Loading...
HomeMy WebLinkAboutNCG140043_Minotoring Info_20240408 WILLIAMS M U LLEN Ethan R.Ware �( E\��O /V� ��Q d 11 3 Direct Dial: 803.567.4610 eware@williamsmullen.com pQR� April 4, 2024 VIA E-MAIL & U.S. MAIL Ahmad Dromgoole Suzanne Armor Water Enforcement Branch Enforcement and Compliance Assurance Division United States Environmental Protection Agency, Region 4 61 Forsyth Street, S.W. Atlanta, Georgia 30303-8960 dromgoole.ahmadna,eoa.eov armor.suzanne(&eoa.eov Mike Lawyer Supervisor, Stormwater Program Division of Energy, Minerals, and Land Resources North Carolina Department of Environmental Quality 1612 Mail Service Center Raleigh, North Carolina 27699-1612 mike.lawyer(d,,deq.nc.gov Re: Necessary Quarterly Monitoring Concrete Supply Company, LLC, South Plant Administrative Order on Consent, Docket No. CWA-04-2022-03I0 Charlotte, North Carolina Dear Mr. Dromgoole, Ms. Armor and Mr. Lawyer: Please find enclosed a copy of the quarterly monitoring at permitted outfalls of Concrete Supply Company, LLC, South Plant, in accordance with Part I1I. Par. 35.a of the above-referenced Administrative Order on Consent("Order"). Monitoring occurred unless there was no qualifying rain event causing a discharge of storm water during this time,as evidenced by rain gauge readings. Feel free to call if there are any questions. Sincerely, ERW/st ��"'�-146t' Enclosures Ethan R. Ware 1230 Main Street,Suite 330, Columbia,SC 29201 1 P.O.Box 8116 Columbia,SC 29202 T 803.567.4600 F 803.567.4601 1 williamsmullen.com I A Professional Corporation {P", 5ii'N`e STORMWATER-POLLUTION PREVENTION PLAN QUARTERLY - GOOD HOUSKEEPING/PMIBMP INSPECTION PLANT LOCATION: 5nd1111 m0f-z- DATEITIME: 1� aq WEATHER: (inspection frequency: MUST be performed QUARTERLY whe is active) NAME: SIGNATURE: AREAS TO CHECK: Raw material storage areas with water sprinklers/miste s,Truck rinselwash and drum washout areas,Truck wash chemicals and Admix tanks,Oil tank/sheds product storage, Catch basins and pipes, Outfails,Yard for spillage/debris. Baseline BMPS Inspection:Good House Keeping, Equipment, Preventive Maintenance/Inspections,Spill Control Kits Inspection, Employee Training lease use additional sheets if necessary) Good Housekeeping/PM Inspection Checklist Remarks What Action is Needed (Satisfacte ) (cleanup/repair/replace/none) Is trash bin lid closed?&Is the Lid in working condition? YES N �.� 1pec um Is trash removed from the site on a timely basis? YE NO Is the site swept"As Needed Basis"at a minimum Quarterly? YES" NO Is there any debris on the yard? YES NO Are outside areas kept in a neat and orderly condition? YES NO Is the maintenance shop orderly for the equipment,materials and YE NO tanks/drums//totes? Is there an evidence of ddps/leaks from Tracks/Equipment/ YES NO _ Tanks/Drums/Totes? Fines scraped up/removed from equipment areas? ES NO Are the secondary containments in good conditions with NO leaks/ YES NO Cracks/settlement? Is the secondary containment discharge pipe closed and locked? YES NO Are traffic areas free from equipment,materials,and other objects? YES' NO Are chemicals/oils/fuels stored in proper containers? YES NO Are any storage containers leaking or deteriorating with rust? YES NO Are stone/sand areas kept neat and orderly manner? JENO Do you see any leaks from the baghouses? NO Are admix tanks in good condition and did you see any leaks? NO Are Admix tanks located inside a secondary containment? NO Are sediment traps/stone dams in good condition NO Are ditches, pipes,swales and catch basins in good condition? NO Is there a vegetation growth in the ponds? NO Are ponds cleaned regularly for accumulated sediment? NO Are washwater recycling basins are cleaned for accumulated NO sediment? Does the facility required to do BMP feasibility(technical and NO economic)study? Do you hear any unusual noise in the equipment? NO Page 1/2 u -1 S9 - QUARTERLY---GOOD-HOUSKEEPINGIPM/BMP INSPECTION Good Housekeeping/PM Inspection Checklist Remarks what Action is Needed (Satisfactory) (cleanup/repair/replace/none) Are washwater recycling basins pumps working properly? YES I NO Check effects of return concrete and slurry drying areas on the (yE§ NO outfall? Are equipment(pH and other)in washwater recycling basins yES NO working properly? Are effective cleanup procedures used for spilled materials? ES NO Are spill control kits in good condition with all the required yE NO materials? Are there any unauthorized discharges from the facility? YES NO Is process water from truck washing,drum cleaning going to ouffalls? YES NO Are there any signs of erosion on slopes,ponds,or earthen YES gNO berms? Could any new BMPs implemented to protect stormwater quality? YES Have all new employees received Good Housekeeping Training? YE NO Did you provide at a minimum annual Stormwater Training to all YES NO employees that could affect the stormwater quality Check for any changes in the Plant operation that could affect yES NO SWPP Plan Update? Check pH readings from lab report to the pH at process water pits Y i NO Check if any other area not mentioned above needs attention YES NO BMP Inspection Checklist Remar s What Action is Needed (Satisfactory) (cleanup/repair/replace/none) Are oil pumps in working order with no leaks? YES NO Are dust collectors are working properly? YES NO Are compressor bleed is contained? YES NO Are all secondary containment dikes/walls in good condition? YES NO Are all stone and sand barriers orderly? YE NO Is sediment in wash pits orderly and controlled? YES NO Are riprap/hay bales/berms working properly? YE NO Is there a site erosion? YES NO Is sediment from the return concrete storage areas contained? ES NO Are there any leaky equipment/vehicles on the property? YES NO Is SWPP Plan/Site Map update Necessary? YES Additional Remarks/Recommendations: Plan Manager Signature: Date: .3' b a NOTES: Use the additional remarks/recommendations section to describe deficiencies in Housekeeping Measures,and Preventive Maintenance. Use other side if additional space is needed. Page 2/2 449 Springbrook Rd,Charlotte, 28217 faypo.int _ Main704.529.63i4' ANALYTICAL www.waypointanalytical.com 3125/2024 Concrete Supply Company Johnnie Alexander 3823 Raleigh Street Charlotte, NC,28206 Ref: Analytical Testing Lab Report Number: 24-078-0025 Client Project Description:South Plant Facility Dear Johnnie Alexander: Waypoint Analytical,LLC(Charlotte)received sample(s)on 311812024 for the analyses presented in the following report. The above referenced project has been analyzed per your instructions. The analyses were performed in accordance with the applicable analytical method. The analytical data has been validated using standard quality control measures performed as required by the analytical method. Quality Assurance,method validations, instrumentation maintenance and calibration for all parameters were performed in accordance with guidelines established by the USEPA(including 40 CFR 136 Method Update Rule May 2021)unless otherwise indicated. Certain parameters(chlorine, pH, dissolved oxygen,sulfite...)are required to be analyzed within 15 minutes of sampling. Usually, but not always,any field parameter analyzed at the laboratory is outside of this holding time. Refer to sample analysis time for confirmation of holding time compliance. The results are shown on the attached Report of Analysis(s). Results for solid matrices are reported on an as- received basis unless otherwise indicated.This report shall not be reproduced except in full and relates only to the samples included in this report. Please do not hesitate to contact me or client services if you have any questions or need additional information. Sincerely, 6 -%(!r � Jamie Corporeal Laboratory Project Manager Laboratory's liability in any claim relating to analyses performed shall be limited to,at laboratory's option,repeating the analysis in question at laboratory's expense,or the refund of the charges paid for performance of said analysis. -- - Page 1-o£-a— ---- --- p, p%va o _ __. — vvOy)p®_ 1nt�° _� - 449 Springhroolc_Rd,_ChMain7„N29.6364 - - - -- --� � �i dy Main 704.529.G364 ANALYTICAL www.waypointanalytfcal.com Certification Summary Laboratory ID:WP CNC:Waypoint Analytical Carolina,Inc.(C),Charlotte,NC State -- Program Lab ID Expiration Date _ North Carolina State Program 37735 07/31/2024 North Carolina State Program 402 12/31/2024 South Carolina State Program 99012 07/31/2024 South Carolina State Program 99012 12/31/2023 Page 1 of 1 00016/24-078-0025 Page 2 of 8 } ���®I�6. 449.5pringbrook Rd,'Charlotte,NC'2821T- — - — - -----� Main 704,529,6364 ANALYTICAL www.waypointanalytical.com Sample Summary Table Report Number: 24-078-0025 Client Project Description: South Plant Facility Lab No Client Sample ID Matrix Date Collected DateReceived 99626 001 Aqueous 03/18/2024 15:45 03/18/2024 15:25 -- -- Page "3 of-8 Q - - �p aypo'n�f - 449 Springbrooland,Charlotte,- 282ll - - - -� • ! Main 704.529.6369 olasa ANALYTICAL www.waypointanalyticaLcom Concrete Supply Company Project South Plant Facility Johnnie Alexander Report Date: 0 312 5/2 0 2 4 3823 Raleigh Street Information: Received:0 3/1 812 0 24 Charlotte, NC 28206 Report Number:24-078-0025 REPORT OFANAL YSIS Lab No: 99626 Matrix: Aqueous Sample ID:001 Sampled:3/18/202415:45 Test Results Units MOL OF Date ITiime ' By Analytical Analyzed Method HEM:Oil and Grease <5.7 mg/L 5.7 1 03/21/24 09:49 GOB 16648 pH 7.5 S.U. 1 03/18/24 15:45 FLD FIELD Total Suspended Solids 31.6 mg/L 5.0 1 03/20/24 12:47 GOB 2540D-2015 Qualifiers/ OF Dilution Factor MQL Method Quantitation Limit Definitions -- Page 4 of 8 -- - 449 5pringbrook Rd,Charlotte,NC 28212 _ ®`- Main704.529.6364 ANALYTICAL www.waypointanalytiwl.com Shipment Receipt Form Customer Number:01058 Customer Name: Concrete Supply Company Report Number: 24-078-0025 Shipping Method Fed Ex US Postal 0I Lab 1.1 Other: UPS Client Courier Thermometer ID: IRT15 3.7C Shipping container/cooler uncompromised? is)Yes No Number of coolers/boxes received Custody seals intact on shipping container/cooler? Yes i )No ill Not Present Custody seals intact on sample bottles? Yes No 4, Not Present Chain of Custody(COC)present? 4P Yes No COC agrees with sample label(s)? 0!Yes No COO properly completed (6,Yes No Samples in proper containers? I4+Yes No Sample containers intact? i0i Yes No Sufficient sample volume for indicated test(s)? (4)Yes ! ! No All samples received within holding lime? (o!Yes No Cooler temperature in compliance? (o!Yes No Cooler/Samples arrived at the laboratory on ice. o"Yes No Samples were considered acceptable as cooling process had begun. Water-Sample containers properly preserved (ce!Yes No N/A Water-VOA vials free of headspace Yes 'No to) N/A Trip Blanks received with VOAs Yes No )N/A Soil VOA method 5035—compliance criteria met Yes ! 'I No lei N/A High concentration container(48 hr) F Low concentration EnCore samplers(48 hr) High concentration pre-weighed(methanol-14 d) I Low cone pre-weighed vials (Sod Bis-14 d) Special precautions or instructions included? ,Yes to) No Comments: I I Signature: IAngelo Norvell _ ] Date &Time: ',03%18/202417:20:16 ---- - Page 5 of 8 GHe0.� ®F CUSTODY RECORD py ppy/{;�qw /p tint gy x YES NO N'A 11p e!/ayp ■Y 9 9t PAGE. .. OF OUOTE H TOFNSURE PROPER BILLING! . .__....._ samples INTACT upon arrival? --P YJ Cb� ANALYTICAL project Name: ,_. R¢corv_dINICE? -- --- 449 Springbrook Road•CharlottD•NC 25217 Short Hold ADnlys Yes) (No) UST Project: (Yes) (No) PROPER PRESERVATIVES indicated? v Phone T04IS29-6 E4 Fax=7041525-0 .Please ATTACH any project specific reporting(QC LEVEL 1 li III IV) Renewed'WITHIN HOLDING TIA!ES'% - CUSTODYSEALSINTACT? Client Company Name:_- _ G - provisions and/or QC Requirements �p 1 VGLATILES reed WiOUT HEADSPACE? ._-- - Report To/Contact Name:,----__--._--__-_-___.,.-,_-. Invoice To: ,-. _-.___--. — ---- �-¢! P - --- PROPER CONTNN'RS used' 3 Reporting AddresS:--_ --- — ..-.-- Address--- -... ._.---__ _..---_.__.- ---- 7EbIF' Therm lD. S ODsen283,-1._C Phone:-- _ Fax(Yes)(No):_. _ .. Purchase Order No./Billing Reference _ ___ TO BE FILLED IN BY CLIENT/SAMPLING PERSONNEL Email Address:__,-- __ _--..__.-_--_._ . .-- Requested Due Date J i Day J 7 Days J 7 Days J a Drrys J 5 Days Certification: NC SC__-_ EDD Type:PUP,.- Exaei_Other _.. __. "Working Days" J q-9 Days J standard to days J rFroeusPe ApovCt Bo Other-_ Site Location Name: _..__.-_-_.,.._._------ Samples received after 1500 will be Processed noel business day Site Location Physical Address: _....- —_ Turnaround Nine is based on business days,Excluding evaekendS anD 1tolydaYs. Water Chlorinated: YES__, NO- ( SEE REVERSE FOR TERMS a CONDITIONS REGARDING SERVICES Samples foedU on Collection: YESu._NO_� RENDERED BY WAYPOINT ANALYTICAL.LLC TO CLIENT) P P _ _ T- ANALYSIS REQUESTED TIME MATRIX SAMPLE CONTAINER / f CLIENT DATE COLLECTED (SOIL, PRESESVA- ��Tq �`(y�\ l / j �� REMARKS ID NO. SAMPLE DESCRIPTION COLLECTED MILITARYWATER,OR 'TYPE _----- i �`" l•� ///I\"`/ I I HOURS I SLUDGE) SEE E OW MO. I SIZE 1 V' V I - -!- s - -- ---_...-- — - - - i gloss it{{llni{uii{II{{�i{)Ili{{�ii{ini{nn{�i�{{(({ii{{I{ii��{{�Z07 ...__..I Cencrele Suouly Crimean as :a- {{ smial Plana Facd,ty I f 20 � � Sam /J/�' r r _�•/'• peer 5 Signature �/ ____ Sampled By(Print Name)--_- - _U t 1 1---_ 1__I - -^__ - it i Upon relinquishing,writing this Chain of int An y is al PrauthorizationjectMg for Waypoint Analytical to proceed with the analyses as requested above.Any changes must be Site Arrival Tune!J- sub ed in writing to the Waypoint Analytical Project Manager.There will be charges for any changes after analyses have 6e¢n iniliallzed. Rei , Isnq.. y Is-, .., .Rnenco W sanDwrol Dn;D n,:r.N-,r• Additional CommentsSit.Field Tech um Time: '-- Field Tech Re r 9 t .3 aN>i Hecc -19 +',3m i r t 6a C h Po¢ ..-_. Y I let 51:avt Ry tSgraunor rin-.nr lGor .r'i¢.11 Fif t� �E/p,///�/(I/ I/� T . i U iho�Dl 50rpmtml NOTE:ALLSAIAPLECO ERS SHOULD BETAPED SHUT URTODY FALS FOR TRANBPO ATION TO TILE LABORATORY COC G-rcp re SAMPLER ARE NOT/AC EPTED AND VERIFIED AGAINST COc UNTIL RECEIVED AT THE LABORATORY J Fea x JV_S JMe", E'+c ud J yant Pnat tlf d r .z JOI _ _ NPOES: UST: GROUNDWATER, DRINKING WATER: SOLID WASTE: RCRA: BRWNFLD ' LANDFILL OTHER: J NC J SC J NC J SC I J NC JSC JNC JSC JNC JSC IJNC JSC JNC JSCIJNC JSC JNC .JSC -1 J J___ I J-__ __- J J J-._.-_ J__ VRIG{Pb")L __ `CONTAINER TYPE CODES: A=Amber C=Clear G=Glass P=Plastic; TL=Teilon-Lined Cap VOA=Volatile Organics Analysis(Zero Head Space) 1110 01058 .uncrptn so"N comaanv G69]o` EnvQ,afityuu( Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report fFar guidance ovfflling aw thisfiarnt.please visit hops://deq.oc.gov/about/diviseons!energy-miaenl-laud-resources/ npd es-stonuwater-gps Permit No.: N/C/ / / / / / ! or Certificate of Coverage No : N/C/G/ ! Facility Name: County: ��' �� r . Plione No. Inspector: Date of Inspection: Time of Inspection: Total Event Precipitation(inches): All permits require qualitative monitoring to be perfonned during a"measurable storm event." �^ A "measurable storm event' is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for [local storm events during the sampling period,and the permittee obtains approval from the local DEMUZ Regional Office. f By this signature. I certify that this report is accurate and complete to the best of my knowled,c: (Signature of Permittee or Designee) I. Outfall Description: Outfall No. 0O Structure(pipe,ditch,etc.): Receiving Sircam: Describe the industrial activities that occur within the outiall drainage area: Pane I of Sn'L'8a_,last mtHLncd able U2018 ---- Page 7 of 8 2. Color: Describe the color of the��((lisFharge using basicscolor brown, s red, blue,et)a� ltt (light,medium,dark)as descriptors:_ C ( ���V 3. Odor: Describe any distinct o ors that the discharge may have(i.c..smells strongly aroil, weak chlorine odor,etc.): 100l7`i a. Clarity: Choose the number which best describes the clarity of the discharge, where I is clear and 5 is very cloudy: !`\ h 2 3 A 5 5. Floating Solids: Choose the number which best describes the alilonnt of nOating solids in the stormwater discharge, where I is no solids and 5 is the surface covereri with floating solids: I-\ 2 3 ;I 5 G. Suspended Solids: Choose the number which best describes the amount of suspended solids in Ilse slormmater discharge, where I is no solids ands is extremely muddy: �) 2 3 1 a 7. Is there any loom in the stormwater discharge? O Yes No. 3. Is there an oil sheen in the stormwater discharge? 0Yes 'o. 9. Is there evidence of erosion or deposition at the outfall? O Yes NO. 10. Other Ohvious Indicators of Stormwater Pollution: / List and describe Note: Low,clarity,high solids,and/or the presence of foam,oil sheen, or erosion/deposition may he indicative of pollutant exposure. 'These condilidns warrant further investigation. Illl���il���lll�ll��lt��lill��,fl�I���IliI1111IiIII��N�11�IH�i���g!yeas a as 8c11111 Pldm F:x;ma q 08,O Page 2of2 Swt�:.q,i ssi mode Gcd CS:e It;O15 Page 8 of 8 Stormwater/Process Water Management Inspection Plant: ;A � ( � � � , k 1� Sample Date: h� a Inspection Date: Type of Sample (Circle one) : Stormwater or Processs, Area of Exceedence (Circle ALL that apply): pH - TSS Settleable - Total Petroleum - Identify Other - General Site Observations: Yes No �. Yard free from debris 2. Leaks throughout Yard ex: "vehicles admix other" addressed 3. Wash-out pit well maintained including windrow area q. Is the rock and sand that is washed away from stockpiles scraped up " Minimize solids" s. Catch basin filtration maintained properly " Replace Hay or Rock dams" I Aggregate unloading and storage: Yes No 1. Water runoff from agg directed to catch basins ponds or wash down areas 2. Water clear of oil sheen in delivery areas 3. valley gutters leading towards Storm Water drains have filtration to catch solids and is replaced regularly Batch Plant: Yes No 1. J Block walls around admix secondary poured solid 2. If truck wash is not located in the wash out area is there secondary containment 3. Trash removed from the inside of the secondary containment q. Free of any leaks or spills inside secondary containment Property of Concrete Supply Co Stormwater/Process Water Management Inspection Wash out Area: Yes No 1, Is pit maintained and neat in appearance i.e.. Not overflowing with solids and debris on walls 2. Drying area of proper size 3. Is a Ph adjuster used to treat wash water a. f Do bays allow for solids to settle 5. Is the main Storm water run off separate from the Process water run off 6. Do the wash out area bays also catch processed water from plant and or secondary containments 7. Is all water contained on site other than extreme rain events Additional control measures required " Explain in the Comments section" Truck fueling and Oil storage: Y�e -�N-o t. I 7 i J Is there an oil pallet used to contain possible leaks from drums l i Property of Concrete Supply Cc Stormwater/Process Water Management Inspection Line Number: Section: Comments/Observations/Sust_gestions: d�n5 x_fcnj ,SASd q4d a o/1nj lea ✓,n5 t3 c��i�� 5o1�Js Inspector: / u,517�1 le. - Signature: Document Corrections With-in Two Months of Inspection Date!!! Property of Concrete Supply Co