HomeMy WebLinkAboutSW3230302_Supplement-EZ Form_20240417 SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION
1 Project Name Davis Village
_ 2 Project Area(ac) _ 58.78
3 Coastal Wetland Area(ac) _ 0
4 Surface Water Area(ac) 0.91
5 Is this project High or Low Density? High
6 Does this project use an off-site SCM? No
COMPLIANCE WITH 02H.1003(4)
7 Width of vegetated setbacks provided(feet) 30
8 Will the vegetated setback remain vegetated? Yes
9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A
10 Is streambank stabilization proposed on this project? No
NUMBER AND TYPE OF SCMs:
11 Infiltration System
12 Bioretention Cell
13 Wet Pond 1
14 Stormwater Wetland
15 Permeable Pavement
16 Sand Filter 2
17 Rainwater Harvesting(RWH)
18 Green Roof
19 Level Spreader-Filter Strip(LS-FS)
20 Disconnected Impervious Surface(DIS)
21 Treatment Swale
22 Dry Pond
23 Storm Filter
24 Silva Cell
25 Bayfilter
26 Filterra
FORMS LOADED
DESIGNER CERTIFICATION
27 Name and Title: Edwin Suddreth,Project Manager
28 Organization: W.K.Dickson
29 Street address: 1213 W.Morehead St.Suite 300
30 City,State,Zip: Charlotte,NC 28208
31 Phone number(s): 704-334-5348
32 Email: esuddreth@wkdickson.com
Certification Statement:
I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the
information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans,specifications,
operation and maintenance agreements and other supporting information are consistent with the information provided here.
Designer
'°'........
CAf
00,ess,o �° fditv
QQ '1' `7
S >! Signature of Designer
044570
z,,
T suo-.,.
3/28/24
Mar 28 2024 5:42 PM
Seal Date
DRAINAGE AREAS
1 Is this a high density project? Yes
2 If so,number of drainage areas/SCMs 3
3 Does this project have low density areas? Yes
_4 If so,number of low density drainage areas _ 1
Is all/part of this project subject to previous rule
5 versions? No
I FORMS LOADED I
DRAINAGE AREA INFORMATION Entire Site 1 2 3 LD 1
4 Type of SCM Wetpond Sand Filter Sand Filter NA
5 Total drainage area(sq ft) 3408789.36 1220062.44 298217 202574 820055
6 Onsite drainage area(sq ft) 2540908.61 1220062 298217 202574 820055
7 Offsite drainage area(sq ft) 0.00 0 0 0 0
8 Total BUA in project(sq ft) 1027224.00 614342 sf 135651 sf 113957 sf 147559 sf
New BUA on subdivided lots(subject to
9 permitting)(sq ft) 661930 sf 427875 sf 42000 sf 64500 sf 127555 sf
New BUA not on subdivided lots(subject to
####permitting)(sf) 349579 sf 186467 sf 93651 sf 49457 sf 20004 sf
####Offsite BUA(sq ft) sf
####Breakdown of new BUA not on subdivided lots: sf
-Parking(sq ft) 8842 sf 8842 sf sf
-Sidewalk(sq ft) 78843 sf 45439 sf 19378 sf 9606 sf 4420 sf
-Roof(sq ft) sf sf
-Roadway(sq ft) 241066 sf 141028 sf 54985 sf 29469 sf 15584 sf
-Future(sq ft) 19288 sf 19288 sf
-Other,please specify in the comment box
below(sq ft) sf
New infiltrating permeable pavement on
####subdivided lots(sq ft)
New infiltrating permeable pavement not on
####subdivided lots(sq ft)
Existing BUA that will remain(not subject to
####permitting)(sq ft) 1540 sf 1540 sf
####Existing BUA that is already permitted(sq ft)
####Existing BUA that will be removed(sq ft)
##ff#Percent BUA 30% 50% 45% 56% 18%
####Design storm(inches) 1.0 in 1.0 in 1.0 in 1.0 in NA
####Design volume of SCM(cu ft) 68769 sf 49931 cf 9747 cf 9091 cf NA
####Calculation method for design volume Simple Method Simple Method Simple Method Simple Method NA
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
####drainage area(s):
Future BUA within SCM#2 is for planned amenity
WET POND
1 Drainage area number 1
2 Minimum required treatment volume(cu ft 51159 cf
GENERAL MDC FROM 02H.1050
3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes
4 Is the SCM located away from contaminated soils? No
5 What are the side slopes of the SCM(H:V)? 3:1 _
6 Does the SCM have retaining walls,gabion walls or other engineered No
side slopes?
7 Are the inlets,outlets,and receiving stream protected from erosion Yes
(10-year storm)?
8 Is there an overflow or bypass for inflow volume in excess of the Yes
design volume? _
9 What is the method for dewatering the SCM for maintenance? Pump(preferred)_
10 If applicable,will the SCM be cleaned out after construction? Yes
11 Does the maintenance access comply with General MDC(8)? Yes
12 Does the drainage easement comply with General MDC(9)? Yes
13 If the SCM is on a single family lot,does(will?)the plat comply with N/A
General MDC(10)?
14 Is there an O&M Agreement that complies with General MDC(11)? Yes
15 Is there an O&M Plan that complies with General MDC(12)? Yes _
16 Does the SCM follow the device specific MDC? Yes _
17 Was the SCM desi ned b an NC licensed rofessional? Yes
WET POND MDC FROM 02H.1053
18 Sizing method used SA/DA _
19 Has a stage/storage table been provided in the calculations? Yes _
20 Elevation of the excavated main pool depth(bottom of sediment 549.00
removal)(fmsl)
21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 550.00
22 Elevation of the bottom of the vegetated shelf(fmsl) 555.00
23 Elevation of the permanent pool(fmsl) 555.50
24 Elevation of the top of the vegetated shelf(fmsl) 556.00
25 Elevation of the temporary pool(fmsl) 556.84 _
26 Surface area of the main permanent pool(square feet) 27785 _
27 Volume of the main permanent pool(cubic feet) 112672 cf _
28 Average depth of the main pool(feet) 4.05 ft _
29 Average depth equation used Equation 2 _
30 If using equation 3,main pool perimeter(feet)
31 If using equation 3,width of submerged veg.shelf(feet)
32 Volume of the forebay(cubic feet) 23092 cf
33 Is this 15-20%of the volume in the main pool? Yes _
34 Clean-out depth for forebay(inches) 6 in
35 Design volume of SCM(cu ft) 49931 cf
36 Is the outlet an orifice or a weir? Orifice
37 If orifice,orifice diameter(inches) 4 in _
38 If weir,weir height(inches) na _
39 If weir,weir length(inches) na
40 Drawdown time for the temporary pool(days) 2.2
41 Are the inlet(s)and outlet located in a manner that avoids short- Yes
circuiting?
42 Are berms or baffles provided to improve the flow path? Yes
43 Depth of forebay at entrance(inches) 60 in _
44 Depth of forebay at exit(inches) 72 in
45 Does water flow out of the forebay in a non-erosive manner? Yes
46 Width of the vegetated shelf(feet) 6 ft
47 Slope of vegetated shelf(H:V) 6:1
48 Does the orifice drawdown from below the top surface of the Yes
permanent pool?
49 Does the pond minimize impacts to the receiving channel from the 1- Yes
yr,24-hr storm? _
50 Are fountains proposed?(If Y,please provide documentation that No
MDC(9)is met.)
51 Is a trash rack or other device provided to protect the outlet system? Yes
52 Are the dam and embankment planted in non-clumping turf grass? Yes
53 Species of turf that will be used on the dam and embankment Native Grasses
54 Has a plantingplan been provided for the vegetated shelf? Yes
ADDITIONAL INFORMATION
55 Please use this space to provide any additional information about the
wet pond(s):
Wet Pond 3
SAND FILTER
1 Drainage area number 2 3
2 Minimum required treatment volume(cu ft) 11416 sf 9391 sf
GENERAL MDC FROM 02H.1050
3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes Yes
4 Is the SCM located away from contaminated soils? No No _
5 What are the side slopes of the SCM(H:V)? 3:1 3:1
6 Does the SCM have retaining walls,gabion walls or other engineered No No
side slopes?
7 Are the inlets,outlets,and receiving stream protected from erosion Yes Yes
(10-year storm)?
8 Is there an overflow or bypass for inflow volume in excess of the Yes Yes
design volume?
9 What is the method for dewatering the SCM for maintenance? Pump(preferred) Pump(preferred)
10 If applicable,will the SCM be cleaned out after construction? Yes Yes
11 Does the maintenance access comply with General MDC(8)? Yes Yes
12 Does the drainage easement comply with General MDC(9)? Yes Yes
If the SCM is on a single family lot,does(will?)the plat comply with
13 N/A N/A
General MDC(10)?
14 Is there an O&M Agreement that complies with General MDC(11)? Yes Yes
15 Is there an O&M Plan that complies with General MDC(12)? Yes Yes
16 Does the SCM follow the device specific MDC? Yes Yes
17 Was the SCM designed by an NC licensed professional? Yes Yes
SAND FILTER MDC FROM 02H.1056
18 SHWT elevation(fmsl) NA 544.38
19 Type of sand filter(open or closed) Open Open
20 If closed,will the filter will be pre-cast or pour-in-place?
21 If closed,top of grate elevation(fmsl)
22 Is this sand filter designed to attenuate peak flows? Yes Yes
Sediment Chamber
23 Volume that can be retained in the sediment chamber(cubic feet) 8738 cf 7937 cf
24 Will there be a permanent pool in the sediment chamber? No No
25 Bottom of the sediment chamber(fmsl) 575.00 550.00
26 Area of the sediment chamber(square feet) 6224 sf 3670 sf
27 Physical depth of the sediment chamber(inches) 36 in 36 in
28 Ponding depth in the sediment chamber,above any permanent pool 36 in 36 in
(inches)
29 Elevation of top of weir between chambers(fmsl) 577.5 553
(Sand Chamber
30 Volume that can be retained in the sand chamber(cubic feet) 6653 cf 5921 cf
31 Bottom of the sand chamber(fmsl) 575.00 550.00
32 Area of the sand chamber(square feet) 1427 sf 913 sf
33 Physical depth of the sand chamber(inches) 60 in 96 in
34 Ponding depth in the sand chamber,above the sand surface 13 in 18 in
(inches)
35 Elevation of the bypass device(fmsl) 577.5 553
36 Type of bypass device Weir _ Weir _
37 Mechanism for distributing flow over the sand surface Slope Slope _
38 Sand specification for sand chamber ASTM 33 ASTM 34
39 Depth above underdrain pipe(inches) 27 in 27 in _
40 Will the media be maintained to drain at least two inches per hour at Yes Yes
the sand surface? _
41 Is at least one clean-out pipe provided at the low point of each Yes Yes
underdrain line?
42 Will clean-out pipes be capped? Yes Yes
ADDITIONAL INFORMATION
43 Please use this space to provide any additional information about the
sand filter(s):
Sand Filter 4