHORITIES. 9.NO ADJUSTMENTS WILL BE MADE TO THE CONTRACT PRICE FOR MAINTENANCE OF EROSION CONTROL MEASURES. JM MK SC SC Sennebogen Real Estate LLC SLT Enterprises, LLC Curtis Phillips Pamela W. Phillips Mishelle S. Dean Catherleen H. Sherrill SE N N E B O G E N T R A I L HEAVY DUTY PAVEMENT OVERLAY HEAVY DUTY PAVEMENT OVERLAY SD SD SDSD SD 740 745 750 755 7 4 0 7 4 5 7 5 0 740 745 750 755 73 0 73 5 74 0 74 0 7 3 9 73 9 739 739 74 4 743 743 74 4 OS-2FES-1 37.7 LF 24" CMP @ 2.65% SD SD L O D L O D LOD L O D L O D L O D LO D L O D LOD LOD LOD LOD LOD LOD L O D L O D L O D L OD LOD LOD L O D L O D LOD LOD L O D L O D L O D LOD L O D L O D L O D LOD L O D LOD LOD LO D LOD LOD LOD L OD LOD LOD LOD LOD LOD LOD LOD LOD LOD L O D LODLOD L O D LOD LOD LODLODLODLODLOD LOD LOD LODLOD L O D LODLODLODLOD LO D LO D LO D LO D LO D LO D LOD LOD LOD L O D PROPOSED SLOPE DRAIN, SD-1 15" HDPE TEMPORARY 2:1 SLOPES TO BE SEEDED AND MATTED WITH NAG SC150 OR EQUAL DA-EC-1 AREA=326,900 SF (7.50 AC) C=0.74 TEMPORARY SILT FENCE (TYP) SEE DETAIL PROPOSED LIMITS OF DISTURBANCE = 7.41 AC TEMPORARY CONCRETE WASHOUT (SEE DETAIL) TEMPORARY MINIMUM 25' W X 50' L CONSTRUCTION ENTRANCE (SEE DETAIL) TEMPORARY DIVERSION DITCH (TYP) SEE DETAIL TEMPORARY ROCK CHECK DAM (TYP) SEE DETAIL TEMPORARY SILT FENCE OUTLET (TYP) SEE DETAIL 24" BYPASS PIPE PROPOSED POROUS BAFFLES (TYP) SEE DETAIL TEMPORARY 2.5:1 EMBANKMENT SLOPES TO BE SEEDED AND MATTED TOP OF EMBANKMENT ELEV = 744.00 PROPOSED TEMPORARY SEDIMENT BASIN SKIMMER PIPE DIA: 2.00 IN SKIMMER ORIFICE DIA: 1.25 IN SKIMMER INVERT = 740.0 SKIMMER BASIN BOTTOM = 739.0 SEE DETAIL PROPOSED SLOPE DRAIN, SD-5 15" HDPE PROPOSED SLOPE DRAIN, SD-4 15" HDPE PROPOSED SLOPE DRAIN, SD-3 15" HDPE PROPOSED SLOPE DRAIN, SD-2 15" HDPE TEMPORARY ROCK DAM SEE DETAIL TEMPORARY ROCK DAM SEE DETAIL TEMPORARY SILT FENCE OUTLET (TYP) SEE DETAIL MH-504 FES-1 (TEMPORARY) MH-506 MH-507 MH-508 MH-505 DRAINAGE AREA BOUNDARY (TYP) TEMPORARY STOCKPILE/SPOILS AREA (TYP) TEMPORARY ROCK WEIR SILT FENCE OUTLET (TYP) SEE DETAIL OW N E R / D E V E L O P E R DRAWN BY: CHECKED BY: PROJECT NO: DRAWING TITLE: DRAWING NUMBER: SEAL: DATE:NO:REVISION DESC. DRAWING REVISIONS Copyright 2024 CES Group Engineers, LLP PR O J E C T D E S C R I P T I O N : REVISED BY: ISSUED BY: CES Group Engineers, LLP 3525 Whitehall Park Drive, Suite 150 Charlotte, NC 28273 PH: 704.489.1500 www.ces-group.net ENGINEERS PLANNERS SURVEYORS SCIENTISTS CO. SEAL: ISSUE DATE: 1 - - - - - - DESIGN REVISIONS 4/3/2024 - - - - - - - - - - - - 02/22/2024 8189.0823 SE N N E B O G E N E X P A N S I O N S. C . H O N D R O S & A S S O C I A T E S , I N C . P. O . B O X 2 2 0 4 5 6 , C H A R L O T T E , N C 2 8 2 2 2 - 0 4 5 6 19 5 7 S E N N E B O G E N T R A I L ST A N L E Y , N C 2 8 1 6 4 S: \ E N G I N E E R \ P R O J E C T S \ 8 1 8 9 . 0 8 2 3 C D - S E N N E B O G E N E X P A N S I O N \ D R A W I N G S \ S H E E T S \ S - E C - P H 2 . D W G , Ap r i l 8 , 2 0 2 4 SC O L D R E N 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 40 20 40 8040 C7.1 EROSION CONTROL PLAN PHASE 2 R Know what's below. Call before you dig. NORTH CAROLINA ONE-CALL CENTER INC. DIAL 811 or 1-800-632-4949 2 BUSINESS DAYS BEFORE DIGGING www.ncocc.org EROSION CONTROL LEGEND TEMPORARY HARDWARE CLOTH AND GRAVEL INLET PROTECTION TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY CONCRETE WASHOUT TEMPORARY SILT SACK INLET PROTECTION TEMPORARY CURB INLET FILTER TEMPORARY ROCK CHECK DAM TEMPORARY SILT FENCE OUTLET TEMPORARY ROCK PIPE INLET PROTECTION LOD TEMPORARY SILT FENCE LIMITS OF DISTURBANCE TEMPORARY BAFFLES TEMPORARY ROCK WEIR SILT FENCE OUTLET TEMPORARY DIVERSION CONSTRUCTION SEQUENCE (PHASE 2): 1.THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL PHASE 1 EROSION CONTROL DEVICES AND STRUCTURES. 2.COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF PHASE 1 EROSION CONTROL MEASURES. 3.FOR PHASED EROSION CONTROL PLANS, CONTRACTOR SHALL MEET WITH EROSION CONTROL INSPECTOR PRIOR TO COMMENCING WITH EACH PHASE OF EROSION CONTROL MEASURES. 4.INSTALL ADDITIONAL SILT FENCE, SILT FENCE OUTLETS, CHECK DAMS, DIVERSION DITCHES, SKIMMER SEDIMENT BASIN AND OTHER MEASURES AS SHOWN ON PLANS. 5.ALLOW FOR RUNOFF TO ENTER DROP INLETS AND MAINTAIN INLET PROTECTION. 6.COMPLETE SITE CONSTRUCTION WITHIN THE PROJECT LIMITS AND STABILIZE SITE. 7.SKIMMER BASIN MUST REMAIN IN PLACE UNTIL ALL CONTRIBUTING DRAINAGE AREA IS STABILIZED AND APPROVAL IS RECEIVED FROM LINCOLN COUNTY NATURAL RESOURCES TO CLOSE THE SKIMMER BASIN. 8.MAINTAIN AND RECORD SELF INSPECTIONS PER 15A NCAC 04B.0131 OF NCDEQ FOR EACH PHASE OF PROJECT TO ENSURE EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. 9.MAINTAIN STORM WATER INSPECTION LOG PER NPDES PERMIT. 10.EROSION AND SEDIMENTATION CONTROL MEASURES MUST BE INSPECTED AT LEAST ONCE PER 7 CALENDAR DAYS AND WITHIN 24 HOURS OF A RAINFALL EVENT GREATER THAN 0.5 INCHES PER 24 HOUR PERIOD. 11.AFTER THE SITE IS STABILIZED, INSTALL PERMANENT VEGETATION ON THE DISTURBED AREAS AND REMOVE TEMPORARY EROSION CONTROL DEVICES. SPOT SEED AND MULCH ALL RESULTING BARE AREAS. 12.REQUEST PRE-FINAL INSPECTION FOR "PUNCH LIST" ITEMS. 13.REMOVE ALL EROSION CONTROL DEVICES, SPREADING AND SEEDING ACCUMULATED SEDIMENT. REMOVAL OF EROSION CONTROL MEASURES SHALL BE APPROVED BY EROSION CONTROL INSPECTOR. 14.REQUEST FINAL INSPECTION FROM LINCOLN COUNTY NATURAL RESOURCES. 15.ONCE THE SITE IS COMPLETE AND STABILIZED WITH THE ESTABLISHMENT OF PERMANENT GROUNDCOVER AND APPROVAL FROM LINCOLN COUNTY NATURAL RESOURCES HAS BEEN GIVEN TO CLOSE OUT THE EROSION AND SEDIMENT CONTROL PLAN, THE PERMITTEES SHALL VISIT DEQ.NC.GOV/NCG01 TO SUBMIT AN ELECTRONIC NOTICE OF TERMINATION (E-NOT). A $100 ANNUAL GENERAL PERMIT FEE WILL BE CHARGED UNTIL THE E-NOT HAS BEEN FILLED OUT. JM MK SC SC Sennebogen Real Estate LLC SLT Enterprises, LLC Curtis Phillips Pamela W. Phillips Mishelle S. Dean Catherleen H. Sherrill SE N N E B O G E N T R A I L HEAVY DUTY PAVEMENT OVERLAY HEAVY DUTY PAVEMENT OVERLAY 1111 11 20 ' C L A S S C B U F F E R W I T H SC R E E N I N G F E N C E 20' CLASS C BUFFER WITH WALL 40' CLASS C BUFFER 50' SIDE SETBACK (ABUTTING RE S I D E N T I A L ) 20' SIDE SETBACK (INTERIOR) 50 ' S I D E S E T B A C K (A B U T T I N G R E S I D E N T I A L ) 20 ' S I D E S E T B A C K ( I N T E R I O R ) 20 ' S I D E S E T B A C K ( I N T E R I O R ) 20' SIDE SETBACK (INTERIOR) 1111 73 0 73 5 74 0 74 0 740 74 5 74 5 7 5 0 75 0 7 5 0 75 0 7 5 0 75 0 75 5 7 5 5 755 76 0 76 0 760 760 76 5 76 5 77 0 77 0 755 760 76 5 77 0 756 757 758 75 9 761 76 2 76 3 76 4 76 6 76 7 76 8 76 9 77 1 77 2 77 3 77 4 L OD L O D LOD LOD LOD L O D L O D L O D L O D L O D L O D LOD L O D L O D L O D L O D LO D LOD LOD LOD LOD L OD LOD L O D L O D L O D L O D LOD LOD L O D L O D L O D LOD LOD L O D L O D L O D LO D L O D L O D LOD L O D L O D LOD LOD LO D LO D LOD LOD LOD L OD LOD LOD LOD LOD LOD LOD LOD LOD L O D LODLOD L OD LOD LODLODLODLODLODLOD LOD LOD LODLOD L O D LODLODLODLODLODLODLOD LOD LOD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SDSD TEMPORARY SILT FENCE (TYP) SEE DETAIL PROPOSED LIMITS OF DISTURBANCE = 8.01 AC TEMPORARY CONCRETE WASHOUT (SEE DETAIL) TEMPORARY MINIMUM 25' W X 50' L CONSTRUCTION ENTRANCE (SEE DETAIL) PROPOSED BYPASS PIPE SYSTEM TEMPORARY HARDWARE CLOTH AND GRAVEL INLET PROTECTION (SEE DETAIL) TEMPORARY SILT SACK INLET PROTECTION (SEE DETAIL) DA-EC-1 AREA=406,550 SF (9.33 AC) C=0.75 PROPOSED POROUS BAFFLES (TYP) SEE DETAIL PROPOSED 3:1 EMBANKMENT SLOPES TO BE SEEDED AND MATTED TOP OF EMBANKMENT ELEV = 743.00 PROPOSED TEMPORARY SEDIMENT BASIN SKIMMER PIPE DIA: 2.50 IN SKIMMER ORIFICE DIA: 1.75 IN SKIMMER INVERT = 740.00 SKIMMER BASIN BOTTOM = 739.00 SEE DETAIL TEMPORARY ROCK DAM SEE DETAIL FES-500 MH-501 MH-502 MH-503 OS-600 FES-100 YI-101 MH-504 MH-102 MH-505 CB-103 MH-104 MH-506 CB-301 CB-300 MH-507 MH-508 DI-400 DI-401 DI-402 DI-403 DI-113 DI-112 DI-111 DI-110 DI-109 DI-108 DI-107 DI-106 DI-105 TEMPORARY SILT FENCE OUTLET (TYP) SEE DETAIL PROPOSED 20' WIDE EMERGENCY SPILLWAY WITH CLASS B RIPRAP SEE DETAIL PROPOSED 3:1 SLOPES TO BE SEEDED AND MATTED WITH NORTH AMERICAN GREEN SC150 OR APPROVED EQUAL PROPOSED 3:1 SLOPES TO BE SEEDED AND MATTED WITH NORTH AMERICAN GREEN SC150 OR APPROVED EQUAL TEMPORARY STOCKPILE/SPOILS AREA (TYP) OW N E R / D E V E L O P E R DRAWN BY: CHECKED BY: PROJECT NO: DRAWING TITLE: DRAWING NUMBER: SEAL: DATE:NO:REVISION DESC. DRAWING REVISIONS Copyright 2024 CES Group Engineers, LLP PR O J E C T D E S C R I P T I O N : REVISED BY: ISSUED BY: CES Group Engineers, LLP 3525 Whitehall Park Drive, Suite 150 Charlotte, NC 28273 PH: 704.489.1500 www.ces-group.net ENGINEERS PLANNERS SURVEYORS SCIENTISTS CO. SEAL: ISSUE DATE: 1 - - - - - - DESIGN REVISIONS 4/3/2024 - - - - - - - - - - - - 02/22/2024 8189.0823 SE N N E B O G E N E X P A N S I O N S. C . H O N D R O S & A S S O C I A T E S , I N C . P. O . B O X 2 2 0 4 5 6 , C H A R L O T T E , N C 2 8 2 2 2 - 0 4 5 6 19 5 7 S E N N E B O G E N T R A I L ST A N L E Y , N C 2 8 1 6 4 S: \ E N G I N E E R \ P R O J E C T S \ 8 1 8 9 . 0 8 2 3 C D - S E N N E B O G E N E X P A N S I O N \ D R A W I N G S \ S H E E T S \ S - E C - P H 3 . D W G , Ap r i l 8 , 2 0 2 4 SC O L D R E N 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 40 20 40 8040 C7.2 EROSION CONTROL PLAN PHASE 3 R Know what's below. Call before you dig. NORTH CAROLINA ONE-CALL CENTER INC. DIAL 811 or 1-800-632-4949 2 BUSINESS DAYS BEFORE DIGGING www.ncocc.org EROSION CONTROL LEGEND TEMPORARY HARDWARE CLOTH AND GRAVEL INLET PROTECTION TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY CONCRETE WASHOUT TEMPORARY SILT SACK INLET PROTECTION TEMPORARY CURB INLET FILTER TEMPORARY ROCK CHECK DAM TEMPORARY SILT FENCE OUTLET TEMPORARY ROCK PIPE INLET PROTECTION LOD TEMPORARY SILT FENCE LIMITS OF DISTURBANCE TEMPORARY BAFFLES TEMPORARY ROCK SEDIMENT DIKE TEMPORARY DIVERSION CONSTRUCTION SEQUENCE (PHASE 3): 1.THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL PHASE 2 EROSION CONTROL DEVICES AND STRUCTURES. 2.COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF PHASE 2 EROSION CONTROL MEASURES. 3.FOR PHASED EROSION CONTROL PLANS, CONTRACTOR SHALL MEET WITH EROSION CONTROL INSPECTOR PRIOR TO COMMENCING WITH EACH PHASE OF EROSION CONTROL MEASURES. 4.INSTALL ANY ADDITIONAL SILT FENCE, SILT FENCE OUTLETS, INLET PROTECTION SKIMMER SEDIMENT BASIN AND OTHER MEASURES AS SHOWN ON PLANS. 5.ALLOW FOR RUNOFF TO ENTER DROP INLETS AND MAINTAIN INLET PROTECTION. 6.COMPLETE SITE CONSTRUCTION WITHIN THE PROJECT LIMITS AND STABILIZE SITE. 7.SKIMMER SEDIMENT BASIN MUST REMAIN IN PLACE UNTIL ALL CONTRIBUTING DRAINAGE AREA IS STABILIZED AND APPROVAL IS RECEIVED FROM LINCOLN COUNTY NATURAL RESOURCES TO CLOSE THE SKIMMER SEDIMENT BASIN. 8.MAINTAIN AND RECORD SELF INSPECTIONS PER 15A NCAC 04B.0131 OF NCDEQ FOR EACH PHASE OF PROJECT TO ENSURE EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. 9.MAINTAIN STORM WATER INSPECTION LOG PER NPDES PERMIT. 10.EROSION AND SEDIMENTATION CONTROL MEASURES MUST BE INSPECTED AT LEAST ONCE PER 7 CALENDAR DAYS AND WITHIN 24 HOURS OF A RAINFALL EVENT GREATER THAN 0.5 INCHES PER 24 HOUR PERIOD. 11.AFTER THE SITE IS STABILIZED, INSTALL PERMANENT VEGETATION ON THE DISTURBED AREAS AND REMOVE TEMPORARY EROSION CONTROL DEVICES. SPOT SEED AND MULCH ALL RESULTING BARE AREAS. 12.REQUEST PRE-FINAL INSPECTION FOR "PUNCH LIST" ITEMS. 13.REMOVE ALL EROSION CONTROL DEVICES, SPREADING AND SEEDING ACCUMULATED SEDIMENT. REMOVAL OF EROSION CONTROL MEASURES SHALL BE APPROVED BY EROSION CONTROL INSPECTOR. 14.REQUEST FINAL INSPECTION FROM LINCOLN COUNTY NATURAL RESOURCES. 15.ONCE THE SITE IS COMPLETE AND STABILIZED WITH THE ESTABLISHMENT OF PERMANENT GROUNDCOVER AND APPROVAL FROM LINCOLN COUNTY NATURAL RESOURCES HAS BEEN GIVEN TO CLOSE OUT THE EROSION AND SEDIMENT CONTROL PLAN, THE PERMITTEES SHALL VISIT DEQ.NC.GOV/NCG01 TO SUBMIT AN ELECTRONIC NOTICE OF TERMINATION (E-NOT). A $100 ANNUAL GENERAL PERMIT FEE WILL BE CHARGED UNTIL THE E-NOT HAS BEEN FILLED OUT. JM MK SC SC 5 0 ' S I D E S E T B A C K ( A B U T T I N G R E S I D E N T I A L ) SD S D SD SD SD SD SD SD G 751.22 G 751.09 MH-504 FES-500 740 745 739 741 742 743 744 746 747 74 0 73 9 74 1 74 1 74 2 74 2 74 3 74 3 730 73 5 74 0 735 740 745 PROPOSED SAND FILTER AREA TOP OF EMBANKMENT = 743.00 EMERGENCY SPILLWAY = 741.50 TOP OF RISER = 741.25 TOP OF SAND LAYER = 739.00 SAND FILTER FILTRATION AREA = 1,566 SF TOTAL SAND FILTER VOLUME = 61,391 CF SEE DETAILS THIS SHEET PROPOSED RIPRAP BERM TOP ELEVATION = 741.00 PROPOSED 10' EMBANKMENT TOP WIDTH ELEVATION = 746.00 PROPOSED FOREBAY BOTTOM ELEVATION = 739.00 PROPOSED 20' WIDE CLASS B RIPRAP SPILLWAY ON GEOTEXTILE FABRIC ELEVATION = 741.50 PROPOSED CLASS B RIPRAP APRON ON GEOTEXTILE FABRIC PROPOSED 240 LF PERFORATED 6" SCH. 40 PVC UNDERDRAIN @ MIN 0.5% SLOPE PROPOSED 10 LF SOLID 6" SCH. 40 PVC UNDERDRAIN @ MIN 0.5% SLOPE WITH 45 DEG BEND PROPOSED 4'X4' INSIDE DIMENSIONS CONCRETE RISER STRUCTURE PROPOSED 12' SCM ACCESS DRIVE PROPOSED STORMWATER MAINTENANCE EASEMENT PROPOSED DISCHARGE VELOCITY FOR 10-YR STORM IS 5.78 FT/S PROPOSED CLASS B RIPRAP APRON ON GEOTEXTILE FABRIC EXISTING STREAM BUFFER EXISTING STREAM PROPOSED RETAINING WALL. SEE SITE AND GRADING PLAN SHEETS FOR MORE INFORMATION 29 ' 54' 17' 14 1 . 5 9 ' 30' 33 ' 7.5' 19.5' 17 ' 2 2 . 5 ' 7 . 5 ' 20' 20' MH-501 MH-502 MH-503 OS-600 YI-201 YI-200 YI-101 FES-100 YI-202 20' S: \ E N G I N E E R \ P R O J E C T S \ 8 1 8 9 . 0 8 2 3 C D - S E N N E B O G E N E X P A N S I O N \ D R A W I N G S \ S H E E T S \ 8 1 8 9 - S - S C M P L A N A N D D E T A I L S . D W G , Ap r i l 8 , 2 0 2 4 SC O L D R E N 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 40 20 40 8040 C8.0 SCM PLAN AND DETAILS JM JT SC JM R Know what's below. Call before you dig. NORTH CAROLINA ONE-CALL CENTER INC. DIAL 811 or 1-800-632-4949 2 BUSINESS DAYS BEFORE DIGGING www.ncocc.org OW N E R / D E V E L O P E R DRAWN BY: CHECKED BY: PROJECT NO: DRAWING TITLE: DRAWING NUMBER: SEAL: DATE:NO:REVISION DESC. DRAWING REVISIONS Copyright 2024 CES Group Engineers, LLP PR O J E C T D E S C R I P T I O N : REVISED BY: ISSUED BY: CES Group Engineers, LLP 3525 Whitehall Park Drive, Suite 150 Charlotte, NC 28273 PH: 704.489.1500 www.ces-group.net ENGINEERS PLANNERS SURVEYORS SCIENTISTS CO. SEAL: ISSUE DATE: 1 - - - - - - DESIGN REVISIONS 4/3/2024 - - - - - - - - - - - - 02/22/2024 8189.0823 SE N N E B O G E N E X P A N S I O N S. C . H O N D R O S & A S S O C I A T E S , I N C . P. O . B O X 2 2 0 4 5 6 , C H A R L O T T E , N C 2 8 2 2 2 - 0 4 5 6 19 5 7 S E N N E B O G E N T R A I L ST A N L E Y , N C 2 8 1 6 4 BW 874.50 PROPOSED LEGEND 722 720 HP 874.50 MATCH EX ±874.50 SD SD G 874.50 BC 874.50 TC 874.50 TW 874.50 TC 874.50 BC 874.00 GRADE SPOT ELEVATION BOTTOM OF CURB SPOT ELEVATION TOP OF CURB SPOT ELEVATION TOP/BOTTOM OF CURB SPOT ELEVATION TOP OF WALL SPOT ELEVATION BOTTOM OF WALL SPOT ELEVATION HIGH POINT SPOT ELEVATION MATCH EXISTING SPOT ELEVATION PROPERTY LINE RIGHT-OF-WAY LINE MINOR CONTOUR MAJOR CONTOUR STORM PIPE CATCH BASIN STORM MANHOLE OPEN THROAT CATCH BASIN FLARED END SECTION 30" RCP OUTFLOW PIPE INV OUT = 737.00 INSTALL DRAINAGE STRUCTURE STEPS PER NCDOT STD# 840.66 RISER STRUCTURE NOT TO SCALE 0.5'4.0'0.5'1.0'1.0' 1. 2 5 ' TOP OF CONCRETE RISER INV = 741.25 RISER STRUCTURE INVERT= 737.00 ANTI-FLOATATION CONCRETE 7'X7'X1.25' 4. 2 5 ' PROVIDE REMOVABLE ACCESS HATCH IN TRASH RACK. TRASH RACK HATCH SHALL BE LOCKABLE 4' 4'X4' INSIDE DIMENSIONS 6" WALL THICKNESS TRASH RACK SEE DETAIL 6" SCH. 40 PVC PIPE FROM UNDERDRAIN SYSTEM INV OUT = 737.00 TOP OF SAND FILTER MEDIA = 738.75 TOP OF 3" GRAVEL LAYER = 739.00 24"W X 6"H ORIFICE INV = 740.75 24"W X 8"H ORIFICE INV = 739.50 2. 0 ' TOP OF CHOKING STONE= 737.75 8" 6" 24" 24" TOP OF NO. 57 GRAVEL= 737.58 YI-101 TO FES-500 (SAND FILTER PROFILE -0+25 TO 4+00) 726 727 728 729 730 731 732 733 734 735 736 737 738 739 740 741 742 743 744 745 746 747 748 749 750 751 752 753 754 725 726 727 728 729 730 731 732 733 734 735 736 737 738 739 740 741 742 743 744 745 746 747 748 749 750 751 752 753 754 -0+250+001+002+003+004+00 0+001+002+003+004+00 OS-600 30" RCP MH-502 30" RCP MH-501 30" RCP FES-500 PROPOSED GRADE EXISTING GRADE PROPOSED TOP OF EMBANKMENT = 746.00 PROPOSED EMERGENCY SPILLWAY = 744.50 SPILLWAY DISCHARGES AT DIFFERENT LOCATION FROM PIPE SYSTEM. SHOWN FOR ELEVATION REFERENCE ONLY. PROPOSED 3" LAYER OF NO. 57 STONE PROPOSED 10" LAYER NO. 57 STONE PROPOSED MINIMUM 12" LAYER OF ASTM C-33 SAND PROPOSED 44 LF PERFORATED 6" SCH. 40 PVC PIPE @ 0.5% (5 RUNS) PROPOSED 10 LF SOLID WALL 6" SCH. 40 PVC PIPE @ 0.5% PROPOSED RIPRAP FOREBAY BERM FES-100 36" HD P E YI-101 100-YR ELEV = 741.99 50-YR ELEV = 741.87 25-YR ELEV = 741.71 10-YR ELEV = 741.41 2-YR ELEV = 740.45 1-YR ELEV = 740.09 PROPOSED 12" PERFORATED CMP STAND PIPE WITH 12" SOLID WALL CMP THROUGH BERM PROPOSED CLASS B RIPRAP APRON PROPOSED GRADE PROPOSED 2" LAYER CHOKING STONE S: \ E N G I N E E R \ P R O J E C T S \ 8 1 8 9 . 0 8 2 3 C D - S E N N E B O G E N E X P A N S I O N \ D R A W I N G S \ S H E E T S \ 8 1 8 9 - S - S C M P L A N A N D D E T A I L S . D W G , Ap r i l 8 , 2 0 2 4 SC O L D R E N 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 40 20 40 8040 C8.1 SCM PLAN AND DETAILS JM JT SC JM R Know what's below. Call before you dig. NORTH CAROLINA ONE-CALL CENTER INC. DIAL 811 or 1-800-632-4949 2 BUSINESS DAYS BEFORE DIGGING www.ncocc.org OW N E R / D E V E L O P E R DRAWN BY: CHECKED BY: PROJECT NO: DRAWING TITLE: DRAWING NUMBER: SEAL: DATE:NO:REVISION DESC. DRAWING REVISIONS Copyright 2024 CES Group Engineers, LLP PR O J E C T D E S C R I P T I O N : REVISED BY: ISSUED BY: CES Group Engineers, LLP 3525 Whitehall Park Drive, Suite 150 Charlotte, NC 28273 PH: 704.489.1500 www.ces-group.net ENGINEERS PLANNERS SURVEYORS SCIENTISTS CO. SEAL: ISSUE DATE: 1 - - - - - - DESIGN REVISIONS 4/3/2024 - - - - - - - - - - - - 02/22/2024 8189.0823 SE N N E B O G E N E X P A N S I O N S. C . H O N D R O S & A S S O C I A T E S , I N C . P. O . B O X 2 2 0 4 5 6 , C H A R L O T T E , N C 2 8 2 2 2 - 0 4 5 6 19 5 7 S E N N E B O G E N T R A I L ST A N L E Y , N C 2 8 1 6 4 TOP OF GRAVEL LAYER = 739.00 TOP OF SAND LAYER = 738.75 TOP OF CHOKING STONE = 737.75 3" NO. 57 GRAVEL LAYER 6" PERFORATED SCHEDULE 40 PVC UNDERDRAIN PIPES @ MINIMUM 0.5% SLOPE.PERFORATIONS SHALL BE PER AASHTO M278. SAND FILTER SECTION NOT TO SCALE NON WOVEN GEOTEXTILE FILTER FABRIC MIN. 12" CLEAN WASHED ASTM C33 SAND FILTER LAYER ABOVE TOP OF UNDERDRAIN BOTTOM OF NO. 57 STONE LAYER = 737.00 TOP OF NO. 57 GRAVEL = 737.58 SAND FILTER ELEVATIONS BOTTOM OF NO. 57 STONE = 737.00 TOP OF NO. 57 STONE = 737.58 TOP OF CHOKING STONE = 737.75 TOP OF SAND = 738.75 TOP OF SURFACE STONE = 739.00 TOP OF RISER = 741.25 EMERGENCY SPILLWAY = 741.50 TOP OF EMBANKMENT = 743.00 1-YR WSEL = 740.09 2-YR WSEL = 740.45 10-YR WSEL = 741.41 25-YR WSEL = 741.71 50-YR WSEL = 741.87 100-YR WSEL = 741.99 1111 11 20 ' C L A S S C B U F F E R W I T H SC R E E N I N G F E N C E 20' CLASS C BUFFER WITH WALL 40' CLASS C BUFFER 50' SIDE SETBACK (ABUTTING RE S I D E N T I A L ) 20' SIDE SETBACK (INTERIOR) 50 ' S I D E S E T B A C K (A B U T T I N G R E S I D E N T I A L ) 20 ' S I D E S E T B A C K ( I N T E R I O R ) 20 ' S I D E S E T B A C K ( I N T E R I O R ) 20' SIDE SETBACK (INTERIOR) 1111 Sennebogen Real Estate LLC SLT Enterprises, LLC Curtis Phillips Pamela W. Phillips Mishelle S. Dean Catherleen H. Sherrill SE N N E B O G E N T R A I L HEAVY DUTY PAVEMENT OVERLAY HEAVY DUTY PAVEMENT OVERLAY 0+00 1+00 2+00 3+00 4+ 0 0 5+ 0 0 6+ 0 0 7+ 0 0 7+ 2 6 . 3 9 0+ 0 0 1+ 0 0 1+ 0 5 . 9 6 SD SD SD SD 0+00 1+00 2+00 3+ 0 0 4+ 0 0 5+ 0 0 6+ 0 0 6+ 1 5 . 9 6 SD SD 0+ 0 0 0+ 5 4 . 1 4 0 + 0 0 1 + 0 0 2+ 0 0 3+00 4+00 5+00 6+00 7+00 7+34.77SD SD SD SD SD SD SD SD SD 0+ 0 0 1+ 0 0 2+ 0 0 3+ 0 0 3+ 8 9 ALIGNMENT=STORM 400 STATION=5+12.83 OFFSET=1.05L NORTHING=614160.40 EASTING=1399229.90 SDSD 755 760 765 770 7 3 0 730 735 740 74 0 740 745 74 5 745 7 5 0 7 5 0 75 0 75 0 750 750 75 0 75 0 755 75 5 75 5 760 76 0 76 0 76 5 76 5 77 0 77 0 770755 76 0 75 3 754 756 757 758 75 9 76 5 77 0 76 6 76 7 76 8 76 9 770775 8''F SS SS SS 2''W DA-403 AREA= 21,975.17 SF (0.50 AC) C= 0.90 DA-402 AREA= 21,228.94 SF (0.49 AC) C= 0.92 DA-401 AREA= 11,521.60 SF (0.26 AC) C= 0.85 DA-400 AREA= 31,957.02 SF (0.73 AC) C= 0.78 DA-113 AREA= 5,798.79 SF (0.13 AC) C= 0.85 DA-112 AREA= 6,942.03 SF (0.16 AC) C= 0.92 DA-111 AREA= 6,972.34 SF (0.16 AC) C= 0.92 DA-110 AREA= 7,327.62 SF (0.17 AC) C= 0.92 DA-106 AREA= 6,171.72 SF (0.14 AC) C= 0.92 DA-105 AREA= 10,928.89 SF (0.25 AC) C= 0.78 DA-109 AREA= 6,941.92 SF (0.16 AC) C= 0.92 DA-108 AREA= 4,899.53 SF (0.11 AC) C= 0.92 DA-107 AREA= 4,992.40 SF (0.11 AC) C= 0.92 DA-203 AREA= 25,986.89 SF (0.60 AC) C= 0.71 DA-202 AREA= 25,620.97 SF (0.59 AC) C= 0.88 DA-201 AREA= 24,346.73 SF (0.56 AC) C= 0.88 DA-101 AREA= 30,620.50 SF (0.70 AC) C= 0.81 DA-200 AREA= 24,911.81 SF (0.57 AC) C= 0.88 DA-103 AREA= 10,185.71 SF (0.23 AC) C= 0.92 DA-300 AREA= 8,822.24 SF (0.20 AC) C= 0.92 DA-301 AREA= 20,606.92 SF (0.47 AC) C= 0.92 DA-600 AREA= 26,239.12 SF (0.60 AC) C= 0.60 MH-508 DI-400 MH-507 DI-107 DI-106 DI-105 DI-113 DI-112 DI-111 DI-109 DI-108 DI-110 DI-403 DI-402 DI-401 CB-301 CB-300 MH-506 MH-505 CB-103 YI-203 MH-102 MH-503 MH-504 YI-200 YI-201 YI-202 YI-101 FES-100 OS-600 MH-502 MH-501 FES-500 50 LF 15" HDPE @ 1.00% 50 LF 15" HDPE @ 1.00% 50 LF 18" HDPE @ 1.00% 40 LF 18" HDPE @ 1.00% 81 LF 18" HDPE @ 2.00% 37 LF 18" CLASS IV RCP @ 4.00% 70 LF 30" CLASS IV RCP @ 2.00% 119 LF 18" CLASS IV RCP @ 1.00% 171 LF 18" CLASS IV RCP @ 1.00% 37 LF 24" CLASS IV RCP @ 3.60% 47 LF 24" CLASS IV RCP @ 4.00% 158 LF 24" HDPE @ 2.35% 59 LF 24" CLASS IV RCP @ 5.00% 46 LF 15" CLASS IV RCP @ 3.00% 205 LF 24" CLASS IV RCP @ 3.58% 120 LF 18" CLASS IV RCP @ 1.00% 20 LF 30" RCP @ 2.00% 54 LF 30" RCP @ 1.00% 49 LF 30" RCP @ 5.00% 124 LF 30" HDPE @ 3.47% 206 LF 24" CLASS IV RCP @ 3.60% 52 LF 36" HDPE @ 2.00% 97 LF 15" HDPE @ 1.00% 98 LF 18" HDPE @ 1.00% 99 LF 24" HDPE @ 1.00% 95 LF 24" HDPE @ 1.00% 50 LF 18" HDPE @ 1.00% 29 LF 18" HDPE @ 1.00% 50 LF 18" HDPE @ 1.00%20 LF 30" RCP @ 5.00% 168 LF 24" HDPE @ 4.00% S: \ E N G I N E E R \ P R O J E C T S \ 8 1 8 9 . 0 8 2 3 C D - S E N N E B O G E N E X P A N S I O N \ D R A W I N G S \ S H E E T S \ 8 1 8 9 - S - D R A I N A G E A R E A S . D W G , Ap r i l 8 , 2 0 2 4 SC O L D R E N 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 40 20 40 8040 C8.2 INLET DRAINAGE AREAS JM MK SC SC R Know what's below. Call before you dig. NORTH CAROLINA ONE-CALL CENTER INC. DIAL 811 or 1-800-632-4949 2 BUSINESS DAYS BEFORE DIGGING www.ncocc.org OW N E R / D E V E L O P E R DRAWN BY: CHECKED BY: PROJECT NO: DRAWING TITLE: DRAWING NUMBER: SEAL: DATE:NO:REVISION DESC. DRAWING REVISIONS Copyright 2024 CES Group Engineers, LLP PR O J E C T D E S C R I P T I O N : REVISED BY: ISSUED BY: CES Group Engineers, LLP 3525 Whitehall Park Drive, Suite 150 Charlotte, NC 28273 PH: 704.489.1500 www.ces-group.net ENGINEERS PLANNERS SURVEYORS SCIENTISTS CO. SEAL: ISSUE DATE: 1 - - - - - - DESIGN REVISIONS 4/3/2024 - - - - - - - - - - - - 02/22/2024 8189.0823 SE N N E B O G E N E X P A N S I O N S. C . H O N D R O S & A S S O C I A T E S , I N C . P. O . B O X 2 2 0 4 5 6 , C H A R L O T T E , N C 2 8 2 2 2 - 0 4 5 6 19 5 7 S E N N E B O G E N T R A I L ST A N L E Y , N C 2 8 1 6 4 BW 874.50 PROPOSED LEGEND 722 720 HP 874.50 MATCH EX ±874.50 SD SD G 874.50 BC 874.50 TC 874.50 TW 874.50 TC 874.50 BC 874.00 GRADE SPOT ELEVATION BOTTOM OF CURB SPOT ELEVATION TOP OF CURB SPOT ELEVATION TOP/BOTTOM OF CURB SPOT ELEVATION TOP OF WALL SPOT ELEVATION BOTTOM OF WALL SPOT ELEVATION HIGH POINT SPOT ELEVATION MATCH EXISTING SPOT ELEVATION PROPERTY LINE RIGHT-OF-WAY LINE MINOR CONTOUR MAJOR CONTOUR STORM PIPE CATCH BASIN STORM MANHOLE OPEN THROAT CATCH BASIN FLARED END SECTION S: \ E N G I N E E R \ P R O J E C T S \ 8 1 8 9 . 0 8 2 3 C D - S E N N E B O G E N E X P A N S I O N \ D R A W I N G S \ S H E E T S \ 8 1 8 9 - S - E C D E T A I L S . D W G , Ap r i l 8 , 2 0 2 4 SC O L D R E N OW N E R / D E V E L O P E R DRAWN BY: CHECKED BY: PROJECT NO: DRAWING TITLE: DRAWING NUMBER: SEAL: DATE:NO:REVISION DESC. DRAWING REVISIONS Copyright 2024 CES Group Engineers, LLP PR O J E C T D E S C R I P T I O N : REVISED BY: ISSUED BY: CES Group Engineers, LLP 3525 Whitehall Park Drive, Suite 150 Charlotte, NC 28273 PH: 704.489.1500 www.ces-group.net ENGINEERS PLANNERS SURVEYORS SCIENTISTS CO. SEAL: ISSUE DATE: 1 - - - - - - DESIGN REVISIONS 4/3/2024 - - - - - - - - - - - - 02/22/2024 8189.0823 SE N N E B O G E N E X P A N S I O N S. C . H O N D R O S & A S S O C I A T E S , I N C . P. O . B O X 2 2 0 4 5 6 , C H A R L O T T E , N C 2 8 2 2 2 - 0 4 5 6 19 5 7 S E N N E B O G E N T R A I L ST A N L E Y , N C 2 8 1 6 4 C9.0 EROSION CONTROL DETAILS SEEDING SPECIFICATIONS 3:1 SLOPES OR FLATTER 1.APPLY AGRICULTURAL LIME AT THE RATE OF 90 LBS./L000 S.F. 2.APPLY 10-10-10 COMMERCIAL FERTILIZER AT THE RATE OF 20 LBS/1000 S.F. 3.SEED IN ACCORDANCE WITH THE FOLLOWING SCHEDULE AND APPLICATION RATES: DATE TYPE PLANTING RATE AUGUST 15 - NOVEMBER 1 TALL FESCUE 300 LBS./AC. OR 7 LBS./L000 S.F. *NOVEMBER 1 - MARCH 1 TALL FESCUE 300 LBS./AC. OR 7 LBS./L000 S.F. AND ABRUZZI RYE 25 LBS./AC. OR .5 LB./L000 S.F. MARCH 1 - APRIL 15 TALL FESCUE 300 LBS./AC. OR 7 LBS./1000 S.F. APRIL 15 - JULY 30 HULLED COMMON 30 LBS./AC. OR 1 LB./L000 S. F. BERMUDA GRASS JULY 15 - AUGUST 15 TALL FESCUE AND 300 LBS./AC. OR 7 LBS./1000 S.F. BROWNTOP MILLET 35 LBS./AC. OR 7/8 LB./L000 SF OR SORGHUM SUDAN 30 LBS./AC. OR 3/4 LB./L000 SF HYBRIDS 4.MULCH WITH STRAW APPLIED AT THE RATE OF 1.5 BALES/1000 S.F. *HEAVILY MULCHED DURING JANUARY-MARCH PERIOD. SLOPES GREATER THAN 3:1 TO 2:1 SLOPES 1.APPLY AGRICULTURAL LIME AT THE RATE OF 90 LBS./1000 S.F. 2.APPLY 10-10-10 COMMERCIAL FERTILIZER AT THE RATE OF 20 LBS./1000 S.F. 3.SEED IN ACCORDANCE WITH HE FOLLOWING SCHEDULE AND APPLICATION RATES: DATE TYPE PLANTING RATE MARCH 1 - JUNE 1 SERICEA LESPEDEZA 50 LBS./AC. OR 1.5 LBS./L000 SF MARCH - APRIL ADD TALL FESCUE 50 LBS./AC. OR 3.5 LBS./L000 SF OR MARCH - JUNE ADD WEEPING 5 LBS./AC. OR 1/8 LBS./1000 SF LOVEGRASS JUNE - SEPTEMBER 1 TALL FESCUE AND 60 LBS./AC. OR 1.5 LBS./L000 SF BROWNTOP MILLET 35 LBS./AC. OR 7/8 LBS./1000 SF OR SORGHUM SUDAN 30 LBS./AC. OR 3/4 LBS./1000 SF HYBRIDS SEPTEMBER - MARCH 1 SERICEA LESPEDEZA 70 LBS./AC. OR 3/4 LBS./L000 SF (UNHULLED - UNSCARIFIED) TALL FESCUE OR 150 LBS./AC. OR 3.5 LBS./L000 S.F. MILLET OR SUDAN 20 LBS./AC. OR L/2 LB./L000 S.F. ***TEMPORARY - RESEED SEPTEMBER 1 AT RECOMMENDED RATES. 4.MULCH WITH 3" STRAW APPLIED AT THE RATE OF 50-90 LBS./L000 S.F. AND ANCHOR WITH ASPHALT EMULSION TACK COAT APPLIED AT THE RATE OF 14-28 GALS./L000 S.F. OR 800-1200 GALS./ACRE. SEED BED PREPARATION NOTES: 1.SURFACE WATER CONTROL MEASURES TO BE INSTALLED ACCORDING TO PLAN. 2.AREAS TO BE SEEDED SHALL BE RIPPED AND SPREAD WITH AVAILABLE TOPSOIL 3" DEEP. TOTAL SEEDBED PREPARATION DEPTH SHALL BE 4" TO 6" DEEP. 3.LOOSE ROCKS, ROOTS AND OTHER OBSTRUCTIONS SHALL BE REMOVED FROM THE SURFACE SO THAT THEY WILL NOT INTERFERE WITH ESTABLISHMENT AND MAINTENANCE OF VEGETATION. SURFACE FOR FINAL SEEDBED PREPARATION, AT FINISH GRADES SHOWN, SHALL BE REASONABLY SMOOTH AND UNIFORM. 4.IF NO SOIL TEST IS TAKEN, FERTILIZER AND LIME TO BE ACCORDING TO SEEDING SPECIFICATIONS ABOVE. IN ADDITION, PROVIDE 15 LBS./L000 S.F. OF SUPERPHOSPHATE. 5.IF SOIL TEST IS TAKEN, PROVIDE LIME AND FERTILIZER ACCORDING TO SOIL TEST REPORT. 6.LIME AND FERTILIZER SHALL BE APPLIED UNIFORMLY AND MIXED WITH THE SOIL DURING SEEDBED PREPARATION. STABILIZATION TIMEFRAMES PERIMETER DIKES, DITCHES, SWALES, AND SLOPES - 7 DAYS HIGH QUALITY WATER (HQW) ZONES - 7 DAYS SLOPES GREATER THAN 3:1 - 7 DAYS (IF SLOPES ARE LESS THAN 10' IN LENGTH AND ARE NOT STEEPER THAN 2:1, TIME CAN BE EXTENDED TO 14 DAYS) SLOPES 3:1 OR FLATTER - 14 DAYS (7 DAYS FOR SLOPES GREATER THAN 50 FEET IN LENGTH) ALL OTHER AREAS WITH SLOPES 4:1 OR FLATTER - 14 DAYS (EXCEPT FOR PERIMETERS AREAS AND HWQ ZONES, 7 DAYS) INSPECTION REQUIREMENTS PER NCDENR: EFFECTIVE OCTOBER 1, 2010 PERSONS RESPONSIBLE FOR LAND DISTURBING ACTIVITIES MUST INSPECT THE SEDIMENT AND EROSION CONTROL MEASURES ON A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. AELF-INSPECTION REPORTS ARE REQUIRED. A SAMPLE SELF-INSPECTION REPORT, AS WELL AS DETAILS OF THE SELF-INSPECTION PROGRAM, CAN BE FOUND ON THE NCDENR LAND QUALITY WEBSITE AT: HTTP://PORTAL.NCDENR.ORG/WEB/LR/EROSION JM MK SC SC S: \ E N G I N E E R \ P R O J E C T S \ 8 1 8 9 . 0 8 2 3 C D - S E N N E B O G E N E X P A N S I O N \ D R A W I N G S \ S H E E T S \ 8 1 8 9 - S - E C D E T A I L S . D W G , Ap r i l 8 , 2 0 2 4 SC O L D R E N OW N E R / D E V E L O P E R DRAWN BY: CHECKED BY: PROJECT NO: DRAWING TITLE: DRAWING NUMBER: SEAL: DATE:NO:REVISION DESC. DRAWING REVISIONS Copyright 2024 CES Group Engineers, LLP PR O J E C T D E S C R I P T I O N : REVISED BY: ISSUED BY: CES Group Engineers, LLP 3525 Whitehall Park Drive, Suite 150 Charlotte, NC 28273 PH: 704.489.1500 www.ces-group.net ENGINEERS PLANNERS SURVEYORS SCIENTISTS CO. SEAL: ISSUE DATE: 1 - - - - - - DESIGN REVISIONS 4/3/2024 - - - - - - - - - - - - 02/22/2024 8189.0823 SE N N E B O G E N E X P A N S I O N S. C . H O N D R O S & A S S O C I A T E S , I N C . P. O . B O X 2 2 0 4 5 6 , C H A R L O T T E , N C 2 8 2 2 2 - 0 4 5 6 19 5 7 S E N N E B O G E N T R A I L ST A N L E Y , N C 2 8 1 6 4 C9.1 EROSION CONTROL DETAILS 3' FILTER FABRIC ON GROUND STEEL FENCE POST WIRE FENCE HARDWARE CLOTH FILTER OF #57 WASHED STONE BURY 6" OF UPPER EDGE OF FILTER FABRIC IN TRENCH TOP OF SILT FENCE MUST BE AT LEAST 1' ABOVE THE TOP OF THE WASHED STONE SILT FENCE FRONT VIEW SECTION VIEW STEEL FENCE POST SET MAX 2' APART MIN. 18" INTO SOLID GROUND BURY WIRE FENCE, FILTER FABRIC, & HARDWARE CLOTH IN TRENCH 4' MIN. NOTES: 1. REMOVE SEDIMENT WHEN HALF OF STONE OUTLET IS COVERED. 2. REPLACE STONE AS NEEDED TO ENSURE DEWATERING. NOTE: REFER TO NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, SECTION NO. 6.06 FOR ADDITIONAL DESIGN SPECIFICATIONS REGARDING TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT. SILT FENCE OUTLET NOTES: 1. REMOVE SEDIMENT WHEN HALF OF STONE OUTLET IS COVERED. 2. REPLACE STONE AS NEEDED TO ENSURE DEWATERING. COMPACTED SOIL FLOW NOTE: 1. DIVERSIONS TO SERVE LONGER THAN 30 WORKING DAYS SHOULD BE SEEDED AND MULCHED AS SOON AS THEY ARE CONSTRUCTED. 2. SETTLEMENT MUST BE REMOVED WHEN FILL HEIGHT REACHES 10%. 3. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONABLE MATERIAL. 4. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS ALL DESIGN REQUIREMENTS. 5. PROVIDE SUFFICIENT ROOM AROUND DIVERSION TO PERMIT MACHINE REGRADING AND CLEANOUT. 6. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT THAN THE DESIGN ELEVATION. 7. INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT. JM MK SC SC S: \ E N G I N E E R \ P R O J E C T S \ 8 1 8 9 . 0 8 2 3 C D - S E N N E B O G E N E X P A N S I O N \ D R A W I N G S \ S H E E T S \ 8 1 8 9 - S - S I T E D E T A I L S . D W G , Ap r i l 8 , 2 0 2 4 SC O L D R E N OW N E R / D E V E L O P E R DRAWN BY: CHECKED BY: PROJECT NO: DRAWING TITLE: DRAWING NUMBER: SEAL: DATE:NO:REVISION DESC. DRAWING REVISIONS Copyright 2024 CES Group Engineers, LLP PR O J E C T D E S C R I P T I O N : REVISED BY: ISSUED BY: CES Group Engineers, LLP 3525 Whitehall Park Drive, Suite 150 Charlotte, NC 28273 PH: 704.489.1500 www.ces-group.net ENGINEERS PLANNERS SURVEYORS SCIENTISTS CO. SEAL: ISSUE DATE: 1 - - - - - - DESIGN REVISIONS 4/3/2024 - - - - - - - - - - - - 02/22/2024 8189.0823 SE N N E B O G E N E X P A N S I O N S. C . H O N D R O S & A S S O C I A T E S , I N C . P. O . B O X 2 2 0 4 5 6 , C H A R L O T T E , N C 2 8 2 2 2 - 0 4 5 6 19 5 7 S E N N E B O G E N T R A I L ST A N L E Y , N C 2 8 1 6 4 C10.0 SITE DETAILS JM MK SC SC SUPPLEMENTAL VAN ACCESSIBLE SIGN NOT TO SCALE ACCESSIBLE PARKING AND SIGNAGE STANDARDS NOT TO SCALE NOT TO SCALE TYPICAL LIGHT DUTY ASPHALT NOT TO SCALE TYPICAL HEAVY DUTY ASPHALT SURFACE COURSE 2.0" SF9.5B SUPERPAVE BASE COURSE 6.0" COMPACTED AGGREGATE BASE COURSE SUBGRADE SUBGRADE COMPACTED TO 100% AASHTO T99 SURFACE COURSE 1.5" SF9.5B SUPERPAVE BASE COURSE 8.0" COMPACTED AGGREGATE BASE COURSE SUBGRADE SUBGRADE COMPACTED TO 100% AASHTO T99 INTERMEDIATE COURSE 2.5" I19.0C SUPERPAVE TYPICAL GRAVEL DRIVEWAY 8'' COMPACTED WASHED STONE SUBGRADE SUBGRADE COMPACTED TO 100% AASHTO T99 NOT TO SCALE NOTE: THESE ARE TYPICAL DETAILS, CONTRACTOR REFER TO GEOTECHNICAL REPORT AND RECOMMENDATIONS REGARDING PAVEMENT SECTION TO BE USED AND SUITABILITY OF SUBGRADE. NOT TO SCALE TYPICAL CONCRETE PAVING 6" 8" WELDED STEEL FABRIC (ASTM A 185) X X X 4,000 psi CONC.X COMPACTED SUBGRADE AGGREGATE BASE COURSE NOT TO SCALE 12" THICK CONCRETE PAVING NOT TO SCALE 12" THICK CONCRETE PAVING WELDED STEEL FABRIC (ASTM A 185) X X X 4,000 psi CONC.X #3 REBAR @ 4’-0” O.C. TRANSVERSE ONE (1) LAYER OF #4 @ 4’-0” O.C. 4" CABC W/ 10MIL POLYETHYLENE VAPOR BARRIER 4" WELDED STEEL FABRIC (ASTM A 185) X X X 4,000 psi CONC.X #4 REBAR @ 1’-0” O.C. TRANSVERSE TWO (2) LAYERS OF #5'S @ 1’-0” O.C. 4" CABC4" X X X X 12 " 12 " S: \ E N G I N E E R \ P R O J E C T S \ 8 1 8 9 . 0 8 2 3 C D - S E N N E B O G E N E X P A N S I O N \ D R A W I N G S \ S H E E T S \ 8 1 8 9 - S - D R A I N A G E D E T A I L S . D W G , Ap r i l 8 , 2 0 2 4 SC O L D R E N OW N E R / D E V E L O P E R DRAWN BY: CHECKED BY: PROJECT NO: DRAWING TITLE: DRAWING NUMBER: SEAL: DATE:NO:REVISION DESC. DRAWING REVISIONS Copyright 2024 CES Group Engineers, LLP PR O J E C T D E S C R I P T I O N : REVISED BY: ISSUED BY: CES Group Engineers, LLP 3525 Whitehall Park Drive, Suite 150 Charlotte, NC 28273 PH: 704.489.1500 www.ces-group.net ENGINEERS PLANNERS SURVEYORS SCIENTISTS CO. SEAL: ISSUE DATE: 1 - - - - - - DESIGN REVISIONS 4/3/2024 - - - - - - - - - - - - 02/22/2024 8189.0823 SE N N E B O G E N E X P A N S I O N S. C . H O N D R O S & A S S O C I A T E S , I N C . P. O . B O X 2 2 0 4 5 6 , C H A R L O T T E , N C 2 8 2 2 2 - 0 4 5 6 19 5 7 S E N N E B O G E N T R A I L ST A N L E Y , N C 2 8 1 6 4 C11.0 DRAINAGE DETAILS JM MK SC SC S: \ E N G I N E E R \ P R O J E C T S \ 8 1 8 9 . 0 8 2 3 C D - S E N N E B O G E N E X P A N S I O N \ D R A W I N G S \ S H E E T S \ 8 1 8 9 - S - D R A I N A G E D E T A I L S . D W G , Ap r i l 8 , 2 0 2 4 SC O L D R E N OW N E R / D E V E L O P E R DRAWN BY: CHECKED BY: PROJECT NO: DRAWING TITLE: DRAWING NUMBER: SEAL: DATE:NO:REVISION DESC. DRAWING REVISIONS Copyright 2024 CES Group Engineers, LLP PR O J E C T D E S C R I P T I O N : REVISED BY: ISSUED BY: CES Group Engineers, LLP 3525 Whitehall Park Drive, Suite 150 Charlotte, NC 28273 PH: 704.489.1500 www.ces-group.net ENGINEERS PLANNERS SURVEYORS SCIENTISTS CO. SEAL: ISSUE DATE: 1 - - - - - - DESIGN REVISIONS 4/3/2024 - - - - - - - - - - - - 02/22/2024 8189.0823 SE N N E B O G E N E X P A N S I O N S. C . H O N D R O S & A S S O C I A T E S , I N C . P. O . B O X 2 2 0 4 5 6 , C H A R L O T T E , N C 2 8 2 2 2 - 0 4 5 6 19 5 7 S E N N E B O G E N T R A I L ST A N L E Y , N C 2 8 1 6 4 C11.1 DRAINAGE DETAILS JM MK SC SC S: \ E N G I N E E R \ P R O J E C T S \ 8 1 8 9 . 0 8 2 3 C D - S E N N E B O G E N E X P A N S I O N \ D R A W I N G S \ S H E E T S \ 8 1 8 9 - S - U T I L I T Y D E T A I L S . D W G , Ap r i l 8 , 2 0 2 4 SC O L D R E N OW N E R / D E V E L O P E R DRAWN BY: CHECKED BY: PROJECT NO: DRAWING TITLE: DRAWING NUMBER: SEAL: DATE:NO:REVISION DESC. DRAWING REVISIONS Copyright 2024 CES Group Engineers, LLP PR O J E C T D E S C R I P T I O N : REVISED BY: ISSUED BY: CES Group Engineers, LLP 3525 Whitehall Park Drive, Suite 150 Charlotte, NC 28273 PH: 704.489.1500 www.ces-group.net ENGINEERS PLANNERS SURVEYORS SCIENTISTS CO. SEAL: ISSUE DATE: 1 - - - - - - DESIGN REVISIONS 4/3/2024 - - - - - - - - - - - - 02/22/2024 8189.0823 SE N N E B O G E N E X P A N S I O N S. C . H O N D R O S & A S S O C I A T E S , I N C . P. O . B O X 2 2 0 4 5 6 , C H A R L O T T E , N C 2 8 2 2 2 - 0 4 5 6 19 5 7 S E N N E B O G E N T R A I L ST A N L E Y , N C 2 8 1 6 4 C12.0 UTILITY DETAILS JM MK SC SC