Loading...
HomeMy WebLinkAbout20201937 Ver 2_Dead Tree A Credit Release Request Form Task 7 4.16.2024_20240416ID# * 20201937 Version * 2 Select Reviewer: Katie Merritt Initial Review Completed Date 04/18/2024 Mitigation Project Submittal - 4/16/2024 Is this a Prospectus, Technical Proposal or a New Site?* Yes No Type of Mitigation Project:* Stream Wetlands Buffer Nutrient Offset (Select all that apply) Project Contact Information Contact Name: Email Address: Barrett Jenkins barrett.jenkins@davey.com Project Information ID#: 20201937 Version:* 2 Existing ID# Existing Version Project Type: DMS Mitigation Bank Project Name: Dead Tree Phase A Nutrient Offset Bank County: Edgecombe Document Information Mitigation Document Type:* Mitigation Credit Release Request File Upload: Dead Tree A Credit Release Request Form Task 7 574.19KB 4.16.2024.pdf Please upload only one PDF of the complete file that needs to be submitted... Signature .................................................. ............................................................... ................................ ............................................. Print Name:* Barrett Jenkins Signature: Restoration Systems, LLC 1101 Haynes St. Suite 211 Raleigh, North Carolina Ph: (919) 755-9490 Fx: (919) 755-9492 4/16/2024 CREDIT RELEASE REQUEST FORM To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator From: Barrett Jenkins, bjenkins@restorationsystems.com, 512.230.0424 Through: RESTORATION SYSTEMS, LLC We formally request a credit release for the Dead Tree A Nutrient Offset Site (2020-1937v2) for completion of Task 7 per the approved credit release schedule, which is included in the Attachments with this request. The following documents have been previously submitted to DWR for Tasks 7: conservation easement assignment. Credit Type % Release Credit Amount (include Units) Notes/Comments Buffer Restoration Buffer Preservation Buffer Enhancement Generated Nitrogen Nutrient Offset 5% 6,795.08 lbs NOC Delivered Nitrogen Nutrient Offset (Jordan sites only) Generated Phosphorus Nutrient Offset 5% 437.66 lbs POC Delivered Phosphorus Nutrient Offset (Jordan sites only) Signature: Attachments: 1) MBI Approved Credit Release Schedule 3) Asbuilt credit release summary Table 1. Dead Tree Bank Parcel ‐ Phase B ‐ Tar‐Pam 02, 2020‐1937v3, Project Credits Project Area N Credit Conversion Ratio (ft2/pound) P Credit Conversion Ratio (ft2/pound) Credit Type Location Subject? (enter  NO if  ephemeral or  ditch 1) Feature Type Mitigation Activity Min‐Max Buffer  Width (ft)Feature Name Total Area (ft2) Total (Creditable)  Area of Buffer  Mitigation (ft2) Initial Credit  Ratio (x:1)% Full Credit  Final Credit  Ratio (x:1)   Convertible to  Riparian  Buffer?   Riparian Buffer  Credits   Convertible to  Nutrient Offset?   Delivered  Nutrient  Offset: N (lbs)   Delivered  Nutrient  Offset: P (lbs)  Nutrient Offset Rural No Ditch Restoration 0‐100 3A,4D, 5D, 6D, 7B, 8A,  8B, 9A, 9B, 10A 1,318,416 1 100% No — Yes 68,796.709 4,431.040 Nutrient Offset Rural No Ditch Restoration 101‐200 3A,4D, 5D, 6D, 7B, 8A,  8B, 9A, 9B, 10A 1,328,571 1 33% No — Yes 69,326.610 4,465.170 ——— Nutrient Offset Rural Yes I / P Restoration 0‐100 3, 4, 5, 6, 7, 8, 9, 10, 11 1,142,791 1 100% No — Yes 59,632.362 3,840.785 Nutrient Offset Rural Yes I / P Restoration 101‐200 3, 4, 5, 6, 7, 8, 9, 10, 11 1,596,502 1 33% No — Yes 83,307.608 5,365.654 ——— Nutrient Offset Rural No Ditch Restoration Diffused Flow  Deduction Features 7B, 8B, 9A 13,050 1 No —No —— ——— Nutrient Offset Rural Yes Ditch Restoration Non‐Credit Area; Less Than 50‐Ft Features 3A and 9B 626 1 No —No —— ——— Nutrient Offset Rural Yes I / P Restoration Non‐Credit Area; Less Than 50‐Ft Features 7, 8, & 10 6,956 1 No — No — — ——— ——— ——— ——— ——— ——— ——— ——— Totals (ft2):5,406,912 0 0.000 281,063.289 18,102.649 Total Buffer (ft2):00 Total Nutrient Offset (ft2):5,406,912 N/A Total Ephemeral Area (ft2) for Credit:00 Total Eligible Ephemeral Area (ft2):00.0%Ephemeral Reaches as % TABM Enter Preservation Credits Below Total Eligible for Preservation (ft2):00.0%Preservation as % TABM Credit Type Location Subject? Feature Type Mitigation Activity Min‐Max Buffer  Width (ft)Feature Name  Total Area (sf)  Total (Creditable)  Area for Buffer  Mitigation (ft2) Initial Credit  Ratio (x:1)% Full Credit  Final Credit  Ratio (x:1)   Riparian  Buffer Credits  Buffer — Buffer — Buffer — — — — — Buffer — Buffer — Preservation Area Subtotals (ft2):00 Square Feet Credits 0 0.000 0 0.000 0 0.000 0 0.000 Square Feet Credits Nitrogen:281,063.289 Phosphorus:18,102.6495,406,912 TOTAL AREA OF BUFFER MITIGATION (TABM) TOTAL NUTRIENT OFFSET MITIGATION Mitigation Totals Nutrient Offset: Preservation: Total Riparian Buffer: Tar‐Pamlico 03020102 19.16394 297.54099 Restoration: Enhancement: Mitigation Totals 1.The Randleman Lake buffer rules allow some ditches to be classified as subject according to 15A NCAC 02B .0250 (5)(a). last updated 08/03/2020 ASBUILT