HomeMy WebLinkAbout20201937 Ver 3_Dead Tree B Credit Release Request Form Task 7_20240416ID# * 20201937 Version * 3
Select Reviewer:
Katie Merritt
Initial Review Completed Date 04/18/2024
Mitigation Project Submittal - 4/16/2024
Is this a Prospectus, Technical Proposal or a New Site?* Yes No
Type of Mitigation Project:*
Stream Wetlands Buffer Nutrient Offset
(Select all that apply)
Project Contact Information
Contact Name: Email Address:
Barrett Jenkins barrett.jenkins@davey.com
Project Information
ID#: 20201937 Version:* 3
Existing ID# Existing Version
Project Type: DMS Mitigation Bank
Project Name: Dead Tree Phase B Nutrient Offset Bank
County: Edgecombe
Document Information
Mitigation Document Type:*
Mitigation Credit Release Request
File Upload: Dead Tree B Credit Release Request Form Task 548.63KB
7.pdf
Please upload only one PDF of the complete file that needs to be submitted...
Signature
.................................................. ............................................................... ................................ .............................................
Print Name:* Barrett Jenkins
Signature:
Restoration Systems, LLC
1101 Haynes St. Suite 211
Raleigh, North Carolina
Ph: (919) 755-9490
Fx: (919) 755-9492
4/16/2024
CREDIT RELEASE REQUEST FORM
To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator
From: Barrett Jenkins, bjenkins@restorationsystems.com, 512.230.0424
Through: RESTORATION SYSTEMS, LLC
We formally request a credit release for the Dead Tree B Nutrient Offset Site (2020-1937v3) for
completion of Task 7 per the approved credit release schedule, which is included in the Attachments
with this request. The following documents have been previously submitted to and approved by
DWR for Task 7: Conservation Easement Assignment. Credits requested for release are detailed
below:
Credit Type % Release Credit Amount
(include Units)
Notes/Comments
Buffer Restoration
Buffer Preservation
Buffer Enhancement
Generated Nitrogen Nutrient
Offset
5% 14,053.16 lbs
Delivered Nitrogen Nutrient
Offset (Jordan sites only)
Generated Phosphorus Nutrient
Offset
5% 905.13 lbs
Delivered Phosphorus Nutrient
Offset (Jordan sites only)
Signature:
Attachments: 1) Approved Project Credit Table, 2) Approved Credit Release Schedule
Table 1. Dead Tree Bank Parcel ‐ Phase B ‐ Tar‐Pam 02, 2020‐1937v3, Project Credits
Project Area
N Credit Conversion Ratio (ft2/pound)
P Credit Conversion Ratio (ft2/pound)
Credit Type Location
Subject? (enter
NO if
ephemeral or
ditch 1)
Feature Type Mitigation Activity Min‐Max Buffer
Width (ft)Feature Name Total Area (ft2)
Total (Creditable)
Area of Buffer
Mitigation (ft2)
Initial Credit
Ratio (x:1)% Full Credit Final Credit
Ratio (x:1)
Convertible to
Riparian
Buffer?
Riparian Buffer
Credits
Convertible to
Nutrient Offset?
Delivered
Nutrient
Offset: N (lbs)
Delivered
Nutrient
Offset: P (lbs)
Nutrient Offset Rural No Ditch Restoration 0‐100 3A,4D, 5D, 6D, 7B, 8A,
8B, 9A, 9B, 10A 1,318,416 1 100% No — Yes 68,796.709 4,431.040
Nutrient Offset Rural No Ditch Restoration 101‐200 3A,4D, 5D, 6D, 7B, 8A,
8B, 9A, 9B, 10A 1,328,571 1 33% No — Yes 69,326.610 4,465.170
———
Nutrient Offset Rural Yes I / P Restoration 0‐100 3, 4, 5, 6, 7, 8, 9, 10, 11 1,142,791 1 100% No — Yes 59,632.362 3,840.785
Nutrient Offset Rural Yes I / P Restoration 101‐200 3, 4, 5, 6, 7, 8, 9, 10, 11 1,596,502 1 33% No — Yes 83,307.608 5,365.654
———
Nutrient Offset Rural No Ditch Restoration
Diffused Flow
Deduction
Features 7B, 8B, 9A
13,050 1 No —No ——
———
Nutrient Offset Rural Yes Ditch Restoration
Non‐Credit Area;
Less Than 50‐Ft
Features 3A and 9B
626 1 No —No ——
———
Nutrient Offset Rural Yes I / P Restoration
Non‐Credit Area;
Less Than 50‐Ft
Features 7, 8, & 10
6,956 1 No — No — —
———
———
———
———
———
———
———
———
Totals (ft2):5,406,912 0 0.000 281,063.289 18,102.649
Total Buffer (ft2):00
Total Nutrient Offset (ft2):5,406,912 N/A
Total Ephemeral Area (ft2) for Credit:00
Total Eligible Ephemeral Area (ft2):00.0%Ephemeral Reaches as % TABM
Enter Preservation Credits Below Total Eligible for Preservation (ft2):00.0%Preservation as % TABM
Credit Type Location Subject? Feature Type Mitigation Activity Min‐Max Buffer
Width (ft)Feature Name Total Area (sf)
Total (Creditable)
Area for Buffer
Mitigation (ft2)
Initial Credit
Ratio (x:1)% Full Credit Final Credit
Ratio (x:1)
Riparian
Buffer Credits
Buffer —
Buffer —
Buffer —
—
—
—
—
Buffer —
Buffer —
Preservation Area Subtotals (ft2):00
Square Feet Credits
0 0.000
0 0.000
0 0.000
0 0.000
Square Feet Credits
Nitrogen:281,063.289
Phosphorus:18,102.6495,406,912
TOTAL AREA OF BUFFER MITIGATION (TABM)
TOTAL NUTRIENT OFFSET MITIGATION
Mitigation Totals
Nutrient Offset:
Preservation:
Total Riparian Buffer:
Tar‐Pamlico 03020102
19.16394
297.54099
Restoration:
Enhancement:
Mitigation Totals
1.The Randleman Lake buffer rules allow some ditches to be classified as subject according to 15A NCAC 02B .0250 (5)(a).
last updated 08/03/2020
ASBUILT