Loading...
HomeMy WebLinkAboutSW3230302_Design Calculations_20240417 WWI< CHIC KS© N community infrastructure consultants Davis Village Subdivision WKD # 20230964.00.CL CALCULATIONS FOR: BMP Pond Revision DATE: 3/28/2024 •°'Q-� cAti3 p;'•• O oFEssio �'' QQ �,7 REV: S '4 044570 �• /� O!• ,''�•.., T SUS ,.•• Mar 28 2024 5:42 PM 1213 W. MOREHEAD STREET, SUITE 300, CHARLOTTE, NORTH CAROLINA 28208 TEL 704.334.5348 FAX 704.334.0078 www.WKDickson.com Davis Village Subdivision o►WI< PROJECT NO.: 20230964.00.CL BY: ESL D I C I<ScDN DATE: 3/28/2024 T.M.: ETS community infrastructure consultants REVISED: P.M.: ETS PRE/POST DEVELOPMENT CURVE NUMBERS CURVE NUMBER: Predeveloped CN Cover Type Area(SF) % CN Wtd. CN Woods/Grass(B Soils) 3390330 0.92 50.50 Pasture(B Soils) 233477 0.06 3.86 Existing Impervious 68390 0.02 1.82 Total 3692197 1.00 56.18 Composite CN 56.18 Use CN= 56 Postdeveloped CN BMP#A Cover Type Area(SF) % CN Wtd. CN Roadway 141028 0.12 11.33 Sidewalk 45439 0.04 3.65 Buildings 427875 0.35 34.37 Grass (B Soils) 605720 0.50 39.72 Total 1220062 1.00 89.06 Composite CN 89.06 Use CN= Postdeveloped CN BMP#B Cover Type Area(SF) % CN Wtd. CN Roadway 54985 0.18 18.07 Sidewalk 19378 0.06 6.37 Buildings 42000 0.14 13.80 Grass(B Soils) 162566 0.55 43.61 Amenity 19288 0.06 6.34 Total 298217 1.00 88.19 Composite CN 88.19 Use CN= Postdeveloped CN BMP#C Cover Type Area (SF) % CN Wtd. CN Roadway 29469 0.15 98 14.26 Sidewalk 9606 0.05 98 4.65 Buildings 64500 0.32 98 31.20 Existing Impervious 1540 0.01 98 0.75 Parking 8842 0.04 98 4.28 Grass (B Soils) 88617 0.44 80 35.00 Total 202574 1.00 90.13 Composite CN 90.13 Use CN= Postdeveloped CN Bypass Cover Type Area (SF) % CN Wtd. CN Roadway 15584 0.02 1.86 Buildings 127555 0.16 15.24 Sidewalk 4420 0.01 0.53 Pasture(B Soils) 672496 0.82 45.10 Total 820055 1.00 62.74 Composite CN 62.74 Use CN= Davis Village Subdivision 'PkWI< PROJECT NO.: 20230964.00.CL BY: ESL Mar Co I C I<SO N DATE: 3/28/2024 T.M.: ETS community infrastructure consultants REVISED: P.M.: ETS IMPERVIOUS CALCULATIONS Impervious Calculations for Basins BMP A Drainage Area 28.01 acres Impervious Areas Right of Way(paving, curb, sidewalk, parking lot)= 186467 sf #Lots sf/lot Lots(building, sidewalk, concrete patios, driveways, etc.)= 427875 sf 122.25 3500 Total Impervious= 614342 sf Percent Impervious= 50.35% BMP B Drainage Area 6.85 acres Impervious Areas Right of Way(paving, curb, sidewalk)= 74363 sf #Lots sf/lot Lots(building, sidewalk, concrete patios, driveways, etc.)= 42000 sf 12.00 3500 Amenity= 19288 sf Total Impervious= 135651 sf Percent Impervious= 45.49% BMP C Drainage Area 4.65 acres Impervious Areas Right of Way(paving, curb, sidewalk)= 49457 sf #Lots sf/lot Lots(building, sidewalk, concrete patios, driveways, etc.)= 64500 sf 37.50 1720 Total Impervious= 113957 sf Percent Impervious= 56.25% BYPASS Drainage Area 18.83 acres Impervious Areas #Lots sf/lot Right of Way(paving, curb, sidewalk)= 20004 sf 6.50 1720 Lots(building, sidewalk, concrete patios, driveways, etc.)= 127555 sf 33.25 3500 Total Impervious= 147559 sf Percent Impervious= 17.99% Davis Village Subdivision ►WK PROJECT NO.: 20230964.00.CL BY: ESL Ma,i I C I<SD N DATE: 3/28/2024 T.M.: ETS community ir*frostructure oonsultomts REVISED: P.M.: ETS WATER QUALITY BASIN CALCULATIONS-WETPOND#A WATER QUALITY REQUIREMENTS To meet the Water Quality requirements,the procedure outlined in the"Stormwater Best Management Practices"published by NCDENR will be used. This guide gives the required pond surface area and storage volume to meet an 85%pollutant removal efficiency. Also,the pond must detain the first 1"of rainfall and release this volume over a period of 2 to 5 days.Calculations for these requirements are as follows: % PERMANENT POOL DEPTH Surface area requirements Impervious 3_ 4 5 6 7 8 Drainage area to pond(Da)= 28.01 Ac 10 0.51 0.43 0.37 0.3 0.27 _ 0.25 Post-development impervious percentage= 50% 20 0.84 0.69 0.61 0.51 0.44 0.4 Average pool depth= 4 ft 30 1.17 0.94 0.84 0.72 0.61 0.56 Designed permanent pool elevation= 555.5 40 1.51 1.24 1.09 0.91 0.78 0.71 50 1.79 1.51 1.31 1.13 0.95 0.87 60 2.09 1.77 1.49 1.31 1.12 1.03 Interpolation to find required SA/DA ratio for non whole number 70 2.51 2.09 1.8 1.56 1.34 1.17 Storage 80 2.92 2.41 2.07 1.82 1.62 1.4 Depth volume 90 3.25 2.64 2.31 2.04 1.84 1.59 4 1.52 4 1.52 5 1.32 From table 1.1 in the BMP guidelines the required Surface Area to Drainage Area Ratio(SA/DA)for a permanent pool depth= 1.52 Required surface area=SA/DA/100 x Drainage area= 0.43 Ac 18535.023 Surface area of pond as designed at permanent pool elevation= 0.63786 Ac Average Depth Calculations Equation 2 Equation 3 1"rainfall requirements vPP = 4.055 D VPP-Vshelf 4.39 Using the runoff volume calculations in the"Simple Method": DAVG SA AVG Abottom of shelf SA 27785 A6onom of shelf=25512 Rv=0.05+0.9(I) VPP= 112672 Vshuf= 590.25 Rv= 0.5032 in/in Perimeter.m,n,,,=787 Vshei f=0.5 *Depthmax over shelf*Perimeterperm pool*Width submerged part of shelf Volume=(Design rainfall)(Rv)(Drainage Area) Volume=1"rainfall x Rv in/in x 1/12 in/ft x Da= *Depth rounded down to nearest 0.5* or 1.17 ac-ft *USE EQUATION 2* This volume must be released over a period of 2-5 days 51159 ft^3 As designed pond areas: Permanent Pond Storage Volume r - Elevation Forebay Forebay FB Volume FB Volume Pond Pond Pond Volume Pond Volume Storage Volumes (msl) (of) (as) (cu-ft) (ac-ft) (of) (an) (cu-ft) (ac-ft) Cumulative 550 I 805 I 0.0185 0 I 0.0000 II 11695 10.2685 II 0 I 0.0000 I' Elevation Area(ac) Volume(ac-ft) 551 I 1688 I 0.0388 1218 I 0.0280 II 16817 lI 0.3861 II 14165 I 0.3252 I 555.5 0.794 0.00 552 I 2668 I 0.0612 3376 I 0.0775 II 18886 10.4336 II 31988 I 0.7343 [ 556 0.862 0.41 553 I 3745 lI 0.0860 6564 I 0.1507 I[ 21026 10.4827 II 51915 I 1.1918 I 557 0.946 1.32 554 4914 I 0.1128 10876 I 0.2497 23224 0.5331 II 74008 I 1.6990 I 558 1.029 2.30 555 6150 I 0.1412 16391 I 0.3763 25512 0.5857 II 98343 I 2.2576 I 559 1.113 3.37 555.5 6793 I 0.1559 19536 I 0.4505 27785 0.6379 II 112672 I 2.5866 I 560 1.198 4.53 556 7453 I 0.1711 23092 I 0.5321 30106 0.6911 II- 127126 I 2.9184 1 561 1.241 5.74 557 0 I 0.0000 25574 I 0.0000 41209 0.9460II 162603 I 3.7329 I 558 0 lI 0.0000 25574 I 0.0000 44809 1 1.0287 II 205557 I 4.7189 I 559 0 I 0.0000 25574 0.0000 48473 1.1128 II 252139 5.7883 I 560 0 -II 0.0000 25574 0.0000 52204 1.1984 II 302416 6.9425 560.5 0 I 0.0000 25574 0.0000 54057 1.2410 II 328953 7.5517 [ I II I Forebay Volume(CF) 23092 I II [ r Main Pool Volume(CF) 127126 I II Forebay%of Pond 18.16% I II [ I II I I II I I II I Interpolation to find elevation at which required storage volume is reached Storage Storage Storage Elev volume area(ac.) area(cf.) 556 0.41 0.86 37559 Elev 1.17 0.93 40635 557 1.32 0.95 41209 Elev= 556.84 Storage elevation= 1.34 feet above permanent pool elevation Determination of Orifice size for 2-5 day drawdown a=2A x sqrt(h) *Falling head equation C= Orifice constant 32.2 ft/s^2 Ct(sqrt(2g)) 1.34 ft Minimum orifice area= 0.6 a=Area of orifice Minimum orifice size= t=Time to drawdown Selected orifice size= 0.09 sqft 4.0 inches A=Average pond surface area a sqft g=Gravity constant 190080 sec (2.2 day drawdown) 4.00 inches h=Change in head 34210 sf BMP#B STAGE-STORAGE TABLE Sand Filter Forebay(Basin Bottom to Top of Forebay) ELEVATION DEPTH CHANGE SURFACE AREA INC.VOLUME TOTAL VOLUME TOTAL VOLUME _ ft. ft, sq.ft. cu.ft. cu.ft. ac-ft 0 0 0.000 575.0 6,224 1.0 6,702 6,702 0.154 576.0 7,192 1.0 7,696 14,398 0.331 577.0 8,211 0.5 4,237 18,635 0.428 577.5 8,738 _ STAGE-STORAGE TABLE Sand Filter(Basin Bottom to Top of Forebay) ELEVATION DEPTH CHANGE SURFACE AREA INC.VOLUME TOTAL VOLUME TOTAL VOLUME ft. ft, sq.ft. cu.ft. cu.ft. ac-ft - 0 0 0.000 575.0 1,427 1.0 1,669 1,669 0.038 576.0 1,923 1.0 2,197 3,865 0.089 577.0 2,482 0.5 1,316 5,181 0.119 577.5 2,785 STAGE-STORAGE TABLE Sand Filter(Filter Bottom to Top of Berm) ELEVATION DEPTH CHANGE SURFACE AREA INC.VOLUME TOTAL VOLUME TOTAL VOLUME ft. ft, sq.ft. cu.ft. cu.ft. ac-ft 0 0 0.000 575.0 7,651 1.0 8,372 8,372 0.192 576.0 9,115 1.0 9,894 18,266 0.419 577.0 10,693 1.0 11,529 29,794 0.684 578.0 12,385 1.0 34,220 42,593 0.978 579.0 13,864 1.0 38,913 57,179 1.313 580.0 15,391 Project Name: Davis Village Subdivision Project Number: 20230964.00.CL Given Information: Land Use: Single Family Development Drainage Area to Facility(Acres): 6.85 Impervious Area(Acres): 3.11 Percent Impervious: 45.5% Soil Type: CmB Soil Group: D Curve Number(CN)Pre: 84 Curve Number(CN)Post: 88 Time of Concentration Pre(hour): 0.6667 Time of Concentration Post(hour): 0.0833 Design Storm Rainfall Depth(in): 1.0 (Typically 1") Detention Time(Day): 1.66 Meck.County: 2 days-85%TSS&70%TP(Optimal Efficiency) 1 day-70%TSS&35%TP(Standard Efficiency) 2 days-85%TSS&0%TP(TSS-Only Efficiency) NCDENR 1.66 days Coefficient of Permeability for the Sand Filter Bed: 1.75 inches/hour Watershed: N/A Efficiency: NCDEQ Sand Filter Design (NCDEQ) Project Name: Davis Village Subdivision Job Number: 20230964.00.CL BMP #B Step 1: Compute the water quality volume (WQV). WQV(Ft3)= (Rv/1)X(AD/ 1)X(43,560 Ft2/ 1 Acre)X(RD/1)X(1 Ft/ 12 i n) WQVAdJ(Ft3)= (0.75)WQV Where: WQV=Water Quality Volume(Ft3) WQVAdJ=Adjusted Water Quality Volume(Ft3) AD= Drainage Area to Sand Filter(acres). Max. 5 acres. Rv=Volumetric Runoff Coefficient=0.05+0.9(% Impervious) RD= Design Storm Rainfall Depth (in).Typically 1.0". Percent Impervious= 45% AD= 6.85 acres RD= 1.0 in Rv= 0.46 WQV= 11,416 Ft3 WQVAdJ= 8,562 Fe Step 2: Determine the maximum head on the sand filter and sedimentation basin. ha (ft)= hMaxFilter/2 hMaxFilter(Ft)= (WQVAdJ)/(As+Af) As(Ft2)=-(Q0/w)x(In (1 -E)) Af(Ft2)= (WQV x dF)/(k x t x(hA+dF)) Q(Ft3/Sec)= k x(1 Day/86,400 Sec)x(Af)x((ha +dF)/dF) Where: ha=Average Head (Ft) hMaxFilter= Maximum Head on the Sand Filter(Ft) As= Surface Area of the Sedimentation Basin (Ft2) Af=Surface Area of the Sand Filter Bed (Ft2) Qo=Average Rate of Outflow From Sedimentation Chamber(Ft3/sec.)=WQV/86,400 E =Trap Efficiency of the Chamber= 0.9 w= Settling Velocity of Particle (Ft/sec)(Assume Particle Diameter of 20 microns=0.0004 Ft/sec) dF= Depth of Sand Filter Bed (Ft) k=Coefficient of Permeability for the Sand Filter Bed = 3.5 Ft/day t=Time Required to Drain the WQV through the Sand Filter Bed (day). Q=Sand Filter Infiltration Rate at hMaxFilter(Ft3/Sec). (Darcy's Law) For maximum heads between 2 and 6 feet, the following combinations of variables will work: (Ideal situation As=Af) hMaxFilter WQVAaJ As+Af (Ft) (Ft3) (Ft2) 2 8,562 4,281 3 8,562 2,854 4 8,562 2,141 5 8,562 1,712 6 8,562 1,427 Area available for sand filter= 7,651 Ft2 hMaxFilter= 1.12 Ft ha= 0.6 Ft Minimum As= 761 Ft` dF= 1.5 Ft k= 3.5 Ft/day t= 1.66 day Minimum Af= 1,403 Ft` Min. required area for sand filter= 2,164 Ft2 TRUE Af= 1,427 Ft` As= 6,224 Ft` hMaxFilter= 1.1 Ft ha= 0.6 Ft Q= 0.081 Ft3/Sec Step 3: Ensure that the Water Quality Volume is Contained. (Af+As)x hMaxFilter WQVAdj 8,562 Ft3 >_ 8,562 Ft3 TRUE Step 4: Additional Design Requirements. For underground sand filters, provide at least 5 feet of clearance between the surface of the sand filter and the bottom of the roof of the underground structure to facilitate cleaning and maintenance. Step 5: Calculate Surface Area and Underdrain Requirements Q(Ft3/Sec)= k x(1 Day/86,400 Sec)x(Af)x((ha +dF)/dF) Where: ha=Average Head (Ft) hMaxFilter= Maximum Head on the Sand Filter(Ft)(Maximum of 2.0 Ft) Af=Surface Area of the Sand Filter Bed (Ft2) As= Surface Area of the Sedimentation Basin (Ft2) Cd= Sediment Chamber Depth (Ft) dF= Depth of Sand Filter Bed (Ft)(Minimum of 2.0 Ft) k=Coefficient of Permeability for the Sand Filter Bed = 3.5 Ft/day QAveFilter=Sand Filter Infiltration Rate at ha (Ft3/Sec). (Darcy's Law) Qo=Sand Filter Infiltration Rate at Top of Sand (Ft3/Sec). (Darcy's Law) WQVAdj= 8,562 Ft' Required Af= 1,403 Ft` Provided Af= 1,427 Ft` Required AS= 761 Ft` Provided AS= 6,224 Ft` Required Cd= 0.5 Ft Provided Cd= 2.5 Ft QAveFilter= 0.081 Ft'/Sec Qo= 0.000 Ft'/Sec Drawdown = 0.059 Ft3/Sec Number of Underdrain Rows Required = 2 (Maximum Spacing = 10 Ft) Total Length of Underdrain =I 15 Ft Number of Underdrain Perforations = 104 Holes 50% of Perforations= 52 Holes Area of One Perforation = 0.00077 Ft2 Capacity of One Hole= 0.0054 Ft3/Sec Total Capacity of Perforations= 0.28 Ft3/Sec Check: 0.28 Ft3/Sec > 0.081 Ft3/Sec :. GOOD Capacity of 6" PVC Underdrain at 0.50%Slope= 0.39 Ft3/Sec Assume 50% Clogging = 0.20 Ft3/Sec Check: 0.20 Ft3/Sec > 0.081 Ft3/Sec :. GOOD BMP#C STAGE-STORAGE TABLE Sand Filter Forebay(Basin Bottom to Top of Forebay) ELEVATION DEPTH CHANGE SURFACE AREA INC.VOLUME TOTAL VOLUME TOTAL VOLUME ft. ft, sq.ft. cu.ft. cu.ft. ac-ft - 0 0 0.000 550.0 3,670 1.0 4,313 4,313 0.099 551.0 4,989 1.0 5,685 9,998 0.230 552.0 6,411 1.0 7,160 17,158 0.394 553.0 7,937 STAGE-STORAGE TABLE Sand Filter(Basin Bottom to Top of Forebay) ELEVATION DEPTH CHANGE SURFACE AREA INC.VOLUME TOTAL VOLUME TOTAL VOLUME ft. ft, sq.ft. cu.ft. cu.ft. ac-ft - 0 0 0.000 550.0 913 1.0 1,105 1,105 0.025 551.0 1,309 1.0 1,537 2,642 0.061 552.0 1,776 1.0 1,994 4,636 0.106 553.0 2,221 STAGE-STORAGE TABLE Sand Filter(Filter Bottom to Top of Berm) ELEVATION DEPTH CHANGE SURFACE AREA INC.VOLUME TOTAL VOLUME TOTAL VOLUME ft. ft, sq.ft. cu.ft. cu.ft. ac-ft 0 0 0.000 550.0 4,583 1.0 5,418 5,418 0.124 551.0 6,298 1.0 7,222 12,640 0.290 552.0 8,187 1.0 9,155 21,795 0.500 553.0 10,158 1.0 27,085 32,503 0.746 554.0 12,069 1.0 32,697 45,336 1.041 555.0 13,858 1.0 14,772 60,109 1.380 Project Name: Davis Village Subdivision Project Number: 20230964.00.CL Given Information: Land Use: Single Family Development Drainage Area to Facility(Acres): 4.65 NCDEQ(Maximum 5 Acres) Meck.County(Maximum 10 Ac for a Surface Filter) Meck.County(Maximum 2 Ac for a Perimeter Filter) Meck.County(Maximum 5 Ac for an Underground Filter) Impervious Area(Acres): 2.62 Percent Impervious: 56.3% Soil Type: CmB Soil Group: B Curve Number(CN)Pre: 80 Curve Number(CN)Post: 90 Time of Concentration Pre(hour): 0.6667 Time of Concentration Post(hour): 0.0833 Design Storm Rainfall Depth(in): 1.0 (Typically 1") Detention Time(Day): 1.66 Meck.County: 2 days-85%TSS&70%TP(Optimal Efficiency) 1 day-70%TSS&35%TP(Standard Efficiency) 2 days-85%TSS&0%TP(TSS-Only Efficiency) NCDENR 1.66 days Coefficient of Permeability for the Sand Filter Bed: 1.75 inches/hour Watershed: N/A Efficiency: NCDEQ Sand Filter Design (NCDEQ) Project Name: Davis Village Subdivision Job Number: 20230964.00.CL BMP #C Step 1: Compute the water quality volume (WQV). WQV(Ft3)= (Rv/1)X(AD/ 1)X(43,560 Ft2/ 1 Acre)X(RD/1)X(1 Ft/ 12 i n) WQVAdJ(Ft3)= (0.75)WQV Where: WQV=Water Quality Volume(Ft3) WQVAdJ=Adjusted Water Quality Volume(Ft3) AD= Drainage Area to Sand Filter(acres). Max. 5 acres. Rv=Volumetric Runoff Coefficient=0.05+0.9(% Impervious) RD= Design Storm Rainfall Depth (in).Typically 1.0". Percent Impervious= 56% AD= 4.65 acres RD= 1.0 in Rv= 0.56 WQV= 9,391 Ft3 WQVAdJ= 7,043 Fe Step 2: Determine the maximum head on the sand filter and sedimentation basin. ha (ft)= hMaxFilter/2 hMaxFilter(Ft)= (WQVAdJ)/(As+Af) As(Ft2)=-(Q0/w)x(In (1 -E)) Af(Ft2)= (WQV x dF)/(k x t x(hA+dF)) Q(Ft3/Sec)= k x(1 Day/86,400 Sec)x(Af)x((ha +dF)/dF) Where: ha=Average Head (Ft) hMaxFitter= Maximum Head on the Sand Filter(Ft) As= Surface Area of the Sedimentation Basin (Ft2) Af=Surface Area of the Sand Filter Bed (Ft2) Qo=Average Rate of Outflow From Sedimentation Chamber(Ft3/sec.)=WQV/86,400 E =Trap Efficiency of the Chamber= 0.9 w= Settling Velocity of Particle (Ft/sec)(Assume Particle Diameter of 20 microns=0.0004 Ft/sec) dF= Depth of Sand Filter Bed (Ft)(Minimum of 1.0 Ft) k=Coefficient of Permeability for the Sand Filter Bed = 3.5 Ft/day t=Time Required to Drain the WQV through the Sand Filter Bed (day). Q=Sand Filter Infiltration Rate at hMaxFitter(Ft3/Sec). (Darcy's Law) For maximum heads between 2 and 6 feet, the following combinations of variables will work: (Ideal situation As=Af) hMaxFitter WQVAaJ As+Af (Ft) (Ft3) (Ft2) 2 7,043 3,522 3 7,043 2,348 4 7,043 1,761 5 7,043 1,409 6 7,043 1,174 Area available for sand filter= 4,583 Ft2 hMaxFitter= 1.54 Ft ha= 0.8 Ft Minimum As= 626 Ft` dF= 1.0 Ft k= 3.5 Ft/day t= 1.66 day Minimum Af= 898 Ft` Min. required area for sand filter= 1,524 Ft2 TRUE Af= 913 Ft` As= 3,670 Ft` hMaxFilter= 1.5 Ft ha = 0.8 Ft Q= 0.067 Ft3/Sec Step 3: Ensure that the Water Quality Volume is Contained. (Af+As)x hMaxFilter WQVAdj 7,043 Ft3 >_ 7,043 Ft3 TRUE Step 4: Additional Design Requirements. For underground sand filters, provide at least 5 feet of clearance between the surface of the sand filter and the bottom of the roof of the underground structure to facilitate cleaning and maintenance. Step 5: Calculate Surface Area and Underdrain Requirements Q(Ft3/Sec)= k x(1 Day/86,400 Sec)x(Af)x((ha +dF)/dF) Where: ha=Average Head (Ft) hMaxFilter= Maximum Head on the Sand Filter(Ft)(Maximum of 2.0 Ft) Af=Surface Area of the Sand Filter Bed (Ft2) As= Surface Area of the Sedimentation Basin (Ft2) Cd= Sediment Chamber Depth (Ft) dF= Depth of Sand Filter Bed (Ft)(Minimum of 2.0 Ft) k=Coefficient of Permeability for the Sand Filter Bed = 3.5 Ft/day QAveFilter=Sand Filter Infiltration Rate at ha (Ft3/Sec). (Darcy's Law) Qo=Sand Filter Infiltration Rate at Top of Sand (Ft3/Sec). (Darcy's Law) WQVAdj= 7,043 Ft' Required Af= 898 Ft` Provided Af= 900 Ft` Required AS= 626 Ft` Provided AS= 3,670 Ft` Required Cd= 1 Ft Provided Cd= 3 Ft QAveFilter= 0.066 Ft'/Sec Qo= 0.000 Ft'/Sec Drawdown = 0.049 Ft3/Sec Number of Underdrain Rows Required = 2 (Maximum Spacing = 10 Ft) Total Length of Underdrain = 30 Ft Number of Underdrain Perforations = 224 Holes 50% of Perforations= 112 Holes Area of One Perforation = 0.00077 Ft2 Capacity of One Hole= 0.0050 Ft3/Sec Total Capacity of Perforations= 0.56 Ft3/Sec Check: 0.56 Ft3/Sec > 0.066 Ft3/Sec :. GOOD Capacity of 6" PVC Underdrain at 0.50%Slope= 0.39 Ft3/Sec Assume 50% Clogging = 0.20 Ft3/Sec Check: 0.20 Ft3/Sec > 0.066 Ft3/Sec :. GOOD <PRE#> DA#1 D BMP-1 Predevelopment#1 Post-Development Pond BMP #1 #1 <PRE#2 DA#2 D BMP-2 Predevelopment#2 Post-Development Pond BMP #2 #2 <PRE#> <DA#3> D BMP#3 Predevelopment#3 Post-Development Pond BMP #3 #3 KSubcat Reach 'ono Link Routing Diagram for Davis Village Prepared by WK Dickson, Printed 4/12/2024 HydroCAD®10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Detention Davis Village Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 2 Project Notes Rainfall events imported from "BMP-1 CALCULATIONS_20220412.hcp" Copied 6 events from Charlotte 6-hr storm Detention Davis Village Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 3 Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 19.671 80 >75% Grass cover, Good, HSG D (DA#1, DA#2, DA#3) 0.443 98 Amenity Impervious (DA#2) 12.268 98 Buildings/Driveways (DA#1, DA#2, DA#3) 0.035 98 Ex. Impervious (DA#3) 0.203 98 Parking (DA#3) 62.866 84 Pasture/grassland/range, Fair, HSG D (PRE#1, PRE#2, PRE#3) 5.177 98 Roadway (DA#1, DA#2, DA#3) 1.709 98 Sidewalk (DA#1, DA#2, DA#3) 102.372 86 TOTAL AREA Detention Davis Village Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 4 Pipe Listing (all nodes) Line# Node In-Invert Out-Invert Length Slope n Width Diam/Height Inside-Fill Node Number (feet) (feet) (feet) (ft/ft) (inches) (inches) (inches) Name 1 BMP#3 549.50 548.96 85.0 0.0064 0.013 0.0 24.0 0.0 2 BMP-1 550.00 548.00 115.0 0.0174 0.013 0.0 36.0 0.0 3 BMP-2 574.40 574.00 88.0 0.0045 0.013 0.0 24.0 0.0 Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 5 Time span=0.00-120.00 hrs, dt=0.10 hrs, 1201 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DA#1: Post-Development Runoff Area=28.009 ac 50.36% Impervious Runoff Depth=0.28" Tc=5.0 min CN=89 Runoff=16.05 cfs 0.665 af Subcatchment DA#2: Post-Development Runoff Area=6.846 ac 45.49% Impervious Runoff Depth=0.25" Tc=5.0 min CN=88 Runoff=3.45 cfs 0.144 of Subcatchment DA#3: Post-Development Runoff Area=4.651 ac 56.27% Impervious Runoff Depth=0.32" Tc=5.0 min CN=90 Runoff=3.02 cfs 0.124 of Subcatchment PRE#1: Predevelopment#1 Runoff Area=28.010 ac 0.00% Impervious Runoff Depth=0.15" Tc=29.5 min CN=84 Runoff=3.88 cfs 0.354 af Subcatchment PRE#2: Predevelopment#2 Runoff Area=6.846 ac 0.00% Impervious Runoff Depth=0.15" Tc=31.9 min CN=84 Runoff=0.91 cfs 0.087 af SubcatchmentPRE#3: Predevelopment#3 Runoff Area=28.010 ac 0.00% Impervious Runoff Depth=0.15" Tc=31.9 min CN=84 Runoff=3.73 cfs 0.354 af Pond BMP#3: BMP#3 Peak Elev=550.84' Storage=4,468 cf Inflow=3.02 cfs 0.124 af Primary=0.08 cfs 0.124 af Secondary=0.00 cfs 0.000 af Outflow=0.08 cfs 0.124 af Pond BMP-1: BMP#1 Peak EIev=556.20' Storage=25,490 cf Inflow=16.05 cfs 0.665 af Primary=0.35 cfs 0.665 af Secondary=0.00 cfs 0.000 af Outflow=0.35 cfs 0.665 af Pond BMP-2: BMP#2 Peak Elev=575.66' Storage=5,364 cf Inflow=3.45 cfs 0.144 af Primary=0.08 cfs 0.144 af Secondary=0.00 cfs 0.000 af Outflow=0.08 cfs 0.144 af Total Runoff Area = 102.372 ac Runoff Volume = 1.729 af Average Runoff Depth = 0.20" 80.62% Pervious = 82.537 ac 19.38% Impervious = 19.835 ac Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment DA#1: Post-Development Pond #1 Runoff = 16.05 cfs @ 3.19 hrs, Volume= 0.665 af, Depth= 0.28" Routed to Pond BMP-1 : BMP #1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Charlotte 6-hr 1-inch Rainfall=1.00" Area (ac) CN Description • 3.238 98 Roadway • 1.043 98 Sidewalk • 9.823 98 Buildings/Driveways 13.905 80 >75% Grass cover, Good, HSG D 28.009 89 Weighted Average 13.905 49.64% Pervious Area 14.104 50.36% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA#1: Post-Development Pond #1 Hydrograph — •Runoff 16.05 cfs lidrikttir t� IlCll 14/ 14: 1 I tRai�f1II .10i"13Y Runoff Ar 28.QO9-at 12= 11- Runoff 1/11I4m1et0. _6 f • 97 _L ! L!rirlD71: h7_°'121" I o nun _ LT. �5.Q 0 lf/,ff/ f/S //ll( S(/ l(/ l/,/l(/,/(// (/l/llff( l/,(ff(,/f// / lfr 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 7 Hydrograph for Subcatchment DA#1: Post-Development Pond #1 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 1.00 0.28 0.00 2.00 0.11 0.00 0.00 106.00 1.00 0.28 0.00 4.00 0.88 0.22 1.75 108.00 1.00 0.28 0.00 6.00 1.00 0.28 0.61 110.00 1.00 0.28 0.00 8.00 1.00 0.28 0.00 112.00 1.00 0.28 0.00 10.00 1.00 0.28 0.00 114.00 1.00 0.28 0.00 12.00 1.00 0.28 0.00 116.00 1.00 0.28 0.00 14.00 1.00 0.28 0.00 118.00 1.00 0.28 0.00 16.00 1.00 0.28 0.00 120.00 1.00 0.28 0.00 18.00 1.00 0.28 0.00 20.00 1.00 0.28 0.00 22.00 1.00 0.28 0.00 24.00 1.00 0.28 0.00 26.00 1.00 0.28 0.00 28.00 1.00 0.28 0.00 30.00 1.00 0.28 0.00 32.00 1.00 0.28 0.00 34.00 1.00 0.28 0.00 36.00 1.00 0.28 0.00 38.00 1.00 0.28 0.00 40.00 1.00 0.28 0.00 42.00 1.00 0.28 0.00 44.00 1.00 0.28 0.00 46.00 1.00 0.28 0.00 48.00 1.00 0.28 0.00 50.00 1.00 0.28 0.00 52.00 1.00 0.28 0.00 54.00 1.00 0.28 0.00 56.00 1.00 0.28 0.00 58.00 1.00 0.28 0.00 60.00 1.00 0.28 0.00 62.00 1.00 0.28 0.00 64.00 1.00 0.28 0.00 66.00 1.00 0.28 0.00 68.00 1.00 0.28 0.00 70.00 1.00 0.28 0.00 72.00 1.00 0.28 0.00 74.00 1.00 0.28 0.00 76.00 1.00 0.28 0.00 78.00 1.00 0.28 0.00 80.00 1.00 0.28 0.00 82.00 1.00 0.28 0.00 84.00 1.00 0.28 0.00 86.00 1.00 0.28 0.00 88.00 1.00 0.28 0.00 90.00 1.00 0.28 0.00 92.00 1.00 0.28 0.00 94.00 1.00 0.28 0.00 96.00 1.00 0.28 0.00 98.00 1.00 0.28 0.00 100.00 1.00 0.28 0.00 102.00 1.00 0.28 0.00 Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment DA#2: Post-Development Pond #2 Runoff = 3.45 cfs @ 3.19 hrs, Volume= 0.144 af, Depth= 0.25" Routed to Pond BMP-2 : BMP #2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Charlotte 6-hr 1-inch Rainfall=1.00" Area (ac) CN Description • 1.262 98 Roadway • 0.445 98 Sidewalk • 0.964 98 Buildings/Driveways 3.732 80 >75% Grass cover, Good, HSG D • 0.443 98 Amenity Impervious 6.846 88 Weighted Average 3.732 54.51% Pervious Area 3.114 45.49% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA#2: Post-Development Pond #2 Hydrograph — ❑Runoff 3.45 cfs I ICha�rl�tte 8-I�r '�-illlcrl 3 * tRainf1 11 .001" IRUnbff Area=6.846 ad RLn9ff Volume=0.144 of 2 / !Runcfff 1:reph70.F-5" Tc=5.0 m i n CN=88 1 / / 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 9 Hydrograph for Subcatchment DA#2: Post-Development Pond #2 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 1.00 0.25 0.00 2.00 0.11 0.00 0.00 106.00 1.00 0.25 0.00 4.00 0.88 0.19 0.40 108.00 1.00 0.25 0.00 6.00 1.00 0.25 0.14 110.00 1.00 0.25 0.00 8.00 1.00 0.25 0.00 112.00 1.00 0.25 0.00 10.00 1.00 0.25 0.00 114.00 1.00 0.25 0.00 12.00 1.00 0.25 0.00 116.00 1.00 0.25 0.00 14.00 1.00 0.25 0.00 118.00 1.00 0.25 0.00 16.00 1.00 0.25 0.00 120.00 1.00 0.25 0.00 18.00 1.00 0.25 0.00 20.00 1.00 0.25 0.00 22.00 1.00 0.25 0.00 24.00 1.00 0.25 0.00 26.00 1.00 0.25 0.00 28.00 1.00 0.25 0.00 30.00 1.00 0.25 0.00 32.00 1.00 0.25 0.00 34.00 1.00 0.25 0.00 36.00 1.00 0.25 0.00 38.00 1.00 0.25 0.00 40.00 1.00 0.25 0.00 42.00 1.00 0.25 0.00 44.00 1.00 0.25 0.00 46.00 1.00 0.25 0.00 48.00 1.00 0.25 0.00 50.00 1.00 0.25 0.00 52.00 1.00 0.25 0.00 54.00 1.00 0.25 0.00 56.00 1.00 0.25 0.00 58.00 1.00 0.25 0.00 60.00 1.00 0.25 0.00 62.00 1.00 0.25 0.00 64.00 1.00 0.25 0.00 66.00 1.00 0.25 0.00 68.00 1.00 0.25 0.00 70.00 1.00 0.25 0.00 72.00 1.00 0.25 0.00 74.00 1.00 0.25 0.00 76.00 1.00 0.25 0.00 78.00 1.00 0.25 0.00 80.00 1.00 0.25 0.00 82.00 1.00 0.25 0.00 84.00 1.00 0.25 0.00 86.00 1.00 0.25 0.00 88.00 1.00 0.25 0.00 90.00 1.00 0.25 0.00 92.00 1.00 0.25 0.00 94.00 1.00 0.25 0.00 96.00 1.00 0.25 0.00 98.00 1.00 0.25 0.00 100.00 1.00 0.25 0.00 102.00 1.00 0.25 0.00 Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment DA#3: Post-Development Pond #3 Runoff = 3.02 cfs @ 3.19 hrs, Volume= 0.124 af, Depth= 0.32" Routed to Pond BMP#3 : BMP #3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Charlotte 6-hr 1-inch Rainfall=1.00" Area (ac) CN Description • 0.677 98 Roadway • 0.221 98 Sidewalk • 1.481 98 Buildings/Driveways 2.034 80 >75% Grass cover, Good, HSG D • 0.203 98 Parking • 0.035 98 Ex. Impervious 4.651 90 Weighted Average 2.034 43.73% Pervious Area 2.617 56.27% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA#3: Post-Development Pond #3 Hydrograph ❑Runoff 3.02 cfs 3 16hrItte 6-h r Rainf�II 1.100" IRUnbff Area=4.6511 ad 2 Ri npff-VplumeF0.1-24 f 3 / Runoff Depth=0.32" LL Tc=5.0 min 6NL9b / 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 11 Hydrograph for Subcatchment DA#3: Post-Development Pond #3 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 1.00 0.32 0.00 2.00 0.11 0.00 0.00 106.00 1.00 0.32 0.00 4.00 0.88 0.25 0.31 108.00 1.00 0.32 0.00 6.00 1.00 0.32 0.11 110.00 1.00 0.32 0.00 8.00 1.00 0.32 0.00 112.00 1.00 0.32 0.00 10.00 1.00 0.32 0.00 114.00 1.00 0.32 0.00 12.00 1.00 0.32 0.00 116.00 1.00 0.32 0.00 14.00 1.00 0.32 0.00 118.00 1.00 0.32 0.00 16.00 1.00 0.32 0.00 120.00 1.00 0.32 0.00 18.00 1.00 0.32 0.00 20.00 1.00 0.32 0.00 22.00 1.00 0.32 0.00 24.00 1.00 0.32 0.00 26.00 1.00 0.32 0.00 28.00 1.00 0.32 0.00 30.00 1.00 0.32 0.00 32.00 1.00 0.32 0.00 34.00 1.00 0.32 0.00 36.00 1.00 0.32 0.00 38.00 1.00 0.32 0.00 40.00 1.00 0.32 0.00 42.00 1.00 0.32 0.00 44.00 1.00 0.32 0.00 46.00 1.00 0.32 0.00 48.00 1.00 0.32 0.00 50.00 1.00 0.32 0.00 52.00 1.00 0.32 0.00 54.00 1.00 0.32 0.00 56.00 1.00 0.32 0.00 58.00 1.00 0.32 0.00 60.00 1.00 0.32 0.00 62.00 1.00 0.32 0.00 64.00 1.00 0.32 0.00 66.00 1.00 0.32 0.00 68.00 1.00 0.32 0.00 70.00 1.00 0.32 0.00 72.00 1.00 0.32 0.00 74.00 1.00 0.32 0.00 76.00 1.00 0.32 0.00 78.00 1.00 0.32 0.00 80.00 1.00 0.32 0.00 82.00 1.00 0.32 0.00 84.00 1.00 0.32 0.00 86.00 1.00 0.32 0.00 88.00 1.00 0.32 0.00 90.00 1.00 0.32 0.00 92.00 1.00 0.32 0.00 94.00 1.00 0.32 0.00 96.00 1.00 0.32 0.00 98.00 1.00 0.32 0.00 100.00 1.00 0.32 0.00 102.00 1.00 0.32 0.00 Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment PRE#1: Predevelopment #1 Runoff = 3.88 cfs @ 3.58 hrs, Volume= 0.354 af, Depth= 0.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Charlotte 6-hr 1-inch Rainfall=1.00" Area (ac) CN Description 28.010 84 Pasture/grassland/range, Fair, HSG D 28.010 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 29.5 Direct Entry, Subcatchment PRE#1: Predevelopment #1 Hydrograph 0 Runoff 3.88 cfs Clhrlbtte 6-hr 1-inch Rainfall 1.b0 3 Iurho -f Area=28.0T0 ac Ryncff Vplume=0. 511 of _�t nipi Depth70.11 ' o 2 Tc= 9.5 min GIN-84 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 13 Hydrograph for Subcatchment PRE#1: Predevelopment #1 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 1.00 0.15 0.00 2.00 0.11 0.00 0.00 106.00 1.00 0.15 0.00 4.00 0.88 0.10 2.11 108.00 1.00 0.15 0.00 6.00 1.00 0.15 0.52 110.00 1.00 0.15 0.00 8.00 1.00 0.15 0.00 112.00 1.00 0.15 0.00 10.00 1.00 0.15 0.00 114.00 1.00 0.15 0.00 12.00 1.00 0.15 0.00 116.00 1.00 0.15 0.00 14.00 1.00 0.15 0.00 118.00 1.00 0.15 0.00 16.00 1.00 0.15 0.00 120.00 1.00 0.15 0.00 18.00 1.00 0.15 0.00 20.00 1.00 0.15 0.00 22.00 1.00 0.15 0.00 24.00 1.00 0.15 0.00 26.00 1.00 0.15 0.00 28.00 1.00 0.15 0.00 30.00 1.00 0.15 0.00 32.00 1.00 0.15 0.00 34.00 1.00 0.15 0.00 36.00 1.00 0.15 0.00 38.00 1.00 0.15 0.00 40.00 1.00 0.15 0.00 42.00 1.00 0.15 0.00 44.00 1.00 0.15 0.00 46.00 1.00 0.15 0.00 48.00 1.00 0.15 0.00 50.00 1.00 0.15 0.00 52.00 1.00 0.15 0.00 54.00 1.00 0.15 0.00 56.00 1.00 0.15 0.00 58.00 1.00 0.15 0.00 60.00 1.00 0.15 0.00 62.00 1.00 0.15 0.00 64.00 1.00 0.15 0.00 66.00 1.00 0.15 0.00 68.00 1.00 0.15 0.00 70.00 1.00 0.15 0.00 72.00 1.00 0.15 0.00 74.00 1.00 0.15 0.00 76.00 1.00 0.15 0.00 78.00 1.00 0.15 0.00 80.00 1.00 0.15 0.00 82.00 1.00 0.15 0.00 84.00 1.00 0.15 0.00 86.00 1.00 0.15 0.00 88.00 1.00 0.15 0.00 90.00 1.00 0.15 0.00 92.00 1.00 0.15 0.00 94.00 1.00 0.15 0.00 96.00 1.00 0.15 0.00 98.00 1.00 0.15 0.00 100.00 1.00 0.15 0.00 102.00 1.00 0.15 0.00 Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 14 Summary for Subcatchment PRE#2: Predevelopment #2 Runoff = 0.91 cfs @ 3.62 hrs, Volume= 0.087 af, Depth= 0.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Charlotte 6-hr 1-inch Rainfall=1.00" Area (ac) CN Description 6.846 84 Pasture/grassland/range, Fair, HSG D 6.846 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.9 Direct Entry, Subcatchment PRE#2: Predevelopment #2 Hydrograph 1� - ❑Runoff 0.91 cfs 2 6hrIbtte 6-h r Rainfall=1.b0" IRUnbff Area=6.846 ac Rin9ff Vplume=0.087 of / !Runoff Dep h70.115" Tc=31.9 min LL 6NL84 o 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 15 Hydrograph for Subcatchment PRE#2: Predevelopment #2 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 1.00 0.15 0.00 2.00 0.11 0.00 0.00 106.00 1.00 0.15 0.00 4.00 0.88 0.10 0.55 108.00 1.00 0.15 0.00 6.00 1.00 0.15 0.13 110.00 1.00 0.15 0.00 8.00 1.00 0.15 0.00 112.00 1.00 0.15 0.00 10.00 1.00 0.15 0.00 114.00 1.00 0.15 0.00 12.00 1.00 0.15 0.00 116.00 1.00 0.15 0.00 14.00 1.00 0.15 0.00 118.00 1.00 0.15 0.00 16.00 1.00 0.15 0.00 120.00 1.00 0.15 0.00 18.00 1.00 0.15 0.00 20.00 1.00 0.15 0.00 22.00 1.00 0.15 0.00 24.00 1.00 0.15 0.00 26.00 1.00 0.15 0.00 28.00 1.00 0.15 0.00 30.00 1.00 0.15 0.00 32.00 1.00 0.15 0.00 34.00 1.00 0.15 0.00 36.00 1.00 0.15 0.00 38.00 1.00 0.15 0.00 40.00 1.00 0.15 0.00 42.00 1.00 0.15 0.00 44.00 1.00 0.15 0.00 46.00 1.00 0.15 0.00 48.00 1.00 0.15 0.00 50.00 1.00 0.15 0.00 52.00 1.00 0.15 0.00 54.00 1.00 0.15 0.00 56.00 1.00 0.15 0.00 58.00 1.00 0.15 0.00 60.00 1.00 0.15 0.00 62.00 1.00 0.15 0.00 64.00 1.00 0.15 0.00 66.00 1.00 0.15 0.00 68.00 1.00 0.15 0.00 70.00 1.00 0.15 0.00 72.00 1.00 0.15 0.00 74.00 1.00 0.15 0.00 76.00 1.00 0.15 0.00 78.00 1.00 0.15 0.00 80.00 1.00 0.15 0.00 82.00 1.00 0.15 0.00 84.00 1.00 0.15 0.00 86.00 1.00 0.15 0.00 88.00 1.00 0.15 0.00 90.00 1.00 0.15 0.00 92.00 1.00 0.15 0.00 94.00 1.00 0.15 0.00 96.00 1.00 0.15 0.00 98.00 1.00 0.15 0.00 100.00 1.00 0.15 0.00 102.00 1.00 0.15 0.00 Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 16 Summary for Subcatchment PRE#3: Predevelopment #3 Runoff = 3.73 cfs @ 3.62 hrs, Volume= 0.354 af, Depth= 0.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Charlotte 6-hr 1-inch Rainfall=1.00" Area (ac) CN Description 28.010 84 Pasture/grassland/range, Fair, HSG D 28.010 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.9 Direct Entry, Subcatchment PRE#3: Predevelopment #3 Hydrograph ❑Runoff 3.73 cfs j dhrlootte I I I 1 Rainfall=1.1001" 3 Runoff Area=28.010 ad Ryncff 1/9I9me=0. 51 �f 2 ; rt 1- fi l T ! L?irli:.!117-4111-57 Tc1.9 min GIN-814 1 1 - 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 17 Hydrograph for Subcatchment PRE#3: Predevelopment #3 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 1.00 0.15 0.00 2.00 0.11 0.00 0.00 106.00 1.00 0.15 0.00 4.00 0.88 0.10 2.23 108.00 1.00 0.15 0.00 6.00 1.00 0.15 0.53 110.00 1.00 0.15 0.00 8.00 1.00 0.15 0.00 112.00 1.00 0.15 0.00 10.00 1.00 0.15 0.00 114.00 1.00 0.15 0.00 12.00 1.00 0.15 0.00 116.00 1.00 0.15 0.00 14.00 1.00 0.15 0.00 118.00 1.00 0.15 0.00 16.00 1.00 0.15 0.00 120.00 1.00 0.15 0.00 18.00 1.00 0.15 0.00 20.00 1.00 0.15 0.00 22.00 1.00 0.15 0.00 24.00 1.00 0.15 0.00 26.00 1.00 0.15 0.00 28.00 1.00 0.15 0.00 30.00 1.00 0.15 0.00 32.00 1.00 0.15 0.00 34.00 1.00 0.15 0.00 36.00 1.00 0.15 0.00 38.00 1.00 0.15 0.00 40.00 1.00 0.15 0.00 42.00 1.00 0.15 0.00 44.00 1.00 0.15 0.00 46.00 1.00 0.15 0.00 48.00 1.00 0.15 0.00 50.00 1.00 0.15 0.00 52.00 1.00 0.15 0.00 54.00 1.00 0.15 0.00 56.00 1.00 0.15 0.00 58.00 1.00 0.15 0.00 60.00 1.00 0.15 0.00 62.00 1.00 0.15 0.00 64.00 1.00 0.15 0.00 66.00 1.00 0.15 0.00 68.00 1.00 0.15 0.00 70.00 1.00 0.15 0.00 72.00 1.00 0.15 0.00 74.00 1.00 0.15 0.00 76.00 1.00 0.15 0.00 78.00 1.00 0.15 0.00 80.00 1.00 0.15 0.00 82.00 1.00 0.15 0.00 84.00 1.00 0.15 0.00 86.00 1.00 0.15 0.00 88.00 1.00 0.15 0.00 90.00 1.00 0.15 0.00 92.00 1.00 0.15 0.00 94.00 1.00 0.15 0.00 96.00 1.00 0.15 0.00 98.00 1.00 0.15 0.00 100.00 1.00 0.15 0.00 102.00 1.00 0.15 0.00 Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 18 Summary for Pond BMP#3: BMP #3 Inflow Area = 4.651 ac, 56.27% Impervious, Inflow Depth = 0.32" for 1-inch event Inflow = 3.02 cfs @ 3.19 hrs, Volume= 0.124 of Outflow = 0.08 cfs @ 3.10 hrs, Volume= 0.124 af, Atten= 97%, Lag= 0.0 min Primary = 0.08 cfs @ 3.10 hrs, Volume= 0.124 af Routed to nonexistent node POST-POI#1 Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to nonexistent node POST-POI#1 Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Peak Elev= 550.84' @ 6.02 hrs Surf.Area= 6,027 sf Storage= 4,468 cf Plug-Flow detention time= 507.8 min calculated for 0.124 af(100% of inflow) Center-of-Mass det. time= 508.1 min ( 729.8 - 221.7 ) Volume Invert Avail.Storage Storage Description #1 550.00' 95,966 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 550.00 4,583 0 0 551.00 6,298 5,441 5,441 552.00 8,187 7,243 12,683 553.00 10,158 9,173 21,856 554.00 12,069 11,114 32,969 555.00 13,858 12,964 45,933 556.00 15,706 14,782 60,715 557.00 17,611 16,659 77,373 558.00 19,575 18,593 95,966 Device Routing Invert Outlet Devices #1 Primary 549.50' 24.0" Round RCP Round 24" L= 85.0' RCP, square edge headwall, Ke= 0.500 Inlet/Outlet Invert= 549.50' / 548.96' S= 0.0064 '/' Cc= 0.900 n= 0.013 Concrete sewer w/manholes & inlets, Flow Area= 3.14 sf #2 Device 1 550.00' Sand Filter Head (feet) 0.00 0.01 6.00 Disch. (cfs) 0.000 0.081 0.081 #3 Device 1 553.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 Width (feet) 2.00 2.00 #4 Device 1 554.00' 48.0" x 48.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads #5 Secondary 556.00' 10.0' long x 16.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 19 Primary OutFlow Max=0.08 cfs @ 3.10 hrs HW=550.13' (Free Discharge) =RCP_Round 24" (Passes 0.08 cfs of 1.95 cfs potential flow) —2=Sand Filter (Custom Controls 0.08 cfs) —3=Custom Weir/Orifice ( Controls 0.00 cfs) —4=Riser ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=550.00' (Free Discharge) 5=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Pond BMP#3: BMP #3 Hydrograph 3.02 cfs ❑Inflow / ❑Outflow Inflow Area=4.651 ac ❑Primary ❑Secondary I Peak Elev=550.84' Storage=4,468 cf w 2 3 / 0 LL 1 n nR 0.08 cfs0.00 cfs 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 20 Pond BMP#3: BMP #3 Stage-Discharge ❑Total ' 558 ❑Primary ❑Secondary 557 / /.� Broad-Crested Rectan.ular Weir 556 ^ 555 ...d/ .2 /a�' Riser 0 554 ' �� Custom Weir/Orifice III 553 % 552 551 / Sand Filter / 0 10 20 30 40 50 60 70 80 90 100 110 Discharge (cfs) Pond BMP#3: BMP #3 Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-ft) 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 Surface ❑Storage 558_ I I 1 ��� ������� 557 I ��� �� I I I 5561/ 555� ��/�/ 2 - ' II II I //' I I o 554- , //�/ /� I 41 I > - w553LZ I 4 II 41 I - 552:/ 5511/ 1 Custom Stage Data 550 ( , 0 10,,000 20,000 30,000 40,000 50,000 60,,000 70,000 80,000 90,000' Storage(cubic-feet) Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 21 Hydrograph for Pond BMP#3: BMP #3 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 550.00 0.00 0.00 0.00 5.00 0.17 4,270 550.81 0.08 0.08 0.00 10.00 0.00 3,334 550.65 0.08 0.08 0.00 15.00 0.00 1,876 550.38 0.08 0.08 0.00 20.00 0.00 418 550.09 0.08 0.08 0.00 25.00 0.00 0 550.00 0.00 0.00 0.00 30.00 0.00 0 550.00 0.00 0.00 0.00 35.00 0.00 0 550.00 0.00 0.00 0.00 40.00 0.00 0 550.00 0.00 0.00 0.00 45.00 0.00 0 550.00 0.00 0.00 0.00 50.00 0.00 0 550.00 0.00 0.00 0.00 55.00 0.00 0 550.00 0.00 0.00 0.00 60.00 0.00 0 550.00 0.00 0.00 0.00 65.00 0.00 0 550.00 0.00 0.00 0.00 70.00 0.00 0 550.00 0.00 0.00 0.00 75.00 0.00 0 550.00 0.00 0.00 0.00 80.00 0.00 0 550.00 0.00 0.00 0.00 85.00 0.00 0 550.00 0.00 0.00 0.00 90.00 0.00 0 550.00 0.00 0.00 0.00 95.00 0.00 0 550.00 0.00 0.00 0.00 100.00 0.00 0 550.00 0.00 0.00 0.00 105.00 0.00 0 550.00 0.00 0.00 0.00 110.00 0.00 0 550.00 0.00 0.00 0.00 115.00 0.00 0 550.00 0.00 0.00 0.00 120.00 0.00 0 550.00 0.00 0.00 0.00 Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 22 Stage-Discharge for Pond BMP#3: BMP #3 Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 550.00 0.00 0.00 0.00 555.20 32.45 32.45 0.00 550.10 0.08 0.08 0.00 555.30 32.83 32.83 0.00 550.20 0.08 0.08 0.00 555.40 33.21 33.21 0.00 550.30 0.08 0.08 0.00 555.50 33.58 33.58 0.00 550.40 0.08 0.08 0.00 555.60 33.95 33.95 0.00 550.50 0.08 0.08 0.00 555.70 34.31 34.31 0.00 550.60 0.08 0.08 0.00 555.80 34.67 34.67 0.00 550.70 0.08 0.08 0.00 555.90 35.03 35.03 0.00 550.80 0.08 0.08 0.00 556.00 35.38 35.38 0.00 550.90 0.08 0.08 0.00 556.10 36.58 35.73 0.85 551.00 0.08 0.08 0.00 556.20 38.47 36.07 2.40 551.10 0.08 0.08 0.00 556.30 40.84 36.42 4.42 551.20 0.08 0.08 0.00 556.40 43.57 36.74 6.83 551.30 0.08 0.08 0.00 556.50 46.60 37.05 9.55 551.40 0.08 0.08 0.00 556.60 49.91 37.36 12.55 551.50 0.08 0.08 0.00 556.70 53.30 37.67 15.64 551.60 0.08 0.08 0.00 556.80 56.86 37.97 18.89 551.70 0.08 0.08 0.00 556.90 60.77 38.27 22.50 551.80 0.08 0.08 0.00 557.00 64.87 38.57 26.30 551.90 0.08 0.08 0.00 557.10 69.26 38.86 30.40 552.00 0.08 0.08 0.00 557.20 73.86 39.15 34.70 552.10 0.08 0.08 0.00 557.30 78.58 39.45 39.13 552.20 0.08 0.08 0.00 557.40 83.47 39.73 43.73 552.30 0.08 0.08 0.00 557.50 88.43 40.02 48.41 552.40 0.08 0.08 0.00 557.60 93.53 40.31 53.23 552.50 0.08 0.08 0.00 557.70 98.88 40.59 58.29 552.60 0.08 0.08 0.00 557.80 104.38 40.87 63.51 552.70 0.08 0.08 0.00 557.90 110.03 41.15 68.88 552.80 0.08 0.08 0.00 558.00 115.81 41.43 74.39 552.90 0.08 0.08 0.00 553.00 0.08 0.08 0.00 553.10 0.29 0.29 0.00 553.20 0.67 0.67 0.00 553.30 1.16 1.16 0.00 553.40 1.74 1.74 0.00 553.50 2.40 2.40 0.00 553.60 3.13 3.13 0.00 553.70 3.92 3.92 0.00 553.80 4.77 4.77 0.00 553.90 5.67 5.67 0.00 554.00 6.63 6.63 0.00 554.10 9.09 9.09 0.00 554.20 12.78 12.78 0.00 554.30 17.31 17.31 0.00 554.40 22.51 22.51 0.00 554.50 28.30 28.30 0.00 554.60 30.07 30.07 0.00 554.70 30.48 30.48 0.00 554.80 30.88 30.88 0.00 554.90 31.28 31.28 0.00 555.00 31.68 31.68 0.00 555.10 32.06 32.06 0.00 Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 23 Stage-Area-Storage for Pond BMP#3: BMP #3 Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 550.00 4,583 0 555.20 14,228 48,741 550.10 4,755 467 555.30 14,412 50,173 550.20 4,926 951 555.40 14,597 51,624 550.30 5,097 1,452 555.50 14,782 53,093 550.40 5,269 1,970 555.60 14,967 54,580 550.50 5,441 2,506 555.70 15,152 56,086 550.60 5,612 3,059 555.80 15,336 57,610 550.70 5,784 3,628 555.90 15,521 59,153 550.80 5,955 4,215 556.00 15,706 60,715 550.90 6,126 4,819 556.10 15,897 62,295 551.00 6,298 5,441 556.20 16,087 63,894 551.10 6,487 6,080 556.30 16,277 65,512 551.20 6,676 6,738 556.40 16,468 67,149 551.30 6,865 7,415 556.50 16,659 68,806 551.40 7,054 8,111 556.60 16,849 70,481 551.50 7,243 8,826 556.70 17,040 72,175 551.60 7,431 9,559 556.80 17,230 73,889 551.70 7,620 10,312 556.90 17,420 75,621 551.80 7,809 11,083 557.00 17,611 77,373 551.90 7,998 11,874 557.10 17,807 79,144 552.00 8,187 12,683 557.20 18,004 80,934 552.10 8,384 13,512 557.30 18,200 82,745 552.20 8,581 14,360 557.40 18,397 84,575 552.30 8,778 15,228 557.50 18,593 86,424 552.40 8,975 16,115 557.60 18,789 88,293 552.50 9,173 17,023 557.70 18,986 90,182 552.60 9,370 17,950 557.80 19,182 92,090 552.70 9,567 18,897 557.90 19,379 94,018 552.80 9,764 19,863 558.00 19,575 95,966 552.90 9,961 20,850 553.00 10,158 21,856 553.10 10,349 22,881 553.20 10,540 23,925 553.30 10,731 24,989 553.40 10,922 26,072 553.50 11,114 27,173 553.60 11,305 28,294 553.70 11,496 29,434 553.80 11,687 30,593 553.90 11,878 31,772 554.00 12,069 32,969 554.10 12,248 34,185 554.20 12,427 35,419 554.30 12,606 36,670 554.40 12,785 37,940 554.50 12,964 39,227 554.60 13,142 40,532 554.70 13,321 41,856 554.80 13,500 43,197 554.90 13,679 44,556 555.00 13,858 45,933 555.10 14,043 47,328 Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 24 Summary for Pond BMP-1: BMP #1 Inflow Area = 28.009 ac, 50.36% Impervious, Inflow Depth = 0.28" for 1-inch event Inflow = 16.05 cfs @ 3.19 hrs, Volume= 0.665 af Outflow = 0.35 cfs @ 6.06 hrs, Volume= 0.665 af, Atten= 98%, Lag= 172.5 min Primary = 0.35 cfs @ 6.06 hrs, Volume= 0.665 af Routed to nonexistent node POST-POI#1 Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to nonexistent node POST-POI#1 Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Peak Elev= 556.20' @ 6.06 hrs Surf.Area= 38,277 sf Storage= 25,490 cf Plug-Flow detention time= 882.5 min calculated for 0.665 af(100% of inflow) Center-of-Mass det. time= 886.4 min ( 1,109.8 - 223.4 ) Volume Invert Avail.Storage Storage Description #1 555.50' 223,972 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 555.50 34,578 0 0 556.00 37,559 18,034 18,034 557.00 41,209 39,384 57,418 558.00 44,809 43,009 100,427 559.00 48,473 46,641 147,068 560.00 52,204 50,339 197,407 560.50 54,057 26,565 223,972 Device Routing Invert Outlet Devices #1 Primary 550.00' 36.0" Round RCP_Round 36" L= 115.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 550.00' / 548.00' S= 0.0174 '/' Cc= 0.900 n= 0.013 Concrete sewer w/manholes & inlets, Flow Area= 7.07 sf #2 Device 1 555.50' 4.0" Horiz. WQ/CP Orifice C= 0.600 Limited to weir flow at low heads #3 Device 1 557.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 0.50 Width (feet) 2.00 2.00 #4 Device 1 557.50' 48.0" x 48.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads #5 Secondary 559.00' 20.0' long x 16.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 25 Primary OutFlow Max=0.35 cfs © 6.06 hrs HW=556.20' (Free Discharge) L1=RCP_Round 36" (Passes 0.35 cfs of 73.76 cfs potential flow) 2=WQ/CP Orifice (Orifice Controls 0.35 cfs © 4.02 fps) 3=Custom Weir/Orifice ( Controls 0.00 cfs) 4=Riser ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=555.50' (Free Discharge) LS=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Pond BMP-1: BMP #1 Hydrograph /_ L I — I ;16.05 cfs ■ flow �Q ❑Outflow ' l Fiifia ►v r =LV.����+91�/� ❑Se ondary 177 16 11 1 14 -Peakl €aeit=55h6.l�l� — 157 14II 4 -k -§t9-r -R_,'1'94 — 13; 12i / +— H -H E 1—IH I — 11 - 10 2 I— H 1 t H I � I—IH 1 3 _ 8'� / I I I I U - / 5� / 4 ' 1 1 1 1 7 3V� I n '�q, rf 2.I 0.35 cfs 0.00 cfs "'`'`"' O/%///O//////O//////O//// 0-, "/// // 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 26 Pond BMP-1: BMP #1 Stage-Discharge 0 Total 0 Primary ❑Secondary 560 /�// Broad-Crested Rectan.ular Weir �` 559 / 0 558 � •; % j Riser w / Custom Weir/Orifice 557 556 % WQ/CP Orifice 0 20 40 60 80 100 120 140 160 180 Discharge (cfs) Pond BMP-1: BMP #1 Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-ft) 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 0 Surfacel ❑Storage 560 /// /// 559 z /// 0558 II m W II 557 - I I I 556-' Custom Stage Data 0 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000 180,000 200,000 220,000 Storage(cubic-feet) Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 27 Hydrograph for Pond BMP-1: BMP #1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 555.50 0.00 0.00 0.00 5.00 0.96 23,942 556.16 0.34 0.34 0.00 10.00 0.00 20,822 556.07 0.32 0.32 0.00 15.00 0.00 15,473 555.93 0.28 0.28 0.00 20.00 0.00 10,895 555.81 0.23 0.23 0.00 25.00 0.00 7,103 555.70 0.19 0.19 0.00 30.00 0.00 4,169 555.62 0.13 0.13 0.00 35.00 0.00 2,439 555.57 0.07 0.07 0.00 40.00 0.00 1,581 555.55 0.03 0.03 0.00 45.00 0.00 1,063 555.53 0.02 0.02 0.00 50.00 0.00 715 555.52 0.02 0.02 0.00 55.00 0.00 481 555.51 0.01 0.01 0.00 60.00 0.00 323 555.51 0.01 0.01 0.00 65.00 0.00 217 555.51 0.00 0.00 0.00 70.00 0.00 146 555.50 0.00 0.00 0.00 75.00 0.00 98 555.50 0.00 0.00 0.00 80.00 0.00 66 555.50 0.00 0.00 0.00 85.00 0.00 44 555.50 0.00 0.00 0.00 90.00 0.00 30 555.50 0.00 0.00 0.00 95.00 0.00 20 555.50 0.00 0.00 0.00 100.00 0.00 14 555.50 0.00 0.00 0.00 105.00 0.00 9 555.50 0.00 0.00 0.00 110.00 0.00 6 555.50 0.00 0.00 0.00 115.00 0.00 4 555.50 0.00 0.00 0.00 120.00 0.00 3 555.50 0.00 0.00 0.00 Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 28 Stage-Discharge for Pond BMP-1: BMP #1 Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 555.50 0.00 0.00 0.00 558.10 29.51 29.51 0.00 555.55 0.04 0.04 0.00 558.15 32.75 32.75 0.00 555.60 0.11 0.11 0.00 558.20 36.11 36.11 0.00 555.65 0.16 0.16 0.00 558.25 39.58 39.58 0.00 555.70 0.19 0.19 0.00 558.30 43.16 43.16 0.00 555.75 0.21 0.21 0.00 558.35 46.85 46.85 0.00 555.80 0.23 0.23 0.00 558.40 50.64 50.64 0.00 555.85 0.25 0.25 0.00 558.45 54.54 54.54 0.00 555.90 0.27 0.27 0.00 558.50 58.53 58.53 0.00 555.95 0.28 0.28 0.00 558.55 62.62 62.62 0.00 556.00 0.30 0.30 0.00 558.60 66.80 66.80 0.00 556.05 0.31 0.31 0.00 558.65 71.07 71.07 0.00 556.10 0.33 0.33 0.00 558.70 75.44 75.44 0.00 556.15 0.34 0.34 0.00 558.75 79.89 79.89 0.00 556.20 0.35 0.35 0.00 558.80 84.42 84.42 0.00 556.25 0.36 0.36 0.00 558.85 89.04 89.04 0.00 556.30 0.38 0.38 0.00 558.90 92.59 92.59 0.00 556.35 0.39 0.39 0.00 558.95 92.90 92.90 0.00 556.40 0.40 0.40 0.00 559.00 93.21 93.21 0.00 556.45 0.41 0.41 0.00 559.05 94.12 93.52 0.60 556.50 0.42 0.42 0.00 559.10 95.52 93.83 1.69 556.55 0.43 0.43 0.00 559.15 97.25 94.14 3.11 556.60 0.44 0.44 0.00 559.20 99.24 94.44 4.79 556.65 0.45 0.45 0.00 559.25 101.46 94.75 6.71 556.70 0.46 0.46 0.00 559.30 103.90 95.05 8.84 556.75 0.47 0.47 0.00 559.35 106.52 95.36 11.16 556.80 0.48 0.48 0.00 559.40 109.32 95.66 13.66 556.85 0.49 0.49 0.00 559.45 112.27 95.96 16.30 556.90 0.50 0.50 0.00 559.50 115.36 96.27 19.09 556.95 0.51 0.51 0.00 559.55 118.59 96.57 22.03 557.00 0.51 0.51 0.00 559.60 121.96 96.87 25.10 557.05 0.60 0.60 0.00 559.65 125.31 97.16 28.14 557.10 0.74 0.74 0.00 559.70 128.74 97.46 31.27 557.15 0.92 0.92 0.00 559.75 132.25 97.76 34.49 557.20 1.13 1.13 0.00 559.80 135.83 98.05 37.78 557.25 1.37 1.37 0.00 559.85 139.69 98.35 41.34 557.30 1.64 1.64 0.00 559.90 143.64 98.64 45.00 557.35 1.93 1.93 0.00 559.95 147.69 98.94 48.75 557.40 2.24 2.24 0.00 560.00 151.83 99.23 52.60 557.45 2.56 2.56 0.00 560.05 156.17 99.52 56.65 557.50 2.91 2.91 0.00 560.10 160.61 99.81 60.80 557.55 3.79 3.79 0.00 560.15 165.15 100.10 65.05 557.60 5.10 5.10 0.00 560.20 169.80 100.39 69.41 557.65 6.71 6.71 0.00 560.25 174.47 100.68 73.79 557.70 8.55 8.55 0.00 560.30 179.23 100.96 78.26 557.75 10.61 10.61 0.00 560.35 184.07 101.25 82.82 557.80 12.84 12.84 0.00 560.40 189.00 101.54 87.46 557.85 15.25 15.25 0.00 560.45 193.92 101.82 92.10 557.90 17.82 17.82 0.00 560.50 198.92 102.11 96.82 557.95 20.54 20.54 0.00 558.00 23.40 23.40 0.00 558.05 26.39 26.39 0.00 Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 29 Stage-Area-Storage for Pond BMP-1: BMP #1 Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 555.50 34,578 0 558.10 45,175 104,926 555.55 34,876 1,736 558.15 45,359 107,190 555.60 35,174 3,488 558.20 45,542 109,462 555.65 35,472 5,254 558.25 45,725 111,744 555.70 35,770 7,035 558.30 45,908 114,035 555.75 36,069 8,831 558.35 46,091 116,335 555.80 36,367 10,642 558.40 46,275 118,644 555.85 36,665 12,467 558.45 46,458 120,962 555.90 36,963 14,308 558.50 46,641 123,290 555.95 37,261 16,164 558.55 46,824 125,626 556.00 37,559 18,034 558.60 47,007 127,972 556.05 37,741 19,917 558.65 47,191 130,327 556.10 37,924 21,808 558.70 47,374 132,691 556.15 38,106 23,709 558.75 47,557 135,065 556.20 38,289 25,619 558.80 47,740 137,447 556.25 38,472 27,538 558.85 47,923 139,839 556.30 38,654 29,466 558.90 48,107 142,239 556.35 38,837 31,403 558.95 48,290 144,649 556.40 39,019 33,350 559.00 48,473 147,068 556.45 39,202 35,305 559.05 48,660 149,497 556.50 39,384 37,270 559.10 48,846 151,934 556.55 39,566 39,244 559.15 49,033 154,381 556.60 39,749 41,227 559.20 49,219 156,837 556.65 39,931 43,219 559.25 49,406 159,303 556.70 40,114 45,220 559.30 49,592 161,778 556.75 40,297 47,230 559.35 49,779 164,262 556.80 40,479 49,249 559.40 49,965 166,756 556.85 40,662 51,278 559.45 50,152 169,259 556.90 40,844 53,316 559.50 50,339 171,771 556.95 41,027 55,362 559.55 50,525 174,293 557.00 41,209 57,418 559.60 50,712 176,824 557.05 41,389 59,483 559.65 50,898 179,364 557.10 41,569 61,557 559.70 51,085 181,913 557.15 41,749 63,640 559.75 51,271 184,472 557.20 41,929 65,732 559.80 51,458 187,041 557.25 42,109 67,833 559.85 51,644 189,618 557.30 42,289 69,943 559.90 51,831 192,205 557.35 42,469 72,062 559.95 52,017 194,801 557.40 42,649 74,190 560.00 52,204 197,407 557.45 42,829 76,327 560.05 52,389 200,022 557.50 43,009 78,473 560.10 52,575 202,646 557.55 43,189 80,628 560.15 52,760 205,279 557.60 43,369 82,792 560.20 52,945 207,922 557.65 43,549 84,965 560.25 53,131 210,574 557.70 43,729 87,147 560.30 53,316 213,235 557.75 43,909 89,338 560.35 53,501 215,905 557.80 44,089 91,537 560.40 53,686 218,585 557.85 44,269 93,746 560.45 53,872 221,274 557.90 44,449 95,964 560.50 54,057 223,972 557.95 44,629 98,191 558.00 44,809 100,427 558.05 44,992 102,672 Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 30 Summary for Pond BMP-2: BMP #2 Inflow Area = 6.846 ac, 45.49% Impervious, Inflow Depth = 0.25" for 1-inch event Inflow = 3.45 cfs @ 3.19 hrs, Volume= 0.144 of Outflow = 0.08 cfs @ 3.10 hrs, Volume= 0.144 af, Atten= 98%, Lag= 0.0 min Primary = 0.08 cfs @ 3.10 hrs, Volume= 0.144 af Routed to nonexistent node POST-POI#1 Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to nonexistent node POST-POI#1 Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Peak Elev= 575.66' @ 6.06 hrs Surf.Area= 8,617 sf Storage= 5,364 cf Plug-Flow detention time= 598.8 min calculated for 0.144 af(100% of inflow) Center-of-Mass det. time= 599.3 min ( 824.5 - 225.2 ) Volume Invert Avail.Storage Storage Description #1 575.00' 57,570 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 575.00 7,651 0 0 576.00 9,115 8,383 8,383 577.00 10,693 9,904 18,287 577.50 11,523 5,554 23,841 578.00 12,385 5,977 29,818 579.00 13,864 13,125 42,943 580.00 15,391 14,628 57,570 Device Routing Invert Outlet Devices #1 Primary 574.40' 24.0" Round RCP Round 24" L= 88.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 574.40' / 574.00' S= 0.0045 '/' Cc= 0.900 n= 0.013 Concrete sewer w/manholes & inlets, Flow Area= 3.14 sf #2 Device 1 575.00' Sand Filter Head (feet) 0.00 0.01 6.00 Disch. (cfs) 0.000 0.081 0.081 #3 Device 1 577.50' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 0.50 Width (feet) 3.00 3.00 #4 Device 1 578.00' 48.0" x 48.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads #5 Secondary 579.00' 10.0' long x 16.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 31 Primary OutFlow Max=0.08 cfs @ 3.10 hrs HW=575.07' (Free Discharge) =RCP_Round 24" (Passes 0.08 cfs of 1.93 cfs potential flow) —2=Sand Filter (Custom Controls 0.08 cfs) —3=Custom Weir/Orifice ( Controls 0.00 cfs) —4=Riser ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=575.00' (Free Discharge) 5=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Pond BMP-2: BMP #2 /� Hydrograph / I ❑Inflow 3.45 cfs ❑outflow / 1 1 1 Inflow Area=6.846 ac o se ondary 1 I 1 I 1 1 Peak Elev=575.66' 3 . 1 1 1 I I I I 1 1 Storage=5,364 cf rt I 1 u_ �.. 2 I fl (1Rrf 0.08 cfs j,///0.00 cfs 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 32 Pond BMP-2: BMP #2 Stage-Discharge ❑Total ❑Primary 581 �'' ❑Secondary 580 Broad-Crested Rectangular Weir 579 Riser 0 578 Custom Weir/Orifice w 577 576 Sand Filter / 0 10 20 30 40 50 60 70 80 90 100 Discharge (cfs) Pond BMP-2: BMP #2 Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-ft) 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 11,000 12,000 13,000 14,000 15,000 Surface ` . ( ❑Storage 581 580:/ i 579:/ I I w 577� i ////���� II 576- _ J J Custom Stage Data 575 , , , , , , , , 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 55,000 Storage(cubic-feet) Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 33 Hydrograph for Pond BMP-2: BMP #2 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 575.00 0.00 0.00 0.00 5.00 0.22 5,018 575.62 0.08 0.08 0.00 10.00 0.00 4,234 575.53 0.08 0.08 0.00 15.00 0.00 2,776 575.35 0.08 0.08 0.00 20.00 0.00 1,318 575.17 0.08 0.08 0.00 25.00 0.00 4 575.00 0.00 0.00 0.00 30.00 0.00 0 575.00 0.00 0.00 0.00 35.00 0.00 0 575.00 0.00 0.00 0.00 40.00 0.00 0 575.00 0.00 0.00 0.00 45.00 0.00 0 575.00 0.00 0.00 0.00 50.00 0.00 0 575.00 0.00 0.00 0.00 55.00 0.00 0 575.00 0.00 0.00 0.00 60.00 0.00 0 575.00 0.00 0.00 0.00 65.00 0.00 0 575.00 0.00 0.00 0.00 70.00 0.00 0 575.00 0.00 0.00 0.00 75.00 0.00 0 575.00 0.00 0.00 0.00 80.00 0.00 0 575.00 0.00 0.00 0.00 85.00 0.00 0 575.00 0.00 0.00 0.00 90.00 0.00 0 575.00 0.00 0.00 0.00 95.00 0.00 0 575.00 0.00 0.00 0.00 100.00 0.00 0 575.00 0.00 0.00 0.00 105.00 0.00 0 575.00 0.00 0.00 0.00 110.00 0.00 0 575.00 0.00 0.00 0.00 115.00 0.00 0 575.00 0.00 0.00 0.00 120.00 0.00 0 575.00 0.00 0.00 0.00 Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 34 Stage-Discharge for Pond BMP-2: BMP #2 Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 575.00 0.00 0.00 0.00 580.20 66.77 32.06 34.70 575.10 0.08 0.08 0.00 580.30 71.57 32.44 39.13 575.20 0.08 0.08 0.00 580.40 76.55 32.82 43.73 575.30 0.08 0.08 0.00 580.50 81.60 33.19 48.41 575.40 0.08 0.08 0.00 580.60 86.78 33.55 53.23 575.50 0.08 0.08 0.00 580.70 92.21 33.92 58.29 575.60 0.08 0.08 0.00 580.80 97.79 34.28 63.51 575.70 0.08 0.08 0.00 580.90 103.51 34.63 68.88 575.80 0.08 0.08 0.00 581.00 109.37 34.98 74.39 575.90 0.08 0.08 0.00 576.00 0.08 0.08 0.00 576.10 0.08 0.08 0.00 576.20 0.08 0.08 0.00 576.30 0.08 0.08 0.00 576.40 0.08 0.08 0.00 576.50 0.08 0.08 0.00 576.60 0.08 0.08 0.00 576.70 0.08 0.08 0.00 576.80 0.08 0.08 0.00 576.90 0.08 0.08 0.00 577.00 0.08 0.08 0.00 577.10 0.08 0.08 0.00 577.20 0.08 0.08 0.00 577.30 0.08 0.08 0.00 577.40 0.08 0.08 0.00 577.50 0.08 0.08 0.00 577.60 0.39 0.39 0.00 577.70 0.96 0.96 0.00 577.80 1.70 1.70 0.00 577.90 2.57 2.57 0.00 578.00 3.55 3.55 0.00 578.10 5.99 5.99 0.00 578.20 9.64 9.64 0.00 578.30 14.09 14.09 0.00 578.40 19.22 19.22 0.00 578.50 24.74 24.74 0.00 578.60 25.23 25.23 0.00 578.70 25.71 25.71 0.00 578.80 26.18 26.18 0.00 578.90 26.64 26.64 0.00 579.00 27.10 27.10 0.00 579.10 28.39 27.55 0.85 579.20 30.38 27.99 2.40 579.30 32.84 28.42 4.42 579.40 35.68 28.85 6.83 579.50 38.82 29.27 9.55 579.60 42.23 29.68 12.55 579.70 45.73 30.09 15.64 579.80 49.39 30.50 18.89 579.90 53.39 30.90 22.50 580.00 57.59 31.29 26.30 580.10 62.08 31.68 30.40 Detention Davis Village Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 35 Stage-Area-Storage for Pond BMP-2: BMP #2 Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 575.00 7,651 0 580.20 15,391 57,570 575.10 7,797 772 580.30 15,391 57,570 575.20 7,944 1,559 580.40 15,391 57,570 575.30 8,090 2,361 580.50 15,391 57,570 575.40 8,237 3,178 580.60 15,391 57,570 575.50 8,383 4,009 580.70 15,391 57,570 575.60 8,529 4,854 580.80 15,391 57,570 575.70 8,676 5,714 580.90 15,391 57,570 575.80 8,822 6,589 581.00 15,391 57,570 575.90 8,969 7,479 576.00 9,115 8,383 576.10 9,273 9,302 576.20 9,431 10,238 576.30 9,588 11,189 576.40 9,746 12,155 576.50 9,904 13,138 576.60 10,062 14,136 576.70 10,220 15,150 576.80 10,377 16,180 576.90 10,535 17,226 577.00 10,693 18,287 577.10 10,859 19,365 577.20 11,025 20,459 577.30 11,191 21,570 577.40 11,357 22,697 577.50 11,523 23,841 577.60 11,695 25,002 577.70 11,868 26,180 577.80 12,040 27,375 577.90 12,213 28,588 578.00 12,385 29,818 578.10 12,533 31,064 578.20 12,681 32,325 578.30 12,829 33,600 578.40 12,977 34,890 578.50 13,125 36,195 578.60 13,272 37,515 578.70 13,420 38,850 578.80 13,568 40,199 578.90 13,716 41,563 579.00 13,864 42,943 579.10 14,017 44,337 579.20 14,169 45,746 579.30 14,322 47,170 579.40 14,475 48,610 579.50 14,628 50,065 579.60 14,780 51,536 579.70 14,933 53,021 579.80 15,086 54,522 579.90 15,238 56,039 580.00 15,391 57,570 580.10 15,391 57,570 Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 36 Time span=0.00-120.00 hrs, dt=0.10 hrs, 1201 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method SubcatchmentDA#1: Post-Development Runoff Area=28.009 ac 50.36% Impervious Runoff Depth=1.91" Tc=5.0 min CN=89 Runoff=83.39 cfs 4.455 af Subcatchment DA#2: Post-Development Runoff Area=6.846 ac 45.49% Impervious Runoff Depth=1.83" Tc=5.0 min CN=88 Runoff=19.64 cfs 1.042 of Subcatchment DA#3: Post-Development Runoff Area=4.651 ac 56.27% Impervious Runoff Depth=1.99" Tc=5.0 min CN=90 Runoff=14.35 cfs 0.773 af Subcatchment PRE#1: Predevelopment#1 Runoff Area=28.010 ac 0.00% Impervious Runoff Depth=1.52" Tc=29.5 min CN=84 Runoff=36.95 cfs 3.558 af Subcatchment PRE#2: Predevelopment#2 Runoff Area=6.846 ac 0.00% Impervious Runoff Depth=1.52" Tc=31.9 min CN=84 Runoff=8.54 cfs 0.870 af SubcatchmentPRE#3: Predevelopment#3 Runoff Area=28.010 ac 0.00% Impervious Runoff Depth=1.52" Tc=31.9 min CN=84 Runoff=34.95 cfs 3.558 af Pond BMP#3: BMP#3 Peak Elev=553.13' Storage=23,180 cf Inflow=14.35 cfs 0.773 af Primary=0.39 cfs 0.773 af Secondary=0.00 cfs 0.000 af Outflow=0.39 cfs 0.773 af Pond BMP-1: BMP#1 Peak EIev=557.90' Storage=96,107 cf Inflow=83.39 cfs 4.455 af Primary=19.66 cfs 4.454 af Secondary=0.00 cfs 0.000 af Outflow=19.66 cfs 4.454 af Pond BMP-2: BMP#2 Peak Elev=577.73' Storage=26,542 cf Inflow=19.64 cfs 1.042 af Primary=1.17 cfs 1.042 af Secondary=0.00 cfs 0.000 af Outflow=1.17 cfs 1.042 af Total Runoff Area = 102.372 ac Runoff Volume = 14.257 af Average Runoff Depth = 1.67" 80.62% Pervious = 82.537 ac 19.38% Impervious = 19.835 ac Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 37 Summary for Subcatchment DA#1: Post-Development Pond #1 Runoff = 83.39 cfs @ 11.96 hrs, Volume= 4.455 af, Depth= 1.91" Routed to Pond BMP-1 : BMP #1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Type II 24-hr 1yr-24hr Rainfall=3.01" Area (ac) CN Description • 3.238 98 Roadway • 1.043 98 Sidewalk • 9.823 98 Buildings/Driveways 13.905 80 >75% Grass cover, Good, HSG D 28.009 89 Weighted Average 13.905 49.64% Pervious Area 14.104 50.36% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA#1: Post-Development Pond #1 Hydrograph 1 I I I I i I 90 83.39 cfs ■Ruoff 85 I — — H H i ti;n1r - 80 75 H H H H 1 r1 ht�R� 3.10-11" - 70 Runoff /� 'Q /y/� 65 H L H H H Ar 028.QO9 — 55 LIM� I t e f 31.5 45 H T I H F ! -L!rictsff1 !'h71 .. _ - _ min 35 30 fi t rt � I � 25 15 10 + — 5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 38 Hydrograph for Subcatchment DA#1: Post-Development Pond #1 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 3.01 1.91 0.00 2.00 0.07 0.00 0.00 106.00 3.01 1.91 0.00 4.00 0.14 0.00 0.00 108.00 3.01 1.91 0.00 6.00 0.24 0.00 0.00 110.00 3.01 1.91 0.00 8.00 0.36 0.01 0.29 112.00 3.01 1.91 0.00 10.00 0.54 0.06 1.13 114.00 3.01 1.91 0.00 12.00 2.00 1.02 77.62 116.00 3.01 1.91 0.00 14.00 2.47 1.43 2.86 118.00 3.01 1.91 0.00 16.00 2.65 1.59 1.77 120.00 3.01 1.91 0.00 18.00 2.77 1.70 1.38 20.00 2.87 1.78 1.01 22.00 2.94 1.85 0.92 24.00 3.01 1.91 0.83 26.00 3.01 1.91 0.00 28.00 3.01 1.91 0.00 30.00 3.01 1.91 0.00 32.00 3.01 1.91 0.00 34.00 3.01 1.91 0.00 36.00 3.01 1.91 0.00 38.00 3.01 1.91 0.00 40.00 3.01 1.91 0.00 42.00 3.01 1.91 0.00 44.00 3.01 1.91 0.00 46.00 3.01 1.91 0.00 48.00 3.01 1.91 0.00 50.00 3.01 1.91 0.00 52.00 3.01 1.91 0.00 54.00 3.01 1.91 0.00 56.00 3.01 1.91 0.00 58.00 3.01 1.91 0.00 60.00 3.01 1.91 0.00 62.00 3.01 1.91 0.00 64.00 3.01 1.91 0.00 66.00 3.01 1.91 0.00 68.00 3.01 1.91 0.00 70.00 3.01 1.91 0.00 72.00 3.01 1.91 0.00 74.00 3.01 1.91 0.00 76.00 3.01 1.91 0.00 78.00 3.01 1.91 0.00 80.00 3.01 1.91 0.00 82.00 3.01 1.91 0.00 84.00 3.01 1.91 0.00 86.00 3.01 1.91 0.00 88.00 3.01 1.91 0.00 90.00 3.01 1.91 0.00 92.00 3.01 1.91 0.00 94.00 3.01 1.91 0.00 96.00 3.01 1.91 0.00 98.00 3.01 1.91 0.00 100.00 3.01 1.91 0.00 102.00 3.01 1.91 0.00 Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 39 Summary for Subcatchment DA#2: Post-Development Pond #2 Runoff = 19.64 cfs @ 11.96 hrs, Volume= 1.042 af, Depth= 1.83" Routed to Pond BMP-2 : BMP #2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Type II 24-hr 1yr-24hr Rainfall=3.01" Area (ac) CN Description • 1.262 98 Roadway • 0.445 98 Sidewalk • 0.964 98 Buildings/Driveways 3.732 80 >75% Grass cover, Good, HSG D • 0.443 98 Amenity Impervious 6.846 88 Weighted Average 3.732 54.51% Pervious Area 3.114 45.49% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA#2: Post-Development Pond #2 Hydrograph / ■Runoff 21= 19.64 cfs 20 n� 19 — 13 11_2 tar _ 18 — f- 1r122h Rililf II '3.0'11" _ �17 — — 16V 15t _ 1- I I t rt 1ROnbff-Awed-6.846�c 14_ 3y I _[ � � ��Iume 1.Q4 f = 3 " nf 'I 5 10_ - ni- . n 7V 5 2= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 40 Hydrograph for Subcatchment DA#2: Post-Development Pond #2 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 3.01 1.83 0.00 2.00 0.07 0.00 0.00 106.00 3.01 1.83 0.00 4.00 0.14 0.00 0.00 108.00 3.01 1.83 0.00 6.00 0.24 0.00 0.00 110.00 3.01 1.83 0.00 8.00 0.36 0.01 0.05 112.00 3.01 1.83 0.00 10.00 0.54 0.05 0.24 114.00 3.01 1.83 0.00 12.00 2.00 0.96 18.33 116.00 3.01 1.83 0.00 14.00 2.47 1.35 0.68 118.00 3.01 1.83 0.00 16.00 2.65 1.51 0.42 120.00 3.01 1.83 0.00 18.00 2.77 1.62 0.33 20.00 2.87 1.70 0.24 22.00 2.94 1.77 0.22 24.00 3.01 1.83 0.20 26.00 3.01 1.83 0.00 28.00 3.01 1.83 0.00 30.00 3.01 1.83 0.00 32.00 3.01 1.83 0.00 34.00 3.01 1.83 0.00 36.00 3.01 1.83 0.00 38.00 3.01 1.83 0.00 40.00 3.01 1.83 0.00 42.00 3.01 1.83 0.00 44.00 3.01 1.83 0.00 46.00 3.01 1.83 0.00 48.00 3.01 1.83 0.00 50.00 3.01 1.83 0.00 52.00 3.01 1.83 0.00 54.00 3.01 1.83 0.00 56.00 3.01 1.83 0.00 58.00 3.01 1.83 0.00 60.00 3.01 1.83 0.00 62.00 3.01 1.83 0.00 64.00 3.01 1.83 0.00 66.00 3.01 1.83 0.00 68.00 3.01 1.83 0.00 70.00 3.01 1.83 0.00 72.00 3.01 1.83 0.00 74.00 3.01 1.83 0.00 76.00 3.01 1.83 0.00 78.00 3.01 1.83 0.00 80.00 3.01 1.83 0.00 82.00 3.01 1.83 0.00 84.00 3.01 1.83 0.00 86.00 3.01 1.83 0.00 88.00 3.01 1.83 0.00 90.00 3.01 1.83 0.00 92.00 3.01 1.83 0.00 94.00 3.01 1.83 0.00 96.00 3.01 1.83 0.00 98.00 3.01 1.83 0.00 100.00 3.01 1.83 0.00 102.00 3.01 1.83 0.00 Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 41 Summary for Subcatchment DA#3: Post-Development Pond #3 Runoff = 14.35 cfs @ 11.95 hrs, Volume= 0.773 af, Depth= 1.99" Routed to Pond BMP#3 : BMP #3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Type II 24-hr 1yr-24hr Rainfall=3.01" Area (ac) CN Description • 0.677 98 Roadway • 0.221 98 Sidewalk • 1.481 98 Buildings/Driveways 2.034 80 >75% Grass cover, Good, HSG D • 0.203 98 Parking • 0.035 98 Ex. Impervious 4.651 90 Weighted Average 2.034 43.73% Pervious Area 2.617 56.27% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA#3: Post-Development Pond #3 Hydrograph 16 ■Runoff 15=/ 14.35 cfs H - H4HH + fop ii 4- r = 14= 13= H H H - 12 11 H 1RUIRtlinQfnf�� f VfAreea=4.651� mac 10_ r— O_f _e=0• f - 9/ L !Rt!nr Depth= .ri" _ 3 8= 7 c=5. m i n 6/ 64 4/ I - 3= 2_ 11/ 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 42 Hydrograph for Subcatchment DA#3: Post-Development Pond #3 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 3.01 1.99 0.00 2.00 0.07 0.00 0.00 106.00 3.01 1.99 0.00 4.00 0.14 0.00 0.00 108.00 3.01 1.99 0.00 6.00 0.24 0.00 0.01 110.00 3.01 1.99 0.00 8.00 0.36 0.02 0.06 112.00 3.01 1.99 0.00 10.00 0.54 0.07 0.21 114.00 3.01 1.99 0.00 12.00 2.00 1.09 13.32 116.00 3.01 1.99 0.00 14.00 2.47 1.50 0.48 118.00 3.01 1.99 0.00 16.00 2.65 1.66 0.30 120.00 3.01 1.99 0.00 18.00 2.77 1.78 0.23 20.00 2.87 1.86 0.17 22.00 2.94 1.93 0.16 24.00 3.01 1.99 0.14 26.00 3.01 1.99 0.00 28.00 3.01 1.99 0.00 30.00 3.01 1.99 0.00 32.00 3.01 1.99 0.00 34.00 3.01 1.99 0.00 36.00 3.01 1.99 0.00 38.00 3.01 1.99 0.00 40.00 3.01 1.99 0.00 42.00 3.01 1.99 0.00 44.00 3.01 1.99 0.00 46.00 3.01 1.99 0.00 48.00 3.01 1.99 0.00 50.00 3.01 1.99 0.00 52.00 3.01 1.99 0.00 54.00 3.01 1.99 0.00 56.00 3.01 1.99 0.00 58.00 3.01 1.99 0.00 60.00 3.01 1.99 0.00 62.00 3.01 1.99 0.00 64.00 3.01 1.99 0.00 66.00 3.01 1.99 0.00 68.00 3.01 1.99 0.00 70.00 3.01 1.99 0.00 72.00 3.01 1.99 0.00 74.00 3.01 1.99 0.00 76.00 3.01 1.99 0.00 78.00 3.01 1.99 0.00 80.00 3.01 1.99 0.00 82.00 3.01 1.99 0.00 84.00 3.01 1.99 0.00 86.00 3.01 1.99 0.00 88.00 3.01 1.99 0.00 90.00 3.01 1.99 0.00 92.00 3.01 1.99 0.00 94.00 3.01 1.99 0.00 96.00 3.01 1.99 0.00 98.00 3.01 1.99 0.00 100.00 3.01 1.99 0.00 102.00 3.01 1.99 0.00 Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 43 Summary for Subcatchment PRE#1: Predevelopment #1 Runoff = 36.95 cfs @ 12.24 hrs, Volume= 3.558 af, Depth= 1.52" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Type II 24-hr 1yr-24hr Rainfall=3.01" Area (ac) CN Description 28.010 84 Pasture/grassland/range, Fair, HSG D 28.010 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 29.5 Direct Entry, Subcatchment PRE#1: Predevelopment #1 Hydrograph 40=/ — — -1 4 1— 1 - ■Runoff 38 36.9�cfs 4 4 f�1 Li 36 r - 34_! f— 1 r.24h 14ai if II -3.10'11" - 32 30V t —L Runoff Area#28.VO c 28� 24 - 1- - r IRIPIOrIVOTTle,346f 3 zoo ncff De . " T min 16 14V - - 12 I J I_ 1 _H 1 1_ _1 - 10=/ s � - 14 I— I - in I � 6= 4= _I - I - 2 0 //,., �/ll�/ �/ �/g 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 44 Hydrograph for Subcatchment PRE#1: Predevelopment #1 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 3.01 1.52 0.00 2.00 0.07 0.00 0.00 106.00 3.01 1.52 0.00 4.00 0.14 0.00 0.00 108.00 3.01 1.52 0.00 6.00 0.24 0.00 0.00 110.00 3.01 1.52 0.00 8.00 0.36 0.00 0.00 112.00 3.01 1.52 0.00 10.00 0.54 0.01 0.32 114.00 3.01 1.52 0.00 12.00 2.00 0.74 16.54 116.00 3.01 1.52 0.00 14.00 2.47 1.09 3.04 118.00 3.01 1.52 0.00 16.00 2.65 1.23 1.75 120.00 3.01 1.52 0.00 18.00 2.77 1.33 1.30 20.00 2.87 1.41 0.97 22.00 2.94 1.47 0.85 24.00 3.01 1.52 0.78 26.00 3.01 1.52 0.00 28.00 3.01 1.52 0.00 30.00 3.01 1.52 0.00 32.00 3.01 1.52 0.00 34.00 3.01 1.52 0.00 36.00 3.01 1.52 0.00 38.00 3.01 1.52 0.00 40.00 3.01 1.52 0.00 42.00 3.01 1.52 0.00 44.00 3.01 1.52 0.00 46.00 3.01 1.52 0.00 48.00 3.01 1.52 0.00 50.00 3.01 1.52 0.00 52.00 3.01 1.52 0.00 54.00 3.01 1.52 0.00 56.00 3.01 1.52 0.00 58.00 3.01 1.52 0.00 60.00 3.01 1.52 0.00 62.00 3.01 1.52 0.00 64.00 3.01 1.52 0.00 66.00 3.01 1.52 0.00 68.00 3.01 1.52 0.00 70.00 3.01 1.52 0.00 72.00 3.01 1.52 0.00 74.00 3.01 1.52 0.00 76.00 3.01 1.52 0.00 78.00 3.01 1.52 0.00 80.00 3.01 1.52 0.00 82.00 3.01 1.52 0.00 84.00 3.01 1.52 0.00 86.00 3.01 1.52 0.00 88.00 3.01 1.52 0.00 90.00 3.01 1.52 0.00 92.00 3.01 1.52 0.00 94.00 3.01 1.52 0.00 96.00 3.01 1.52 0.00 98.00 3.01 1.52 0.00 100.00 3.01 1.52 0.00 102.00 3.01 1.52 0.00 Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 45 Summary for Subcatchment PRE#2: Predevelopment #2 Runoff = 8.54 cfs @ 12.28 hrs, Volume= 0.870 af, Depth= 1.52" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Type II 24-hr 1yr-24hr Rainfall=3.01" Area (ac) CN Description 6.846 84 Pasture/grassland/range, Fair, HSG D 6.846 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.9 Direct Entry, Subcatchment PRE#2: Predevelopment #2 Hydrograph / - ■Runoff 9_ 8.54 cfs TypeLIl124 -h1-r $_ 1 r12 h Rainf�II .b " _ 7 IRUnbff Area=6.846 ab fZLn9ff VfoIym1e=0.$79 �f 5_ / 1RuncTsffID-!Plh7-1-'1F1 _LL 4./ TIC= 1.9-m l n 31-/ 2:/i 11, 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 46 Hydrograph for Subcatchment PRE#2: Predevelopment #2 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 3.01 1.52 0.00 2.00 0.07 0.00 0.00 106.00 3.01 1.52 0.00 4.00 0.14 0.00 0.00 108.00 3.01 1.52 0.00 6.00 0.24 0.00 0.00 110.00 3.01 1.52 0.00 8.00 0.36 0.00 0.00 112.00 3.01 1.52 0.00 10.00 0.54 0.01 0.07 114.00 3.01 1.52 0.00 12.00 2.00 0.74 3.49 116.00 3.01 1.52 0.00 14.00 2.47 1.09 0.76 118.00 3.01 1.52 0.00 16.00 2.65 1.23 0.43 120.00 3.01 1.52 0.00 18.00 2.77 1.33 0.32 20.00 2.87 1.41 0.24 22.00 2.94 1.47 0.21 24.00 3.01 1.52 0.19 26.00 3.01 1.52 0.00 28.00 3.01 1.52 0.00 30.00 3.01 1.52 0.00 32.00 3.01 1.52 0.00 34.00 3.01 1.52 0.00 36.00 3.01 1.52 0.00 38.00 3.01 1.52 0.00 40.00 3.01 1.52 0.00 42.00 3.01 1.52 0.00 44.00 3.01 1.52 0.00 46.00 3.01 1.52 0.00 48.00 3.01 1.52 0.00 50.00 3.01 1.52 0.00 52.00 3.01 1.52 0.00 54.00 3.01 1.52 0.00 56.00 3.01 1.52 0.00 58.00 3.01 1.52 0.00 60.00 3.01 1.52 0.00 62.00 3.01 1.52 0.00 64.00 3.01 1.52 0.00 66.00 3.01 1.52 0.00 68.00 3.01 1.52 0.00 70.00 3.01 1.52 0.00 72.00 3.01 1.52 0.00 74.00 3.01 1.52 0.00 76.00 3.01 1.52 0.00 78.00 3.01 1.52 0.00 80.00 3.01 1.52 0.00 82.00 3.01 1.52 0.00 84.00 3.01 1.52 0.00 86.00 3.01 1.52 0.00 88.00 3.01 1.52 0.00 90.00 3.01 1.52 0.00 92.00 3.01 1.52 0.00 94.00 3.01 1.52 0.00 96.00 3.01 1.52 0.00 98.00 3.01 1.52 0.00 100.00 3.01 1.52 0.00 102.00 3.01 1.52 0.00 Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 47 Summary for Subcatchment PRE#3: Predevelopment #3 Runoff = 34.95 cfs @ 12.28 hrs, Volume= 3.558 af, Depth= 1.52" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Type II 24-hr 1yr-24hr Rainfall=3.01" Area (ac) CN Description 28.010 84 Pasture/grassland/range, Fair, HSG D 28.010 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.9 Direct Entry, Subcatchment PRE#3: Predevelopment #3 Hydrograph 38� _ — � � •Runoff ;/I 34.95 cfs 36 3a� 4 1-r1It I& jr - 321 H 1 "" — 304/_ 1�yr 2h> R�r�fll3. 28 4 H H -+ Rufo-ff Are#28.O40 ab 26- EY 244/L / H -1 H- I22 / 3 20 I_ I - H H- 1 4 !Rnr11)-! -hr'IF' — 0 18� / T-C 1 - min - LL16�L jF HIS HI4 IH 4 diJ44 10= 8/ / ' I IHf IHH � I 6V 1//l((/(// //„f( f( f(/ f(/ f(/ /// //fff <f/lf/ ((/ f/t (/( ((( 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 48 Hydrograph for Subcatchment PRE#3: Predevelopment #3 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 3.01 1.52 0.00 2.00 0.07 0.00 0.00 106.00 3.01 1.52 0.00 4.00 0.14 0.00 0.00 108.00 3.01 1.52 0.00 6.00 0.24 0.00 0.00 110.00 3.01 1.52 0.00 8.00 0.36 0.00 0.00 112.00 3.01 1.52 0.00 10.00 0.54 0.01 0.31 114.00 3.01 1.52 0.00 12.00 2.00 0.74 14.28 116.00 3.01 1.52 0.00 14.00 2.47 1.09 3.10 118.00 3.01 1.52 0.00 16.00 2.65 1.23 1.77 120.00 3.01 1.52 0.00 18.00 2.77 1.33 1.31 20.00 2.87 1.41 0.98 22.00 2.94 1.47 0.85 24.00 3.01 1.52 0.79 26.00 3.01 1.52 0.00 28.00 3.01 1.52 0.00 30.00 3.01 1.52 0.00 32.00 3.01 1.52 0.00 34.00 3.01 1.52 0.00 36.00 3.01 1.52 0.00 38.00 3.01 1.52 0.00 40.00 3.01 1.52 0.00 42.00 3.01 1.52 0.00 44.00 3.01 1.52 0.00 46.00 3.01 1.52 0.00 48.00 3.01 1.52 0.00 50.00 3.01 1.52 0.00 52.00 3.01 1.52 0.00 54.00 3.01 1.52 0.00 56.00 3.01 1.52 0.00 58.00 3.01 1.52 0.00 60.00 3.01 1.52 0.00 62.00 3.01 1.52 0.00 64.00 3.01 1.52 0.00 66.00 3.01 1.52 0.00 68.00 3.01 1.52 0.00 70.00 3.01 1.52 0.00 72.00 3.01 1.52 0.00 74.00 3.01 1.52 0.00 76.00 3.01 1.52 0.00 78.00 3.01 1.52 0.00 80.00 3.01 1.52 0.00 82.00 3.01 1.52 0.00 84.00 3.01 1.52 0.00 86.00 3.01 1.52 0.00 88.00 3.01 1.52 0.00 90.00 3.01 1.52 0.00 92.00 3.01 1.52 0.00 94.00 3.01 1.52 0.00 96.00 3.01 1.52 0.00 98.00 3.01 1.52 0.00 100.00 3.01 1.52 0.00 102.00 3.01 1.52 0.00 Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 49 Summary for Pond BMP#3: BMP #3 Inflow Area = 4.651 ac, 56.27% Impervious, Inflow Depth = 1.99" for 1yr-24hr event Inflow = 14.35 cfs @ 11.95 hrs, Volume= 0.773 af Outflow = 0.39 cfs @ 14.99 hrs, Volume= 0.773 af, Atten= 97%, Lag= 182.0 min Primary = 0.39 cfs @ 14.99 hrs, Volume= 0.773 af Routed to nonexistent node POST-POI#1 Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to nonexistent node POST-POI#1 Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Peak Elev= 553.13' @ 14.99 hrs Surf.Area= 10,404 sf Storage= 23,180 cf Plug-Flow detention time= 1,995.9 min calculated for 0.772 af(100% of inflow) Center-of-Mass det. time= 1,998.0 min ( 2,803.3 - 805.3 ) Volume Invert Avail.Storage Storage Description #1 550.00' 95,966 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 550.00 4,583 0 0 551.00 6,298 5,441 5,441 552.00 8,187 7,243 12,683 553.00 10,158 9,173 21,856 554.00 12,069 11,114 32,969 555.00 13,858 12,964 45,933 556.00 15,706 14,782 60,715 557.00 17,611 16,659 77,373 558.00 19,575 18,593 95,966 Device Routing Invert Outlet Devices #1 Primary 549.50' 24.0" Round RCP Round 24" L= 85.0' RCP, square edge headwall, Ke= 0.500 Inlet/Outlet Invert= 549.50' / 548.96' S= 0.0064 '/' Cc= 0.900 n= 0.013 Concrete sewer w/manholes & inlets, Flow Area= 3.14 sf #2 Device 1 550.00' Sand Filter Head (feet) 0.00 0.01 6.00 Disch. (cfs) 0.000 0.081 0.081 #3 Device 1 553.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 Width (feet) 2.00 2.00 #4 Device 1 554.00' 48.0" x 48.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads #5 Secondary 556.00' 10.0' long x 16.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 50 Primary OutFlow Max=0.38 cfs © 14.99 hrs HW=553.13' (Free Discharge) L1=RCP_Round 24" (Passes 0.38 cfs of 23.21 cfs potential flow) 2=Sand Filter (Custom Controls 0.08 cfs) 3=Custom Weir/Orifice (Weir Controls 0.30 cfs @ 1.18 fps) 4=Riser ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=550.00' (Free Discharge) LS=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Pond BMP#3: BMP #3 Hydrograph T I T T T I T 1 1 1 1 T 1 - ■Inflow / 14.35 cfs `�-, N outflow / / - r 1 tbfioi iA� �6 7 1� — •Secondary 16= 15/ j / / I I ± Peak E� 5&3.it 3' 14� — 13/ / S4v�u I-8O-e 12� / z— iliz 10.I/ 91/ j z ]— 4 - 1 1 LL7_ L H —I I I - 6 5 / / 1 1 H1 L A A I 1 1 4z / ,� 7 i 7 i 3� J n 'AO rf Y 2 / 0.39 cfs 0.00 cfs 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 51 Pond BMP#3: BMP #3 Stage-Discharge ❑Total ' 558 ❑Primary ❑Secondary 557 / /.� Broad-Crested Rectan.ular Weir 556 ^ 555 ...d/ .2 /a�' Riser 0 554 ' �III Custom Weir/Orifice 553 % 552 551 / Sand Filter / 0 10 20 30 40 50 60 70 80 90 100 110 Discharge (cfs) Pond BMP#3: BMP #3 Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-ft) 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 Surface ❑Storage 558_ I I 1 ��� ������� 557 I ��� �� I I I 5561/ 555� ��/�/ 2 - ' II II I //' I I o 554- , //�/ /� I 41 I > - w553LZ I 4 II 41 I - 552:/ 5511/ 1 Custom Stage Data 550 ( , 0 10,,000 20,000 30,000 40,000 50,000 60,,000 70,000 80,000 90,000' Storage(cubic-feet) Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 52 Hydrograph for Pond BMP#3: BMP #3 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 550.00 0.00 0.00 0.00 5.00 0.00 0 550.00 0.00 0.00 0.00 10.00 0.21 394 550.08 0.08 0.08 0.00 15.00 0.39 23,180 553.13 0.39 0.39 0.00 20.00 0.17 22,526 553.07 0.20 0.20 0.00 25.00 0.00 21,942 553.01 0.09 0.09 0.00 30.00 0.00 20,479 552.86 0.08 0.08 0.00 35.00 0.00 19,021 552.71 0.08 0.08 0.00 40.00 0.00 17,563 552.56 0.08 0.08 0.00 45.00 0.00 16,105 552.40 0.08 0.08 0.00 50.00 0.00 14,647 552.23 0.08 0.08 0.00 55.00 0.00 13,189 552.06 0.08 0.08 0.00 60.00 0.00 11,731 551.88 0.08 0.08 0.00 65.00 0.00 10,273 551.69 0.08 0.08 0.00 70.00 0.00 8,815 551.50 0.08 0.08 0.00 75.00 0.00 7,357 551.29 0.08 0.08 0.00 80.00 0.00 5,899 551.07 0.08 0.08 0.00 85.00 0.00 4,441 550.84 0.08 0.08 0.00 90.00 0.00 2,983 550.59 0.08 0.08 0.00 95.00 0.00 1,525 550.31 0.08 0.08 0.00 100.00 0.00 67 550.01 0.08 0.08 0.00 105.00 0.00 0 550.00 0.00 0.00 0.00 110.00 0.00 0 550.00 0.00 0.00 0.00 115.00 0.00 0 550.00 0.00 0.00 0.00 120.00 0.00 0 550.00 0.00 0.00 0.00 Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 53 Stage-Discharge for Pond BMP#3: BMP #3 Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 550.00 0.00 0.00 0.00 555.20 32.45 32.45 0.00 550.10 0.08 0.08 0.00 555.30 32.83 32.83 0.00 550.20 0.08 0.08 0.00 555.40 33.21 33.21 0.00 550.30 0.08 0.08 0.00 555.50 33.58 33.58 0.00 550.40 0.08 0.08 0.00 555.60 33.95 33.95 0.00 550.50 0.08 0.08 0.00 555.70 34.31 34.31 0.00 550.60 0.08 0.08 0.00 555.80 34.67 34.67 0.00 550.70 0.08 0.08 0.00 555.90 35.03 35.03 0.00 550.80 0.08 0.08 0.00 556.00 35.38 35.38 0.00 550.90 0.08 0.08 0.00 556.10 36.58 35.73 0.85 551.00 0.08 0.08 0.00 556.20 38.47 36.07 2.40 551.10 0.08 0.08 0.00 556.30 40.84 36.42 4.42 551.20 0.08 0.08 0.00 556.40 43.57 36.74 6.83 551.30 0.08 0.08 0.00 556.50 46.60 37.05 9.55 551.40 0.08 0.08 0.00 556.60 49.91 37.36 12.55 551.50 0.08 0.08 0.00 556.70 53.30 37.67 15.64 551.60 0.08 0.08 0.00 556.80 56.86 37.97 18.89 551.70 0.08 0.08 0.00 556.90 60.77 38.27 22.50 551.80 0.08 0.08 0.00 557.00 64.87 38.57 26.30 551.90 0.08 0.08 0.00 557.10 69.26 38.86 30.40 552.00 0.08 0.08 0.00 557.20 73.86 39.15 34.70 552.10 0.08 0.08 0.00 557.30 78.58 39.45 39.13 552.20 0.08 0.08 0.00 557.40 83.47 39.73 43.73 552.30 0.08 0.08 0.00 557.50 88.43 40.02 48.41 552.40 0.08 0.08 0.00 557.60 93.53 40.31 53.23 552.50 0.08 0.08 0.00 557.70 98.88 40.59 58.29 552.60 0.08 0.08 0.00 557.80 104.38 40.87 63.51 552.70 0.08 0.08 0.00 557.90 110.03 41.15 68.88 552.80 0.08 0.08 0.00 558.00 115.81 41.43 74.39 552.90 0.08 0.08 0.00 553.00 0.08 0.08 0.00 553.10 0.29 0.29 0.00 553.20 0.67 0.67 0.00 553.30 1.16 1.16 0.00 553.40 1.74 1.74 0.00 553.50 2.40 2.40 0.00 553.60 3.13 3.13 0.00 553.70 3.92 3.92 0.00 553.80 4.77 4.77 0.00 553.90 5.67 5.67 0.00 554.00 6.63 6.63 0.00 554.10 9.09 9.09 0.00 554.20 12.78 12.78 0.00 554.30 17.31 17.31 0.00 554.40 22.51 22.51 0.00 554.50 28.30 28.30 0.00 554.60 30.07 30.07 0.00 554.70 30.48 30.48 0.00 554.80 30.88 30.88 0.00 554.90 31.28 31.28 0.00 555.00 31.68 31.68 0.00 555.10 32.06 32.06 0.00 Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 54 Stage-Area-Storage for Pond BMP#3: BMP #3 Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 550.00 4,583 0 555.20 14,228 48,741 550.10 4,755 467 555.30 14,412 50,173 550.20 4,926 951 555.40 14,597 51,624 550.30 5,097 1,452 555.50 14,782 53,093 550.40 5,269 1,970 555.60 14,967 54,580 550.50 5,441 2,506 555.70 15,152 56,086 550.60 5,612 3,059 555.80 15,336 57,610 550.70 5,784 3,628 555.90 15,521 59,153 550.80 5,955 4,215 556.00 15,706 60,715 550.90 6,126 4,819 556.10 15,897 62,295 551.00 6,298 5,441 556.20 16,087 63,894 551.10 6,487 6,080 556.30 16,277 65,512 551.20 6,676 6,738 556.40 16,468 67,149 551.30 6,865 7,415 556.50 16,659 68,806 551.40 7,054 8,111 556.60 16,849 70,481 551.50 7,243 8,826 556.70 17,040 72,175 551.60 7,431 9,559 556.80 17,230 73,889 551.70 7,620 10,312 556.90 17,420 75,621 551.80 7,809 11,083 557.00 17,611 77,373 551.90 7,998 11,874 557.10 17,807 79,144 552.00 8,187 12,683 557.20 18,004 80,934 552.10 8,384 13,512 557.30 18,200 82,745 552.20 8,581 14,360 557.40 18,397 84,575 552.30 8,778 15,228 557.50 18,593 86,424 552.40 8,975 16,115 557.60 18,789 88,293 552.50 9,173 17,023 557.70 18,986 90,182 552.60 9,370 17,950 557.80 19,182 92,090 552.70 9,567 18,897 557.90 19,379 94,018 552.80 9,764 19,863 558.00 19,575 95,966 552.90 9,961 20,850 553.00 10,158 21,856 553.10 10,349 22,881 553.20 10,540 23,925 553.30 10,731 24,989 553.40 10,922 26,072 553.50 11,114 27,173 553.60 11,305 28,294 553.70 11,496 29,434 553.80 11,687 30,593 553.90 11,878 31,772 554.00 12,069 32,969 554.10 12,248 34,185 554.20 12,427 35,419 554.30 12,606 36,670 554.40 12,785 37,940 554.50 12,964 39,227 554.60 13,142 40,532 554.70 13,321 41,856 554.80 13,500 43,197 554.90 13,679 44,556 555.00 13,858 45,933 555.10 14,043 47,328 Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 55 Summary for Pond BMP-1: BMP #1 Inflow Area = 28.009 ac, 50.36% Impervious, Inflow Depth = 1.91" for 1yr-24hr event Inflow = 83.39 cfs @ 11.96 hrs, Volume= 4.455 af Outflow = 19.66 cfs @ 12.15 hrs, Volume= 4.454 af, Atten= 76%, Lag= 11.7 min Primary = 19.66 cfs @ 12.15 hrs, Volume= 4.454 af Routed to nonexistent node POST-POI#1 Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to nonexistent node POST-POI#1 Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Peak Elev= 557.90' @ 12.10 hrs Surf.Area= 44,461 sf Storage= 96,107 cf Plug-Flow detention time= 701.3 min calculated for 4.450 af(100% of inflow) Center-of-Mass det. time= 704.8 min ( 1,514.4 - 809.5 ) Volume Invert Avail.Storage Storage Description #1 555.50' 223,972 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 555.50 34,578 0 0 556.00 37,559 18,034 18,034 557.00 41,209 39,384 57,418 558.00 44,809 43,009 100,427 559.00 48,473 46,641 147,068 560.00 52,204 50,339 197,407 560.50 54,057 26,565 223,972 Device Routing Invert Outlet Devices #1 Primary 550.00' 36.0" Round RCP_Round 36" L= 115.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 550.00' / 548.00' S= 0.0174 '/' Cc= 0.900 n= 0.013 Concrete sewer w/manholes & inlets, Flow Area= 7.07 sf #2 Device 1 555.50' 4.0" Horiz. WQ/CP Orifice C= 0.600 Limited to weir flow at low heads #3 Device 1 557.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 0.50 Width (feet) 2.00 2.00 #4 Device 1 557.50' 48.0" x 48.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads #5 Secondary 559.00' 20.0' long x 16.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 56 Primary OutFlow Max=17.99 cfs © 12.15 hrs HW=557.90' (Free Discharge) L1=RCP_Round 36" (Passes 17.99 cfs of 86.12 cfs potential flow) 2=WQ/CP Orifice (Orifice Controls 0.65 cfs © 7.46 fps) 3=Custom Weir/Orifice (Orifice Controls 3.95 cfs @ 3.95 fps) 4=Riser (Weir Controls 13.39 cfs © 2.08 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=555.50' (Free Discharge) LS=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Pond BMP-1: BMP #1 Hydrograph =_ 83.39 cfs / ICI � 4I � I iPrimarY i Outflow[ f AY6 =i8 o�9 � - ■Seond ary 90 85 > /— 1- I t -Pe cl€leii=557.1901' 80V z 65=� , � 1— —11 —I I —L I—I I - 60V 55t, 50_ / 4 4 1 —1 1 4 1-1 4 1 - 3 455/ / LL 40_/ z I * —P H 4 1 + —1 H 14 1-1 4 1 - J!I $ . 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 57 Pond BMP-1: BMP #1 Stage-Discharge 0 Total 0 Primary ❑Secondary 560 /�// Broad-Crested Rectan.ular Weir �` 559 / 0 558 � •; % j Riser w / Custom Weir/Orifice 557 556 % WQ/CP Orifice 0 20 40 60 80 100 120 140 160 180 Discharge (cfs) Pond BMP-1: BMP #1 Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-ft) 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 0 Surfacel ❑Storage 560 /// /// 559 z /// 0558 II m W II 557 - I I I 556-' Custom Stage Data 0 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000 180,000 200,000 220,000 Storage(cubic-feet) Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 58 Hydrograph for Pond BMP-1: BMP #1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 555.50 0.00 0.00 0.00 5.00 0.00 0 555.50 0.00 0.00 0.00 10.00 1.13 4,998 555.64 0.15 0.15 0.00 15.00 2.28 78,090 557.49 2.85 2.85 0.00 20.00 1.01 68,348 557.26 1.44 1.44 0.00 25.00 0.00 61,643 557.10 0.75 0.75 0.00 30.00 0.00 51,867 556.86 0.49 0.49 0.00 35.00 0.00 43,386 556.65 0.45 0.45 0.00 40.00 0.00 35,621 556.46 0.41 0.41 0.00 45.00 0.00 28,585 556.28 0.37 0.37 0.00 50.00 0.00 22,291 556.11 0.33 0.33 0.00 55.00 0.00 16,750 555.97 0.29 0.29 0.00 60.00 0.00 11,976 555.84 0.24 0.24 0.00 65.00 0.00 7,984 555.73 0.20 0.20 0.00 70.00 0.00 4,799 555.64 0.15 0.15 0.00 75.00 0.00 2,769 555.58 0.08 0.08 0.00 80.00 0.00 1,748 555.55 0.04 0.04 0.00 85.00 0.00 1,175 555.53 0.03 0.03 0.00 90.00 0.00 790 555.52 0.02 0.02 0.00 95.00 0.00 531 555.52 0.01 0.01 0.00 100.00 0.00 357 555.51 0.01 0.01 0.00 105.00 0.00 240 555.51 0.01 0.01 0.00 110.00 0.00 162 555.50 0.00 0.00 0.00 115.00 0.00 109 555.50 0.00 0.00 0.00 120.00 0.00 73 555.50 0.00 0.00 0.00 Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 59 Stage-Discharge for Pond BMP-1: BMP #1 Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 555.50 0.00 0.00 0.00 558.10 29.51 29.51 0.00 555.55 0.04 0.04 0.00 558.15 32.75 32.75 0.00 555.60 0.11 0.11 0.00 558.20 36.11 36.11 0.00 555.65 0.16 0.16 0.00 558.25 39.58 39.58 0.00 555.70 0.19 0.19 0.00 558.30 43.16 43.16 0.00 555.75 0.21 0.21 0.00 558.35 46.85 46.85 0.00 555.80 0.23 0.23 0.00 558.40 50.64 50.64 0.00 555.85 0.25 0.25 0.00 558.45 54.54 54.54 0.00 555.90 0.27 0.27 0.00 558.50 58.53 58.53 0.00 555.95 0.28 0.28 0.00 558.55 62.62 62.62 0.00 556.00 0.30 0.30 0.00 558.60 66.80 66.80 0.00 556.05 0.31 0.31 0.00 558.65 71.07 71.07 0.00 556.10 0.33 0.33 0.00 558.70 75.44 75.44 0.00 556.15 0.34 0.34 0.00 558.75 79.89 79.89 0.00 556.20 0.35 0.35 0.00 558.80 84.42 84.42 0.00 556.25 0.36 0.36 0.00 558.85 89.04 89.04 0.00 556.30 0.38 0.38 0.00 558.90 92.59 92.59 0.00 556.35 0.39 0.39 0.00 558.95 92.90 92.90 0.00 556.40 0.40 0.40 0.00 559.00 93.21 93.21 0.00 556.45 0.41 0.41 0.00 559.05 94.12 93.52 0.60 556.50 0.42 0.42 0.00 559.10 95.52 93.83 1.69 556.55 0.43 0.43 0.00 559.15 97.25 94.14 3.11 556.60 0.44 0.44 0.00 559.20 99.24 94.44 4.79 556.65 0.45 0.45 0.00 559.25 101.46 94.75 6.71 556.70 0.46 0.46 0.00 559.30 103.90 95.05 8.84 556.75 0.47 0.47 0.00 559.35 106.52 95.36 11.16 556.80 0.48 0.48 0.00 559.40 109.32 95.66 13.66 556.85 0.49 0.49 0.00 559.45 112.27 95.96 16.30 556.90 0.50 0.50 0.00 559.50 115.36 96.27 19.09 556.95 0.51 0.51 0.00 559.55 118.59 96.57 22.03 557.00 0.51 0.51 0.00 559.60 121.96 96.87 25.10 557.05 0.60 0.60 0.00 559.65 125.31 97.16 28.14 557.10 0.74 0.74 0.00 559.70 128.74 97.46 31.27 557.15 0.92 0.92 0.00 559.75 132.25 97.76 34.49 557.20 1.13 1.13 0.00 559.80 135.83 98.05 37.78 557.25 1.37 1.37 0.00 559.85 139.69 98.35 41.34 557.30 1.64 1.64 0.00 559.90 143.64 98.64 45.00 557.35 1.93 1.93 0.00 559.95 147.69 98.94 48.75 557.40 2.24 2.24 0.00 560.00 151.83 99.23 52.60 557.45 2.56 2.56 0.00 560.05 156.17 99.52 56.65 557.50 2.91 2.91 0.00 560.10 160.61 99.81 60.80 557.55 3.79 3.79 0.00 560.15 165.15 100.10 65.05 557.60 5.10 5.10 0.00 560.20 169.80 100.39 69.41 557.65 6.71 6.71 0.00 560.25 174.47 100.68 73.79 557.70 8.55 8.55 0.00 560.30 179.23 100.96 78.26 557.75 10.61 10.61 0.00 560.35 184.07 101.25 82.82 557.80 12.84 12.84 0.00 560.40 189.00 101.54 87.46 557.85 15.25 15.25 0.00 560.45 193.92 101.82 92.10 557.90 17.82 17.82 0.00 560.50 198.92 102.11 96.82 557.95 20.54 20.54 0.00 558.00 23.40 23.40 0.00 558.05 26.39 26.39 0.00 Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 60 Stage-Area-Storage for Pond BMP-1: BMP #1 Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 555.50 34,578 0 558.10 45,175 104,926 555.55 34,876 1,736 558.15 45,359 107,190 555.60 35,174 3,488 558.20 45,542 109,462 555.65 35,472 5,254 558.25 45,725 111,744 555.70 35,770 7,035 558.30 45,908 114,035 555.75 36,069 8,831 558.35 46,091 116,335 555.80 36,367 10,642 558.40 46,275 118,644 555.85 36,665 12,467 558.45 46,458 120,962 555.90 36,963 14,308 558.50 46,641 123,290 555.95 37,261 16,164 558.55 46,824 125,626 556.00 37,559 18,034 558.60 47,007 127,972 556.05 37,741 19,917 558.65 47,191 130,327 556.10 37,924 21,808 558.70 47,374 132,691 556.15 38,106 23,709 558.75 47,557 135,065 556.20 38,289 25,619 558.80 47,740 137,447 556.25 38,472 27,538 558.85 47,923 139,839 556.30 38,654 29,466 558.90 48,107 142,239 556.35 38,837 31,403 558.95 48,290 144,649 556.40 39,019 33,350 559.00 48,473 147,068 556.45 39,202 35,305 559.05 48,660 149,497 556.50 39,384 37,270 559.10 48,846 151,934 556.55 39,566 39,244 559.15 49,033 154,381 556.60 39,749 41,227 559.20 49,219 156,837 556.65 39,931 43,219 559.25 49,406 159,303 556.70 40,114 45,220 559.30 49,592 161,778 556.75 40,297 47,230 559.35 49,779 164,262 556.80 40,479 49,249 559.40 49,965 166,756 556.85 40,662 51,278 559.45 50,152 169,259 556.90 40,844 53,316 559.50 50,339 171,771 556.95 41,027 55,362 559.55 50,525 174,293 557.00 41,209 57,418 559.60 50,712 176,824 557.05 41,389 59,483 559.65 50,898 179,364 557.10 41,569 61,557 559.70 51,085 181,913 557.15 41,749 63,640 559.75 51,271 184,472 557.20 41,929 65,732 559.80 51,458 187,041 557.25 42,109 67,833 559.85 51,644 189,618 557.30 42,289 69,943 559.90 51,831 192,205 557.35 42,469 72,062 559.95 52,017 194,801 557.40 42,649 74,190 560.00 52,204 197,407 557.45 42,829 76,327 560.05 52,389 200,022 557.50 43,009 78,473 560.10 52,575 202,646 557.55 43,189 80,628 560.15 52,760 205,279 557.60 43,369 82,792 560.20 52,945 207,922 557.65 43,549 84,965 560.25 53,131 210,574 557.70 43,729 87,147 560.30 53,316 213,235 557.75 43,909 89,338 560.35 53,501 215,905 557.80 44,089 91,537 560.40 53,686 218,585 557.85 44,269 93,746 560.45 53,872 221,274 557.90 44,449 95,964 560.50 54,057 223,972 557.95 44,629 98,191 558.00 44,809 100,427 558.05 44,992 102,672 Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 61 Summary for Pond BMP-2: BMP #2 Inflow Area = 6.846 ac, 45.49% Impervious, Inflow Depth = 1.83" for 1yr-24hr event Inflow = 19.64 cfs @ 11.96 hrs, Volume= 1.042 af Outflow = 1.17 cfs @ 12.96 hrs, Volume= 1.042 af, Atten= 94%, Lag= 60.0 min Primary = 1.17 cfs @ 12.96 hrs, Volume= 1.042 af Routed to nonexistent node POST-POI#1 Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to nonexistent node POST-POI#1 Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Peak Elev= 577.73' @ 12.96 hrs Surf.Area= 11,920 sf Storage= 26,542 cf Plug-Flow detention time= 1,735.6 min calculated for 1.041 af(100% of inflow) Center-of-Mass det. time= 1,738.3 min ( 2,551.9 - 813.6 ) Volume Invert Avail.Storage Storage Description #1 575.00' 57,570 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 575.00 7,651 0 0 576.00 9,115 8,383 8,383 577.00 10,693 9,904 18,287 577.50 11,523 5,554 23,841 578.00 12,385 5,977 29,818 579.00 13,864 13,125 42,943 580.00 15,391 14,628 57,570 Device Routing Invert Outlet Devices #1 Primary 574.40' 24.0" Round RCP Round 24" L= 88.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 574.40' / 574.00' S= 0.0045 '/' Cc= 0.900 n= 0.013 Concrete sewer w/manholes & inlets, Flow Area= 3.14 sf #2 Device 1 575.00' Sand Filter Head (feet) 0.00 0.01 6.00 Disch. (cfs) 0.000 0.081 0.081 #3 Device 1 577.50' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 0.50 Width (feet) 3.00 3.00 #4 Device 1 578.00' 48.0" x 48.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads #5 Secondary 579.00' 10.0' long x 16.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 62 Primary OutFlow Max=1.17 cfs © 12.96 hrs HW=577.73' (Free Discharge) L1=RCP_Round 24" (Passes 1.17 cfs of 20.58 cfs potential flow) 2=Sand Filter (Custom Controls 0.08 cfs) 3=Custom Weir/Orifice (Weir Controls 1.08 cfs @ 1.57 fps) 4=Riser ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=575.00' (Free Discharge) LS=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Pond BMP-2: BMP #2 Hydrograph — 11— —L ]— I I , •cfsr •Ow / 4Hr - 19.641 i 1 1 ii t iiI fl �� .646 1a - •Primary Secondary 21 / z 20/ / /- 1 I 1 ]— 4 —I H- Peak �-�eVl=5717. 3' - 19/ / / - 18 / tot Z6�542icf - 17=7, / 15 / / /— 1 1 * —P 1— H + —I 1 —F 1 - 14 / 134 / u 121/ / ; 1 LL 9� / 7 ! / I 1 1 1 1 647 - 5=' I I I LW 17rf 3;/ 1.17 cfs ////�/ 0.00 cfs //////// 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 63 Pond BMP-2: BMP #2 Stage-Discharge ❑Total ❑Primary 581 �'' ❑Secondary 580 Broad-Crested Rectangular Weir 579 Riser 0 578 Custom Weir/Orifice w 577 576 Sand Filter / 0 10 20 30 40 50 60 70 80 90 100 Discharge (cfs) Pond BMP-2: BMP #2 Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-ft) 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 11,000 12,000 13,000 14,000 15,000 Surface ` . ( ❑Storage 581 580:-/ i 579:-/ I I w 577� i ////���� II 576- _ J J Custom Stage Data 575 , , , , , , , , 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 55,000 Storage(cubic-feet) Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 64 Hydrograph for Pond BMP-2: BMP #2 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 575.00 0.00 0.00 0.00 5.00 0.00 0 575.00 0.00 0.00 0.00 10.00 0.24 450 575.06 0.08 0.08 0.00 15.00 0.55 25,542 577.65 0.63 0.63 0.00 20.00 0.24 24,681 577.57 0.28 0.28 0.00 25.00 0.00 23,977 577.51 0.10 0.10 0.00 30.00 0.00 22,507 577.38 0.08 0.08 0.00 35.00 0.00 21,049 577.25 0.08 0.08 0.00 40.00 0.00 19,591 577.12 0.08 0.08 0.00 45.00 0.00 18,133 576.99 0.08 0.08 0.00 50.00 0.00 16,675 576.85 0.08 0.08 0.00 55.00 0.00 15,217 576.71 0.08 0.08 0.00 60.00 0.00 13,759 576.56 0.08 0.08 0.00 65.00 0.00 12,301 576.41 0.08 0.08 0.00 70.00 0.00 10,843 576.26 0.08 0.08 0.00 75.00 0.00 9,385 576.11 0.08 0.08 0.00 80.00 0.00 7,927 575.95 0.08 0.08 0.00 85.00 0.00 6,469 575.79 0.08 0.08 0.00 90.00 0.00 5,011 575.62 0.08 0.08 0.00 95.00 0.00 3,553 575.45 0.08 0.08 0.00 100.00 0.00 2,095 575.27 0.08 0.08 0.00 105.00 0.00 637 575.08 0.08 0.08 0.00 110.00 0.00 0 575.00 0.00 0.00 0.00 115.00 0.00 0 575.00 0.00 0.00 0.00 120.00 0.00 0 575.00 0.00 0.00 0.00 Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 65 Stage-Discharge for Pond BMP-2: BMP #2 Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 575.00 0.00 0.00 0.00 580.20 66.77 32.06 34.70 575.10 0.08 0.08 0.00 580.30 71.57 32.44 39.13 575.20 0.08 0.08 0.00 580.40 76.55 32.82 43.73 575.30 0.08 0.08 0.00 580.50 81.60 33.19 48.41 575.40 0.08 0.08 0.00 580.60 86.78 33.55 53.23 575.50 0.08 0.08 0.00 580.70 92.21 33.92 58.29 575.60 0.08 0.08 0.00 580.80 97.79 34.28 63.51 575.70 0.08 0.08 0.00 580.90 103.51 34.63 68.88 575.80 0.08 0.08 0.00 581.00 109.37 34.98 74.39 575.90 0.08 0.08 0.00 576.00 0.08 0.08 0.00 576.10 0.08 0.08 0.00 576.20 0.08 0.08 0.00 576.30 0.08 0.08 0.00 576.40 0.08 0.08 0.00 576.50 0.08 0.08 0.00 576.60 0.08 0.08 0.00 576.70 0.08 0.08 0.00 576.80 0.08 0.08 0.00 576.90 0.08 0.08 0.00 577.00 0.08 0.08 0.00 577.10 0.08 0.08 0.00 577.20 0.08 0.08 0.00 577.30 0.08 0.08 0.00 577.40 0.08 0.08 0.00 577.50 0.08 0.08 0.00 577.60 0.39 0.39 0.00 577.70 0.96 0.96 0.00 577.80 1.70 1.70 0.00 577.90 2.57 2.57 0.00 578.00 3.55 3.55 0.00 578.10 5.99 5.99 0.00 578.20 9.64 9.64 0.00 578.30 14.09 14.09 0.00 578.40 19.22 19.22 0.00 578.50 24.74 24.74 0.00 578.60 25.23 25.23 0.00 578.70 25.71 25.71 0.00 578.80 26.18 26.18 0.00 578.90 26.64 26.64 0.00 579.00 27.10 27.10 0.00 579.10 28.39 27.55 0.85 579.20 30.38 27.99 2.40 579.30 32.84 28.42 4.42 579.40 35.68 28.85 6.83 579.50 38.82 29.27 9.55 579.60 42.23 29.68 12.55 579.70 45.73 30.09 15.64 579.80 49.39 30.50 18.89 579.90 53.39 30.90 22.50 580.00 57.59 31.29 26.30 580.10 62.08 31.68 30.40 Detention Davis Village Type 1124-hr 1 yr-24hr Rainfall=3.01" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 66 Stage-Area-Storage for Pond BMP-2: BMP #2 Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 575.00 7,651 0 580.20 15,391 57,570 575.10 7,797 772 580.30 15,391 57,570 575.20 7,944 1,559 580.40 15,391 57,570 575.30 8,090 2,361 580.50 15,391 57,570 575.40 8,237 3,178 580.60 15,391 57,570 575.50 8,383 4,009 580.70 15,391 57,570 575.60 8,529 4,854 580.80 15,391 57,570 575.70 8,676 5,714 580.90 15,391 57,570 575.80 8,822 6,589 581.00 15,391 57,570 575.90 8,969 7,479 576.00 9,115 8,383 576.10 9,273 9,302 576.20 9,431 10,238 576.30 9,588 11,189 576.40 9,746 12,155 576.50 9,904 13,138 576.60 10,062 14,136 576.70 10,220 15,150 576.80 10,377 16,180 576.90 10,535 17,226 577.00 10,693 18,287 577.10 10,859 19,365 577.20 11,025 20,459 577.30 11,191 21,570 577.40 11,357 22,697 577.50 11,523 23,841 577.60 11,695 25,002 577.70 11,868 26,180 577.80 12,040 27,375 577.90 12,213 28,588 578.00 12,385 29,818 578.10 12,533 31,064 578.20 12,681 32,325 578.30 12,829 33,600 578.40 12,977 34,890 578.50 13,125 36,195 578.60 13,272 37,515 578.70 13,420 38,850 578.80 13,568 40,199 578.90 13,716 41,563 579.00 13,864 42,943 579.10 14,017 44,337 579.20 14,169 45,746 579.30 14,322 47,170 579.40 14,475 48,610 579.50 14,628 50,065 579.60 14,780 51,536 579.70 14,933 53,021 579.80 15,086 54,522 579.90 15,238 56,039 580.00 15,391 57,570 580.10 15,391 57,570 Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 67 Time span=0.00-120.00 hrs, dt=0.10 hrs, 1201 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DA#1: Post-Development Runoff Area=28.009 ac 50.36% Impervious Runoff Depth=2.59" Tc=5.0 min CN=89 Runoff=125.71 cfs 6.043 af Subcatchment DA#2: Post-Development Runoff Area=6.846 ac 45.49% Impervious Runoff Depth=2.50" Tc=5.0 min CN=88 Runoff=29.82 cfs 1.425 af Subcatchment DA#3: Post-Development Runoff Area=4.651 ac 56.27% Impervious Runoff Depth=2.68" Tc=5.0 min CN=90 Runoff=21.65 cfs 1.040 af Subcatchment PRE#1: Predevelopment#1 Runoff Area=28.010 ac 0.00% Impervious Runoff Depth=2.15" Tc=29.5 min CN=84 Runoff=65.09 cfs 5.024 af Subcatchment PRE#2: Predevelopment#2 Runoff Area=6.846 ac 0.00% Impervious Runoff Depth=2.15" Tc=31.9 min CN=84 Runoff=15.29 cfs 1.228 af SubcatchmentPRE#3: Predevelopment#3 Runoff Area=28.010 ac 0.00% Impervious Runoff Depth=2.15" Tc=31.9 min CN=84 Runoff=62.57 cfs 5.024 af Pond BMP#3: BMP#3 Peak Elev=553.71' Storage=29,551 cf Inflow=21.65 cfs 1.040 af Primary=4.01 cfs 1.040 af Secondary=0.00 cfs 0.000 af Outflow=4.01 cfs 1.040 af Pond BMP-1: BMP#1 Peak Elev=558.60' Storage=127,790 cf Inflow=125.71 cfs 6.043 af Primary=66.30 cfs 6.043 af Secondary=0.00 cfs 0.000 af Outflow=66.30 cfs 6.043 af Pond BMP-2: BMP#2 Peak Elev=578.27' Storage=33,203 cf Inflow=29.82 cfs 1.425 af Primary=12.64 cfs 1.425 af Secondary=0.00 cfs 0.000 af Outflow=12.64 cfs 1.425 af Total Runoff Area = 102.372 ac Runoff Volume = 19.783 af Average Runoff Depth = 2.32" 80.62% Pervious = 82.537 ac 19.38% Impervious = 19.835 ac Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 68 Summary for Subcatchment DA#1: Post-Development Pond #1 Runoff = 125.71 cfs @ 3.15 hrs, Volume= 6.043 af, Depth= 2.59" Routed to Pond BMP-1 : BMP #1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Area (ac) CN Description • 3.238 98 Roadway • 1.043 98 Sidewalk • 9.823 98 Buildings/Driveways 13.905 80 >75% Grass cover, Good, HSG D 28.009 89 Weighted Average 13.905 49.64% Pervious Area 14.104 50.36% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA#1: Post-Development Pond #1 Hydrograph 140 ( 0 Runoff 125.71 cfs I 1207 611Larioite 6ir -�r 110_ 10-yr- hr-RainfalI=3J75" 100- Runoff Area=28.009 ad 90 ' Yrr9f fV91ul11e6n919 80• ,- 70— Ranc�ff p 7 P9" o :: i C=50rn 40 I I 30 20 10- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 69 Hydrograph for Subcatchment DA#1: Post-Development Pond #1 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 3.75 2.59 0.00 2.00 0.39 0.02 1.60 106.00 3.75 2.59 0.00 4.00 3.32 2.19 12.54 108.00 3.75 2.59 0.00 6.00 3.75 2.59 3.46 110.00 3.75 2.59 0.00 8.00 3.75 2.59 0.00 112.00 3.75 2.59 0.00 10.00 3.75 2.59 0.00 114.00 3.75 2.59 0.00 12.00 3.75 2.59 0.00 116.00 3.75 2.59 0.00 14.00 3.75 2.59 0.00 118.00 3.75 2.59 0.00 16.00 3.75 2.59 0.00 120.00 3.75 2.59 0.00 18.00 3.75 2.59 0.00 20.00 3.75 2.59 0.00 22.00 3.75 2.59 0.00 24.00 3.75 2.59 0.00 26.00 3.75 2.59 0.00 28.00 3.75 2.59 0.00 30.00 3.75 2.59 0.00 32.00 3.75 2.59 0.00 34.00 3.75 2.59 0.00 36.00 3.75 2.59 0.00 38.00 3.75 2.59 0.00 40.00 3.75 2.59 0.00 42.00 3.75 2.59 0.00 44.00 3.75 2.59 0.00 46.00 3.75 2.59 0.00 48.00 3.75 2.59 0.00 50.00 3.75 2.59 0.00 52.00 3.75 2.59 0.00 54.00 3.75 2.59 0.00 56.00 3.75 2.59 0.00 58.00 3.75 2.59 0.00 60.00 3.75 2.59 0.00 62.00 3.75 2.59 0.00 64.00 3.75 2.59 0.00 66.00 3.75 2.59 0.00 68.00 3.75 2.59 0.00 70.00 3.75 2.59 0.00 72.00 3.75 2.59 0.00 74.00 3.75 2.59 0.00 76.00 3.75 2.59 0.00 78.00 3.75 2.59 0.00 80.00 3.75 2.59 0.00 82.00 3.75 2.59 0.00 84.00 3.75 2.59 0.00 86.00 3.75 2.59 0.00 88.00 3.75 2.59 0.00 90.00 3.75 2.59 0.00 92.00 3.75 2.59 0.00 94.00 3.75 2.59 0.00 96.00 3.75 2.59 0.00 98.00 3.75 2.59 0.00 100.00 3.75 2.59 0.00 102.00 3.75 2.59 0.00 Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 70 Summary for Subcatchment DA#2: Post-Development Pond #2 Runoff = 29.82 cfs @ 3.15 hrs, Volume= 1.425 af, Depth= 2.50" Routed to Pond BMP-2 : BMP #2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Area (ac) CN Description • 1.262 98 Roadway • 0.445 98 Sidewalk • 0.964 98 Buildings/Driveways 3.732 80 >75% Grass cover, Good, HSG D • 0.443 98 Amenity Impervious 6.846 88 Weighted Average 3.732 54.51% Pervious Area 3.114 45.49% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA#2: Post-Development Pond #2 Hydrograph ■Runoff 29.82 cfs 30 % 6 aTbite 6-hr-16 r - 26 I t I —[ 24 4 I -4 4 tRUnbff-Area=6.846 at 22 20_ L I aRt.ToM 9me_.4-2 f 18 16 r rt r ! L1'19'-ff11:7131'72.P" = - min LL14= �5$ 12 G'NL88 6 / 4 % j7 H o 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 71 Hydrograph for Subcatchment DA#2: Post-Development Pond #2 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 3.75 2.50 0.00 2.00 0.39 0.01 0.29 106.00 3.75 2.50 0.00 4.00 3.32 2.10 3.02 108.00 3.75 2.50 0.00 6.00 3.75 2.50 0.84 110.00 3.75 2.50 0.00 8.00 3.75 2.50 0.00 112.00 3.75 2.50 0.00 10.00 3.75 2.50 0.00 114.00 3.75 2.50 0.00 12.00 3.75 2.50 0.00 116.00 3.75 2.50 0.00 14.00 3.75 2.50 0.00 118.00 3.75 2.50 0.00 16.00 3.75 2.50 0.00 120.00 3.75 2.50 0.00 18.00 3.75 2.50 0.00 20.00 3.75 2.50 0.00 22.00 3.75 2.50 0.00 24.00 3.75 2.50 0.00 26.00 3.75 2.50 0.00 28.00 3.75 2.50 0.00 30.00 3.75 2.50 0.00 32.00 3.75 2.50 0.00 34.00 3.75 2.50 0.00 36.00 3.75 2.50 0.00 38.00 3.75 2.50 0.00 40.00 3.75 2.50 0.00 42.00 3.75 2.50 0.00 44.00 3.75 2.50 0.00 46.00 3.75 2.50 0.00 48.00 3.75 2.50 0.00 50.00 3.75 2.50 0.00 52.00 3.75 2.50 0.00 54.00 3.75 2.50 0.00 56.00 3.75 2.50 0.00 58.00 3.75 2.50 0.00 60.00 3.75 2.50 0.00 62.00 3.75 2.50 0.00 64.00 3.75 2.50 0.00 66.00 3.75 2.50 0.00 68.00 3.75 2.50 0.00 70.00 3.75 2.50 0.00 72.00 3.75 2.50 0.00 74.00 3.75 2.50 0.00 76.00 3.75 2.50 0.00 78.00 3.75 2.50 0.00 80.00 3.75 2.50 0.00 82.00 3.75 2.50 0.00 84.00 3.75 2.50 0.00 86.00 3.75 2.50 0.00 88.00 3.75 2.50 0.00 90.00 3.75 2.50 0.00 92.00 3.75 2.50 0.00 94.00 3.75 2.50 0.00 96.00 3.75 2.50 0.00 98.00 3.75 2.50 0.00 100.00 3.75 2.50 0.00 102.00 3.75 2.50 0.00 Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 72 Summary for Subcatchment DA#3: Post-Development Pond #3 Runoff = 21.65 cfs @ 3.15 hrs, Volume= 1.040 af, Depth= 2.68" Routed to Pond BMP#3 : BMP #3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Area (ac) CN Description • 0.677 98 Roadway • 0.221 98 Sidewalk • 1.481 98 Buildings/Driveways 2.034 80 >75% Grass cover, Good, HSG D • 0.203 98 Parking • 0.035 98 Ex. Impervious 4.651 90 Weighted Average 2.034 43.73% Pervious Area 2.617 56.27% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA#3: Post-Development Pond #3 Hydrograph 24 — — 1 21.65 cfs - ■Runoff zz- 21 C-haloite 6 h r4 6-r — 20 19 1( r hRaiifII3.17- " 18 17 Runoff-Area=4.6�511 -arc - ' 16 15 1Rtff VIe1•Q4Q�f = 14 3 12 ° 11 - c=5$ mmtm - io 0 — I— 4 J4I � 6 � 5 3 I/ 2 � 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 73 Hydrograph for Subcatchment DA#3: Post-Development Pond #3 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 3.75 2.68 0.00 2.00 0.39 0.02 0.34 106.00 3.75 2.68 0.00 4.00 3.32 2.28 2.11 108.00 3.75 2.68 0.00 6.00 3.75 2.68 0.58 110.00 3.75 2.68 0.00 8.00 3.75 2.68 0.00 112.00 3.75 2.68 0.00 10.00 3.75 2.68 0.00 114.00 3.75 2.68 0.00 12.00 3.75 2.68 0.00 116.00 3.75 2.68 0.00 14.00 3.75 2.68 0.00 118.00 3.75 2.68 0.00 16.00 3.75 2.68 0.00 120.00 3.75 2.68 0.00 18.00 3.75 2.68 0.00 20.00 3.75 2.68 0.00 22.00 3.75 2.68 0.00 24.00 3.75 2.68 0.00 26.00 3.75 2.68 0.00 28.00 3.75 2.68 0.00 30.00 3.75 2.68 0.00 32.00 3.75 2.68 0.00 34.00 3.75 2.68 0.00 36.00 3.75 2.68 0.00 38.00 3.75 2.68 0.00 40.00 3.75 2.68 0.00 42.00 3.75 2.68 0.00 44.00 3.75 2.68 0.00 46.00 3.75 2.68 0.00 48.00 3.75 2.68 0.00 50.00 3.75 2.68 0.00 52.00 3.75 2.68 0.00 54.00 3.75 2.68 0.00 56.00 3.75 2.68 0.00 58.00 3.75 2.68 0.00 60.00 3.75 2.68 0.00 62.00 3.75 2.68 0.00 64.00 3.75 2.68 0.00 66.00 3.75 2.68 0.00 68.00 3.75 2.68 0.00 70.00 3.75 2.68 0.00 72.00 3.75 2.68 0.00 74.00 3.75 2.68 0.00 76.00 3.75 2.68 0.00 78.00 3.75 2.68 0.00 80.00 3.75 2.68 0.00 82.00 3.75 2.68 0.00 84.00 3.75 2.68 0.00 86.00 3.75 2.68 0.00 88.00 3.75 2.68 0.00 90.00 3.75 2.68 0.00 92.00 3.75 2.68 0.00 94.00 3.75 2.68 0.00 96.00 3.75 2.68 0.00 98.00 3.75 2.68 0.00 100.00 3.75 2.68 0.00 102.00 3.75 2.68 0.00 Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 74 Summary for Subcatchment PRE#1: Predevelopment #1 Runoff = 65.09 cfs @ 3.48 hrs, Volume= 5.024 af, Depth= 2.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Area (ac) CN Description 28.010 84 Pasture/grassland/range, Fair, HSG D 28.010 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 29.5 Direct Entry, Subcatchment PRE#1: Predevelopment #1 Hydrograph — ■Runoff 65.09 cfs 65 a lote6 r-6-r - 607 1 �161111.4ihl Ratlf 11 3.F7-51" 55- 50�,� T � ►rya ZB.O1O 45 — H HRunct V_14mle -5. f 41, _3 35� / I T 71 T 1 7 7 !It!nr113-!Ihr'1151" min - LL30� IBC9 L 814 25� "" 20� —1 T 1 1- 7 1 T 1 � 1 � 15 — 14 — - I � 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 75 Hydrograph for Subcatchment PRE#1: Predevelopment #1 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 3.75 2.15 0.00 2.00 0.39 0.00 0.00 106.00 3.75 2.15 0.00 4.00 3.32 1.78 24.16 108.00 3.75 2.15 0.00 6.00 3.75 2.15 3.82 110.00 3.75 2.15 0.00 8.00 3.75 2.15 0.00 112.00 3.75 2.15 0.00 10.00 3.75 2.15 0.00 114.00 3.75 2.15 0.00 12.00 3.75 2.15 0.00 116.00 3.75 2.15 0.00 14.00 3.75 2.15 0.00 118.00 3.75 2.15 0.00 16.00 3.75 2.15 0.00 120.00 3.75 2.15 0.00 18.00 3.75 2.15 0.00 20.00 3.75 2.15 0.00 22.00 3.75 2.15 0.00 24.00 3.75 2.15 0.00 26.00 3.75 2.15 0.00 28.00 3.75 2.15 0.00 30.00 3.75 2.15 0.00 32.00 3.75 2.15 0.00 34.00 3.75 2.15 0.00 36.00 3.75 2.15 0.00 38.00 3.75 2.15 0.00 40.00 3.75 2.15 0.00 42.00 3.75 2.15 0.00 44.00 3.75 2.15 0.00 46.00 3.75 2.15 0.00 48.00 3.75 2.15 0.00 50.00 3.75 2.15 0.00 52.00 3.75 2.15 0.00 54.00 3.75 2.15 0.00 56.00 3.75 2.15 0.00 58.00 3.75 2.15 0.00 60.00 3.75 2.15 0.00 62.00 3.75 2.15 0.00 64.00 3.75 2.15 0.00 66.00 3.75 2.15 0.00 68.00 3.75 2.15 0.00 70.00 3.75 2.15 0.00 72.00 3.75 2.15 0.00 74.00 3.75 2.15 0.00 76.00 3.75 2.15 0.00 78.00 3.75 2.15 0.00 80.00 3.75 2.15 0.00 82.00 3.75 2.15 0.00 84.00 3.75 2.15 0.00 86.00 3.75 2.15 0.00 88.00 3.75 2.15 0.00 90.00 3.75 2.15 0.00 92.00 3.75 2.15 0.00 94.00 3.75 2.15 0.00 96.00 3.75 2.15 0.00 98.00 3.75 2.15 0.00 100.00 3.75 2.15 0.00 102.00 3.75 2.15 0.00 Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 76 Summary for Subcatchment PRE#2: Predevelopment #2 Runoff = 15.29 cfs @ 3.52 hrs, Volume= 1.228 af, Depth= 2.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Area (ac) CN Description 6.846 84 Pasture/grassland/range, Fair, HSG D 6.846 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.9 Direct Entry, Subcatchment PRE#2: Predevelopment #2 Hydrograph 17 (I ■Runoff 15.29 cfs _ I ± T � - 15= 6._tarloite 6 rt6-r 13T -k 1 - 1 Ell r4ihi-kaliif II 3.F7- "51 - 12V T 1 T T 1 T R u noffAI ea 5.846 a 114-/ 10V T T T T 1 RLn�V ILle -1•?2 f - T T I HRnr I�!p hr'11�' 8- T-c- - nun — LL H4 — I -I T -1 4 1- IT 1 1 aNL-814 4= _ 3= T T T TI T1 TT 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 77 Hydrograph for Subcatchment PRE#2: Predevelopment #2 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 3.75 2.15 0.00 2.00 0.39 0.00 0.00 106.00 3.75 2.15 0.00 4.00 3.32 1.78 6.44 108.00 3.75 2.15 0.00 6.00 3.75 2.15 0.95 110.00 3.75 2.15 0.00 8.00 3.75 2.15 0.00 112.00 3.75 2.15 0.00 10.00 3.75 2.15 0.00 114.00 3.75 2.15 0.00 12.00 3.75 2.15 0.00 116.00 3.75 2.15 0.00 14.00 3.75 2.15 0.00 118.00 3.75 2.15 0.00 16.00 3.75 2.15 0.00 120.00 3.75 2.15 0.00 18.00 3.75 2.15 0.00 20.00 3.75 2.15 0.00 22.00 3.75 2.15 0.00 24.00 3.75 2.15 0.00 26.00 3.75 2.15 0.00 28.00 3.75 2.15 0.00 30.00 3.75 2.15 0.00 32.00 3.75 2.15 0.00 34.00 3.75 2.15 0.00 36.00 3.75 2.15 0.00 38.00 3.75 2.15 0.00 40.00 3.75 2.15 0.00 42.00 3.75 2.15 0.00 44.00 3.75 2.15 0.00 46.00 3.75 2.15 0.00 48.00 3.75 2.15 0.00 50.00 3.75 2.15 0.00 52.00 3.75 2.15 0.00 54.00 3.75 2.15 0.00 56.00 3.75 2.15 0.00 58.00 3.75 2.15 0.00 60.00 3.75 2.15 0.00 62.00 3.75 2.15 0.00 64.00 3.75 2.15 0.00 66.00 3.75 2.15 0.00 68.00 3.75 2.15 0.00 70.00 3.75 2.15 0.00 72.00 3.75 2.15 0.00 74.00 3.75 2.15 0.00 76.00 3.75 2.15 0.00 78.00 3.75 2.15 0.00 80.00 3.75 2.15 0.00 82.00 3.75 2.15 0.00 84.00 3.75 2.15 0.00 86.00 3.75 2.15 0.00 88.00 3.75 2.15 0.00 90.00 3.75 2.15 0.00 92.00 3.75 2.15 0.00 94.00 3.75 2.15 0.00 96.00 3.75 2.15 0.00 98.00 3.75 2.15 0.00 100.00 3.75 2.15 0.00 102.00 3.75 2.15 0.00 Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 78 Summary for Subcatchment PRE#3: Predevelopment #3 Runoff = 62.57 cfs @ 3.52 hrs, Volume= 5.024 af, Depth= 2.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Area (ac) CN Description 28.010 84 Pasture/grassland/range, Fair, HSG D 28.010 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.9 Direct Entry, Subcatchment PRE#3: Predevelopment #3 Hydrograph 70 _ •Runoff 62.57 cfs I ' A - Crar1Coi el 6=ihrli C -- r - 60 55 r irt1 p�y.{11.4. rA Ra i i1611 �/.�F7V.� 501/ L I A_ �7►�1�ho__ 1 Are_a#28.01W a + 45� 40 -/ - fi V 14 1e�'• f 0 35 , nrI la! 7-2•I I LT 30- TCi= 1 m i n f- � IIG-NLf314 25 , 20-? 10- 0 5 10 15 20�/1����/��//l�//l��l��l 25 30 35 40 45 50�/ 55 60 65 70 75 80 85 9'0 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 79 Hydrograph for Subcatchment PRE#3: Predevelopment #3 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 3.75 2.15 0.00 2.00 0.39 0.00 0.00 106.00 3.75 2.15 0.00 4.00 3.32 1.78 26.35 108.00 3.75 2.15 0.00 6.00 3.75 2.15 3.87 110.00 3.75 2.15 0.00 8.00 3.75 2.15 0.00 112.00 3.75 2.15 0.00 10.00 3.75 2.15 0.00 114.00 3.75 2.15 0.00 12.00 3.75 2.15 0.00 116.00 3.75 2.15 0.00 14.00 3.75 2.15 0.00 118.00 3.75 2.15 0.00 16.00 3.75 2.15 0.00 120.00 3.75 2.15 0.00 18.00 3.75 2.15 0.00 20.00 3.75 2.15 0.00 22.00 3.75 2.15 0.00 24.00 3.75 2.15 0.00 26.00 3.75 2.15 0.00 28.00 3.75 2.15 0.00 30.00 3.75 2.15 0.00 32.00 3.75 2.15 0.00 34.00 3.75 2.15 0.00 36.00 3.75 2.15 0.00 38.00 3.75 2.15 0.00 40.00 3.75 2.15 0.00 42.00 3.75 2.15 0.00 44.00 3.75 2.15 0.00 46.00 3.75 2.15 0.00 48.00 3.75 2.15 0.00 50.00 3.75 2.15 0.00 52.00 3.75 2.15 0.00 54.00 3.75 2.15 0.00 56.00 3.75 2.15 0.00 58.00 3.75 2.15 0.00 60.00 3.75 2.15 0.00 62.00 3.75 2.15 0.00 64.00 3.75 2.15 0.00 66.00 3.75 2.15 0.00 68.00 3.75 2.15 0.00 70.00 3.75 2.15 0.00 72.00 3.75 2.15 0.00 74.00 3.75 2.15 0.00 76.00 3.75 2.15 0.00 78.00 3.75 2.15 0.00 80.00 3.75 2.15 0.00 82.00 3.75 2.15 0.00 84.00 3.75 2.15 0.00 86.00 3.75 2.15 0.00 88.00 3.75 2.15 0.00 90.00 3.75 2.15 0.00 92.00 3.75 2.15 0.00 94.00 3.75 2.15 0.00 96.00 3.75 2.15 0.00 98.00 3.75 2.15 0.00 100.00 3.75 2.15 0.00 102.00 3.75 2.15 0.00 Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 80 Summary for Pond BMP#3: BMP #3 Inflow Area = 4.651 ac, 56.27% Impervious, Inflow Depth = 2.68" for 10-yr-6hr event Inflow = 21.65 cfs @ 3.15 hrs, Volume= 1.040 of Outflow = 4.01 cfs @ 3.60 hrs, Volume= 1.040 af, Atten= 81%, Lag= 27.1 min Primary = 4.01 cfs @ 3.60 hrs, Volume= 1.040 af Routed to nonexistent node POST-POI#1 Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to nonexistent node POST-POI#1 Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Peak Elev= 553.71' @ 3.60 hrs Surf.Area= 11,515 sf Storage= 29,551 cf Plug-Flow detention time= 1,268.9 min calculated for 1.039 af(100% of inflow) Center-of-Mass det. time= 1,271.7 min ( 1,478.0 - 206.3 ) Volume Invert Avail.Storage Storage Description #1 550.00' 95,966 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 550.00 4,583 0 0 551.00 6,298 5,441 5,441 552.00 8,187 7,243 12,683 553.00 10,158 9,173 21,856 554.00 12,069 11,114 32,969 555.00 13,858 12,964 45,933 556.00 15,706 14,782 60,715 557.00 17,611 16,659 77,373 558.00 19,575 18,593 95,966 Device Routing Invert Outlet Devices #1 Primary 549.50' 24.0" Round RCP Round 24" L= 85.0' RCP, square edge headwall, Ke= 0.500 Inlet/Outlet Invert= 549.50' / 548.96' S= 0.0064 '/' Cc= 0.900 n= 0.013 Concrete sewer w/manholes & inlets, Flow Area= 3.14 sf #2 Device 1 550.00' Sand Filter Head (feet) 0.00 0.01 6.00 Disch. (cfs) 0.000 0.081 0.081 #3 Device 1 553.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 Width (feet) 2.00 2.00 #4 Device 1 554.00' 48.0" x 48.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads #5 Secondary 556.00' 10.0' long x 16.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 81 Primary OutFlow Max=4.00 cfs © 3.60 hrs HW=553.71' (Free Discharge) 4-1=RCP_Round 24" (Passes 4.00 cfs of 26.13 cfs potential flow) 2=Sand Filter (Custom Controls 0.08 cfs) 3=Custom Weir/Orifice (Weir Controls 3.92 cfs @ 2.76 fps) 4=Riser ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=550.00' (Free Discharge) LS=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Pond BMP#3: BMP #3 Hydrograph A H— r 7 I I T I A r 17 1 ■Inflow 21.65 cfs LA,-,1A/� - ■outflow 24 / I`if`�e�v �e��A 1 lad ■Secondary 227:- ± Peak El Vi=553.1 v - 20� Storage=2%5511 cf 18- 16Y - 14 1—14 1 - in' 14= TTTI7F17I - / 0 : / L � a 104 / yy 84 d f11 rfk 1 1 H 1 1-1 rt l 4.01 cfs 4 ,j Z / ,// ZZis 0.00 cfs %///////////////////////////////////////////////////////������������� 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 82 Pond BMP#3: BMP #3 Stage-Discharge ❑Total ' 558 ❑Primary ❑Secondary 557 / /.� Broad-Crested Rectan.ular Weir 556 ^ 555 ...d/ .2 /a�' Riser 0 554 ' �III Custom Weir/Orifice 553 % 552 551 / Sand Filter / 0 10 20 30 40 50 60 70 80 90 100 110 Discharge (cfs) Pond BMP#3: BMP #3 Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-ft) 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 Surface ❑Storage 558_ I I 1 ��� ������� 557 I ��� �� I I I 5561/ 555� ��/�/ — 2 - ' II II I //' — I I o 554- , //�/ /� I 41 I > - w 553LZ I 4 I I 4I I - 552:/ 5511/ 1 Custom Stage Data 550 ( , 0 10,,000 20,000 30,000 40,000 50,000 60,,000 70,000 80,000 90,000' Storage(cubic-feet) Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 83 Hydrograph for Pond BMP#3: BMP #3 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 550.00 0.00 0.00 0.00 5.00 0.86 25,372 553.34 1.36 1.36 0.00 10.00 0.00 21,488 552.96 0.08 0.08 0.00 15.00 0.00 20,030 552.82 0.08 0.08 0.00 20.00 0.00 18,572 552.67 0.08 0.08 0.00 25.00 0.00 17,114 552.51 0.08 0.08 0.00 30.00 0.00 15,656 552.35 0.08 0.08 0.00 35.00 0.00 14,198 552.18 0.08 0.08 0.00 40.00 0.00 12,740 552.01 0.08 0.08 0.00 45.00 0.00 11,282 551.83 0.08 0.08 0.00 50.00 0.00 9,824 551.64 0.08 0.08 0.00 55.00 0.00 8,366 551.44 0.08 0.08 0.00 60.00 0.00 6,908 551.23 0.08 0.08 0.00 65.00 0.00 5,450 551.00 0.08 0.08 0.00 70.00 0.00 3,992 550.76 0.08 0.08 0.00 75.00 0.00 2,534 550.51 0.08 0.08 0.00 80.00 0.00 1,076 550.23 0.08 0.08 0.00 85.00 0.00 0 550.00 0.00 0.00 0.00 90.00 0.00 0 550.00 0.00 0.00 0.00 95.00 0.00 0 550.00 0.00 0.00 0.00 100.00 0.00 0 550.00 0.00 0.00 0.00 105.00 0.00 0 550.00 0.00 0.00 0.00 110.00 0.00 0 550.00 0.00 0.00 0.00 115.00 0.00 0 550.00 0.00 0.00 0.00 120.00 0.00 0 550.00 0.00 0.00 0.00 Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 84 Stage-Discharge for Pond BMP#3: BMP #3 Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 550.00 0.00 0.00 0.00 555.20 32.45 32.45 0.00 550.10 0.08 0.08 0.00 555.30 32.83 32.83 0.00 550.20 0.08 0.08 0.00 555.40 33.21 33.21 0.00 550.30 0.08 0.08 0.00 555.50 33.58 33.58 0.00 550.40 0.08 0.08 0.00 555.60 33.95 33.95 0.00 550.50 0.08 0.08 0.00 555.70 34.31 34.31 0.00 550.60 0.08 0.08 0.00 555.80 34.67 34.67 0.00 550.70 0.08 0.08 0.00 555.90 35.03 35.03 0.00 550.80 0.08 0.08 0.00 556.00 35.38 35.38 0.00 550.90 0.08 0.08 0.00 556.10 36.58 35.73 0.85 551.00 0.08 0.08 0.00 556.20 38.47 36.07 2.40 551.10 0.08 0.08 0.00 556.30 40.84 36.42 4.42 551.20 0.08 0.08 0.00 556.40 43.57 36.74 6.83 551.30 0.08 0.08 0.00 556.50 46.60 37.05 9.55 551.40 0.08 0.08 0.00 556.60 49.91 37.36 12.55 551.50 0.08 0.08 0.00 556.70 53.30 37.67 15.64 551.60 0.08 0.08 0.00 556.80 56.86 37.97 18.89 551.70 0.08 0.08 0.00 556.90 60.77 38.27 22.50 551.80 0.08 0.08 0.00 557.00 64.87 38.57 26.30 551.90 0.08 0.08 0.00 557.10 69.26 38.86 30.40 552.00 0.08 0.08 0.00 557.20 73.86 39.15 34.70 552.10 0.08 0.08 0.00 557.30 78.58 39.45 39.13 552.20 0.08 0.08 0.00 557.40 83.47 39.73 43.73 552.30 0.08 0.08 0.00 557.50 88.43 40.02 48.41 552.40 0.08 0.08 0.00 557.60 93.53 40.31 53.23 552.50 0.08 0.08 0.00 557.70 98.88 40.59 58.29 552.60 0.08 0.08 0.00 557.80 104.38 40.87 63.51 552.70 0.08 0.08 0.00 557.90 110.03 41.15 68.88 552.80 0.08 0.08 0.00 558.00 115.81 41.43 74.39 552.90 0.08 0.08 0.00 553.00 0.08 0.08 0.00 553.10 0.29 0.29 0.00 553.20 0.67 0.67 0.00 553.30 1.16 1.16 0.00 553.40 1.74 1.74 0.00 553.50 2.40 2.40 0.00 553.60 3.13 3.13 0.00 553.70 3.92 3.92 0.00 553.80 4.77 4.77 0.00 553.90 5.67 5.67 0.00 554.00 6.63 6.63 0.00 554.10 9.09 9.09 0.00 554.20 12.78 12.78 0.00 554.30 17.31 17.31 0.00 554.40 22.51 22.51 0.00 554.50 28.30 28.30 0.00 554.60 30.07 30.07 0.00 554.70 30.48 30.48 0.00 554.80 30.88 30.88 0.00 554.90 31.28 31.28 0.00 555.00 31.68 31.68 0.00 555.10 32.06 32.06 0.00 Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 85 Stage-Area-Storage for Pond BMP#3: BMP #3 Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 550.00 4,583 0 555.20 14,228 48,741 550.10 4,755 467 555.30 14,412 50,173 550.20 4,926 951 555.40 14,597 51,624 550.30 5,097 1,452 555.50 14,782 53,093 550.40 5,269 1,970 555.60 14,967 54,580 550.50 5,441 2,506 555.70 15,152 56,086 550.60 5,612 3,059 555.80 15,336 57,610 550.70 5,784 3,628 555.90 15,521 59,153 550.80 5,955 4,215 556.00 15,706 60,715 550.90 6,126 4,819 556.10 15,897 62,295 551.00 6,298 5,441 556.20 16,087 63,894 551.10 6,487 6,080 556.30 16,277 65,512 551.20 6,676 6,738 556.40 16,468 67,149 551.30 6,865 7,415 556.50 16,659 68,806 551.40 7,054 8,111 556.60 16,849 70,481 551.50 7,243 8,826 556.70 17,040 72,175 551.60 7,431 9,559 556.80 17,230 73,889 551.70 7,620 10,312 556.90 17,420 75,621 551.80 7,809 11,083 557.00 17,611 77,373 551.90 7,998 11,874 557.10 17,807 79,144 552.00 8,187 12,683 557.20 18,004 80,934 552.10 8,384 13,512 557.30 18,200 82,745 552.20 8,581 14,360 557.40 18,397 84,575 552.30 8,778 15,228 557.50 18,593 86,424 552.40 8,975 16,115 557.60 18,789 88,293 552.50 9,173 17,023 557.70 18,986 90,182 552.60 9,370 17,950 557.80 19,182 92,090 552.70 9,567 18,897 557.90 19,379 94,018 552.80 9,764 19,863 558.00 19,575 95,966 552.90 9,961 20,850 553.00 10,158 21,856 553.10 10,349 22,881 553.20 10,540 23,925 553.30 10,731 24,989 553.40 10,922 26,072 553.50 11,114 27,173 553.60 11,305 28,294 553.70 11,496 29,434 553.80 11,687 30,593 553.90 11,878 31,772 554.00 12,069 32,969 554.10 12,248 34,185 554.20 12,427 35,419 554.30 12,606 36,670 554.40 12,785 37,940 554.50 12,964 39,227 554.60 13,142 40,532 554.70 13,321 41,856 554.80 13,500 43,197 554.90 13,679 44,556 555.00 13,858 45,933 555.10 14,043 47,328 Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 86 Summary for Pond BMP-1: BMP #1 Inflow Area = 28.009 ac, 50.36% Impervious, Inflow Depth = 2.59" for 10-yr-6hr event Inflow = 125.71 cfs @ 3.15 hrs, Volume= 6.043 af Outflow = 66.30 cfs @ 3.33 hrs, Volume= 6.043 af, Atten= 47%, Lag= 10.8 min Primary = 66.30 cfs @ 3.33 hrs, Volume= 6.043 af Routed to nonexistent node POST-POI#1 Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to nonexistent node POST-POI#1 Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Peak Elev= 558.60' @ 3.33 hrs Surf.Area= 46,993 sf Storage= 127,790 cf Plug-Flow detention time= 418.2 min calculated for 6.043 af(100% of inflow) Center-of-Mass det. time= 417.8 min ( 625.1 - 207.3 ) Volume Invert Avail.Storage Storage Description #1 555.50' 223,972 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 555.50 34,578 0 0 556.00 37,559 18,034 18,034 557.00 41,209 39,384 57,418 558.00 44,809 43,009 100,427 559.00 48,473 46,641 147,068 560.00 52,204 50,339 197,407 560.50 54,057 26,565 223,972 Device Routing Invert Outlet Devices #1 Primary 550.00' 36.0" Round RCP_Round 36" L= 115.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 550.00' / 548.00' S= 0.0174 '/' Cc= 0.900 n= 0.013 Concrete sewer w/manholes & inlets, Flow Area= 7.07 sf #2 Device 1 555.50' 4.0" Horiz. WQ/CP Orifice C= 0.600 Limited to weir flow at low heads #3 Device 1 557.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 0.50 Width (feet) 2.00 2.00 #4 Device 1 557.50' 48.0" x 48.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads #5 Secondary 559.00' 20.0' long x 16.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 87 Primary OutFlow Max=63.13 cfs © 3.33 hrs HW=558.56' (Free Discharge) 4-1=RCP Round 36" (Passes 63.13 cfs of 90.41 cfs potential flow) 2=WQ/CP Orifice (Orifice Controls 0.73 cfs © 8.42 fps) 3=Custom Weir/Orifice (Orifice Controls 5.61 cfs @ 5.61 fps) 4=Riser (Weir Controls 56.79 cfs © 3.36 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=555.50' (Free Discharge) LS=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Pond BMP-1: BMP #1 Hydrograph /�i T 17 71 7 171 17 H 1 7 171 r 1 ❑Inflow 125.71 cfs 3 outflow 0 Primary 140_ 11�1 I V'W �e .0 a ❑Secondary 130/ 1 _I 1 1 A 1 I 1_1 1 Pe it Ele558.I60_' 120/ 110 -r - fi rt 1-1 T 11 fi IS °rage711217[99Glf 100// I -1IIH1 + 1H - 1I1 + 1HI1H 901 RR In rf w 8 66.30 cfs I I 1 A 1 _I 1 1 3 70� LL 60 -/ —' rt 1 firt rt fi 50/ 1 —1 1 1 40/ 30 -/ 1 20/ ,/ 0.00 cfs 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 88 Pond BMP-1: BMP #1 Stage-Discharge 0 Total 0 Primary ❑Secondary 560 /�// Broad-Crested Rectan.ular Weir �` 559 / 0 558 � •; % j Riser w / Custom Weir/Orifice 557 556 % WQ/CP Orifice 0 20 40 60 80 100 120 140 160 180 Discharge (cfs) Pond BMP-1: BMP #1 Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-ft) 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 0 Surfacel ❑Storage 560 /// /// 559 z /// 0558 II m W II 557 - I I I 556-' Custom Stage Data 0 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000 180,000 200,000 220,000 Storage(cubic-feet) Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 89 Hydrograph for Pond BMP-1: BMP #1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 555.50 0.00 0.00 0.00 5.00 5.12 84,855 557.65 6.63 6.63 0.00 10.00 0.00 60,328 557.07 0.65 0.65 0.00 15.00 0.00 50,947 556.84 0.49 0.49 0.00 20.00 0.00 42,540 556.63 0.45 0.45 0.00 25.00 0.00 34,851 556.44 0.41 0.41 0.00 30.00 0.00 27,892 556.26 0.37 0.37 0.00 35.00 0.00 21,676 556.10 0.32 0.32 0.00 40.00 0.00 16,215 555.95 0.28 0.28 0.00 45.00 0.00 11,522 555.82 0.24 0.24 0.00 50.00 0.00 7,613 555.72 0.20 0.20 0.00 55.00 0.00 4,527 555.63 0.14 0.14 0.00 60.00 0.00 2,625 555.58 0.07 0.07 0.00 65.00 0.00 1,677 555.55 0.04 0.04 0.00 70.00 0.00 1,128 555.53 0.02 0.02 0.00 75.00 0.00 758 555.52 0.02 0.02 0.00 80.00 0.00 510 555.51 0.01 0.01 0.00 85.00 0.00 343 555.51 0.01 0.01 0.00 90.00 0.00 230 555.51 0.01 0.01 0.00 95.00 0.00 155 555.50 0.00 0.00 0.00 100.00 0.00 104 555.50 0.00 0.00 0.00 105.00 0.00 70 555.50 0.00 0.00 0.00 110.00 0.00 47 555.50 0.00 0.00 0.00 115.00 0.00 32 555.50 0.00 0.00 0.00 120.00 0.00 21 555.50 0.00 0.00 0.00 Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 90 Stage-Discharge for Pond BMP-1: BMP #1 Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 555.50 0.00 0.00 0.00 558.10 29.51 29.51 0.00 555.55 0.04 0.04 0.00 558.15 32.75 32.75 0.00 555.60 0.11 0.11 0.00 558.20 36.11 36.11 0.00 555.65 0.16 0.16 0.00 558.25 39.58 39.58 0.00 555.70 0.19 0.19 0.00 558.30 43.16 43.16 0.00 555.75 0.21 0.21 0.00 558.35 46.85 46.85 0.00 555.80 0.23 0.23 0.00 558.40 50.64 50.64 0.00 555.85 0.25 0.25 0.00 558.45 54.54 54.54 0.00 555.90 0.27 0.27 0.00 558.50 58.53 58.53 0.00 555.95 0.28 0.28 0.00 558.55 62.62 62.62 0.00 556.00 0.30 0.30 0.00 558.60 66.80 66.80 0.00 556.05 0.31 0.31 0.00 558.65 71.07 71.07 0.00 556.10 0.33 0.33 0.00 558.70 75.44 75.44 0.00 556.15 0.34 0.34 0.00 558.75 79.89 79.89 0.00 556.20 0.35 0.35 0.00 558.80 84.42 84.42 0.00 556.25 0.36 0.36 0.00 558.85 89.04 89.04 0.00 556.30 0.38 0.38 0.00 558.90 92.59 92.59 0.00 556.35 0.39 0.39 0.00 558.95 92.90 92.90 0.00 556.40 0.40 0.40 0.00 559.00 93.21 93.21 0.00 556.45 0.41 0.41 0.00 559.05 94.12 93.52 0.60 556.50 0.42 0.42 0.00 559.10 95.52 93.83 1.69 556.55 0.43 0.43 0.00 559.15 97.25 94.14 3.11 556.60 0.44 0.44 0.00 559.20 99.24 94.44 4.79 556.65 0.45 0.45 0.00 559.25 101.46 94.75 6.71 556.70 0.46 0.46 0.00 559.30 103.90 95.05 8.84 556.75 0.47 0.47 0.00 559.35 106.52 95.36 11.16 556.80 0.48 0.48 0.00 559.40 109.32 95.66 13.66 556.85 0.49 0.49 0.00 559.45 112.27 95.96 16.30 556.90 0.50 0.50 0.00 559.50 115.36 96.27 19.09 556.95 0.51 0.51 0.00 559.55 118.59 96.57 22.03 557.00 0.51 0.51 0.00 559.60 121.96 96.87 25.10 557.05 0.60 0.60 0.00 559.65 125.31 97.16 28.14 557.10 0.74 0.74 0.00 559.70 128.74 97.46 31.27 557.15 0.92 0.92 0.00 559.75 132.25 97.76 34.49 557.20 1.13 1.13 0.00 559.80 135.83 98.05 37.78 557.25 1.37 1.37 0.00 559.85 139.69 98.35 41.34 557.30 1.64 1.64 0.00 559.90 143.64 98.64 45.00 557.35 1.93 1.93 0.00 559.95 147.69 98.94 48.75 557.40 2.24 2.24 0.00 560.00 151.83 99.23 52.60 557.45 2.56 2.56 0.00 560.05 156.17 99.52 56.65 557.50 2.91 2.91 0.00 560.10 160.61 99.81 60.80 557.55 3.79 3.79 0.00 560.15 165.15 100.10 65.05 557.60 5.10 5.10 0.00 560.20 169.80 100.39 69.41 557.65 6.71 6.71 0.00 560.25 174.47 100.68 73.79 557.70 8.55 8.55 0.00 560.30 179.23 100.96 78.26 557.75 10.61 10.61 0.00 560.35 184.07 101.25 82.82 557.80 12.84 12.84 0.00 560.40 189.00 101.54 87.46 557.85 15.25 15.25 0.00 560.45 193.92 101.82 92.10 557.90 17.82 17.82 0.00 560.50 198.92 102.11 96.82 557.95 20.54 20.54 0.00 558.00 23.40 23.40 0.00 558.05 26.39 26.39 0.00 Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 91 Stage-Area-Storage for Pond BMP-1: BMP #1 Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 555.50 34,578 0 558.10 45,175 104,926 555.55 34,876 1,736 558.15 45,359 107,190 555.60 35,174 3,488 558.20 45,542 109,462 555.65 35,472 5,254 558.25 45,725 111,744 555.70 35,770 7,035 558.30 45,908 114,035 555.75 36,069 8,831 558.35 46,091 116,335 555.80 36,367 10,642 558.40 46,275 118,644 555.85 36,665 12,467 558.45 46,458 120,962 555.90 36,963 14,308 558.50 46,641 123,290 555.95 37,261 16,164 558.55 46,824 125,626 556.00 37,559 18,034 558.60 47,007 127,972 556.05 37,741 19,917 558.65 47,191 130,327 556.10 37,924 21,808 558.70 47,374 132,691 556.15 38,106 23,709 558.75 47,557 135,065 556.20 38,289 25,619 558.80 47,740 137,447 556.25 38,472 27,538 558.85 47,923 139,839 556.30 38,654 29,466 558.90 48,107 142,239 556.35 38,837 31,403 558.95 48,290 144,649 556.40 39,019 33,350 559.00 48,473 147,068 556.45 39,202 35,305 559.05 48,660 149,497 556.50 39,384 37,270 559.10 48,846 151,934 556.55 39,566 39,244 559.15 49,033 154,381 556.60 39,749 41,227 559.20 49,219 156,837 556.65 39,931 43,219 559.25 49,406 159,303 556.70 40,114 45,220 559.30 49,592 161,778 556.75 40,297 47,230 559.35 49,779 164,262 556.80 40,479 49,249 559.40 49,965 166,756 556.85 40,662 51,278 559.45 50,152 169,259 556.90 40,844 53,316 559.50 50,339 171,771 556.95 41,027 55,362 559.55 50,525 174,293 557.00 41,209 57,418 559.60 50,712 176,824 557.05 41,389 59,483 559.65 50,898 179,364 557.10 41,569 61,557 559.70 51,085 181,913 557.15 41,749 63,640 559.75 51,271 184,472 557.20 41,929 65,732 559.80 51,458 187,041 557.25 42,109 67,833 559.85 51,644 189,618 557.30 42,289 69,943 559.90 51,831 192,205 557.35 42,469 72,062 559.95 52,017 194,801 557.40 42,649 74,190 560.00 52,204 197,407 557.45 42,829 76,327 560.05 52,389 200,022 557.50 43,009 78,473 560.10 52,575 202,646 557.55 43,189 80,628 560.15 52,760 205,279 557.60 43,369 82,792 560.20 52,945 207,922 557.65 43,549 84,965 560.25 53,131 210,574 557.70 43,729 87,147 560.30 53,316 213,235 557.75 43,909 89,338 560.35 53,501 215,905 557.80 44,089 91,537 560.40 53,686 218,585 557.85 44,269 93,746 560.45 53,872 221,274 557.90 44,449 95,964 560.50 54,057 223,972 557.95 44,629 98,191 558.00 44,809 100,427 558.05 44,992 102,672 Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 92 Summary for Pond BMP-2: BMP #2 Inflow Area = 6.846 ac, 45.49% Impervious, Inflow Depth = 2.50" for 10-yr-6hr event Inflow = 29.82 cfs @ 3.15 hrs, Volume= 1.425 af Outflow = 12.64 cfs @ 3.37 hrs, Volume= 1.425 af, Atten= 58%, Lag= 12.9 min Primary = 12.64 cfs @ 3.37 hrs, Volume= 1.425 af Routed to nonexistent node POST-POI#1 Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to nonexistent node POST-POI#1 Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Peak Elev= 578.27' @ 3.37 hrs Surf.Area= 12,783 sf Storage= 33,203 cf Plug-Flow detention time= 1,082.2 min calculated for 1.424 af(100% of inflow) Center-of-Mass det. time= 1,085.5 min ( 1,293.7 - 208.2 ) Volume Invert Avail.Storage Storage Description #1 575.00' 57,570 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 575.00 7,651 0 0 576.00 9,115 8,383 8,383 577.00 10,693 9,904 18,287 577.50 11,523 5,554 23,841 578.00 12,385 5,977 29,818 579.00 13,864 13,125 42,943 580.00 15,391 14,628 57,570 Device Routing Invert Outlet Devices #1 Primary 574.40' 24.0" Round RCP Round 24" L= 88.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 574.40' / 574.00' S= 0.0045 '/' Cc= 0.900 n= 0.013 Concrete sewer w/manholes & inlets, Flow Area= 3.14 sf #2 Device 1 575.00' Sand Filter Head (feet) 0.00 0.01 6.00 Disch. (cfs) 0.000 0.081 0.081 #3 Device 1 577.50' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 0.50 Width (feet) 3.00 3.00 #4 Device 1 578.00' 48.0" x 48.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads #5 Secondary 579.00' 10.0' long x 16.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 93 Primary OutFlow Max=12.20 cfs © 3.37 hrs HW=578.26' (Free Discharge) 4-1=RCP_Round 24" (Passes 12.20 cfs of 23.52 cfs potential flow) 2=Sand Filter (Custom Controls 0.08 cfs) 3=Custom Weir/Orifice (Orifice Controls 5.20 cfs @ 3.47 fps) 4=Riser (Weir Controls 6.91 cfs © 1.67 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=575.00' (Free Discharge) LS=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Pond BMP-2: BMP #2 Hydrograph 4 I—I + , , I 1 1 1 . - Inflow cfs `` �p �Q _ •Outflow )-29.82 lilf1 '/`1i .V ■Secondary 32 lir 28 14 I —L 14 S�tota =33�2O3I�t — 26='. 24+' 1 LH 1 1 4 1 —I L 1 _[ L 1 _ 1 - 22 . 18� 19Rtrf 3 1LL 412.64 cfs I i i 4 L 4 1 1 L _I 4 Ili L 14 10 10 8 1 1 I 6 7 ���� Z Z ZZ 0.00 cfs , / 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 94 Pond BMP-2: BMP #2 Stage-Discharge ❑Total ❑Primary 581 �'' ❑Secondary 580 Broad-Crested Rectangular Weir 579 Riser 0 578 Custom Weir/Orifice w 577 576 Sand Filter / 0 10 20 30 40 50 60 70 80 90 100 Discharge (cfs) Pond BMP-2: BMP #2 Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-ft) 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,00011,00012,00013,00014,00015,000 Surface ` . ❑Storage 581 580:-/ i 579:-/ w 577� i ////���� II 576- _ J J Custom Stage Data 575 , , , , , , , , 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 55,000 Storage(cubic-feet) Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 95 Hydrograph for Pond BMP-2: BMP #2 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 575.00 0.00 0.00 0.00 5.00 1.24 27,368 577.80 1.70 1.70 0.00 10.00 0.00 23,409 577.46 0.08 0.08 0.00 15.00 0.00 21,951 577.33 0.08 0.08 0.00 20.00 0.00 20,493 577.20 0.08 0.08 0.00 25.00 0.00 19,035 577.07 0.08 0.08 0.00 30.00 0.00 17,577 576.93 0.08 0.08 0.00 35.00 0.00 16,119 576.79 0.08 0.08 0.00 40.00 0.00 14,661 576.65 0.08 0.08 0.00 45.00 0.00 13,203 576.51 0.08 0.08 0.00 50.00 0.00 11,745 576.36 0.08 0.08 0.00 55.00 0.00 10,287 576.21 0.08 0.08 0.00 60.00 0.00 8,829 576.05 0.08 0.08 0.00 65.00 0.00 7,371 575.89 0.08 0.08 0.00 70.00 0.00 5,913 575.72 0.08 0.08 0.00 75.00 0.00 4,455 575.55 0.08 0.08 0.00 80.00 0.00 2,997 575.38 0.08 0.08 0.00 85.00 0.00 1,539 575.20 0.08 0.08 0.00 90.00 0.00 81 575.01 0.08 0.08 0.00 95.00 0.00 0 575.00 0.00 0.00 0.00 100.00 0.00 0 575.00 0.00 0.00 0.00 105.00 0.00 0 575.00 0.00 0.00 0.00 110.00 0.00 0 575.00 0.00 0.00 0.00 115.00 0.00 0 575.00 0.00 0.00 0.00 120.00 0.00 0 575.00 0.00 0.00 0.00 Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 96 Stage-Discharge for Pond BMP-2: BMP #2 Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 575.00 0.00 0.00 0.00 580.20 66.77 32.06 34.70 575.10 0.08 0.08 0.00 580.30 71.57 32.44 39.13 575.20 0.08 0.08 0.00 580.40 76.55 32.82 43.73 575.30 0.08 0.08 0.00 580.50 81.60 33.19 48.41 575.40 0.08 0.08 0.00 580.60 86.78 33.55 53.23 575.50 0.08 0.08 0.00 580.70 92.21 33.92 58.29 575.60 0.08 0.08 0.00 580.80 97.79 34.28 63.51 575.70 0.08 0.08 0.00 580.90 103.51 34.63 68.88 575.80 0.08 0.08 0.00 581.00 109.37 34.98 74.39 575.90 0.08 0.08 0.00 576.00 0.08 0.08 0.00 576.10 0.08 0.08 0.00 576.20 0.08 0.08 0.00 576.30 0.08 0.08 0.00 576.40 0.08 0.08 0.00 576.50 0.08 0.08 0.00 576.60 0.08 0.08 0.00 576.70 0.08 0.08 0.00 576.80 0.08 0.08 0.00 576.90 0.08 0.08 0.00 577.00 0.08 0.08 0.00 577.10 0.08 0.08 0.00 577.20 0.08 0.08 0.00 577.30 0.08 0.08 0.00 577.40 0.08 0.08 0.00 577.50 0.08 0.08 0.00 577.60 0.39 0.39 0.00 577.70 0.96 0.96 0.00 577.80 1.70 1.70 0.00 577.90 2.57 2.57 0.00 578.00 3.55 3.55 0.00 578.10 5.99 5.99 0.00 578.20 9.64 9.64 0.00 578.30 14.09 14.09 0.00 578.40 19.22 19.22 0.00 578.50 24.74 24.74 0.00 578.60 25.23 25.23 0.00 578.70 25.71 25.71 0.00 578.80 26.18 26.18 0.00 578.90 26.64 26.64 0.00 579.00 27.10 27.10 0.00 579.10 28.39 27.55 0.85 579.20 30.38 27.99 2.40 579.30 32.84 28.42 4.42 579.40 35.68 28.85 6.83 579.50 38.82 29.27 9.55 579.60 42.23 29.68 12.55 579.70 45.73 30.09 15.64 579.80 49.39 30.50 18.89 579.90 53.39 30.90 22.50 580.00 57.59 31.29 26.30 580.10 62.08 31.68 30.40 Detention Davis Village Charlotte 6-hr 10-yr 10-yr-6hr Rainfall=3.75" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 97 Stage-Area-Storage for Pond BMP-2: BMP #2 Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 575.00 7,651 0 580.20 15,391 57,570 575.10 7,797 772 580.30 15,391 57,570 575.20 7,944 1,559 580.40 15,391 57,570 575.30 8,090 2,361 580.50 15,391 57,570 575.40 8,237 3,178 580.60 15,391 57,570 575.50 8,383 4,009 580.70 15,391 57,570 575.60 8,529 4,854 580.80 15,391 57,570 575.70 8,676 5,714 580.90 15,391 57,570 575.80 8,822 6,589 581.00 15,391 57,570 575.90 8,969 7,479 576.00 9,115 8,383 576.10 9,273 9,302 576.20 9,431 10,238 576.30 9,588 11,189 576.40 9,746 12,155 576.50 9,904 13,138 576.60 10,062 14,136 576.70 10,220 15,150 576.80 10,377 16,180 576.90 10,535 17,226 577.00 10,693 18,287 577.10 10,859 19,365 577.20 11,025 20,459 577.30 11,191 21,570 577.40 11,357 22,697 577.50 11,523 23,841 577.60 11,695 25,002 577.70 11,868 26,180 577.80 12,040 27,375 577.90 12,213 28,588 578.00 12,385 29,818 578.10 12,533 31,064 578.20 12,681 32,325 578.30 12,829 33,600 578.40 12,977 34,890 578.50 13,125 36,195 578.60 13,272 37,515 578.70 13,420 38,850 578.80 13,568 40,199 578.90 13,716 41,563 579.00 13,864 42,943 579.10 14,017 44,337 579.20 14,169 45,746 579.30 14,322 47,170 579.40 14,475 48,610 579.50 14,628 50,065 579.60 14,780 51,536 579.70 14,933 53,021 579.80 15,086 54,522 579.90 15,238 56,039 580.00 15,391 57,570 580.10 15,391 57,570 Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 98 Time span=0.00-120.00 hrs, dt=0.10 hrs, 1201 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DA#1: Post-Development Runoff Area=28.009 ac 50.36% Impervious Runoff Depth=3.24" Tc=5.0 min CN=89 Runoff=154.57 cfs 7.558 af Subcatchment DA#2: Post-Development Runoff Area=6.846 ac 45.49% Impervious Runoff Depth=3.14" Tc=5.0 min CN=88 Runoff=36.82 cfs 1.791 af Subcatchment DA#3: Post-Development Runoff Area=4.651 ac 56.27% Impervious Runoff Depth=3.34" Tc=5.0 min CN=90 Runoff=26.30 cfs 1.294 af Subcatchment PRE#1: Predevelopment#1 Runoff Area=28.010 ac 0.00% Impervious Runoff Depth=2.76" Tc=29.5 min CN=84 Runoff=82.46 cfs 6.448 af Subcatchment PRE#2: Predevelopment#2 Runoff Area=6.846 ac 0.00% Impervious Runoff Depth=2.76" Tc=31.9 min CN=84 Runoff=19.39 cfs 1.576 of SubcatchmentPRE#3: Predevelopment#3 Runoff Area=28.010 ac 0.00% Impervious Runoff Depth=2.76" Tc=31.9 min CN=84 Runoff=79.33 cfs 6.448 af Pond BMP#3: BMP#3 Peak Elev=554.05' Storage=33,565 cf Inflow=26.30 cfs 1.294 af Primary=7.62 cfs 1.294 af Secondary=0.00 cfs 0.000 af Outflow=7.62 cfs 1.294 af Pond BMP-1: BMP#1 Peak Elev=558.93' Storage=143,553 cf Inflow=154.57 cfs 7.558 af Primary=92.79 cfs 7.558 af Secondary=0.00 cfs 0.000 af Outflow=92.79 cfs 7.558 af Pond BMP-2: BMP#2 Peak Elev=578.51' Storage=36,359 cf Inflow=36.82 cfs 1.791 af Primary=24.43 cfs 1.791 af Secondary=0.00 cfs 0.000 af Outflow=24.43 cfs 1.791 af Total Runoff Area = 102.372 ac Runoff Volume = 25.117 af Average Runoff Depth = 2.94" 80.62% Pervious = 82.537 ac 19.38% Impervious = 19.835 ac Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 99 Summary for Subcatchment DA#1: Post-Development Pond #1 Runoff = 154.57 cfs @ 3.15 hrs, Volume= 7.558 af, Depth= 3.24" Routed to Pond BMP-1 : BMP #1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Area (ac) CN Description • 3.238 98 Roadway • 1.043 98 Sidewalk • 9.823 98 Buildings/Driveways 13.905 80 >75% Grass cover, Good, HSG D 28.009 89 Weighted Average 13.905 49.64% Pervious Area 14.104 50.36% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA#1: Post-Development Pond #1 Hydrograph 170 I I I I0 Runoff 154.57 cfs _ 4 4 4 � � 150_" barote 6hr/ 140_ - - 25-yr-6h �+�,fa41 14L' 130=� 120=H Runoff ilV�ea2 0109 110_/ T fftVQ i I3 100= 711 90 / —h —114h1191ff 1D4Pr=r-IF411 0 80 / c=5.0-- ini 70 64=86 60 50 / IJ LI 40 1 I 1 1 I 7 r 1 30 20 / 10_ /� 0 / 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 100 Hydrograph for Subcatchment DA#1: Post-Development Pond #1 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 4.44 3.24 0.00 2.00 0.48 0.04 2.85 106.00 4.44 3.24 0.00 4.00 3.92 2.75 15.38 108.00 4.44 3.24 0.00 6.00 4.44 3.24 4.50 110.00 4.44 3.24 0.00 8.00 4.44 3.24 0.00 112.00 4.44 3.24 0.00 10.00 4.44 3.24 0.00 114.00 4.44 3.24 0.00 12.00 4.44 3.24 0.00 116.00 4.44 3.24 0.00 14.00 4.44 3.24 0.00 118.00 4.44 3.24 0.00 16.00 4.44 3.24 0.00 120.00 4.44 3.24 0.00 18.00 4.44 3.24 0.00 20.00 4.44 3.24 0.00 22.00 4.44 3.24 0.00 24.00 4.44 3.24 0.00 26.00 4.44 3.24 0.00 28.00 4.44 3.24 0.00 30.00 4.44 3.24 0.00 32.00 4.44 3.24 0.00 34.00 4.44 3.24 0.00 36.00 4.44 3.24 0.00 38.00 4.44 3.24 0.00 40.00 4.44 3.24 0.00 42.00 4.44 3.24 0.00 44.00 4.44 3.24 0.00 46.00 4.44 3.24 0.00 48.00 4.44 3.24 0.00 50.00 4.44 3.24 0.00 52.00 4.44 3.24 0.00 54.00 4.44 3.24 0.00 56.00 4.44 3.24 0.00 58.00 4.44 3.24 0.00 60.00 4.44 3.24 0.00 62.00 4.44 3.24 0.00 64.00 4.44 3.24 0.00 66.00 4.44 3.24 0.00 68.00 4.44 3.24 0.00 70.00 4.44 3.24 0.00 72.00 4.44 3.24 0.00 74.00 4.44 3.24 0.00 76.00 4.44 3.24 0.00 78.00 4.44 3.24 0.00 80.00 4.44 3.24 0.00 82.00 4.44 3.24 0.00 84.00 4.44 3.24 0.00 86.00 4.44 3.24 0.00 88.00 4.44 3.24 0.00 90.00 4.44 3.24 0.00 92.00 4.44 3.24 0.00 94.00 4.44 3.24 0.00 96.00 4.44 3.24 0.00 98.00 4.44 3.24 0.00 100.00 4.44 3.24 0.00 102.00 4.44 3.24 0.00 Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 101 Summary for Subcatchment DA#2: Post-Development Pond #2 Runoff = 36.82 cfs @ 3.15 hrs, Volume= 1.791 af, Depth= 3.14" Routed to Pond BMP-2 : BMP #2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Area (ac) CN Description • 1.262 98 Roadway • 0.445 98 Sidewalk • 0.964 98 Buildings/Driveways 3.732 80 >75% Grass cover, Good, HSG D • 0.443 98 Amenity Impervious 6.846 88 Weighted Average 3.732 54.51% Pervious Area 3.114 45.49% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA#2: Post-Development Pond #2 Hydrograph 111 ■Runoff 36.82 cfs _ H H H 36 r H Cba4o #e_ 6-hr� ��- r - 34= , fi 2 114 h R11i1# 114.144" _ 32=' 30_ IROnaFA a=6.846 AM 28_' 26 24 1R pff Vial4-rne7-1.7-91f13 201 !R-1.!rirlD?P -h=73.1.1-4:1 - 18 Ic 5.0min 16_% I - - 1_ I 6-NJ=i8 14=' 12= / I � I A - 14 I- I -k I 10_ — 8 / _4 4 I- I -I I 4 ]- I - 6 4= i% 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 102 Hydrograph for Subcatchment DA#2: Post-Development Pond #2 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 4.44 3.14 0.00 2.00 0.48 0.03 0.58 106.00 4.44 3.14 0.00 4.00 3.92 2.65 3.72 108.00 4.44 3.14 0.00 6.00 4.44 3.14 1.09 110.00 4.44 3.14 0.00 8.00 4.44 3.14 0.00 112.00 4.44 3.14 0.00 10.00 4.44 3.14 0.00 114.00 4.44 3.14 0.00 12.00 4.44 3.14 0.00 116.00 4.44 3.14 0.00 14.00 4.44 3.14 0.00 118.00 4.44 3.14 0.00 16.00 4.44 3.14 0.00 120.00 4.44 3.14 0.00 18.00 4.44 3.14 0.00 20.00 4.44 3.14 0.00 22.00 4.44 3.14 0.00 24.00 4.44 3.14 0.00 26.00 4.44 3.14 0.00 28.00 4.44 3.14 0.00 30.00 4.44 3.14 0.00 32.00 4.44 3.14 0.00 34.00 4.44 3.14 0.00 36.00 4.44 3.14 0.00 38.00 4.44 3.14 0.00 40.00 4.44 3.14 0.00 42.00 4.44 3.14 0.00 44.00 4.44 3.14 0.00 46.00 4.44 3.14 0.00 48.00 4.44 3.14 0.00 50.00 4.44 3.14 0.00 52.00 4.44 3.14 0.00 54.00 4.44 3.14 0.00 56.00 4.44 3.14 0.00 58.00 4.44 3.14 0.00 60.00 4.44 3.14 0.00 62.00 4.44 3.14 0.00 64.00 4.44 3.14 0.00 66.00 4.44 3.14 0.00 68.00 4.44 3.14 0.00 70.00 4.44 3.14 0.00 72.00 4.44 3.14 0.00 74.00 4.44 3.14 0.00 76.00 4.44 3.14 0.00 78.00 4.44 3.14 0.00 80.00 4.44 3.14 0.00 82.00 4.44 3.14 0.00 84.00 4.44 3.14 0.00 86.00 4.44 3.14 0.00 88.00 4.44 3.14 0.00 90.00 4.44 3.14 0.00 92.00 4.44 3.14 0.00 94.00 4.44 3.14 0.00 96.00 4.44 3.14 0.00 98.00 4.44 3.14 0.00 100.00 4.44 3.14 0.00 102.00 4.44 3.14 0.00 Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 103 Summary for Subcatchment DA#3: Post-Development Pond #3 Runoff = 26.30 cfs @ 3.15 hrs, Volume= 1.294 af, Depth= 3.34" Routed to Pond BMP#3 : BMP #3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Area (ac) CN Description • 0.677 98 Roadway • 0.221 98 Sidewalk • 1.481 98 Buildings/Driveways 2.034 80 >75% Grass cover, Good, HSG D • 0.203 98 Parking • 0.035 98 Ex. Impervious 4.651 90 Weighted Average 2.034 43.73% Pervious Area 2.617 56.27% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA#3: Post-Development Pond #3 Hydrograph ■Runoff 26.30 cfs 26- / t Chailotte 6-hri -I r — 24 — �2rhRainf�ll�4. " 22 20 - fi rt 1RUnroftAlrea=4.6511 18_ Rncff Volume1.294f 13 ° 14 - - !Zunoff,II?pp73. 4" C�S$ min - LL 12_ 1 10- ���+++������111---777���JJJ 8-�/ 6= j - — 4- 2- - j� � 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 104 Hydrograph for Subcatchment DA#3: Post-Development Pond #3 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 4.44 3.34 0.00 2.00 0.48 0.05 0.56 106.00 4.44 3.34 0.00 4.00 3.92 2.84 2.58 108.00 4.44 3.34 0.00 6.00 4.44 3.34 0.75 110.00 4.44 3.34 0.00 8.00 4.44 3.34 0.00 112.00 4.44 3.34 0.00 10.00 4.44 3.34 0.00 114.00 4.44 3.34 0.00 12.00 4.44 3.34 0.00 116.00 4.44 3.34 0.00 14.00 4.44 3.34 0.00 118.00 4.44 3.34 0.00 16.00 4.44 3.34 0.00 120.00 4.44 3.34 0.00 18.00 4.44 3.34 0.00 20.00 4.44 3.34 0.00 22.00 4.44 3.34 0.00 24.00 4.44 3.34 0.00 26.00 4.44 3.34 0.00 28.00 4.44 3.34 0.00 30.00 4.44 3.34 0.00 32.00 4.44 3.34 0.00 34.00 4.44 3.34 0.00 36.00 4.44 3.34 0.00 38.00 4.44 3.34 0.00 40.00 4.44 3.34 0.00 42.00 4.44 3.34 0.00 44.00 4.44 3.34 0.00 46.00 4.44 3.34 0.00 48.00 4.44 3.34 0.00 50.00 4.44 3.34 0.00 52.00 4.44 3.34 0.00 54.00 4.44 3.34 0.00 56.00 4.44 3.34 0.00 58.00 4.44 3.34 0.00 60.00 4.44 3.34 0.00 62.00 4.44 3.34 0.00 64.00 4.44 3.34 0.00 66.00 4.44 3.34 0.00 68.00 4.44 3.34 0.00 70.00 4.44 3.34 0.00 72.00 4.44 3.34 0.00 74.00 4.44 3.34 0.00 76.00 4.44 3.34 0.00 78.00 4.44 3.34 0.00 80.00 4.44 3.34 0.00 82.00 4.44 3.34 0.00 84.00 4.44 3.34 0.00 86.00 4.44 3.34 0.00 88.00 4.44 3.34 0.00 90.00 4.44 3.34 0.00 92.00 4.44 3.34 0.00 94.00 4.44 3.34 0.00 96.00 4.44 3.34 0.00 98.00 4.44 3.34 0.00 100.00 4.44 3.34 0.00 102.00 4.44 3.34 0.00 Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 105 Summary for Subcatchment PRE#1: Predevelopment #1 Runoff = 82.46 cfs @ 3.48 hrs, Volume= 6.448 af, Depth= 2.76" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Area (ac) CN Description 28.010 84 Pasture/grassland/range, Fair, HSG D 28.010 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 29.5 Direct Entry, Subcatchment PRE#1: Predevelopment #1 Hydrograph — I H H + ]- 1 -1 •Runoff 82.46 cfs 1 1 -k 1 1 4 I— 6aroitel - 80 Czhr2�- r 75= / —1 — 70 65/1 H H H H I ufaff Areat28.0-10 — 55 / H H H "RIM Pff VIL me 644 f 50� / I !Rhi!nr11)!1h7r1 -0 45 LT. 40� / TCi9. 35V H 7171 T 7171 T 1 7 1— 17 1717 GLi _ 25 -/ rt fi rt l rt 11 15- t t III 10501 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 106 Hydrograph for Subcatchment PRE#1: Predevelopment #1 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 4.44 2.76 0.00 2.00 0.48 0.01 0.05 106.00 4.44 2.76 0.00 4.00 3.92 2.30 30.05 108.00 4.44 2.76 0.00 6.00 4.44 2.76 4.98 110.00 4.44 2.76 0.00 8.00 4.44 2.76 0.00 112.00 4.44 2.76 0.00 10.00 4.44 2.76 0.00 114.00 4.44 2.76 0.00 12.00 4.44 2.76 0.00 116.00 4.44 2.76 0.00 14.00 4.44 2.76 0.00 118.00 4.44 2.76 0.00 16.00 4.44 2.76 0.00 120.00 4.44 2.76 0.00 18.00 4.44 2.76 0.00 20.00 4.44 2.76 0.00 22.00 4.44 2.76 0.00 24.00 4.44 2.76 0.00 26.00 4.44 2.76 0.00 28.00 4.44 2.76 0.00 30.00 4.44 2.76 0.00 32.00 4.44 2.76 0.00 34.00 4.44 2.76 0.00 36.00 4.44 2.76 0.00 38.00 4.44 2.76 0.00 40.00 4.44 2.76 0.00 42.00 4.44 2.76 0.00 44.00 4.44 2.76 0.00 46.00 4.44 2.76 0.00 48.00 4.44 2.76 0.00 50.00 4.44 2.76 0.00 52.00 4.44 2.76 0.00 54.00 4.44 2.76 0.00 56.00 4.44 2.76 0.00 58.00 4.44 2.76 0.00 60.00 4.44 2.76 0.00 62.00 4.44 2.76 0.00 64.00 4.44 2.76 0.00 66.00 4.44 2.76 0.00 68.00 4.44 2.76 0.00 70.00 4.44 2.76 0.00 72.00 4.44 2.76 0.00 74.00 4.44 2.76 0.00 76.00 4.44 2.76 0.00 78.00 4.44 2.76 0.00 80.00 4.44 2.76 0.00 82.00 4.44 2.76 0.00 84.00 4.44 2.76 0.00 86.00 4.44 2.76 0.00 88.00 4.44 2.76 0.00 90.00 4.44 2.76 0.00 92.00 4.44 2.76 0.00 94.00 4.44 2.76 0.00 96.00 4.44 2.76 0.00 98.00 4.44 2.76 0.00 100.00 4.44 2.76 0.00 102.00 4.44 2.76 0.00 Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 107 Summary for Subcatchment PRE#2: Predevelopment #2 Runoff = 19.39 cfs @ 3.51 hrs, Volume= 1.576 af, Depth= 2.76" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Area (ac) CN Description 6.846 84 Pasture/grassland/range, Fair, HSG D 6.846 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.9 Direct Entry, Subcatchment PRE#2: Predevelopment #2 Hydrograph . -k I— I —[ 1— I - •Runoff 19.39 cfs 1 -- H 1 -1 H 1 4 1— f- 19 a tie 64hr2� r 18= 2ylrhrRaihfll ' - 17 fi -r � l � fi rt 16_ 15 T I I I I IRunbtEAIE a I6.846 - = � r 14 nti1`_ Y I mei• 1 H1 - 1 H- 1 4 1— Rn f113-! '17 11 o 10 - TC= 1 nitn LL rt fi H 11 -1 H rt 1- 1 - fi 1 1 —h 61.44 - 8 6� 5-_ 4= 1 1 4 1— 1 —1 1 - 1 - 3_ — !. 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 108 Hydrograph for Subcatchment PRE#2: Predevelopment #2 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 4.44 2.76 0.00 2.00 0.48 0.01 0.01 106.00 4.44 2.76 0.00 4.00 3.92 2.30 8.02 108.00 4.44 2.76 0.00 6.00 4.44 2.76 1.23 110.00 4.44 2.76 0.00 8.00 4.44 2.76 0.00 112.00 4.44 2.76 0.00 10.00 4.44 2.76 0.00 114.00 4.44 2.76 0.00 12.00 4.44 2.76 0.00 116.00 4.44 2.76 0.00 14.00 4.44 2.76 0.00 118.00 4.44 2.76 0.00 16.00 4.44 2.76 0.00 120.00 4.44 2.76 0.00 18.00 4.44 2.76 0.00 20.00 4.44 2.76 0.00 22.00 4.44 2.76 0.00 24.00 4.44 2.76 0.00 26.00 4.44 2.76 0.00 28.00 4.44 2.76 0.00 30.00 4.44 2.76 0.00 32.00 4.44 2.76 0.00 34.00 4.44 2.76 0.00 36.00 4.44 2.76 0.00 38.00 4.44 2.76 0.00 40.00 4.44 2.76 0.00 42.00 4.44 2.76 0.00 44.00 4.44 2.76 0.00 46.00 4.44 2.76 0.00 48.00 4.44 2.76 0.00 50.00 4.44 2.76 0.00 52.00 4.44 2.76 0.00 54.00 4.44 2.76 0.00 56.00 4.44 2.76 0.00 58.00 4.44 2.76 0.00 60.00 4.44 2.76 0.00 62.00 4.44 2.76 0.00 64.00 4.44 2.76 0.00 66.00 4.44 2.76 0.00 68.00 4.44 2.76 0.00 70.00 4.44 2.76 0.00 72.00 4.44 2.76 0.00 74.00 4.44 2.76 0.00 76.00 4.44 2.76 0.00 78.00 4.44 2.76 0.00 80.00 4.44 2.76 0.00 82.00 4.44 2.76 0.00 84.00 4.44 2.76 0.00 86.00 4.44 2.76 0.00 88.00 4.44 2.76 0.00 90.00 4.44 2.76 0.00 92.00 4.44 2.76 0.00 94.00 4.44 2.76 0.00 96.00 4.44 2.76 0.00 98.00 4.44 2.76 0.00 100.00 4.44 2.76 0.00 102.00 4.44 2.76 0.00 Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 109 Summary for Subcatchment PRE#3: Predevelopment #3 Runoff = 79.33 cfs @ 3.51 hrs, Volume= 6.448 af, Depth= 2.76" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Area (ac) CN Description 28.010 84 Pasture/grassland/range, Fair, HSG D 28.010 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.9 Direct Entry, Subcatchment PRE#3: Predevelopment #3 Hydrograph I ■Runoff 79.33 cfs 80' 1Car�tot+el 6_4hr1 -r 75= 70_ 1 H- 1 1 �2y1rhRai�fll .�4�" 65= fi fi 1 H- Imhoff Area#28.01-0-at — 60= 55= I1 H- H H- —1 HR 9f V 14mIe6• i3 f - 50 • 45t — —I 4 1 1 1- —1 4 1— !n #F11)-! '17" O - Tc= 'I.._ nun _ 35 H- 11 _L 4 I _L 1_ 1 _ 1 1 _H6NL 30 ' _ 25t0 1- 171 T 7 1- 1 -1 T 15_' 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 110 Hydrograph for Subcatchment PRE#3: Predevelopment #3 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 4.44 2.76 0.00 2.00 0.48 0.01 0.04 106.00 4.44 2.76 0.00 4.00 3.92 2.30 32.81 108.00 4.44 2.76 0.00 6.00 4.44 2.76 5.04 110.00 4.44 2.76 0.00 8.00 4.44 2.76 0.00 112.00 4.44 2.76 0.00 10.00 4.44 2.76 0.00 114.00 4.44 2.76 0.00 12.00 4.44 2.76 0.00 116.00 4.44 2.76 0.00 14.00 4.44 2.76 0.00 118.00 4.44 2.76 0.00 16.00 4.44 2.76 0.00 120.00 4.44 2.76 0.00 18.00 4.44 2.76 0.00 20.00 4.44 2.76 0.00 22.00 4.44 2.76 0.00 24.00 4.44 2.76 0.00 26.00 4.44 2.76 0.00 28.00 4.44 2.76 0.00 30.00 4.44 2.76 0.00 32.00 4.44 2.76 0.00 34.00 4.44 2.76 0.00 36.00 4.44 2.76 0.00 38.00 4.44 2.76 0.00 40.00 4.44 2.76 0.00 42.00 4.44 2.76 0.00 44.00 4.44 2.76 0.00 46.00 4.44 2.76 0.00 48.00 4.44 2.76 0.00 50.00 4.44 2.76 0.00 52.00 4.44 2.76 0.00 54.00 4.44 2.76 0.00 56.00 4.44 2.76 0.00 58.00 4.44 2.76 0.00 60.00 4.44 2.76 0.00 62.00 4.44 2.76 0.00 64.00 4.44 2.76 0.00 66.00 4.44 2.76 0.00 68.00 4.44 2.76 0.00 70.00 4.44 2.76 0.00 72.00 4.44 2.76 0.00 74.00 4.44 2.76 0.00 76.00 4.44 2.76 0.00 78.00 4.44 2.76 0.00 80.00 4.44 2.76 0.00 82.00 4.44 2.76 0.00 84.00 4.44 2.76 0.00 86.00 4.44 2.76 0.00 88.00 4.44 2.76 0.00 90.00 4.44 2.76 0.00 92.00 4.44 2.76 0.00 94.00 4.44 2.76 0.00 96.00 4.44 2.76 0.00 98.00 4.44 2.76 0.00 100.00 4.44 2.76 0.00 102.00 4.44 2.76 0.00 Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 111 Summary for Pond BMP#3: BMP #3 Inflow Area = 4.651 ac, 56.27% Impervious, Inflow Depth = 3.34" for 25-yr-6hr event Inflow = 26.30 cfs @ 3.15 hrs, Volume= 1.294 af Outflow = 7.62 cfs @ 3.44 hrs, Volume= 1.294 af, Atten= 71%, Lag= 17.5 min Primary = 7.62 cfs @ 3.44 hrs, Volume= 1.294 af Routed to nonexistent node POST-POI#1 Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to nonexistent node POST-POI#1 Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Peak Elev= 554.05' @ 3.44 hrs Surf.Area= 12,157 sf Storage= 33,565 cf Plug-Flow detention time= 1,032.2 min calculated for 1.294 af(100% of inflow) Center-of-Mass det. time= 1,032.1 min ( 1,237.2 - 205.1 ) Volume Invert Avail.Storage Storage Description #1 550.00' 95,966 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 550.00 4,583 0 0 551.00 6,298 5,441 5,441 552.00 8,187 7,243 12,683 553.00 10,158 9,173 21,856 554.00 12,069 11,114 32,969 555.00 13,858 12,964 45,933 556.00 15,706 14,782 60,715 557.00 17,611 16,659 77,373 558.00 19,575 18,593 95,966 Device Routing Invert Outlet Devices #1 Primary 549.50' 24.0" Round RCP Round 24" L= 85.0' RCP, square edge headwall, Ke= 0.500 Inlet/Outlet Invert= 549.50' / 548.96' S= 0.0064 '/' Cc= 0.900 n= 0.013 Concrete sewer w/manholes & inlets, Flow Area= 3.14 sf #2 Device 1 550.00' Sand Filter Head (feet) 0.00 0.01 6.00 Disch. (cfs) 0.000 0.081 0.081 #3 Device 1 553.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 Width (feet) 2.00 2.00 #4 Device 1 554.00' 48.0" x 48.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads #5 Secondary 556.00' 10.0' long x 16.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 112 Primary OutFlow Max=7.24 cfs © 3.44 hrs HW=554.03' (Free Discharge) L1=RCP_Round 24" (Passes 7.24 cfs of 27.63 cfs potential flow) 2=Sand Filter (Custom Controls 0.08 cfs) 3=Custom Weir/Orifice (Orifice Controls 6.84 cfs @ 3.42 fps) 4=Riser (Weir Controls 0.32 cfs © 0.60 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=550.00' (Free Discharge) LS=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Pond BMP#3: BMP #3 Hydrograph Al— I I— J 1 1 1— - 1 I i— I —L 1 - Inflow 26.30 cfs EEEary T 1 T T T 1 I�pf1 �4� 16M 1 - 28J 1 I— —L 1 ± Peak E1tev 554.b5' — 26 24-; 1 1 1 Sto a 565-cf — 22 20� _L _I T 1 _[ L I _L 187: / _o16� —1 TIT TIT _ 14 —h 1 1 T1 � 1— H H— H T1 —F 1-1H 1 — 'L 1 �l 7 R7 rf I id 7.62 cfs 1 1 T 1 ]— 4 - 14 I—14 1 8 s 1 1 1 1 I ' 1 1 1 1 4 ////// / / 0.00 cfs 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 113 Pond BMP#3: BMP #3 Stage-Discharge ❑Total ' 558 ❑Primary - z ❑Secondary 557 / �� Broad-Crested Rectan.ular Weir 556 ^ 555 -1/ .2 /a�' Riser 0 554 ' �III Custom Weir/Orifice 553 % 552 551 Sand Filter / 0 10 20 30 40 50 60 70 80 90 100 110 Discharge (cfs) Pond BMP#3: BMP #3 Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-ft) 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 Surface ❑Storage 558_ I I 1 �� 557 I ��� �� I I I 5561/ 555� ��/�/ — - z— II II I //' I I / o 554- /z I I 41 I > - w 553LZ I 4 I I 4I 1 552:/ I -I I - 5511/ 1 Custom Stage Data 550 ( , 0 10,,000 20,000 30,000 40,000 50,000 60,,000 70,000 80,000 90,000' Storage(cubic-feet) Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 114 Hydrograph for Pond BMP#3: BMP #3 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 550.00 0.00 0.00 0.00 5.00 1.08 25,902 553.38 1.65 1.65 0.00 10.00 0.00 21,527 552.97 0.08 0.08 0.00 15.00 0.00 20,069 552.82 0.08 0.08 0.00 20.00 0.00 18,611 552.67 0.08 0.08 0.00 25.00 0.00 17,153 552.51 0.08 0.08 0.00 30.00 0.00 15,695 552.35 0.08 0.08 0.00 35.00 0.00 14,237 552.19 0.08 0.08 0.00 40.00 0.00 12,779 552.01 0.08 0.08 0.00 45.00 0.00 11,321 551.83 0.08 0.08 0.00 50.00 0.00 9,863 551.64 0.08 0.08 0.00 55.00 0.00 8,405 551.44 0.08 0.08 0.00 60.00 0.00 6,947 551.23 0.08 0.08 0.00 65.00 0.00 5,489 551.01 0.08 0.08 0.00 70.00 0.00 4,031 550.77 0.08 0.08 0.00 75.00 0.00 2,573 550.51 0.08 0.08 0.00 80.00 0.00 1,115 550.23 0.08 0.08 0.00 85.00 0.00 0 550.00 0.00 0.00 0.00 90.00 0.00 0 550.00 0.00 0.00 0.00 95.00 0.00 0 550.00 0.00 0.00 0.00 100.00 0.00 0 550.00 0.00 0.00 0.00 105.00 0.00 0 550.00 0.00 0.00 0.00 110.00 0.00 0 550.00 0.00 0.00 0.00 115.00 0.00 0 550.00 0.00 0.00 0.00 120.00 0.00 0 550.00 0.00 0.00 0.00 Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 115 Stage-Discharge for Pond BMP#3: BMP #3 Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 550.00 0.00 0.00 0.00 555.20 32.45 32.45 0.00 550.10 0.08 0.08 0.00 555.30 32.83 32.83 0.00 550.20 0.08 0.08 0.00 555.40 33.21 33.21 0.00 550.30 0.08 0.08 0.00 555.50 33.58 33.58 0.00 550.40 0.08 0.08 0.00 555.60 33.95 33.95 0.00 550.50 0.08 0.08 0.00 555.70 34.31 34.31 0.00 550.60 0.08 0.08 0.00 555.80 34.67 34.67 0.00 550.70 0.08 0.08 0.00 555.90 35.03 35.03 0.00 550.80 0.08 0.08 0.00 556.00 35.38 35.38 0.00 550.90 0.08 0.08 0.00 556.10 36.58 35.73 0.85 551.00 0.08 0.08 0.00 556.20 38.47 36.07 2.40 551.10 0.08 0.08 0.00 556.30 40.84 36.42 4.42 551.20 0.08 0.08 0.00 556.40 43.57 36.74 6.83 551.30 0.08 0.08 0.00 556.50 46.60 37.05 9.55 551.40 0.08 0.08 0.00 556.60 49.91 37.36 12.55 551.50 0.08 0.08 0.00 556.70 53.30 37.67 15.64 551.60 0.08 0.08 0.00 556.80 56.86 37.97 18.89 551.70 0.08 0.08 0.00 556.90 60.77 38.27 22.50 551.80 0.08 0.08 0.00 557.00 64.87 38.57 26.30 551.90 0.08 0.08 0.00 557.10 69.26 38.86 30.40 552.00 0.08 0.08 0.00 557.20 73.86 39.15 34.70 552.10 0.08 0.08 0.00 557.30 78.58 39.45 39.13 552.20 0.08 0.08 0.00 557.40 83.47 39.73 43.73 552.30 0.08 0.08 0.00 557.50 88.43 40.02 48.41 552.40 0.08 0.08 0.00 557.60 93.53 40.31 53.23 552.50 0.08 0.08 0.00 557.70 98.88 40.59 58.29 552.60 0.08 0.08 0.00 557.80 104.38 40.87 63.51 552.70 0.08 0.08 0.00 557.90 110.03 41.15 68.88 552.80 0.08 0.08 0.00 558.00 115.81 41.43 74.39 552.90 0.08 0.08 0.00 553.00 0.08 0.08 0.00 553.10 0.29 0.29 0.00 553.20 0.67 0.67 0.00 553.30 1.16 1.16 0.00 553.40 1.74 1.74 0.00 553.50 2.40 2.40 0.00 553.60 3.13 3.13 0.00 553.70 3.92 3.92 0.00 553.80 4.77 4.77 0.00 553.90 5.67 5.67 0.00 554.00 6.63 6.63 0.00 554.10 9.09 9.09 0.00 554.20 12.78 12.78 0.00 554.30 17.31 17.31 0.00 554.40 22.51 22.51 0.00 554.50 28.30 28.30 0.00 554.60 30.07 30.07 0.00 554.70 30.48 30.48 0.00 554.80 30.88 30.88 0.00 554.90 31.28 31.28 0.00 555.00 31.68 31.68 0.00 555.10 32.06 32.06 0.00 Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 116 Stage-Area-Storage for Pond BMP#3: BMP #3 Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 550.00 4,583 0 555.20 14,228 48,741 550.10 4,755 467 555.30 14,412 50,173 550.20 4,926 951 555.40 14,597 51,624 550.30 5,097 1,452 555.50 14,782 53,093 550.40 5,269 1,970 555.60 14,967 54,580 550.50 5,441 2,506 555.70 15,152 56,086 550.60 5,612 3,059 555.80 15,336 57,610 550.70 5,784 3,628 555.90 15,521 59,153 550.80 5,955 4,215 556.00 15,706 60,715 550.90 6,126 4,819 556.10 15,897 62,295 551.00 6,298 5,441 556.20 16,087 63,894 551.10 6,487 6,080 556.30 16,277 65,512 551.20 6,676 6,738 556.40 16,468 67,149 551.30 6,865 7,415 556.50 16,659 68,806 551.40 7,054 8,111 556.60 16,849 70,481 551.50 7,243 8,826 556.70 17,040 72,175 551.60 7,431 9,559 556.80 17,230 73,889 551.70 7,620 10,312 556.90 17,420 75,621 551.80 7,809 11,083 557.00 17,611 77,373 551.90 7,998 11,874 557.10 17,807 79,144 552.00 8,187 12,683 557.20 18,004 80,934 552.10 8,384 13,512 557.30 18,200 82,745 552.20 8,581 14,360 557.40 18,397 84,575 552.30 8,778 15,228 557.50 18,593 86,424 552.40 8,975 16,115 557.60 18,789 88,293 552.50 9,173 17,023 557.70 18,986 90,182 552.60 9,370 17,950 557.80 19,182 92,090 552.70 9,567 18,897 557.90 19,379 94,018 552.80 9,764 19,863 558.00 19,575 95,966 552.90 9,961 20,850 553.00 10,158 21,856 553.10 10,349 22,881 553.20 10,540 23,925 553.30 10,731 24,989 553.40 10,922 26,072 553.50 11,114 27,173 553.60 11,305 28,294 553.70 11,496 29,434 553.80 11,687 30,593 553.90 11,878 31,772 554.00 12,069 32,969 554.10 12,248 34,185 554.20 12,427 35,419 554.30 12,606 36,670 554.40 12,785 37,940 554.50 12,964 39,227 554.60 13,142 40,532 554.70 13,321 41,856 554.80 13,500 43,197 554.90 13,679 44,556 555.00 13,858 45,933 555.10 14,043 47,328 Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 117 Summary for Pond BMP-1: BMP #1 Inflow Area = 28.009 ac, 50.36% Impervious, Inflow Depth = 3.24" for 25-yr-6hr event Inflow = 154.57 cfs @ 3.15 hrs, Volume= 7.558 af Outflow = 92.79 cfs @ 3.30 hrs, Volume= 7.558 af, Atten= 40%, Lag= 9.5 min Primary = 92.79 cfs @ 3.30 hrs, Volume= 7.558 af Routed to nonexistent node POST-POI#1 Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to nonexistent node POST-POI#1 Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Peak Elev= 558.93' @ 3.30 hrs Surf.Area= 48,207 sf Storage= 143,553 cf Plug-Flow detention time= 339.8 min calculated for 7.558 af(100% of inflow) Center-of-Mass det. time= 339.5 min ( 545.5 - 206.1 ) Volume Invert Avail.Storage Storage Description #1 555.50' 223,972 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 555.50 34,578 0 0 556.00 37,559 18,034 18,034 557.00 41,209 39,384 57,418 558.00 44,809 43,009 100,427 559.00 48,473 46,641 147,068 560.00 52,204 50,339 197,407 560.50 54,057 26,565 223,972 Device Routing Invert Outlet Devices #1 Primary 550.00' 36.0" Round RCP_Round 36" L= 115.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 550.00' / 548.00' S= 0.0174 '/' Cc= 0.900 n= 0.013 Concrete sewer w/manholes & inlets, Flow Area= 7.07 sf #2 Device 1 555.50' 4.0" Horiz. WQ/CP Orifice C= 0.600 Limited to weir flow at low heads #3 Device 1 557.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 0.50 Width (feet) 2.00 2.00 #4 Device 1 557.50' 48.0" x 48.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads #5 Secondary 559.00' 20.0' long x 16.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 118 Primary OutFlow Max=92.70 cfs © 3.30 hrs HW=558.92' (Free Discharge) L1=RCP_Round 36" (Inlet Controls 92.70 cfs @ 13.11 fps) 2=WQ/CP Orifice (Passes < 0.78 cfs potential flow) 3=Custom Weir/Orifice (Passes < 6.34 cfs potential flow) 4=Riser (Passes < 88.39 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=555.50' (Free Discharge) LS=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Pond BMP-1: BMP #1 Hydrograph A— t H t l T T I T I—I —It T T I ❑Inflow 154.57 cfs - 3 outflow H T 1 T T 1 T 1 T Wif lAie =2$I.OS 170 Lo ndary 160. T T T 1 T T T 11 TI Telalci Ete1► 5 .1a3I' 150"140E./ ! T T T I T T I s°rag _�1144154 rf 1 120,-- 1 92 79 cfs f T T T H T 1 T T T T 1o03- T T TIT T 11 IT T1 11 TI _ �, 9ov LL8o 1TT ITT ITT TTI 60 T T TIT T T ITT TTI 504/ 40 r —1 I I — 1 I-1 1 — ' I I / 420" / / / /// // 0.00 cfs /////////////////////// o ff?'((( , , , 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 119 Pond BMP-1: BMP #1 Stage-Discharge 0 Total 0 Primary ❑Secondary 560 Broad-Crested Rectan.ular Weir �` 559 / 0 558 •; % j Riser w / Custom Weir/Orifice 557 556 % WQ/CP Orifice 0 20 40 60 80 100 120 140 160 180 Discharge (cfs) Pond BMP-1: BMP #1 Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-ft) 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 0 Surfacel ❑Storage 560 /// 559 /// 0558 II m W II 557 - I I I 556-' Custom Stage Data 0 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000 180,000 200,000 220,000 Storage(cubic-feet) Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 120 Hydrograph for Pond BMP-1: BMP #1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 555.50 0.00 0.00 0.00 5.00 6.47 86,437 557.68 7.95 7.95 0.00 10.00 0.00 60,563 557.08 0.67 0.67 0.00 15.00 0.00 51,120 556.85 0.49 0.49 0.00 20.00 0.00 42,699 556.64 0.45 0.45 0.00 25.00 0.00 34,996 556.44 0.41 0.41 0.00 30.00 0.00 28,022 556.26 0.37 0.37 0.00 35.00 0.00 21,791 556.10 0.33 0.33 0.00 40.00 0.00 16,315 555.95 0.28 0.28 0.00 45.00 0.00 11,607 555.83 0.24 0.24 0.00 50.00 0.00 7,682 555.72 0.20 0.20 0.00 55.00 0.00 4,577 555.63 0.14 0.14 0.00 60.00 0.00 2,651 555.58 0.07 0.07 0.00 65.00 0.00 1,690 555.55 0.04 0.04 0.00 70.00 0.00 1,136 555.53 0.03 0.03 0.00 75.00 0.00 764 555.52 0.02 0.02 0.00 80.00 0.00 514 555.51 0.01 0.01 0.00 85.00 0.00 345 555.51 0.01 0.01 0.00 90.00 0.00 232 555.51 0.01 0.01 0.00 95.00 0.00 156 555.50 0.00 0.00 0.00 100.00 0.00 105 555.50 0.00 0.00 0.00 105.00 0.00 71 555.50 0.00 0.00 0.00 110.00 0.00 47 555.50 0.00 0.00 0.00 115.00 0.00 32 555.50 0.00 0.00 0.00 120.00 0.00 21 555.50 0.00 0.00 0.00 Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 121 Stage-Discharge for Pond BMP-1: BMP #1 Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 555.50 0.00 0.00 0.00 558.10 29.51 29.51 0.00 555.55 0.04 0.04 0.00 558.15 32.75 32.75 0.00 555.60 0.11 0.11 0.00 558.20 36.11 36.11 0.00 555.65 0.16 0.16 0.00 558.25 39.58 39.58 0.00 555.70 0.19 0.19 0.00 558.30 43.16 43.16 0.00 555.75 0.21 0.21 0.00 558.35 46.85 46.85 0.00 555.80 0.23 0.23 0.00 558.40 50.64 50.64 0.00 555.85 0.25 0.25 0.00 558.45 54.54 54.54 0.00 555.90 0.27 0.27 0.00 558.50 58.53 58.53 0.00 555.95 0.28 0.28 0.00 558.55 62.62 62.62 0.00 556.00 0.30 0.30 0.00 558.60 66.80 66.80 0.00 556.05 0.31 0.31 0.00 558.65 71.07 71.07 0.00 556.10 0.33 0.33 0.00 558.70 75.44 75.44 0.00 556.15 0.34 0.34 0.00 558.75 79.89 79.89 0.00 556.20 0.35 0.35 0.00 558.80 84.42 84.42 0.00 556.25 0.36 0.36 0.00 558.85 89.04 89.04 0.00 556.30 0.38 0.38 0.00 558.90 92.59 92.59 0.00 556.35 0.39 0.39 0.00 558.95 92.90 92.90 0.00 556.40 0.40 0.40 0.00 559.00 93.21 93.21 0.00 556.45 0.41 0.41 0.00 559.05 94.12 93.52 0.60 556.50 0.42 0.42 0.00 559.10 95.52 93.83 1.69 556.55 0.43 0.43 0.00 559.15 97.25 94.14 3.11 556.60 0.44 0.44 0.00 559.20 99.24 94.44 4.79 556.65 0.45 0.45 0.00 559.25 101.46 94.75 6.71 556.70 0.46 0.46 0.00 559.30 103.90 95.05 8.84 556.75 0.47 0.47 0.00 559.35 106.52 95.36 11.16 556.80 0.48 0.48 0.00 559.40 109.32 95.66 13.66 556.85 0.49 0.49 0.00 559.45 112.27 95.96 16.30 556.90 0.50 0.50 0.00 559.50 115.36 96.27 19.09 556.95 0.51 0.51 0.00 559.55 118.59 96.57 22.03 557.00 0.51 0.51 0.00 559.60 121.96 96.87 25.10 557.05 0.60 0.60 0.00 559.65 125.31 97.16 28.14 557.10 0.74 0.74 0.00 559.70 128.74 97.46 31.27 557.15 0.92 0.92 0.00 559.75 132.25 97.76 34.49 557.20 1.13 1.13 0.00 559.80 135.83 98.05 37.78 557.25 1.37 1.37 0.00 559.85 139.69 98.35 41.34 557.30 1.64 1.64 0.00 559.90 143.64 98.64 45.00 557.35 1.93 1.93 0.00 559.95 147.69 98.94 48.75 557.40 2.24 2.24 0.00 560.00 151.83 99.23 52.60 557.45 2.56 2.56 0.00 560.05 156.17 99.52 56.65 557.50 2.91 2.91 0.00 560.10 160.61 99.81 60.80 557.55 3.79 3.79 0.00 560.15 165.15 100.10 65.05 557.60 5.10 5.10 0.00 560.20 169.80 100.39 69.41 557.65 6.71 6.71 0.00 560.25 174.47 100.68 73.79 557.70 8.55 8.55 0.00 560.30 179.23 100.96 78.26 557.75 10.61 10.61 0.00 560.35 184.07 101.25 82.82 557.80 12.84 12.84 0.00 560.40 189.00 101.54 87.46 557.85 15.25 15.25 0.00 560.45 193.92 101.82 92.10 557.90 17.82 17.82 0.00 560.50 198.92 102.11 96.82 557.95 20.54 20.54 0.00 558.00 23.40 23.40 0.00 558.05 26.39 26.39 0.00 Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 122 Stage-Area-Storage for Pond BMP-1: BMP #1 Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 555.50 34,578 0 558.10 45,175 104,926 555.55 34,876 1,736 558.15 45,359 107,190 555.60 35,174 3,488 558.20 45,542 109,462 555.65 35,472 5,254 558.25 45,725 111,744 555.70 35,770 7,035 558.30 45,908 114,035 555.75 36,069 8,831 558.35 46,091 116,335 555.80 36,367 10,642 558.40 46,275 118,644 555.85 36,665 12,467 558.45 46,458 120,962 555.90 36,963 14,308 558.50 46,641 123,290 555.95 37,261 16,164 558.55 46,824 125,626 556.00 37,559 18,034 558.60 47,007 127,972 556.05 37,741 19,917 558.65 47,191 130,327 556.10 37,924 21,808 558.70 47,374 132,691 556.15 38,106 23,709 558.75 47,557 135,065 556.20 38,289 25,619 558.80 47,740 137,447 556.25 38,472 27,538 558.85 47,923 139,839 556.30 38,654 29,466 558.90 48,107 142,239 556.35 38,837 31,403 558.95 48,290 144,649 556.40 39,019 33,350 559.00 48,473 147,068 556.45 39,202 35,305 559.05 48,660 149,497 556.50 39,384 37,270 559.10 48,846 151,934 556.55 39,566 39,244 559.15 49,033 154,381 556.60 39,749 41,227 559.20 49,219 156,837 556.65 39,931 43,219 559.25 49,406 159,303 556.70 40,114 45,220 559.30 49,592 161,778 556.75 40,297 47,230 559.35 49,779 164,262 556.80 40,479 49,249 559.40 49,965 166,756 556.85 40,662 51,278 559.45 50,152 169,259 556.90 40,844 53,316 559.50 50,339 171,771 556.95 41,027 55,362 559.55 50,525 174,293 557.00 41,209 57,418 559.60 50,712 176,824 557.05 41,389 59,483 559.65 50,898 179,364 557.10 41,569 61,557 559.70 51,085 181,913 557.15 41,749 63,640 559.75 51,271 184,472 557.20 41,929 65,732 559.80 51,458 187,041 557.25 42,109 67,833 559.85 51,644 189,618 557.30 42,289 69,943 559.90 51,831 192,205 557.35 42,469 72,062 559.95 52,017 194,801 557.40 42,649 74,190 560.00 52,204 197,407 557.45 42,829 76,327 560.05 52,389 200,022 557.50 43,009 78,473 560.10 52,575 202,646 557.55 43,189 80,628 560.15 52,760 205,279 557.60 43,369 82,792 560.20 52,945 207,922 557.65 43,549 84,965 560.25 53,131 210,574 557.70 43,729 87,147 560.30 53,316 213,235 557.75 43,909 89,338 560.35 53,501 215,905 557.80 44,089 91,537 560.40 53,686 218,585 557.85 44,269 93,746 560.45 53,872 221,274 557.90 44,449 95,964 560.50 54,057 223,972 557.95 44,629 98,191 558.00 44,809 100,427 558.05 44,992 102,672 Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 123 Summary for Pond BMP-2: BMP #2 Inflow Area = 6.846 ac, 45.49% Impervious, Inflow Depth = 3.14" for 25-yr-6hr event Inflow = 36.82 cfs @ 3.15 hrs, Volume= 1.791 af Outflow = 24.43 cfs @ 3.31 hrs, Volume= 1.791 af, Atten= 34%, Lag= 9.6 min Primary = 24.43 cfs @ 3.31 hrs, Volume= 1.791 af Routed to nonexistent node POST-POI#1 Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to nonexistent node POST-POI#1 Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Peak Elev= 578.51' @ 3.31 hrs Surf.Area= 13,143 sf Storage= 36,359 cf Plug-Flow detention time= 869.4 min calculated for 1.791 af(100% of inflow) Center-of-Mass det. time= 869.3 min ( 1,076.3 - 207.0 ) Volume Invert Avail.Storage Storage Description #1 575.00' 57,570 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 575.00 7,651 0 0 576.00 9,115 8,383 8,383 577.00 10,693 9,904 18,287 577.50 11,523 5,554 23,841 578.00 12,385 5,977 29,818 579.00 13,864 13,125 42,943 580.00 15,391 14,628 57,570 Device Routing Invert Outlet Devices #1 Primary 574.40' 24.0" Round RCP Round 24" L= 88.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 574.40' / 574.00' S= 0.0045 '/' Cc= 0.900 n= 0.013 Concrete sewer w/manholes & inlets, Flow Area= 3.14 sf #2 Device 1 575.00' Sand Filter Head (feet) 0.00 0.01 6.00 Disch. (cfs) 0.000 0.081 0.081 #3 Device 1 577.50' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 0.50 Width (feet) 3.00 3.00 #4 Device 1 578.00' 48.0" x 48.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads #5 Secondary 579.00' 10.0' long x 16.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 124 Primary OutFlow Max=24.73 cfs © 3.31 hrs HW=578.50' (Free Discharge) L1=RCP_Round 24" (Barrel Controls 24.73 cfs @ 7.87 fps) 2=Sand Filter (Passes < 0.08 cfs potential flow) 3=Custom Weir/Orifice (Passes < 6.34 cfs potential flow) 4=Riser (Passes < 18.37 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=575.00' (Free Discharge) AtS=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Pond BMP-2: BMP #2 Hydrograph A -H I - ]— 4 I , I , 4 1-1 H- _ ■Inflow 36.82 cfs I I tbfie w-A� la ■Primarimae .646 _ ■Primary / / - ■Secondary 40 38 / I I I I -L Peak �Vi5/-O.54' - 36=� / 34 EY / fi I -t Stota =36359-cf - 32✓7d d'Q rf 2 24.43 cfs I I I I 26 — - w 24 -H I 1— H —I -H I - f 1—I H I - 2iI. 22 �18� 16 12 10 I I I 1 I I 8/ 6 Z AJZ 0.00 cfs o , , , , , / // / , , 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 125 Pond BMP-2: BMP #2 Stage-Discharge ❑Total ❑Primary 581 �'' ❑Secondary 580 Broad-Crested Rectangular Weir 579 Riser 0 578 Custom Weir/Orifice w 577 576 Sand Filter / 0 10 20 30 40 50 60 70 80 90 100 Discharge (cfs) Pond BMP-2: BMP #2 Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-ft) 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 11,000 12,000 13,000 14,000 15,000 Surface ` . ( ❑Storage 581 580:-/ i 579:-/ I I w 577� i ////���� II 576- _ J J Custom Stage Data 575 , , , , , , , , 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 55,000 Storage(cubic-feet) Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 126 Hydrograph for Pond BMP-2: BMP #2 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 575.00 0.00 0.00 0.00 5.00 1.56 27,826 577.84 2.01 2.01 0.00 10.00 0.00 23,440 577.47 0.08 0.08 0.00 15.00 0.00 21,982 577.34 0.08 0.08 0.00 20.00 0.00 20,524 577.21 0.08 0.08 0.00 25.00 0.00 19,066 577.07 0.08 0.08 0.00 30.00 0.00 17,608 576.94 0.08 0.08 0.00 35.00 0.00 16,150 576.80 0.08 0.08 0.00 40.00 0.00 14,692 576.65 0.08 0.08 0.00 45.00 0.00 13,234 576.51 0.08 0.08 0.00 50.00 0.00 11,776 576.36 0.08 0.08 0.00 55.00 0.00 10,318 576.21 0.08 0.08 0.00 60.00 0.00 8,860 576.05 0.08 0.08 0.00 65.00 0.00 7,402 575.89 0.08 0.08 0.00 70.00 0.00 5,944 575.73 0.08 0.08 0.00 75.00 0.00 4,486 575.56 0.08 0.08 0.00 80.00 0.00 3,028 575.38 0.08 0.08 0.00 85.00 0.00 1,570 575.20 0.08 0.08 0.00 90.00 0.00 112 575.01 0.08 0.08 0.00 95.00 0.00 0 575.00 0.00 0.00 0.00 100.00 0.00 0 575.00 0.00 0.00 0.00 105.00 0.00 0 575.00 0.00 0.00 0.00 110.00 0.00 0 575.00 0.00 0.00 0.00 115.00 0.00 0 575.00 0.00 0.00 0.00 120.00 0.00 0 575.00 0.00 0.00 0.00 Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 127 Stage-Discharge for Pond BMP-2: BMP #2 Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 575.00 0.00 0.00 0.00 580.20 66.77 32.06 34.70 575.10 0.08 0.08 0.00 580.30 71.57 32.44 39.13 575.20 0.08 0.08 0.00 580.40 76.55 32.82 43.73 575.30 0.08 0.08 0.00 580.50 81.60 33.19 48.41 575.40 0.08 0.08 0.00 580.60 86.78 33.55 53.23 575.50 0.08 0.08 0.00 580.70 92.21 33.92 58.29 575.60 0.08 0.08 0.00 580.80 97.79 34.28 63.51 575.70 0.08 0.08 0.00 580.90 103.51 34.63 68.88 575.80 0.08 0.08 0.00 581.00 109.37 34.98 74.39 575.90 0.08 0.08 0.00 576.00 0.08 0.08 0.00 576.10 0.08 0.08 0.00 576.20 0.08 0.08 0.00 576.30 0.08 0.08 0.00 576.40 0.08 0.08 0.00 576.50 0.08 0.08 0.00 576.60 0.08 0.08 0.00 576.70 0.08 0.08 0.00 576.80 0.08 0.08 0.00 576.90 0.08 0.08 0.00 577.00 0.08 0.08 0.00 577.10 0.08 0.08 0.00 577.20 0.08 0.08 0.00 577.30 0.08 0.08 0.00 577.40 0.08 0.08 0.00 577.50 0.08 0.08 0.00 577.60 0.39 0.39 0.00 577.70 0.96 0.96 0.00 577.80 1.70 1.70 0.00 577.90 2.57 2.57 0.00 578.00 3.55 3.55 0.00 578.10 5.99 5.99 0.00 578.20 9.64 9.64 0.00 578.30 14.09 14.09 0.00 578.40 19.22 19.22 0.00 578.50 24.74 24.74 0.00 578.60 25.23 25.23 0.00 578.70 25.71 25.71 0.00 578.80 26.18 26.18 0.00 578.90 26.64 26.64 0.00 579.00 27.10 27.10 0.00 579.10 28.39 27.55 0.85 579.20 30.38 27.99 2.40 579.30 32.84 28.42 4.42 579.40 35.68 28.85 6.83 579.50 38.82 29.27 9.55 579.60 42.23 29.68 12.55 579.70 45.73 30.09 15.64 579.80 49.39 30.50 18.89 579.90 53.39 30.90 22.50 580.00 57.59 31.29 26.30 580.10 62.08 31.68 30.40 Detention Davis Village Charlotte 6-hr 25-yr 25-yr-6hr Rainfall=4.44" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 128 Stage-Area-Storage for Pond BMP-2: BMP #2 Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 575.00 7,651 0 580.20 15,391 57,570 575.10 7,797 772 580.30 15,391 57,570 575.20 7,944 1,559 580.40 15,391 57,570 575.30 8,090 2,361 580.50 15,391 57,570 575.40 8,237 3,178 580.60 15,391 57,570 575.50 8,383 4,009 580.70 15,391 57,570 575.60 8,529 4,854 580.80 15,391 57,570 575.70 8,676 5,714 580.90 15,391 57,570 575.80 8,822 6,589 581.00 15,391 57,570 575.90 8,969 7,479 576.00 9,115 8,383 576.10 9,273 9,302 576.20 9,431 10,238 576.30 9,588 11,189 576.40 9,746 12,155 576.50 9,904 13,138 576.60 10,062 14,136 576.70 10,220 15,150 576.80 10,377 16,180 576.90 10,535 17,226 577.00 10,693 18,287 577.10 10,859 19,365 577.20 11,025 20,459 577.30 11,191 21,570 577.40 11,357 22,697 577.50 11,523 23,841 577.60 11,695 25,002 577.70 11,868 26,180 577.80 12,040 27,375 577.90 12,213 28,588 578.00 12,385 29,818 578.10 12,533 31,064 578.20 12,681 32,325 578.30 12,829 33,600 578.40 12,977 34,890 578.50 13,125 36,195 578.60 13,272 37,515 578.70 13,420 38,850 578.80 13,568 40,199 578.90 13,716 41,563 579.00 13,864 42,943 579.10 14,017 44,337 579.20 14,169 45,746 579.30 14,322 47,170 579.40 14,475 48,610 579.50 14,628 50,065 579.60 14,780 51,536 579.70 14,933 53,021 579.80 15,086 54,522 579.90 15,238 56,039 580.00 15,391 57,570 580.10 15,391 57,570 Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 129 Time span=0.00-120.00 hrs, dt=0.10 hrs, 1201 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DA#1: Post-Development Runoff Area=28.009 ac 50.36% Impervious Runoff Depth=3.76" Tc=5.0 min CN=89 Runoff=175.14 cfs 8.782 of Subcatchment DA#2: Post-Development Runoff Area=6.846 ac 45.49% Impervious Runoff Depth=3.66" Tc=5.0 min CN=88 Runoff=41.87 cfs 2.088 af Subcatchment DA#3: Post-Development Runoff Area=4.651 ac 56.27% Impervious Runoff Depth=3.87" Tc=5.0 min CN=90 Runoff=29.70 cfs 1.499 af Subcatchment PRE#1: Predevelopment#1 Runoff Area=28.010 ac 0.00% Impervious Runoff Depth=3.26" Tc=29.5 min CN=84 Runoff=95.53 cfs 7.612 of Subcatchment PRE#2: Predevelopment#2 Runoff Area=6.846 ac 0.00% Impervious Runoff Depth=3.26" Tc=31.9 min CN=84 Runoff=22.48 cfs 1.861 af SubcatchmentPRE#3: Predevelopment#3 Runoff Area=28.010 ac 0.00% Impervious Runoff Depth=3.26" Tc=31.9 min CN=84 Runoff=91.96 cfs 7.612 of Pond BMP#3: BMP#3 Peak Elev=554.24' Storage=35,860 cf Inflow=29.70 cfs 1.499 af Primary=13.33 cfs 1.499 af Secondary=0.00 cfs 0.000 af Outflow=13.33 cfs 1.499 af Pond BMP-1: BMP#1 Peak Elev=559.26' Storage=159,857 cf Inflow=175.14 cfs 8.782 af Primary=94.82 cfs 8.708 af Secondary=7.19 cfs 0.073 af Outflow=102.01 cfs 8.781 af Pond BMP-2: BMP#2 Peak Elev=578.73' Storage=39,289 cf Inflow=41.87 cfs 2.088 af Primary=25.89 cfs 2.088 af Secondary=0.00 cfs 0.000 af Outflow=25.89 cfs 2.088 af Total Runoff Area = 102.372 ac Runoff Volume = 29.453 af Average Runoff Depth = 3.45" 80.62% Pervious = 82.537 ac 19.38% Impervious = 19.835 ac Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 130 Summary for Subcatchment DA#1: Post-Development Pond #1 Runoff = 175.14 cfs @ 3.15 hrs, Volume= 8.782 af, Depth= 3.76" Routed to Pond BMP-1 : BMP #1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Area (ac) CN Description • 3.238 98 Roadway • 1.043 98 Sidewalk • 9.823 98 Buildings/Driveways 13.905 80 >75% Grass cover, Good, HSG D 28.009 89 Weighted Average 13.905 49.64% Pervious Area 14.104 50.36% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA#1: Post-Development Pond #1 Hydrograph III I 0 Runoff 17. cfs 4- I I H I I H 1- I I H I � I 1 r 170� a lotte 6Jlr 5U-� 150 140-V — — Rtaio# A-rea-t28 01A9 aI� 130 120H 1R4nnPV914n1le •Ta w 110_ 100 R rI pt, 76- 3 � 90= — — — — — — — — c5.A-rn+n LL 70= — — — — — — — • — 60= H H H H H 1• H 50i 40 1 H I- H 1 H H 1 H H I I H 30 20 ,( ,/f(/�//l��ff��f(�ff ( 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 131 Hydrograph for Subcatchment DA#1: Post-Development Pond #1 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 4.99 3.76 0.00 2.00 0.56 0.06 4.24 106.00 4.99 3.76 0.00 4.00 4.39 3.19 17.81 108.00 4.99 3.76 0.00 6.00 4.99 3.76 5.19 110.00 4.99 3.76 0.00 8.00 4.99 3.76 0.00 112.00 4.99 3.76 0.00 10.00 4.99 3.76 0.00 114.00 4.99 3.76 0.00 12.00 4.99 3.76 0.00 116.00 4.99 3.76 0.00 14.00 4.99 3.76 0.00 118.00 4.99 3.76 0.00 16.00 4.99 3.76 0.00 120.00 4.99 3.76 0.00 18.00 4.99 3.76 0.00 20.00 4.99 3.76 0.00 22.00 4.99 3.76 0.00 24.00 4.99 3.76 0.00 26.00 4.99 3.76 0.00 28.00 4.99 3.76 0.00 30.00 4.99 3.76 0.00 32.00 4.99 3.76 0.00 34.00 4.99 3.76 0.00 36.00 4.99 3.76 0.00 38.00 4.99 3.76 0.00 40.00 4.99 3.76 0.00 42.00 4.99 3.76 0.00 44.00 4.99 3.76 0.00 46.00 4.99 3.76 0.00 48.00 4.99 3.76 0.00 50.00 4.99 3.76 0.00 52.00 4.99 3.76 0.00 54.00 4.99 3.76 0.00 56.00 4.99 3.76 0.00 58.00 4.99 3.76 0.00 60.00 4.99 3.76 0.00 62.00 4.99 3.76 0.00 64.00 4.99 3.76 0.00 66.00 4.99 3.76 0.00 68.00 4.99 3.76 0.00 70.00 4.99 3.76 0.00 72.00 4.99 3.76 0.00 74.00 4.99 3.76 0.00 76.00 4.99 3.76 0.00 78.00 4.99 3.76 0.00 80.00 4.99 3.76 0.00 82.00 4.99 3.76 0.00 84.00 4.99 3.76 0.00 86.00 4.99 3.76 0.00 88.00 4.99 3.76 0.00 90.00 4.99 3.76 0.00 92.00 4.99 3.76 0.00 94.00 4.99 3.76 0.00 96.00 4.99 3.76 0.00 98.00 4.99 3.76 0.00 100.00 4.99 3.76 0.00 102.00 4.99 3.76 0.00 Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 132 Summary for Subcatchment DA#2: Post-Development Pond #2 Runoff = 41.87 cfs @ 3.15 hrs, Volume= 2.088 af, Depth= 3.66" Routed to Pond BMP-2 : BMP #2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Area (ac) CN Description • 1.262 98 Roadway • 0.445 98 Sidewalk • 0.964 98 Buildings/Driveways 3.732 80 >75% Grass cover, Good, HSG D • 0.443 98 Amenity Impervious 6.846 88 Weighted Average 3.732 54.51% Pervious Area 3.114 45.49% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA#2: Post-Development Pond #2 Hydrograph AR _ I ■Runoff 41.87 cfs 40 j Char�toite 338- 6 5�y�r=�hr Raiff II 4.199{" 34_ SROn3fftAk-_ea i8.846 - 32 30 28 4 A � npff VI9me .. 8$ f _ w 264 .24 n / 7 _ 7 7 t !Rnff I� p-'' . ° 22_ Tc=S$ mltn 213 181 V 1L.8� 16= ��1O 14_ / I # 4 H 1— I 12_" — 6 4 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 133 Hydrograph for Subcatchment DA#2: Post-Development Pond #2 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 4.99 3.66 0.00 2.00 0.56 0.05 0.90 106.00 4.99 3.66 0.00 4.00 4.39 3.09 4.31 108.00 4.99 3.66 0.00 6.00 4.99 3.66 1.26 110.00 4.99 3.66 0.00 8.00 4.99 3.66 0.00 112.00 4.99 3.66 0.00 10.00 4.99 3.66 0.00 114.00 4.99 3.66 0.00 12.00 4.99 3.66 0.00 116.00 4.99 3.66 0.00 14.00 4.99 3.66 0.00 118.00 4.99 3.66 0.00 16.00 4.99 3.66 0.00 120.00 4.99 3.66 0.00 18.00 4.99 3.66 0.00 20.00 4.99 3.66 0.00 22.00 4.99 3.66 0.00 24.00 4.99 3.66 0.00 26.00 4.99 3.66 0.00 28.00 4.99 3.66 0.00 30.00 4.99 3.66 0.00 32.00 4.99 3.66 0.00 34.00 4.99 3.66 0.00 36.00 4.99 3.66 0.00 38.00 4.99 3.66 0.00 40.00 4.99 3.66 0.00 42.00 4.99 3.66 0.00 44.00 4.99 3.66 0.00 46.00 4.99 3.66 0.00 48.00 4.99 3.66 0.00 50.00 4.99 3.66 0.00 52.00 4.99 3.66 0.00 54.00 4.99 3.66 0.00 56.00 4.99 3.66 0.00 58.00 4.99 3.66 0.00 60.00 4.99 3.66 0.00 62.00 4.99 3.66 0.00 64.00 4.99 3.66 0.00 66.00 4.99 3.66 0.00 68.00 4.99 3.66 0.00 70.00 4.99 3.66 0.00 72.00 4.99 3.66 0.00 74.00 4.99 3.66 0.00 76.00 4.99 3.66 0.00 78.00 4.99 3.66 0.00 80.00 4.99 3.66 0.00 82.00 4.99 3.66 0.00 84.00 4.99 3.66 0.00 86.00 4.99 3.66 0.00 88.00 4.99 3.66 0.00 90.00 4.99 3.66 0.00 92.00 4.99 3.66 0.00 94.00 4.99 3.66 0.00 96.00 4.99 3.66 0.00 98.00 4.99 3.66 0.00 100.00 4.99 3.66 0.00 102.00 4.99 3.66 0.00 Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 134 Summary for Subcatchment DA#3: Post-Development Pond #3 Runoff = 29.70 cfs @ 3.14 hrs, Volume= 1.499 af, Depth= 3.87" Routed to Pond BMP#3 : BMP #3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Area (ac) CN Description • 0.677 98 Roadway • 0.221 98 Sidewalk • 1.481 98 Buildings/Driveways 2.034 80 >75% Grass cover, Good, HSG D • 0.203 98 Parking • 0.035 98 Ex. Impervious 4.651 90 Weighted Average 2.034 43.73% Pervious Area 2.617 56.27% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA#3: Post-Development Pond #3 Hydrograph ' I ■Runoff 29.70 cfsJU 28- V 6-r arioite 649-56-yr 26- 56 ylr 6hrrRaiii611 .J9" 24_ 1ROnofff-Area=4.651 Z b 22= 20 —Rntif Vlume1. 91f18 0 16= I _F 7 7 7 nc!ff Depth=-3. " 14 Tc=5 O min 12= di J4 10=' o 4= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 135 Hydrograph for Subcatchment DA#3: Post-Development Pond #3 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 4.99 3.87 0.00 2.00 0.56 0.08 0.81 106.00 4.99 3.87 0.00 4.00 4.39 3.29 2.98 108.00 4.99 3.87 0.00 6.00 4.99 3.87 0.87 110.00 4.99 3.87 0.00 8.00 4.99 3.87 0.00 112.00 4.99 3.87 0.00 10.00 4.99 3.87 0.00 114.00 4.99 3.87 0.00 12.00 4.99 3.87 0.00 116.00 4.99 3.87 0.00 14.00 4.99 3.87 0.00 118.00 4.99 3.87 0.00 16.00 4.99 3.87 0.00 120.00 4.99 3.87 0.00 18.00 4.99 3.87 0.00 20.00 4.99 3.87 0.00 22.00 4.99 3.87 0.00 24.00 4.99 3.87 0.00 26.00 4.99 3.87 0.00 28.00 4.99 3.87 0.00 30.00 4.99 3.87 0.00 32.00 4.99 3.87 0.00 34.00 4.99 3.87 0.00 36.00 4.99 3.87 0.00 38.00 4.99 3.87 0.00 40.00 4.99 3.87 0.00 42.00 4.99 3.87 0.00 44.00 4.99 3.87 0.00 46.00 4.99 3.87 0.00 48.00 4.99 3.87 0.00 50.00 4.99 3.87 0.00 52.00 4.99 3.87 0.00 54.00 4.99 3.87 0.00 56.00 4.99 3.87 0.00 58.00 4.99 3.87 0.00 60.00 4.99 3.87 0.00 62.00 4.99 3.87 0.00 64.00 4.99 3.87 0.00 66.00 4.99 3.87 0.00 68.00 4.99 3.87 0.00 70.00 4.99 3.87 0.00 72.00 4.99 3.87 0.00 74.00 4.99 3.87 0.00 76.00 4.99 3.87 0.00 78.00 4.99 3.87 0.00 80.00 4.99 3.87 0.00 82.00 4.99 3.87 0.00 84.00 4.99 3.87 0.00 86.00 4.99 3.87 0.00 88.00 4.99 3.87 0.00 90.00 4.99 3.87 0.00 92.00 4.99 3.87 0.00 94.00 4.99 3.87 0.00 96.00 4.99 3.87 0.00 98.00 4.99 3.87 0.00 100.00 4.99 3.87 0.00 102.00 4.99 3.87 0.00 Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 136 Summary for Subcatchment PRE#1: Predevelopment #1 Runoff = 95.53 cfs @ 3.48 hrs, Volume= 7.612 af, Depth= 3.26" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Area (ac) CN Description 28.010 84 Pasture/grassland/range, Fair, HSG D 28.010 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 29.5 Direct Entry, Subcatchment PRE#1: Predevelopment #1 Hydrograph 1 nF (1 _ 0 Runoff 95.53 cfs 1— 1 95 fi l 1 barot;6r 5-6- r 90 85V 4 I I I 5d—i--ihrrR fa I §0 8ov 75=/ I I I I Rurho# Area-21.O1-0 ad 70 3 551 1 -1 ± 1- 1 I ± 1R nr 11 7 F 6:7 ,o 50 TC= .5-min 45= 40K —L 1- 1 1 1rt 1- 11 td1-L 35 30V 1 — 1 1-1 1 1 i 25V 0 207 z,�� 1 1 1 1 1 4 I 1 15= 10 �� I �o 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 137 Hydrograph for Subcatchment PRE#1: Predevelopment #1 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 4.99 3.26 0.00 2.00 0.56 0.02 0.29 106.00 4.99 3.26 0.00 4.00 4.39 2.71 34.62 108.00 4.99 3.26 0.00 6.00 4.99 3.26 5.81 110.00 4.99 3.26 0.00 8.00 4.99 3.26 0.00 112.00 4.99 3.26 0.00 10.00 4.99 3.26 0.00 114.00 4.99 3.26 0.00 12.00 4.99 3.26 0.00 116.00 4.99 3.26 0.00 14.00 4.99 3.26 0.00 118.00 4.99 3.26 0.00 16.00 4.99 3.26 0.00 120.00 4.99 3.26 0.00 18.00 4.99 3.26 0.00 20.00 4.99 3.26 0.00 22.00 4.99 3.26 0.00 24.00 4.99 3.26 0.00 26.00 4.99 3.26 0.00 28.00 4.99 3.26 0.00 30.00 4.99 3.26 0.00 32.00 4.99 3.26 0.00 34.00 4.99 3.26 0.00 36.00 4.99 3.26 0.00 38.00 4.99 3.26 0.00 40.00 4.99 3.26 0.00 42.00 4.99 3.26 0.00 44.00 4.99 3.26 0.00 46.00 4.99 3.26 0.00 48.00 4.99 3.26 0.00 50.00 4.99 3.26 0.00 52.00 4.99 3.26 0.00 54.00 4.99 3.26 0.00 56.00 4.99 3.26 0.00 58.00 4.99 3.26 0.00 60.00 4.99 3.26 0.00 62.00 4.99 3.26 0.00 64.00 4.99 3.26 0.00 66.00 4.99 3.26 0.00 68.00 4.99 3.26 0.00 70.00 4.99 3.26 0.00 72.00 4.99 3.26 0.00 74.00 4.99 3.26 0.00 76.00 4.99 3.26 0.00 78.00 4.99 3.26 0.00 80.00 4.99 3.26 0.00 82.00 4.99 3.26 0.00 84.00 4.99 3.26 0.00 86.00 4.99 3.26 0.00 88.00 4.99 3.26 0.00 90.00 4.99 3.26 0.00 92.00 4.99 3.26 0.00 94.00 4.99 3.26 0.00 96.00 4.99 3.26 0.00 98.00 4.99 3.26 0.00 100.00 4.99 3.26 0.00 102.00 4.99 3.26 0.00 Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 138 Summary for Subcatchment PRE#2: Predevelopment #2 Runoff = 22.48 cfs @ 3.51 hrs, Volume= 1.861 af, Depth= 3.26" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Area (ac) CN Description 6.846 84 Pasture/grassland/range, Fair, HSG D 6.846 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.9 Direct Entry, Subcatchment PRE#2: Predevelopment #2 Hydrograph 25 - — - •Runoff 22.48 cfs1 - 1 H- H- 1 H H 22 j Ghao #e 20° 1 1 Sly-ylr h Ratnf 11 .J91" 18= / fi 1 —h 1- 1 —[ -h —h fRO ntAll-Aired=6.8I 6-at 15 �/ -4 I-I 4 I- I H- H I n)f I Ie1.Pl f - 13 I1 1 1 1 1 1 1 ! nrICE!ilh9 .1" 0 12_ / 11 10 , ± 1- ± II 4644 _ 87=� 0 1 1 1 I I I 1 1 I 1 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 139 Hydrograph for Subcatchment PRE#2: Predevelopment #2 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 4.99 3.26 0.00 2.00 0.56 0.02 0.06 106.00 4.99 3.26 0.00 4.00 4.39 2.71 9.24 108.00 4.99 3.26 0.00 6.00 4.99 3.26 1.44 110.00 4.99 3.26 0.00 8.00 4.99 3.26 0.00 112.00 4.99 3.26 0.00 10.00 4.99 3.26 0.00 114.00 4.99 3.26 0.00 12.00 4.99 3.26 0.00 116.00 4.99 3.26 0.00 14.00 4.99 3.26 0.00 118.00 4.99 3.26 0.00 16.00 4.99 3.26 0.00 120.00 4.99 3.26 0.00 18.00 4.99 3.26 0.00 20.00 4.99 3.26 0.00 22.00 4.99 3.26 0.00 24.00 4.99 3.26 0.00 26.00 4.99 3.26 0.00 28.00 4.99 3.26 0.00 30.00 4.99 3.26 0.00 32.00 4.99 3.26 0.00 34.00 4.99 3.26 0.00 36.00 4.99 3.26 0.00 38.00 4.99 3.26 0.00 40.00 4.99 3.26 0.00 42.00 4.99 3.26 0.00 44.00 4.99 3.26 0.00 46.00 4.99 3.26 0.00 48.00 4.99 3.26 0.00 50.00 4.99 3.26 0.00 52.00 4.99 3.26 0.00 54.00 4.99 3.26 0.00 56.00 4.99 3.26 0.00 58.00 4.99 3.26 0.00 60.00 4.99 3.26 0.00 62.00 4.99 3.26 0.00 64.00 4.99 3.26 0.00 66.00 4.99 3.26 0.00 68.00 4.99 3.26 0.00 70.00 4.99 3.26 0.00 72.00 4.99 3.26 0.00 74.00 4.99 3.26 0.00 76.00 4.99 3.26 0.00 78.00 4.99 3.26 0.00 80.00 4.99 3.26 0.00 82.00 4.99 3.26 0.00 84.00 4.99 3.26 0.00 86.00 4.99 3.26 0.00 88.00 4.99 3.26 0.00 90.00 4.99 3.26 0.00 92.00 4.99 3.26 0.00 94.00 4.99 3.26 0.00 96.00 4.99 3.26 0.00 98.00 4.99 3.26 0.00 100.00 4.99 3.26 0.00 102.00 4.99 3.26 0.00 Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 140 Summary for Subcatchment PRE#3: Predevelopment #3 Runoff = 91.96 cfs @ 3.51 hrs, Volume= 7.612 af, Depth= 3.26" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Area (ac) CN Description 28.010 84 Pasture/grassland/range, Fair, HSG D 28.010 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.9 Direct Entry, Subcatchment PRE#3: Predevelopment #3 Hydrograph — — 0 Runoff 91.96 cfs 1— 1 1 1 —h 1— 1 J 90 � araott�64ir s3V- r 85✓ d `-- hrainfa�Il��19 ' 75/ 70i/ fi rt 4 1 14Ruflo#f Area$28 011-Q d` 50 7 171 T 71 71 1 v . ? -q u 55 45 1=r1FF . min LL 814 40 � � �L 35= 30 A 1- 25 10514 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 141 Hydrograph for Subcatchment PRE#3: Predevelopment #3 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 4.99 3.26 0.00 2.00 0.56 0.02 0.24 106.00 4.99 3.26 0.00 4.00 4.39 2.71 37.79 108.00 4.99 3.26 0.00 6.00 4.99 3.26 5.89 110.00 4.99 3.26 0.00 8.00 4.99 3.26 0.00 112.00 4.99 3.26 0.00 10.00 4.99 3.26 0.00 114.00 4.99 3.26 0.00 12.00 4.99 3.26 0.00 116.00 4.99 3.26 0.00 14.00 4.99 3.26 0.00 118.00 4.99 3.26 0.00 16.00 4.99 3.26 0.00 120.00 4.99 3.26 0.00 18.00 4.99 3.26 0.00 20.00 4.99 3.26 0.00 22.00 4.99 3.26 0.00 24.00 4.99 3.26 0.00 26.00 4.99 3.26 0.00 28.00 4.99 3.26 0.00 30.00 4.99 3.26 0.00 32.00 4.99 3.26 0.00 34.00 4.99 3.26 0.00 36.00 4.99 3.26 0.00 38.00 4.99 3.26 0.00 40.00 4.99 3.26 0.00 42.00 4.99 3.26 0.00 44.00 4.99 3.26 0.00 46.00 4.99 3.26 0.00 48.00 4.99 3.26 0.00 50.00 4.99 3.26 0.00 52.00 4.99 3.26 0.00 54.00 4.99 3.26 0.00 56.00 4.99 3.26 0.00 58.00 4.99 3.26 0.00 60.00 4.99 3.26 0.00 62.00 4.99 3.26 0.00 64.00 4.99 3.26 0.00 66.00 4.99 3.26 0.00 68.00 4.99 3.26 0.00 70.00 4.99 3.26 0.00 72.00 4.99 3.26 0.00 74.00 4.99 3.26 0.00 76.00 4.99 3.26 0.00 78.00 4.99 3.26 0.00 80.00 4.99 3.26 0.00 82.00 4.99 3.26 0.00 84.00 4.99 3.26 0.00 86.00 4.99 3.26 0.00 88.00 4.99 3.26 0.00 90.00 4.99 3.26 0.00 92.00 4.99 3.26 0.00 94.00 4.99 3.26 0.00 96.00 4.99 3.26 0.00 98.00 4.99 3.26 0.00 100.00 4.99 3.26 0.00 102.00 4.99 3.26 0.00 Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 142 Summary for Pond BMP#3: BMP #3 Inflow Area = 4.651 ac, 56.27% Impervious, Inflow Depth = 3.87" for 50-yr-6hr event Inflow = 29.70 cfs @ 3.14 hrs, Volume= 1.499 af Outflow = 13.33 cfs @ 3.35 hrs, Volume= 1.499 af, Atten= 55%, Lag= 12.1 min Primary = 13.33 cfs @ 3.35 hrs, Volume= 1.499 af Routed to nonexistent node POST-POI#1 Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to nonexistent node POST-POI#1 Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Peak Elev= 554.24' @ 3.35 hrs Surf.Area= 12,490 sf Storage= 35,860 cf Plug-Flow detention time= 896.5 min calculated for 1.499 af(100% of inflow) Center-of-Mass det. time= 896.4 min ( 1,100.7 - 204.3 ) Volume Invert Avail.Storage Storage Description #1 550.00' 95,966 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 550.00 4,583 0 0 551.00 6,298 5,441 5,441 552.00 8,187 7,243 12,683 553.00 10,158 9,173 21,856 554.00 12,069 11,114 32,969 555.00 13,858 12,964 45,933 556.00 15,706 14,782 60,715 557.00 17,611 16,659 77,373 558.00 19,575 18,593 95,966 Device Routing Invert Outlet Devices #1 Primary 549.50' 24.0" Round RCP Round 24" L= 85.0' RCP, square edge headwall, Ke= 0.500 Inlet/Outlet Invert= 549.50' / 548.96' S= 0.0064 '/' Cc= 0.900 n= 0.013 Concrete sewer w/manholes & inlets, Flow Area= 3.14 sf #2 Device 1 550.00' Sand Filter Head (feet) 0.00 0.01 6.00 Disch. (cfs) 0.000 0.081 0.081 #3 Device 1 553.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 Width (feet) 2.00 2.00 #4 Device 1 554.00' 48.0" x 48.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads #5 Secondary 556.00' 10.0' long x 16.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 143 Primary OutFlow Max=12.28 cfs © 3.35 hrs HW=554.19' (Free Discharge) 4-1=RCP_Round 24" (Passes 12.28 cfs of 28.31 cfs potential flow) 2=Sand Filter (Custom Controls 0.08 cfs) 3=Custom Weir/Orifice (Orifice Controls 7.95 cfs @ 3.97 fps) 4=Riser (Weir Controls 4.26 cfs © 1.42 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=550.00' (Free Discharge) LS=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Pond BMP#3: BMP #3 Hydrograph A—) 1 1 - 1 ]— 4 I 11- - I I _ ■Inflow r29.70 C .Outflow I I—I 4 I ]— 4 I ibtio jAie 4.6- I. - ■Seco dary 32� 30 1 4 1 - -L Peak Ei evl=55 4.24' - 28 - I -H I - 1— H- -L Sto ta 24V / — - - 22- / I 14- I L H _1 I - F. 10=1 i;r-4 1 I I _L1_ H _I 0 1� 13.33cfs 214 _LL _ IIi _I1_ 1 - 10 j 1 1 s 6 4 0.00 cfs 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 144 Pond BMP#3: BMP #3 Stage-Discharge ❑Total ' 558 ❑Primary ❑Secondary 557 / /,� Broad-Crested Rectan.ular Weir 556 ^ 555 ...d/ .2 /a�' Riser 0 554 ' �III Custom Weir/Orifice 553 % 552 551 / Sand Filter / 0 10 20 30 40 50 60 70 80 90 100 110 Discharge (cfs) Pond BMP#3: BMP #3 Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-ft) 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 Surface ❑Storage 558_ I I 1 ��� ������� 557 I ��� �� I I I 5561/ 555 -/ ��/�/ — - z— II II I //' I I o 554- , //�/ /� I 41 I > - w 553LZ I 4 I I 41 1 552: I I -I I - 5511/ 1 Custom Stage Data 550 ( , 0 10,,000 20,000 30,000 40,000 50,000 60,,000 70,000 80,000 90,000' Storage(cubic-feet) Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 145 Hydrograph for Pond BMP#3: BMP #3 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 550.00 0.00 0.00 0.00 5.00 1.26 26,295 553.42 1.87 1.87 0.00 10.00 0.00 21,548 552.97 0.08 0.08 0.00 15.00 0.00 20,090 552.82 0.08 0.08 0.00 20.00 0.00 18,632 552.67 0.08 0.08 0.00 25.00 0.00 17,174 552.52 0.08 0.08 0.00 30.00 0.00 15,716 552.36 0.08 0.08 0.00 35.00 0.00 14,258 552.19 0.08 0.08 0.00 40.00 0.00 12,800 552.01 0.08 0.08 0.00 45.00 0.00 11,342 551.83 0.08 0.08 0.00 50.00 0.00 9,884 551.64 0.08 0.08 0.00 55.00 0.00 8,426 551.44 0.08 0.08 0.00 60.00 0.00 6,968 551.23 0.08 0.08 0.00 65.00 0.00 5,510 551.01 0.08 0.08 0.00 70.00 0.00 4,052 550.77 0.08 0.08 0.00 75.00 0.00 2,594 550.52 0.08 0.08 0.00 80.00 0.00 1,136 550.24 0.08 0.08 0.00 85.00 0.00 0 550.00 0.00 0.00 0.00 90.00 0.00 0 550.00 0.00 0.00 0.00 95.00 0.00 0 550.00 0.00 0.00 0.00 100.00 0.00 0 550.00 0.00 0.00 0.00 105.00 0.00 0 550.00 0.00 0.00 0.00 110.00 0.00 0 550.00 0.00 0.00 0.00 115.00 0.00 0 550.00 0.00 0.00 0.00 120.00 0.00 0 550.00 0.00 0.00 0.00 Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 146 Stage-Discharge for Pond BMP#3: BMP #3 Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 550.00 0.00 0.00 0.00 555.20 32.45 32.45 0.00 550.10 0.08 0.08 0.00 555.30 32.83 32.83 0.00 550.20 0.08 0.08 0.00 555.40 33.21 33.21 0.00 550.30 0.08 0.08 0.00 555.50 33.58 33.58 0.00 550.40 0.08 0.08 0.00 555.60 33.95 33.95 0.00 550.50 0.08 0.08 0.00 555.70 34.31 34.31 0.00 550.60 0.08 0.08 0.00 555.80 34.67 34.67 0.00 550.70 0.08 0.08 0.00 555.90 35.03 35.03 0.00 550.80 0.08 0.08 0.00 556.00 35.38 35.38 0.00 550.90 0.08 0.08 0.00 556.10 36.58 35.73 0.85 551.00 0.08 0.08 0.00 556.20 38.47 36.07 2.40 551.10 0.08 0.08 0.00 556.30 40.84 36.42 4.42 551.20 0.08 0.08 0.00 556.40 43.57 36.74 6.83 551.30 0.08 0.08 0.00 556.50 46.60 37.05 9.55 551.40 0.08 0.08 0.00 556.60 49.91 37.36 12.55 551.50 0.08 0.08 0.00 556.70 53.30 37.67 15.64 551.60 0.08 0.08 0.00 556.80 56.86 37.97 18.89 551.70 0.08 0.08 0.00 556.90 60.77 38.27 22.50 551.80 0.08 0.08 0.00 557.00 64.87 38.57 26.30 551.90 0.08 0.08 0.00 557.10 69.26 38.86 30.40 552.00 0.08 0.08 0.00 557.20 73.86 39.15 34.70 552.10 0.08 0.08 0.00 557.30 78.58 39.45 39.13 552.20 0.08 0.08 0.00 557.40 83.47 39.73 43.73 552.30 0.08 0.08 0.00 557.50 88.43 40.02 48.41 552.40 0.08 0.08 0.00 557.60 93.53 40.31 53.23 552.50 0.08 0.08 0.00 557.70 98.88 40.59 58.29 552.60 0.08 0.08 0.00 557.80 104.38 40.87 63.51 552.70 0.08 0.08 0.00 557.90 110.03 41.15 68.88 552.80 0.08 0.08 0.00 558.00 115.81 41.43 74.39 552.90 0.08 0.08 0.00 553.00 0.08 0.08 0.00 553.10 0.29 0.29 0.00 553.20 0.67 0.67 0.00 553.30 1.16 1.16 0.00 553.40 1.74 1.74 0.00 553.50 2.40 2.40 0.00 553.60 3.13 3.13 0.00 553.70 3.92 3.92 0.00 553.80 4.77 4.77 0.00 553.90 5.67 5.67 0.00 554.00 6.63 6.63 0.00 554.10 9.09 9.09 0.00 554.20 12.78 12.78 0.00 554.30 17.31 17.31 0.00 554.40 22.51 22.51 0.00 554.50 28.30 28.30 0.00 554.60 30.07 30.07 0.00 554.70 30.48 30.48 0.00 554.80 30.88 30.88 0.00 554.90 31.28 31.28 0.00 555.00 31.68 31.68 0.00 555.10 32.06 32.06 0.00 Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 147 Stage-Area-Storage for Pond BMP#3: BMP #3 Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 550.00 4,583 0 555.20 14,228 48,741 550.10 4,755 467 555.30 14,412 50,173 550.20 4,926 951 555.40 14,597 51,624 550.30 5,097 1,452 555.50 14,782 53,093 550.40 5,269 1,970 555.60 14,967 54,580 550.50 5,441 2,506 555.70 15,152 56,086 550.60 5,612 3,059 555.80 15,336 57,610 550.70 5,784 3,628 555.90 15,521 59,153 550.80 5,955 4,215 556.00 15,706 60,715 550.90 6,126 4,819 556.10 15,897 62,295 551.00 6,298 5,441 556.20 16,087 63,894 551.10 6,487 6,080 556.30 16,277 65,512 551.20 6,676 6,738 556.40 16,468 67,149 551.30 6,865 7,415 556.50 16,659 68,806 551.40 7,054 8,111 556.60 16,849 70,481 551.50 7,243 8,826 556.70 17,040 72,175 551.60 7,431 9,559 556.80 17,230 73,889 551.70 7,620 10,312 556.90 17,420 75,621 551.80 7,809 11,083 557.00 17,611 77,373 551.90 7,998 11,874 557.10 17,807 79,144 552.00 8,187 12,683 557.20 18,004 80,934 552.10 8,384 13,512 557.30 18,200 82,745 552.20 8,581 14,360 557.40 18,397 84,575 552.30 8,778 15,228 557.50 18,593 86,424 552.40 8,975 16,115 557.60 18,789 88,293 552.50 9,173 17,023 557.70 18,986 90,182 552.60 9,370 17,950 557.80 19,182 92,090 552.70 9,567 18,897 557.90 19,379 94,018 552.80 9,764 19,863 558.00 19,575 95,966 552.90 9,961 20,850 553.00 10,158 21,856 553.10 10,349 22,881 553.20 10,540 23,925 553.30 10,731 24,989 553.40 10,922 26,072 553.50 11,114 27,173 553.60 11,305 28,294 553.70 11,496 29,434 553.80 11,687 30,593 553.90 11,878 31,772 554.00 12,069 32,969 554.10 12,248 34,185 554.20 12,427 35,419 554.30 12,606 36,670 554.40 12,785 37,940 554.50 12,964 39,227 554.60 13,142 40,532 554.70 13,321 41,856 554.80 13,500 43,197 554.90 13,679 44,556 555.00 13,858 45,933 555.10 14,043 47,328 Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 148 Summary for Pond BMP-1: BMP #1 Inflow Area = 28.009 ac, 50.36% Impervious, Inflow Depth = 3.76" for 50-yr-6hr event Inflow = 175.14 cfs @ 3.15 hrs, Volume= 8.782 of Outflow = 102.01 cfs @ 3.30 hrs, Volume= 8.781 af, Atten= 42%, Lag= 9.3 min Primary = 94.82 cfs @ 3.30 hrs, Volume= 8.708 af Routed to nonexistent node POST-POI#1 Secondary = 7.19 cfs @ 3.30 hrs, Volume= 0.073 af Routed to nonexistent node POST-POI#1 Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Peak Elev= 559.26' @ 3.30 hrs Surf.Area= 49,448 sf Storage= 159,857 cf Plug-Flow detention time= 291.9 min calculated for 8.774 af(100% of inflow) Center-of-Mass det. time= 296.0 min ( 501.3 - 205.3 ) Volume Invert Avail.Storage Storage Description #1 555.50' 223,972 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 555.50 34,578 0 0 556.00 37,559 18,034 18,034 557.00 41,209 39,384 57,418 558.00 44,809 43,009 100,427 559.00 48,473 46,641 147,068 560.00 52,204 50,339 197,407 560.50 54,057 26,565 223,972 Device Routing Invert Outlet Devices #1 Primary 550.00' 36.0" Round RCP_Round 36" L= 115.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 550.00' / 548.00' S= 0.0174 '/' Cc= 0.900 n= 0.013 Concrete sewer w/manholes & inlets, Flow Area= 7.07 sf #2 Device 1 555.50' 4.0" Horiz. WQ/CP Orifice C= 0.600 Limited to weir flow at low heads #3 Device 1 557.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 0.50 Width (feet) 2.00 2.00 #4 Device 1 557.50' 48.0" x 48.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads #5 Secondary 559.00' 20.0' long x 16.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 149 Primary OutFlow Max=94.80 cfs © 3.30 hrs HW=559.26' (Free Discharge) L1=RCP_Round 36" (Inlet Controls 94.80 cfs @ 13.41 fps) 2=WQ/CP Orifice (Passes < 0.81 cfs potential flow) 3=Custom Weir/Orifice (Passes < 6.96 cfs potential flow) 4=Riser (Passes < 102.16 cfs potential flow) Secondary OutFlow Max=7.10 cfs @ 3.30 hrs HW=559.26' (Free Discharge) LS=Broad-Crested Rectangular Weir(Weir Controls 7.10 cfs @ 1.37 fps) Pond BMP-1: BMP #1 Hydrograph /- — H 1— 1 4 H I + I 1 1 ■Inflow 175.14 cfs + ❑outflow i H t 1 -t h 1 1H #I iie .00 p Seondary190 180 I _ —I 1 1 1 1 1 Yea E[elV559.Z160 / 1 -k —I1- 1 —k1-1 -k1-1d- 1 ° 9e_7•11p, 7 150 130fOo1cfS ]± —1 d- 1 - ±I ± I- — 1 - I—I ± 11 1 1 w 11 94.82 cfs 1 1 1 1 1 1 1 1 1 1 1 1 1 1 100 t® 80 70 60 — % 1 - 1HHI + IH -H1H1 + 1H -H1 � 50 1 1 I-1 1 1 1 1 1 1 1 40 / ///// 30 �, 7.19 cfsiu 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 150 Pond BMP-1: BMP #1 Stage-Discharge 0 Total 0 Primary ❑Secondary 560 /�// Broad-Crested Rectan.ular Weir �` 559 / 0 558 � •; % j Riser w / Custom Weir/Orifice 557 556 % WQ/CP Orifice 0 20 40 60 80 100 120 140 160 180 Discharge (cfs) Pond BMP-1: BMP #1 Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-ft) 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 0 Surfacel ❑Storage 560 /// /// 559 z /// 0558 II m W II 557 - I I I 556-' Custom Stage Data 0 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000 180,000 200,000 220,000 Storage(cubic-feet) Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 151 Hydrograph for Pond BMP-1: BMP #1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 555.50 0.00 0.00 0.00 5.00 7.52 87,766 557.71 9.13 9.13 0.00 10.00 0.00 60,688 557.08 0.68 0.68 0.00 15.00 0.00 51,210 556.85 0.49 0.49 0.00 20.00 0.00 42,782 556.64 0.45 0.45 0.00 25.00 0.00 35,071 556.44 0.41 0.41 0.00 30.00 0.00 28,090 556.26 0.37 0.37 0.00 35.00 0.00 21,852 556.10 0.33 0.33 0.00 40.00 0.00 16,368 555.96 0.28 0.28 0.00 45.00 0.00 11,651 555.83 0.24 0.24 0.00 50.00 0.00 7,718 555.72 0.20 0.20 0.00 55.00 0.00 4,603 555.63 0.14 0.14 0.00 60.00 0.00 2,665 555.58 0.08 0.08 0.00 65.00 0.00 1,697 555.55 0.04 0.04 0.00 70.00 0.00 1,141 555.53 0.03 0.03 0.00 75.00 0.00 767 555.52 0.02 0.02 0.00 80.00 0.00 516 555.51 0.01 0.01 0.00 85.00 0.00 347 555.51 0.01 0.01 0.00 90.00 0.00 233 555.51 0.01 0.01 0.00 95.00 0.00 157 555.50 0.00 0.00 0.00 100.00 0.00 105 555.50 0.00 0.00 0.00 105.00 0.00 71 555.50 0.00 0.00 0.00 110.00 0.00 48 555.50 0.00 0.00 0.00 115.00 0.00 32 555.50 0.00 0.00 0.00 120.00 0.00 22 555.50 0.00 0.00 0.00 Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 152 Stage-Discharge for Pond BMP-1: BMP #1 Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 555.50 0.00 0.00 0.00 558.10 29.51 29.51 0.00 555.55 0.04 0.04 0.00 558.15 32.75 32.75 0.00 555.60 0.11 0.11 0.00 558.20 36.11 36.11 0.00 555.65 0.16 0.16 0.00 558.25 39.58 39.58 0.00 555.70 0.19 0.19 0.00 558.30 43.16 43.16 0.00 555.75 0.21 0.21 0.00 558.35 46.85 46.85 0.00 555.80 0.23 0.23 0.00 558.40 50.64 50.64 0.00 555.85 0.25 0.25 0.00 558.45 54.54 54.54 0.00 555.90 0.27 0.27 0.00 558.50 58.53 58.53 0.00 555.95 0.28 0.28 0.00 558.55 62.62 62.62 0.00 556.00 0.30 0.30 0.00 558.60 66.80 66.80 0.00 556.05 0.31 0.31 0.00 558.65 71.07 71.07 0.00 556.10 0.33 0.33 0.00 558.70 75.44 75.44 0.00 556.15 0.34 0.34 0.00 558.75 79.89 79.89 0.00 556.20 0.35 0.35 0.00 558.80 84.42 84.42 0.00 556.25 0.36 0.36 0.00 558.85 89.04 89.04 0.00 556.30 0.38 0.38 0.00 558.90 92.59 92.59 0.00 556.35 0.39 0.39 0.00 558.95 92.90 92.90 0.00 556.40 0.40 0.40 0.00 559.00 93.21 93.21 0.00 556.45 0.41 0.41 0.00 559.05 94.12 93.52 0.60 556.50 0.42 0.42 0.00 559.10 95.52 93.83 1.69 556.55 0.43 0.43 0.00 559.15 97.25 94.14 3.11 556.60 0.44 0.44 0.00 559.20 99.24 94.44 4.79 556.65 0.45 0.45 0.00 559.25 101.46 94.75 6.71 556.70 0.46 0.46 0.00 559.30 103.90 95.05 8.84 556.75 0.47 0.47 0.00 559.35 106.52 95.36 11.16 556.80 0.48 0.48 0.00 559.40 109.32 95.66 13.66 556.85 0.49 0.49 0.00 559.45 112.27 95.96 16.30 556.90 0.50 0.50 0.00 559.50 115.36 96.27 19.09 556.95 0.51 0.51 0.00 559.55 118.59 96.57 22.03 557.00 0.51 0.51 0.00 559.60 121.96 96.87 25.10 557.05 0.60 0.60 0.00 559.65 125.31 97.16 28.14 557.10 0.74 0.74 0.00 559.70 128.74 97.46 31.27 557.15 0.92 0.92 0.00 559.75 132.25 97.76 34.49 557.20 1.13 1.13 0.00 559.80 135.83 98.05 37.78 557.25 1.37 1.37 0.00 559.85 139.69 98.35 41.34 557.30 1.64 1.64 0.00 559.90 143.64 98.64 45.00 557.35 1.93 1.93 0.00 559.95 147.69 98.94 48.75 557.40 2.24 2.24 0.00 560.00 151.83 99.23 52.60 557.45 2.56 2.56 0.00 560.05 156.17 99.52 56.65 557.50 2.91 2.91 0.00 560.10 160.61 99.81 60.80 557.55 3.79 3.79 0.00 560.15 165.15 100.10 65.05 557.60 5.10 5.10 0.00 560.20 169.80 100.39 69.41 557.65 6.71 6.71 0.00 560.25 174.47 100.68 73.79 557.70 8.55 8.55 0.00 560.30 179.23 100.96 78.26 557.75 10.61 10.61 0.00 560.35 184.07 101.25 82.82 557.80 12.84 12.84 0.00 560.40 189.00 101.54 87.46 557.85 15.25 15.25 0.00 560.45 193.92 101.82 92.10 557.90 17.82 17.82 0.00 560.50 198.92 102.11 96.82 557.95 20.54 20.54 0.00 558.00 23.40 23.40 0.00 558.05 26.39 26.39 0.00 Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 153 Stage-Area-Storage for Pond BMP-1: BMP #1 Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 555.50 34,578 0 558.10 45,175 104,926 555.55 34,876 1,736 558.15 45,359 107,190 555.60 35,174 3,488 558.20 45,542 109,462 555.65 35,472 5,254 558.25 45,725 111,744 555.70 35,770 7,035 558.30 45,908 114,035 555.75 36,069 8,831 558.35 46,091 116,335 555.80 36,367 10,642 558.40 46,275 118,644 555.85 36,665 12,467 558.45 46,458 120,962 555.90 36,963 14,308 558.50 46,641 123,290 555.95 37,261 16,164 558.55 46,824 125,626 556.00 37,559 18,034 558.60 47,007 127,972 556.05 37,741 19,917 558.65 47,191 130,327 556.10 37,924 21,808 558.70 47,374 132,691 556.15 38,106 23,709 558.75 47,557 135,065 556.20 38,289 25,619 558.80 47,740 137,447 556.25 38,472 27,538 558.85 47,923 139,839 556.30 38,654 29,466 558.90 48,107 142,239 556.35 38,837 31,403 558.95 48,290 144,649 556.40 39,019 33,350 559.00 48,473 147,068 556.45 39,202 35,305 559.05 48,660 149,497 556.50 39,384 37,270 559.10 48,846 151,934 556.55 39,566 39,244 559.15 49,033 154,381 556.60 39,749 41,227 559.20 49,219 156,837 556.65 39,931 43,219 559.25 49,406 159,303 556.70 40,114 45,220 559.30 49,592 161,778 556.75 40,297 47,230 559.35 49,779 164,262 556.80 40,479 49,249 559.40 49,965 166,756 556.85 40,662 51,278 559.45 50,152 169,259 556.90 40,844 53,316 559.50 50,339 171,771 556.95 41,027 55,362 559.55 50,525 174,293 557.00 41,209 57,418 559.60 50,712 176,824 557.05 41,389 59,483 559.65 50,898 179,364 557.10 41,569 61,557 559.70 51,085 181,913 557.15 41,749 63,640 559.75 51,271 184,472 557.20 41,929 65,732 559.80 51,458 187,041 557.25 42,109 67,833 559.85 51,644 189,618 557.30 42,289 69,943 559.90 51,831 192,205 557.35 42,469 72,062 559.95 52,017 194,801 557.40 42,649 74,190 560.00 52,204 197,407 557.45 42,829 76,327 560.05 52,389 200,022 557.50 43,009 78,473 560.10 52,575 202,646 557.55 43,189 80,628 560.15 52,760 205,279 557.60 43,369 82,792 560.20 52,945 207,922 557.65 43,549 84,965 560.25 53,131 210,574 557.70 43,729 87,147 560.30 53,316 213,235 557.75 43,909 89,338 560.35 53,501 215,905 557.80 44,089 91,537 560.40 53,686 218,585 557.85 44,269 93,746 560.45 53,872 221,274 557.90 44,449 95,964 560.50 54,057 223,972 557.95 44,629 98,191 558.00 44,809 100,427 558.05 44,992 102,672 Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 154 Summary for Pond BMP-2: BMP #2 Inflow Area = 6.846 ac, 45.49% Impervious, Inflow Depth = 3.66" for 50-yr-6hr event Inflow = 41.87 cfs @ 3.15 hrs, Volume= 2.088 of Outflow = 25.89 cfs @ 3.28 hrs, Volume= 2.088 af, Atten= 38%, Lag= 8.0 min Primary = 25.89 cfs @ 3.28 hrs, Volume= 2.088 af Routed to nonexistent node POST-POI#1 Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to nonexistent node POST-POI#1 Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Peak Elev= 578.73' @ 3.29 hrs Surf.Area= 13,469 sf Storage= 39,289 cf Plug-Flow detention time= 746.1 min calculated for 2.086 af(100% of inflow) Center-of-Mass det. time= 749.7 min ( 955.8 - 206.2 ) Volume Invert Avail.Storage Storage Description #1 575.00' 57,570 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 575.00 7,651 0 0 576.00 9,115 8,383 8,383 577.00 10,693 9,904 18,287 577.50 11,523 5,554 23,841 578.00 12,385 5,977 29,818 579.00 13,864 13,125 42,943 580.00 15,391 14,628 57,570 Device Routing Invert Outlet Devices #1 Primary 574.40' 24.0" Round RCP Round 24" L= 88.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 574.40' / 574.00' S= 0.0045 '/' Cc= 0.900 n= 0.013 Concrete sewer w/manholes & inlets, Flow Area= 3.14 sf #2 Device 1 575.00' Sand Filter Head (feet) 0.00 0.01 6.00 Disch. (cfs) 0.000 0.081 0.081 #3 Device 1 577.50' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 0.50 Width (feet) 3.00 3.00 #4 Device 1 578.00' 48.0" x 48.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads #5 Secondary 579.00' 10.0' long x 16.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 155 Primary OutFlow Max=25.73 cfs © 3.28 hrs HW=578.71' (Free Discharge) L1=RCP_Round 24" (Barrel Controls 25.73 cfs @ 8.19 fps) 2=Sand Filter (Passes < 0.08 cfs potential flow) 3=Custom Weir/Orifice (Passes < 7.18 cfs potential flow) 4=Riser (Passes < 31.01 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=575.00' (Free Discharge) LS=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Pond BMP-2: BMP #2 /� Hydrograph /III 1 1 1 1 ■Inflow 41.87 cfs F 1 1 +— 1b f` i. 64 0 Prima r 1a - ou y 46= 0 Secondary 441 42 1 I 1 ]— 4 Peals E-1-6 57-18.f3y —_ 404" / 36= / I to a =n1 9I 3 34;25.89 RQr4 t 1 t 1 —h 1— - 1 t - 1- 1 I—I —h cfs w 26i 2 I 1 -H1 -P ]- 4 + H -HI -E I-14 1 _ V _ 24 20✓ 7/ 1 1 1 1 1 1 - 16= / 1 1 1 1 1 1 14= / 12 / = 10= 6_/ 0.00 cfs , 0 ..,��/ / 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 156 Pond BMP-2: BMP #2 Stage-Discharge ❑Total ❑Primary 581 �'' ❑Secondary 580 Broad-Crested Rectangular Weir 579 Riser 0 578 Custom Weir/Orifice w 577 576 Sand Filter / 0 10 20 30 40 50 60 70 80 90 100 Discharge (cfs) Pond BMP-2: BMP #2 Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-ft) 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 11,000 12,000 13,000 14,000 15,000 Surface ` . ( ❑Storage 581 580:-/ i 579:-/ I I w 577� i ////���� II 576- _ J J Custom Stage Data 575 , , , , , , , , 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 55,000 Storage(cubic-feet) Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 157 Hydrograph for Pond BMP-2: BMP #2 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 575.00 0.00 0.00 0.00 5.00 1.82 28,227 577.87 2.30 2.30 0.00 10.00 0.00 23,458 577.47 0.08 0.08 0.00 15.00 0.00 22,000 577.34 0.08 0.08 0.00 20.00 0.00 20,542 577.21 0.08 0.08 0.00 25.00 0.00 19,084 577.07 0.08 0.08 0.00 30.00 0.00 17,626 576.94 0.08 0.08 0.00 35.00 0.00 16,168 576.80 0.08 0.08 0.00 40.00 0.00 14,710 576.66 0.08 0.08 0.00 45.00 0.00 13,252 576.51 0.08 0.08 0.00 50.00 0.00 11,794 576.36 0.08 0.08 0.00 55.00 0.00 10,336 576.21 0.08 0.08 0.00 60.00 0.00 8,878 576.05 0.08 0.08 0.00 65.00 0.00 7,420 575.89 0.08 0.08 0.00 70.00 0.00 5,962 575.73 0.08 0.08 0.00 75.00 0.00 4,504 575.56 0.08 0.08 0.00 80.00 0.00 3,046 575.38 0.08 0.08 0.00 85.00 0.00 1,588 575.20 0.08 0.08 0.00 90.00 0.00 130 575.02 0.08 0.08 0.00 95.00 0.00 0 575.00 0.00 0.00 0.00 100.00 0.00 0 575.00 0.00 0.00 0.00 105.00 0.00 0 575.00 0.00 0.00 0.00 110.00 0.00 0 575.00 0.00 0.00 0.00 115.00 0.00 0 575.00 0.00 0.00 0.00 120.00 0.00 0 575.00 0.00 0.00 0.00 Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 158 Stage-Discharge for Pond BMP-2: BMP #2 Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 575.00 0.00 0.00 0.00 580.20 66.77 32.06 34.70 575.10 0.08 0.08 0.00 580.30 71.57 32.44 39.13 575.20 0.08 0.08 0.00 580.40 76.55 32.82 43.73 575.30 0.08 0.08 0.00 580.50 81.60 33.19 48.41 575.40 0.08 0.08 0.00 580.60 86.78 33.55 53.23 575.50 0.08 0.08 0.00 580.70 92.21 33.92 58.29 575.60 0.08 0.08 0.00 580.80 97.79 34.28 63.51 575.70 0.08 0.08 0.00 580.90 103.51 34.63 68.88 575.80 0.08 0.08 0.00 581.00 109.37 34.98 74.39 575.90 0.08 0.08 0.00 576.00 0.08 0.08 0.00 576.10 0.08 0.08 0.00 576.20 0.08 0.08 0.00 576.30 0.08 0.08 0.00 576.40 0.08 0.08 0.00 576.50 0.08 0.08 0.00 576.60 0.08 0.08 0.00 576.70 0.08 0.08 0.00 576.80 0.08 0.08 0.00 576.90 0.08 0.08 0.00 577.00 0.08 0.08 0.00 577.10 0.08 0.08 0.00 577.20 0.08 0.08 0.00 577.30 0.08 0.08 0.00 577.40 0.08 0.08 0.00 577.50 0.08 0.08 0.00 577.60 0.39 0.39 0.00 577.70 0.96 0.96 0.00 577.80 1.70 1.70 0.00 577.90 2.57 2.57 0.00 578.00 3.55 3.55 0.00 578.10 5.99 5.99 0.00 578.20 9.64 9.64 0.00 578.30 14.09 14.09 0.00 578.40 19.22 19.22 0.00 578.50 24.74 24.74 0.00 578.60 25.23 25.23 0.00 578.70 25.71 25.71 0.00 578.80 26.18 26.18 0.00 578.90 26.64 26.64 0.00 579.00 27.10 27.10 0.00 579.10 28.39 27.55 0.85 579.20 30.38 27.99 2.40 579.30 32.84 28.42 4.42 579.40 35.68 28.85 6.83 579.50 38.82 29.27 9.55 579.60 42.23 29.68 12.55 579.70 45.73 30.09 15.64 579.80 49.39 30.50 18.89 579.90 53.39 30.90 22.50 580.00 57.59 31.29 26.30 580.10 62.08 31.68 30.40 Detention Davis Village Charlotte 6-hr 50-yr 50-yr-6hr Rainfall=4.99" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 159 Stage-Area-Storage for Pond BMP-2: BMP #2 Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 575.00 7,651 0 580.20 15,391 57,570 575.10 7,797 772 580.30 15,391 57,570 575.20 7,944 1,559 580.40 15,391 57,570 575.30 8,090 2,361 580.50 15,391 57,570 575.40 8,237 3,178 580.60 15,391 57,570 575.50 8,383 4,009 580.70 15,391 57,570 575.60 8,529 4,854 580.80 15,391 57,570 575.70 8,676 5,714 580.90 15,391 57,570 575.80 8,822 6,589 581.00 15,391 57,570 575.90 8,969 7,479 576.00 9,115 8,383 576.10 9,273 9,302 576.20 9,431 10,238 576.30 9,588 11,189 576.40 9,746 12,155 576.50 9,904 13,138 576.60 10,062 14,136 576.70 10,220 15,150 576.80 10,377 16,180 576.90 10,535 17,226 577.00 10,693 18,287 577.10 10,859 19,365 577.20 11,025 20,459 577.30 11,191 21,570 577.40 11,357 22,697 577.50 11,523 23,841 577.60 11,695 25,002 577.70 11,868 26,180 577.80 12,040 27,375 577.90 12,213 28,588 578.00 12,385 29,818 578.10 12,533 31,064 578.20 12,681 32,325 578.30 12,829 33,600 578.40 12,977 34,890 578.50 13,125 36,195 578.60 13,272 37,515 578.70 13,420 38,850 578.80 13,568 40,199 578.90 13,716 41,563 579.00 13,864 42,943 579.10 14,017 44,337 579.20 14,169 45,746 579.30 14,322 47,170 579.40 14,475 48,610 579.50 14,628 50,065 579.60 14,780 51,536 579.70 14,933 53,021 579.80 15,086 54,522 579.90 15,238 56,039 580.00 15,391 57,570 580.10 15,391 57,570 Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 160 Time span=0.00-120.00 hrs, dt=0.10 hrs, 1201 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DA#1: Post-Development Runoff Area=28.009 ac 50.36% Impervious Runoff Depth=4.30" Tc=5.0 min CN=89 Runoff=254.17 cfs 10.038 af Subcatchment DA#2: Post-Development Runoff Area=6.846 ac 45.49% Impervious Runoff Depth=4.19" Tc=5.0 min CN=88 Runoff=61.09 cfs 2.392 af Subcatchment DA#3: Post-Development Runoff Area=4.651 ac 56.27% Impervious Runoff Depth=4.41" Tc=5.0 min CN=90 Runoff=42.88 cfs 1.709 af Subcatchment PRE#1: Predevelopment#1 Runoff Area=28.010 ac 0.00% Impervious Runoff Depth=3.78" Tc=29.5 min CN=84 Runoff=126.81 cfs 8.817 af Subcatchment PRE#2: Predevelopment#2 Runoff Area=6.846 ac 0.00% Impervious Runoff Depth=3.78" Tc=31.9 min CN=84 Runoff=29.31 cfs 2.155 af SubcatchmentPRE#3: Predevelopment#3 Runoff Area=28.010 ac 0.00% Impervious Runoff Depth=3.78" Tc=31.9 min CN=84 Runoff=119.91 cfs 8.817 af Pond BMP#3: BMP#3 Peak Elev=554.43' Storage=38,372 cf Inflow=42.88 cfs 1.709 af Primary=24.37 cfs 1.709 af Secondary=0.00 cfs 0.000 af Outflow=24.37 cfs 1.709 af Pond BMP-1: BMP#1 Peak Elev=559.84' Storage=189,051 cf Inflow=254.17 cfs 10.038 af Primary=98.29 cfs 9.385 af Secondary=40.12 cfs 0.653 af Outflow=138.41 cfs 10.037 af Pond BMP-2: BMP#2 Peak Elev=579.33' Storage=47,605 cf Inflow=61.09 cfs 2.392 af Primary=28.56 cfs 2.337 af Secondary=4.71 cfs 0.056 af Outflow=33.25 cfs 2.392 af Total Runoff Area = 102.372 ac Runoff Volume = 33.927 af Average Runoff Depth = 3.98" 80.62% Pervious = 82.537 ac 19.38% Impervious = 19.835 ac Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 161 Summary for Subcatchment DA#1: Post-Development Pond #1 Runoff = 254.17 cfs @ 2.95 hrs, Volume= 10.038 af, Depth= 4.30" Routed to Pond BMP-1 : BMP #1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Type II 6-hr 100yr 6hr Rainfall=5.55" Area (ac) CN Description • 3.238 98 Roadway • 1.043 98 Sidewalk • 9.823 98 Buildings/Driveways 13.905 80 >75% Grass cover, Good, HSG D 28.009 89 Weighted Average 13.905 49.64% Pervious Area 14.104 50.36% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA#1: Post-Development Pond #1 Hydrograph 2Rn 0 Runoff 254.17 cfs 240 / 220- I I I I I I P -6-fir 200=' I 1p0yr 16hr F�ainfaII 5.155," 1807 _ — + 4 4 rtt.1 niff rleA1=2_p' 0� • 160-' _Ru noff_ olu me= O.038 af • 140 l Runffi Bp h413(r • 120 _ I — — 4 1- I —I 4 4 Ic5�0 �rnh 100 80 60 40 / 20 0 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 162 Hydrograph for Subcatchment DA#1: Post-Development Pond #1 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 5.55 4.30 0.00 2.00 0.69 0.12 6.58 106.00 5.55 4.30 0.00 4.00 4.91 3.69 13.78 108.00 5.55 4.30 0.00 6.00 5.55 4.30 6.36 110.00 5.55 4.30 0.00 8.00 5.55 4.30 0.00 112.00 5.55 4.30 0.00 10.00 5.55 4.30 0.00 114.00 5.55 4.30 0.00 12.00 5.55 4.30 0.00 116.00 5.55 4.30 0.00 14.00 5.55 4.30 0.00 118.00 5.55 4.30 0.00 16.00 5.55 4.30 0.00 120.00 5.55 4.30 0.00 18.00 5.55 4.30 0.00 20.00 5.55 4.30 0.00 22.00 5.55 4.30 0.00 24.00 5.55 4.30 0.00 26.00 5.55 4.30 0.00 28.00 5.55 4.30 0.00 30.00 5.55 4.30 0.00 32.00 5.55 4.30 0.00 34.00 5.55 4.30 0.00 36.00 5.55 4.30 0.00 38.00 5.55 4.30 0.00 40.00 5.55 4.30 0.00 42.00 5.55 4.30 0.00 44.00 5.55 4.30 0.00 46.00 5.55 4.30 0.00 48.00 5.55 4.30 0.00 50.00 5.55 4.30 0.00 52.00 5.55 4.30 0.00 54.00 5.55 4.30 0.00 56.00 5.55 4.30 0.00 58.00 5.55 4.30 0.00 60.00 5.55 4.30 0.00 62.00 5.55 4.30 0.00 64.00 5.55 4.30 0.00 66.00 5.55 4.30 0.00 68.00 5.55 4.30 0.00 70.00 5.55 4.30 0.00 72.00 5.55 4.30 0.00 74.00 5.55 4.30 0.00 76.00 5.55 4.30 0.00 78.00 5.55 4.30 0.00 80.00 5.55 4.30 0.00 82.00 5.55 4.30 0.00 84.00 5.55 4.30 0.00 86.00 5.55 4.30 0.00 88.00 5.55 4.30 0.00 90.00 5.55 4.30 0.00 92.00 5.55 4.30 0.00 94.00 5.55 4.30 0.00 96.00 5.55 4.30 0.00 98.00 5.55 4.30 0.00 100.00 5.55 4.30 0.00 102.00 5.55 4.30 0.00 Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 163 Summary for Subcatchment DA#2: Post-Development Pond #2 Runoff = 61.09 cfs @ 2.95 hrs, Volume= 2.392 af, Depth= 4.19" Routed to Pond BMP-2 : BMP #2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Type II 6-hr 100yr 6hr Rainfall=5.55" Area (ac) CN Description • 1.262 98 Roadway • 0.445 98 Sidewalk • 0.964 98 Buildings/Driveways 3.732 80 >75% Grass cover, Good, HSG D • 0.443 98 Amenity Impervious 6.846 88 Weighted Average 3.732 54.51% Pervious Area 3.114 45.49% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA#2: Post-Development Pond #2 Hydrograph _ ■Runoff 61.09 cfs 60_ j I i i l 557 I Eit 50 101-Oyrr-6h RainfaII#5.551" — 45= 7 7 —I - - 1 7 -- 1Rinpf1-Area=6.846 ac w• 35_- L —Rrnff Vple=2. 9f 307 Runoff Depth=4.19" 25= fi �c5.0 15_ 10- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 164 Hydrograph for Subcatchment DA#2: Post-Development Pond #2 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 5.55 4.19 0.00 2.00 0.69 0.10 1.44 106.00 5.55 4.19 0.00 4.00 4.91 3.58 3.34 108.00 5.55 4.19 0.00 6.00 5.55 4.19 1.54 110.00 5.55 4.19 0.00 8.00 5.55 4.19 0.00 112.00 5.55 4.19 0.00 10.00 5.55 4.19 0.00 114.00 5.55 4.19 0.00 12.00 5.55 4.19 0.00 116.00 5.55 4.19 0.00 14.00 5.55 4.19 0.00 118.00 5.55 4.19 0.00 16.00 5.55 4.19 0.00 120.00 5.55 4.19 0.00 18.00 5.55 4.19 0.00 20.00 5.55 4.19 0.00 22.00 5.55 4.19 0.00 24.00 5.55 4.19 0.00 26.00 5.55 4.19 0.00 28.00 5.55 4.19 0.00 30.00 5.55 4.19 0.00 32.00 5.55 4.19 0.00 34.00 5.55 4.19 0.00 36.00 5.55 4.19 0.00 38.00 5.55 4.19 0.00 40.00 5.55 4.19 0.00 42.00 5.55 4.19 0.00 44.00 5.55 4.19 0.00 46.00 5.55 4.19 0.00 48.00 5.55 4.19 0.00 50.00 5.55 4.19 0.00 52.00 5.55 4.19 0.00 54.00 5.55 4.19 0.00 56.00 5.55 4.19 0.00 58.00 5.55 4.19 0.00 60.00 5.55 4.19 0.00 62.00 5.55 4.19 0.00 64.00 5.55 4.19 0.00 66.00 5.55 4.19 0.00 68.00 5.55 4.19 0.00 70.00 5.55 4.19 0.00 72.00 5.55 4.19 0.00 74.00 5.55 4.19 0.00 76.00 5.55 4.19 0.00 78.00 5.55 4.19 0.00 80.00 5.55 4.19 0.00 82.00 5.55 4.19 0.00 84.00 5.55 4.19 0.00 86.00 5.55 4.19 0.00 88.00 5.55 4.19 0.00 90.00 5.55 4.19 0.00 92.00 5.55 4.19 0.00 94.00 5.55 4.19 0.00 96.00 5.55 4.19 0.00 98.00 5.55 4.19 0.00 100.00 5.55 4.19 0.00 102.00 5.55 4.19 0.00 Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 165 Summary for Subcatchment DA#3: Post-Development Pond #3 Runoff = 42.88 cfs @ 2.95 hrs, Volume= 1.709 af, Depth= 4.41" Routed to Pond BMP#3 : BMP #3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Type II 6-hr 100yr 6hr Rainfall=5.55" Area (ac) CN Description • 0.677 98 Roadway • 0.221 98 Sidewalk • 1.481 98 Buildings/Driveways 2.034 80 >75% Grass cover, Good, HSG D • 0.203 98 Parking • 0.035 98 Ex. Impervious 4.651 90 Weighted Average 2.034 43.73% Pervious Area 2.617 56.27% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA#3: Post-Development Pond #3 Hydrograph 48 I — ■Runoff 42.88 cfs 42 � I 40_ / - � r 38_/ 36 34/ — 4 10-010-6h Rlaihf 11 -5.55" 28 � �� 11 26_ ff Volume=1.7rlf LL 22. Runoff De =4.4 " - 20 18 161 141 H— 1 Cti469j0 12, 10 6 4 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 166 Hydrograph for Subcatchment DA#3: Post-Development Pond #3 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 5.55 4.41 0.00 2.00 0.69 0.14 1.21 106.00 5.55 4.41 0.00 4.00 4.91 3.79 2.31 108.00 5.55 4.41 0.00 6.00 5.55 4.41 1.06 110.00 5.55 4.41 0.00 8.00 5.55 4.41 0.00 112.00 5.55 4.41 0.00 10.00 5.55 4.41 0.00 114.00 5.55 4.41 0.00 12.00 5.55 4.41 0.00 116.00 5.55 4.41 0.00 14.00 5.55 4.41 0.00 118.00 5.55 4.41 0.00 16.00 5.55 4.41 0.00 120.00 5.55 4.41 0.00 18.00 5.55 4.41 0.00 20.00 5.55 4.41 0.00 22.00 5.55 4.41 0.00 24.00 5.55 4.41 0.00 26.00 5.55 4.41 0.00 28.00 5.55 4.41 0.00 30.00 5.55 4.41 0.00 32.00 5.55 4.41 0.00 34.00 5.55 4.41 0.00 36.00 5.55 4.41 0.00 38.00 5.55 4.41 0.00 40.00 5.55 4.41 0.00 42.00 5.55 4.41 0.00 44.00 5.55 4.41 0.00 46.00 5.55 4.41 0.00 48.00 5.55 4.41 0.00 50.00 5.55 4.41 0.00 52.00 5.55 4.41 0.00 54.00 5.55 4.41 0.00 56.00 5.55 4.41 0.00 58.00 5.55 4.41 0.00 60.00 5.55 4.41 0.00 62.00 5.55 4.41 0.00 64.00 5.55 4.41 0.00 66.00 5.55 4.41 0.00 68.00 5.55 4.41 0.00 70.00 5.55 4.41 0.00 72.00 5.55 4.41 0.00 74.00 5.55 4.41 0.00 76.00 5.55 4.41 0.00 78.00 5.55 4.41 0.00 80.00 5.55 4.41 0.00 82.00 5.55 4.41 0.00 84.00 5.55 4.41 0.00 86.00 5.55 4.41 0.00 88.00 5.55 4.41 0.00 90.00 5.55 4.41 0.00 92.00 5.55 4.41 0.00 94.00 5.55 4.41 0.00 96.00 5.55 4.41 0.00 98.00 5.55 4.41 0.00 100.00 5.55 4.41 0.00 102.00 5.55 4.41 0.00 Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 167 Summary for Subcatchment PRE#1: Predevelopment #1 Runoff = 126.81 cfs @ 3.24 hrs, Volume= 8.817 af, Depth= 3.78" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Type II 6-hr 100yr 6hr Rainfall=5.55" Area (ac) CN Description 28.010 84 Pasture/grassland/range, Fair, HSG D 28.010 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 29.5 Direct Entry, Subcatchment PRE#1: Predevelopment #1 Hydrograph 140 9 I ❑Runoff 126.81 cfs 120: T T T� I T 4 t— 110- 100_' 1010yWr 6htt Rlaillfall#5.55" 90 I- 1 I T H T T 1 -1 T o Area 2 W aP ffTV?1 LI 17=8 n!r1—; Runoff De th= LL 60 T T 1-r = 9.l5-ilni- 50 40_ 717 T T IT 717 T 171T TIT 7(:N661 30-/ T 1 1 20= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 168 Hydrograph for Subcatchment PRE#1: Predevelopment #1 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 5.55 3.78 0.00 2.00 0.69 0.04 1.24 106.00 5.55 3.78 0.00 4.00 4.91 3.19 22.30 108.00 5.55 3.78 0.00 6.00 5.55 3.78 6.82 110.00 5.55 3.78 0.00 8.00 5.55 3.78 0.00 112.00 5.55 3.78 0.00 10.00 5.55 3.78 0.00 114.00 5.55 3.78 0.00 12.00 5.55 3.78 0.00 116.00 5.55 3.78 0.00 14.00 5.55 3.78 0.00 118.00 5.55 3.78 0.00 16.00 5.55 3.78 0.00 120.00 5.55 3.78 0.00 18.00 5.55 3.78 0.00 20.00 5.55 3.78 0.00 22.00 5.55 3.78 0.00 24.00 5.55 3.78 0.00 26.00 5.55 3.78 0.00 28.00 5.55 3.78 0.00 30.00 5.55 3.78 0.00 32.00 5.55 3.78 0.00 34.00 5.55 3.78 0.00 36.00 5.55 3.78 0.00 38.00 5.55 3.78 0.00 40.00 5.55 3.78 0.00 42.00 5.55 3.78 0.00 44.00 5.55 3.78 0.00 46.00 5.55 3.78 0.00 48.00 5.55 3.78 0.00 50.00 5.55 3.78 0.00 52.00 5.55 3.78 0.00 54.00 5.55 3.78 0.00 56.00 5.55 3.78 0.00 58.00 5.55 3.78 0.00 60.00 5.55 3.78 0.00 62.00 5.55 3.78 0.00 64.00 5.55 3.78 0.00 66.00 5.55 3.78 0.00 68.00 5.55 3.78 0.00 70.00 5.55 3.78 0.00 72.00 5.55 3.78 0.00 74.00 5.55 3.78 0.00 76.00 5.55 3.78 0.00 78.00 5.55 3.78 0.00 80.00 5.55 3.78 0.00 82.00 5.55 3.78 0.00 84.00 5.55 3.78 0.00 86.00 5.55 3.78 0.00 88.00 5.55 3.78 0.00 90.00 5.55 3.78 0.00 92.00 5.55 3.78 0.00 94.00 5.55 3.78 0.00 96.00 5.55 3.78 0.00 98.00 5.55 3.78 0.00 100.00 5.55 3.78 0.00 102.00 5.55 3.78 0.00 Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 169 Summary for Subcatchment PRE#2: Predevelopment #2 Runoff = 29.31 cfs @ 3.27 hrs, Volume= 2.155 af, Depth= 3.78" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Type II 6-hr 100yr 6hr Rainfall=5.55" Area (ac) CN Description 6.846 84 Pasture/grassland/range, Fair, HSG D 6.846 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.9 Direct Entry, Subcatchment PRE#2: Predevelopment #2 Hydrograph ■Runoff 29.31 cfs _ T 28 1yi eil 267 T 71 T T 1 T T 1717 ir - 22T 1 OlOyrr�h -RlarhffII*-5.1551" - 20V I/ T T _L i 4nloffTAre41 j•q4§Ap - U18 I � T I LL 12 / T S I T T 11 41 1.4 10� / TIC 14 I- I I I 46 - 8- / - - — zt = , 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 170 Hydrograph for Subcatchment PRE#2: Predevelopment #2 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 5.55 3.78 0.00 2.00 0.69 0.04 0.27 106.00 5.55 3.78 0.00 4.00 4.91 3.19 5.98 108.00 5.55 3.78 0.00 6.00 5.55 3.78 1.68 110.00 5.55 3.78 0.00 8.00 5.55 3.78 0.00 112.00 5.55 3.78 0.00 10.00 5.55 3.78 0.00 114.00 5.55 3.78 0.00 12.00 5.55 3.78 0.00 116.00 5.55 3.78 0.00 14.00 5.55 3.78 0.00 118.00 5.55 3.78 0.00 16.00 5.55 3.78 0.00 120.00 5.55 3.78 0.00 18.00 5.55 3.78 0.00 20.00 5.55 3.78 0.00 22.00 5.55 3.78 0.00 24.00 5.55 3.78 0.00 26.00 5.55 3.78 0.00 28.00 5.55 3.78 0.00 30.00 5.55 3.78 0.00 32.00 5.55 3.78 0.00 34.00 5.55 3.78 0.00 36.00 5.55 3.78 0.00 38.00 5.55 3.78 0.00 40.00 5.55 3.78 0.00 42.00 5.55 3.78 0.00 44.00 5.55 3.78 0.00 46.00 5.55 3.78 0.00 48.00 5.55 3.78 0.00 50.00 5.55 3.78 0.00 52.00 5.55 3.78 0.00 54.00 5.55 3.78 0.00 56.00 5.55 3.78 0.00 58.00 5.55 3.78 0.00 60.00 5.55 3.78 0.00 62.00 5.55 3.78 0.00 64.00 5.55 3.78 0.00 66.00 5.55 3.78 0.00 68.00 5.55 3.78 0.00 70.00 5.55 3.78 0.00 72.00 5.55 3.78 0.00 74.00 5.55 3.78 0.00 76.00 5.55 3.78 0.00 78.00 5.55 3.78 0.00 80.00 5.55 3.78 0.00 82.00 5.55 3.78 0.00 84.00 5.55 3.78 0.00 86.00 5.55 3.78 0.00 88.00 5.55 3.78 0.00 90.00 5.55 3.78 0.00 92.00 5.55 3.78 0.00 94.00 5.55 3.78 0.00 96.00 5.55 3.78 0.00 98.00 5.55 3.78 0.00 100.00 5.55 3.78 0.00 102.00 5.55 3.78 0.00 Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 171 Summary for Subcatchment PRE#3: Predevelopment #3 Runoff = 119.91 cfs @ 3.27 hrs, Volume= 8.817 af, Depth= 3.78" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Type II 6-hr 100yr 6hr Rainfall=5.55" Area (ac) CN Description 28.010 84 Pasture/grassland/range, Fair, HSG D 28.010 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.9 Direct Entry, Subcatchment PRE#3: Predevelopment #3 Hydrograph -- 0 Runoff 119.91 cfs 120 I �yp = � � � 100 90 - - * - * 1010 1r-6hr Rairhfel 5-55" 80 / F utpo#f Area=2 qt ap 70 ° 60 Runoff De th=3 8" LL 50 / IT�p1.9 40 / I I dN84 30 / 20 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 172 Hydrograph for Subcatchment PRE#3: Predevelopment #3 Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 104.00 5.55 3.78 0.00 2.00 0.69 0.04 1.10 106.00 5.55 3.78 0.00 4.00 4.91 3.19 24.46 108.00 5.55 3.78 0.00 6.00 5.55 3.78 6.88 110.00 5.55 3.78 0.00 8.00 5.55 3.78 0.00 112.00 5.55 3.78 0.00 10.00 5.55 3.78 0.00 114.00 5.55 3.78 0.00 12.00 5.55 3.78 0.00 116.00 5.55 3.78 0.00 14.00 5.55 3.78 0.00 118.00 5.55 3.78 0.00 16.00 5.55 3.78 0.00 120.00 5.55 3.78 0.00 18.00 5.55 3.78 0.00 20.00 5.55 3.78 0.00 22.00 5.55 3.78 0.00 24.00 5.55 3.78 0.00 26.00 5.55 3.78 0.00 28.00 5.55 3.78 0.00 30.00 5.55 3.78 0.00 32.00 5.55 3.78 0.00 34.00 5.55 3.78 0.00 36.00 5.55 3.78 0.00 38.00 5.55 3.78 0.00 40.00 5.55 3.78 0.00 42.00 5.55 3.78 0.00 44.00 5.55 3.78 0.00 46.00 5.55 3.78 0.00 48.00 5.55 3.78 0.00 50.00 5.55 3.78 0.00 52.00 5.55 3.78 0.00 54.00 5.55 3.78 0.00 56.00 5.55 3.78 0.00 58.00 5.55 3.78 0.00 60.00 5.55 3.78 0.00 62.00 5.55 3.78 0.00 64.00 5.55 3.78 0.00 66.00 5.55 3.78 0.00 68.00 5.55 3.78 0.00 70.00 5.55 3.78 0.00 72.00 5.55 3.78 0.00 74.00 5.55 3.78 0.00 76.00 5.55 3.78 0.00 78.00 5.55 3.78 0.00 80.00 5.55 3.78 0.00 82.00 5.55 3.78 0.00 84.00 5.55 3.78 0.00 86.00 5.55 3.78 0.00 88.00 5.55 3.78 0.00 90.00 5.55 3.78 0.00 92.00 5.55 3.78 0.00 94.00 5.55 3.78 0.00 96.00 5.55 3.78 0.00 98.00 5.55 3.78 0.00 100.00 5.55 3.78 0.00 102.00 5.55 3.78 0.00 Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 173 Summary for Pond BMP#3: BMP #3 Inflow Area = 4.651 ac, 56.27% Impervious, Inflow Depth = 4.41" for 100yr 6hr event Inflow = 42.88 cfs @ 2.95 hrs, Volume= 1.709 af Outflow = 24.37 cfs @ 3.09 hrs, Volume= 1.709 af, Atten= 43%, Lag= 8.2 min Primary = 24.37 cfs @ 3.09 hrs, Volume= 1.709 af Routed to nonexistent node POST-POI#1 Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to nonexistent node POST-POI#1 Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Peak Elev= 554.43' @ 3.09 hrs Surf.Area= 12,845 sf Storage= 38,372 cf Plug-Flow detention time= 789.4 min calculated for 1.707 af(100% of inflow) Center-of-Mass det. time= 792.6 min ( 986.4 - 193.7 ) Volume Invert Avail.Storage Storage Description #1 550.00' 95,966 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 550.00 4,583 0 0 551.00 6,298 5,441 5,441 552.00 8,187 7,243 12,683 553.00 10,158 9,173 21,856 554.00 12,069 11,114 32,969 555.00 13,858 12,964 45,933 556.00 15,706 14,782 60,715 557.00 17,611 16,659 77,373 558.00 19,575 18,593 95,966 Device Routing Invert Outlet Devices #1 Primary 549.50' 24.0" Round RCP Round 24" L= 85.0' RCP, square edge headwall, Ke= 0.500 Inlet/Outlet Invert= 549.50' / 548.96' S= 0.0064 '/' Cc= 0.900 n= 0.013 Concrete sewer w/manholes & inlets, Flow Area= 3.14 sf #2 Device 1 550.00' Sand Filter Head (feet) 0.00 0.01 6.00 Disch. (cfs) 0.000 0.081 0.081 #3 Device 1 553.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 Width (feet) 2.00 2.00 #4 Device 1 554.00' 48.0" x 48.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads #5 Secondary 556.00' 10.0' long x 16.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 174 Primary OutFlow Max=23.17 cfs © 3.09 hrs HW=554.41' (Free Discharge) 4-1=RCP_Round 24" (Passes 23.17 cfs of 29.28 cfs potential flow) 2=Sand Filter (Custom Controls 0.08 cfs) 3=Custom Weir/Orifice (Orifice Controls 9.26 cfs @ 4.63 fps) 4=Riser (Weir Controls 13.83 cfs © 2.10 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=550.00' (Free Discharge) LS=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Pond BMP#3: BMP #3 Hydrograph / 1 1 1 1 1 1 1 1 1 1 1 - ■Inflow l 42.88 cfs � p��� � ■Outflow i li t v �iA►� 4.�6 1 I ■Se ondary / i 45� 1I Peak E+leV 554..43' — 401/ S o a n3 2-e 7d '17rf 2 24.37 cfs w i -(2- 25 U- 20 1 1 1 / 15 / — 10 / I I I 0.00 cfs %/%//////////////%///////////////%///////////////%///����ff������ 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 175 Pond BMP#3: BMP #3 Stage-Discharge ❑Total ' 558 ❑Primary ❑Secondary 557 / /,� Broad-Crested Rectan.ular Weir 556 ^ 555 ...d/ .2 /a�' Riser 0 554 ' �III Custom Weir/Orifice 553 % 552 551 / Sand Filter / 0 10 20 30 40 50 60 70 80 90 100 110 Discharge (cfs) Pond BMP#3: BMP #3 Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-ft) 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 Surface ❑Storage 558_ I I 1 ��� ������� 557 I ��� �� I I I 5561/ 555 -/ ��/�/ — 2 - ' II II I //' — I I o 554- , //�/ /� I 41 I > - w 553LZ I 4 I I 41 1 552: I I -I I - 5511/ 1 Custom Stage Data 550 ( , 0 10,,000 20,000 30,000 40,000 50,000 60,,000 70,000 80,000 90,000' Storage(cubic-feet) Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 176 Hydrograph for Pond BMP#3: BMP #3 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 550.00 0.00 0.00 0.00 5.00 1.37 26,231 553.41 1.83 1.83 0.00 10.00 0.00 21,568 552.97 0.08 0.08 0.00 15.00 0.00 20,110 552.83 0.08 0.08 0.00 20.00 0.00 18,652 552.67 0.08 0.08 0.00 25.00 0.00 17,194 552.52 0.08 0.08 0.00 30.00 0.00 15,736 552.36 0.08 0.08 0.00 35.00 0.00 14,278 552.19 0.08 0.08 0.00 40.00 0.00 12,820 552.02 0.08 0.08 0.00 45.00 0.00 11,362 551.84 0.08 0.08 0.00 50.00 0.00 9,904 551.65 0.08 0.08 0.00 55.00 0.00 8,446 551.45 0.08 0.08 0.00 60.00 0.00 6,988 551.24 0.08 0.08 0.00 65.00 0.00 5,530 551.01 0.08 0.08 0.00 70.00 0.00 4,072 550.78 0.08 0.08 0.00 75.00 0.00 2,614 550.52 0.08 0.08 0.00 80.00 0.00 1,156 550.24 0.08 0.08 0.00 85.00 0.00 0 550.00 0.00 0.00 0.00 90.00 0.00 0 550.00 0.00 0.00 0.00 95.00 0.00 0 550.00 0.00 0.00 0.00 100.00 0.00 0 550.00 0.00 0.00 0.00 105.00 0.00 0 550.00 0.00 0.00 0.00 110.00 0.00 0 550.00 0.00 0.00 0.00 115.00 0.00 0 550.00 0.00 0.00 0.00 120.00 0.00 0 550.00 0.00 0.00 0.00 Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 177 Stage-Discharge for Pond BMP#3: BMP #3 Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 550.00 0.00 0.00 0.00 555.20 32.45 32.45 0.00 550.10 0.08 0.08 0.00 555.30 32.83 32.83 0.00 550.20 0.08 0.08 0.00 555.40 33.21 33.21 0.00 550.30 0.08 0.08 0.00 555.50 33.58 33.58 0.00 550.40 0.08 0.08 0.00 555.60 33.95 33.95 0.00 550.50 0.08 0.08 0.00 555.70 34.31 34.31 0.00 550.60 0.08 0.08 0.00 555.80 34.67 34.67 0.00 550.70 0.08 0.08 0.00 555.90 35.03 35.03 0.00 550.80 0.08 0.08 0.00 556.00 35.38 35.38 0.00 550.90 0.08 0.08 0.00 556.10 36.58 35.73 0.85 551.00 0.08 0.08 0.00 556.20 38.47 36.07 2.40 551.10 0.08 0.08 0.00 556.30 40.84 36.42 4.42 551.20 0.08 0.08 0.00 556.40 43.57 36.74 6.83 551.30 0.08 0.08 0.00 556.50 46.60 37.05 9.55 551.40 0.08 0.08 0.00 556.60 49.91 37.36 12.55 551.50 0.08 0.08 0.00 556.70 53.30 37.67 15.64 551.60 0.08 0.08 0.00 556.80 56.86 37.97 18.89 551.70 0.08 0.08 0.00 556.90 60.77 38.27 22.50 551.80 0.08 0.08 0.00 557.00 64.87 38.57 26.30 551.90 0.08 0.08 0.00 557.10 69.26 38.86 30.40 552.00 0.08 0.08 0.00 557.20 73.86 39.15 34.70 552.10 0.08 0.08 0.00 557.30 78.58 39.45 39.13 552.20 0.08 0.08 0.00 557.40 83.47 39.73 43.73 552.30 0.08 0.08 0.00 557.50 88.43 40.02 48.41 552.40 0.08 0.08 0.00 557.60 93.53 40.31 53.23 552.50 0.08 0.08 0.00 557.70 98.88 40.59 58.29 552.60 0.08 0.08 0.00 557.80 104.38 40.87 63.51 552.70 0.08 0.08 0.00 557.90 110.03 41.15 68.88 552.80 0.08 0.08 0.00 558.00 115.81 41.43 74.39 552.90 0.08 0.08 0.00 553.00 0.08 0.08 0.00 553.10 0.29 0.29 0.00 553.20 0.67 0.67 0.00 553.30 1.16 1.16 0.00 553.40 1.74 1.74 0.00 553.50 2.40 2.40 0.00 553.60 3.13 3.13 0.00 553.70 3.92 3.92 0.00 553.80 4.77 4.77 0.00 553.90 5.67 5.67 0.00 554.00 6.63 6.63 0.00 554.10 9.09 9.09 0.00 554.20 12.78 12.78 0.00 554.30 17.31 17.31 0.00 554.40 22.51 22.51 0.00 554.50 28.30 28.30 0.00 554.60 30.07 30.07 0.00 554.70 30.48 30.48 0.00 554.80 30.88 30.88 0.00 554.90 31.28 31.28 0.00 555.00 31.68 31.68 0.00 555.10 32.06 32.06 0.00 Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 178 Stage-Area-Storage for Pond BMP#3: BMP #3 Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 550.00 4,583 0 555.20 14,228 48,741 550.10 4,755 467 555.30 14,412 50,173 550.20 4,926 951 555.40 14,597 51,624 550.30 5,097 1,452 555.50 14,782 53,093 550.40 5,269 1,970 555.60 14,967 54,580 550.50 5,441 2,506 555.70 15,152 56,086 550.60 5,612 3,059 555.80 15,336 57,610 550.70 5,784 3,628 555.90 15,521 59,153 550.80 5,955 4,215 556.00 15,706 60,715 550.90 6,126 4,819 556.10 15,897 62,295 551.00 6,298 5,441 556.20 16,087 63,894 551.10 6,487 6,080 556.30 16,277 65,512 551.20 6,676 6,738 556.40 16,468 67,149 551.30 6,865 7,415 556.50 16,659 68,806 551.40 7,054 8,111 556.60 16,849 70,481 551.50 7,243 8,826 556.70 17,040 72,175 551.60 7,431 9,559 556.80 17,230 73,889 551.70 7,620 10,312 556.90 17,420 75,621 551.80 7,809 11,083 557.00 17,611 77,373 551.90 7,998 11,874 557.10 17,807 79,144 552.00 8,187 12,683 557.20 18,004 80,934 552.10 8,384 13,512 557.30 18,200 82,745 552.20 8,581 14,360 557.40 18,397 84,575 552.30 8,778 15,228 557.50 18,593 86,424 552.40 8,975 16,115 557.60 18,789 88,293 552.50 9,173 17,023 557.70 18,986 90,182 552.60 9,370 17,950 557.80 19,182 92,090 552.70 9,567 18,897 557.90 19,379 94,018 552.80 9,764 19,863 558.00 19,575 95,966 552.90 9,961 20,850 553.00 10,158 21,856 553.10 10,349 22,881 553.20 10,540 23,925 553.30 10,731 24,989 553.40 10,922 26,072 553.50 11,114 27,173 553.60 11,305 28,294 553.70 11,496 29,434 553.80 11,687 30,593 553.90 11,878 31,772 554.00 12,069 32,969 554.10 12,248 34,185 554.20 12,427 35,419 554.30 12,606 36,670 554.40 12,785 37,940 554.50 12,964 39,227 554.60 13,142 40,532 554.70 13,321 41,856 554.80 13,500 43,197 554.90 13,679 44,556 555.00 13,858 45,933 555.10 14,043 47,328 Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 179 Summary for Pond BMP-1: BMP #1 Inflow Area = 28.009 ac, 50.36% Impervious, Inflow Depth = 4.30" for 100yr 6hr event Inflow = 254.17 cfs @ 2.95 hrs, Volume= 10.038 af Outflow = 138.41 cfs @ 3.07 hrs, Volume= 10.037 af, Atten= 46%, Lag= 7.3 min Primary = 98.29 cfs @ 3.07 hrs, Volume= 9.385 af Routed to nonexistent node POST-POI#1 Secondary = 40.12 cfs @ 3.07 hrs, Volume= 0.653 af Routed to nonexistent node POST-POI#1 Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Peak Elev= 559.84' @ 3.07 hrs Surf.Area= 51,603 sf Storage= 189,051 cf Plug-Flow detention time= 263.9 min calculated for 10.037 af(100% of inflow) Center-of-Mass det. time= 263.5 min ( 458.1 - 194.6 ) Volume Invert Avail.Storage Storage Description #1 555.50' 223,972 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 555.50 34,578 0 0 556.00 37,559 18,034 18,034 557.00 41,209 39,384 57,418 558.00 44,809 43,009 100,427 559.00 48,473 46,641 147,068 560.00 52,204 50,339 197,407 560.50 54,057 26,565 223,972 Device Routing Invert Outlet Devices #1 Primary 550.00' 36.0" Round RCP_Round 36" L= 115.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 550.00' / 548.00' S= 0.0174 '/' Cc= 0.900 n= 0.013 Concrete sewer w/manholes & inlets, Flow Area= 7.07 sf #2 Device 1 555.50' 4.0" Horiz. WQ/CP Orifice C= 0.600 Limited to weir flow at low heads #3 Device 1 557.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 0.50 Width (feet) 2.00 2.00 #4 Device 1 557.50' 48.0" x 48.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads #5 Secondary 559.00' 20.0' long x 16.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 180 Primary OutFlow Max=97.91 cfs © 3.07 hrs HW=559.78' (Free Discharge) L1=RCP Round 36" (Inlet Controls 97.91 cfs @ 13.85 fps) 2=WQ/CP Orifice (Passes < 0.87 cfs potential flow) 3=Custom Weir/Orifice (Passes < 7.81 cfs potential flow) 4=Riser (Passes < 116.24 cfs potential flow) Secondary OutFlow Max=36.40 cfs @ 3.07 hrs HW=559.78' (Free Discharge) LS=Broad-Crested Rectangular Weir(Weir Controls 36.40 cfs @ 2.34 fps) Pond BMP-1: BMP #1 /� raHydrograph / II ❑Inflow 254.17 cfs - Outflow 2801 1 + — H 14 41 H I—1 nii IAle&= .0o9 ❑0 Primary Secondary 260 1 1 1 1 1 1 I I I I Peak Elei✓=559.184I' 240/ / 220/ It H t1H H 1H 1 C ge711 1951c 200/ v 1 - 4 H11 11 1 11 14 H 1 1- 180- 138.41 cfs J 3 160r r , 1 J 98.29 cfs , H H H fi 1 H 1 rt H 1 H 1 H H r 100- P� - - 14 41 H I—1 4 14 41 4 I- H 14 80/ / 0 I 1 1 40.12 cfs40 20 ' lik ��.����� 3������AV 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 181 Pond BMP-1: BMP #1 Stage-Discharge 0 Total 0 Primary ❑Secondary 560 Broad-Crested Rectan.ular Weir �` 559 / 558 •; % Riser w / Custom Weir/Orifice 557 556 % WQ/CP Orifice 0 20 40 60 80 100 120 140 160 180 Discharge (cfs) Pond BMP-1: BMP #1 Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-ft) 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 0 Surfacel ❑Storage 560 559 /// 0558 II m W II 557 - I I I 556-' Custom Stage Data 0 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000 180,000 200,000 220,000 Storage(cubic-feet) Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 182 Hydrograph for Pond BMP-1: BMP #1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 555.50 0.00 0.00 0.00 5.00 8.22 88,245 557.73 9.58 9.58 0.00 10.00 0.00 60,830 557.08 0.69 0.69 0.00 15.00 0.00 51,311 556.85 0.49 0.49 0.00 20.00 0.00 42,875 556.64 0.45 0.45 0.00 25.00 0.00 35,156 556.45 0.41 0.41 0.00 30.00 0.00 28,166 556.27 0.37 0.37 0.00 35.00 0.00 21,919 556.10 0.33 0.33 0.00 40.00 0.00 16,426 555.96 0.28 0.28 0.00 45.00 0.00 11,701 555.83 0.24 0.24 0.00 50.00 0.00 7,759 555.72 0.20 0.20 0.00 55.00 0.00 4,633 555.63 0.14 0.14 0.00 60.00 0.00 2,681 555.58 0.08 0.08 0.00 65.00 0.00 1,705 555.55 0.04 0.04 0.00 70.00 0.00 1,146 555.53 0.03 0.03 0.00 75.00 0.00 771 555.52 0.02 0.02 0.00 80.00 0.00 518 555.51 0.01 0.01 0.00 85.00 0.00 348 555.51 0.01 0.01 0.00 90.00 0.00 234 555.51 0.01 0.01 0.00 95.00 0.00 158 555.50 0.00 0.00 0.00 100.00 0.00 106 555.50 0.00 0.00 0.00 105.00 0.00 71 555.50 0.00 0.00 0.00 110.00 0.00 48 555.50 0.00 0.00 0.00 115.00 0.00 32 555.50 0.00 0.00 0.00 120.00 0.00 22 555.50 0.00 0.00 0.00 Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 183 Stage-Discharge for Pond BMP-1: BMP #1 Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 555.50 0.00 0.00 0.00 558.10 29.51 29.51 0.00 555.55 0.04 0.04 0.00 558.15 32.75 32.75 0.00 555.60 0.11 0.11 0.00 558.20 36.11 36.11 0.00 555.65 0.16 0.16 0.00 558.25 39.58 39.58 0.00 555.70 0.19 0.19 0.00 558.30 43.16 43.16 0.00 555.75 0.21 0.21 0.00 558.35 46.85 46.85 0.00 555.80 0.23 0.23 0.00 558.40 50.64 50.64 0.00 555.85 0.25 0.25 0.00 558.45 54.54 54.54 0.00 555.90 0.27 0.27 0.00 558.50 58.53 58.53 0.00 555.95 0.28 0.28 0.00 558.55 62.62 62.62 0.00 556.00 0.30 0.30 0.00 558.60 66.80 66.80 0.00 556.05 0.31 0.31 0.00 558.65 71.07 71.07 0.00 556.10 0.33 0.33 0.00 558.70 75.44 75.44 0.00 556.15 0.34 0.34 0.00 558.75 79.89 79.89 0.00 556.20 0.35 0.35 0.00 558.80 84.42 84.42 0.00 556.25 0.36 0.36 0.00 558.85 89.04 89.04 0.00 556.30 0.38 0.38 0.00 558.90 92.59 92.59 0.00 556.35 0.39 0.39 0.00 558.95 92.90 92.90 0.00 556.40 0.40 0.40 0.00 559.00 93.21 93.21 0.00 556.45 0.41 0.41 0.00 559.05 94.12 93.52 0.60 556.50 0.42 0.42 0.00 559.10 95.52 93.83 1.69 556.55 0.43 0.43 0.00 559.15 97.25 94.14 3.11 556.60 0.44 0.44 0.00 559.20 99.24 94.44 4.79 556.65 0.45 0.45 0.00 559.25 101.46 94.75 6.71 556.70 0.46 0.46 0.00 559.30 103.90 95.05 8.84 556.75 0.47 0.47 0.00 559.35 106.52 95.36 11.16 556.80 0.48 0.48 0.00 559.40 109.32 95.66 13.66 556.85 0.49 0.49 0.00 559.45 112.27 95.96 16.30 556.90 0.50 0.50 0.00 559.50 115.36 96.27 19.09 556.95 0.51 0.51 0.00 559.55 118.59 96.57 22.03 557.00 0.51 0.51 0.00 559.60 121.96 96.87 25.10 557.05 0.60 0.60 0.00 559.65 125.31 97.16 28.14 557.10 0.74 0.74 0.00 559.70 128.74 97.46 31.27 557.15 0.92 0.92 0.00 559.75 132.25 97.76 34.49 557.20 1.13 1.13 0.00 559.80 135.83 98.05 37.78 557.25 1.37 1.37 0.00 559.85 139.69 98.35 41.34 557.30 1.64 1.64 0.00 559.90 143.64 98.64 45.00 557.35 1.93 1.93 0.00 559.95 147.69 98.94 48.75 557.40 2.24 2.24 0.00 560.00 151.83 99.23 52.60 557.45 2.56 2.56 0.00 560.05 156.17 99.52 56.65 557.50 2.91 2.91 0.00 560.10 160.61 99.81 60.80 557.55 3.79 3.79 0.00 560.15 165.15 100.10 65.05 557.60 5.10 5.10 0.00 560.20 169.80 100.39 69.41 557.65 6.71 6.71 0.00 560.25 174.47 100.68 73.79 557.70 8.55 8.55 0.00 560.30 179.23 100.96 78.26 557.75 10.61 10.61 0.00 560.35 184.07 101.25 82.82 557.80 12.84 12.84 0.00 560.40 189.00 101.54 87.46 557.85 15.25 15.25 0.00 560.45 193.92 101.82 92.10 557.90 17.82 17.82 0.00 560.50 198.92 102.11 96.82 557.95 20.54 20.54 0.00 558.00 23.40 23.40 0.00 558.05 26.39 26.39 0.00 Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 184 Stage-Area-Storage for Pond BMP-1: BMP #1 Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 555.50 34,578 0 558.10 45,175 104,926 555.55 34,876 1,736 558.15 45,359 107,190 555.60 35,174 3,488 558.20 45,542 109,462 555.65 35,472 5,254 558.25 45,725 111,744 555.70 35,770 7,035 558.30 45,908 114,035 555.75 36,069 8,831 558.35 46,091 116,335 555.80 36,367 10,642 558.40 46,275 118,644 555.85 36,665 12,467 558.45 46,458 120,962 555.90 36,963 14,308 558.50 46,641 123,290 555.95 37,261 16,164 558.55 46,824 125,626 556.00 37,559 18,034 558.60 47,007 127,972 556.05 37,741 19,917 558.65 47,191 130,327 556.10 37,924 21,808 558.70 47,374 132,691 556.15 38,106 23,709 558.75 47,557 135,065 556.20 38,289 25,619 558.80 47,740 137,447 556.25 38,472 27,538 558.85 47,923 139,839 556.30 38,654 29,466 558.90 48,107 142,239 556.35 38,837 31,403 558.95 48,290 144,649 556.40 39,019 33,350 559.00 48,473 147,068 556.45 39,202 35,305 559.05 48,660 149,497 556.50 39,384 37,270 559.10 48,846 151,934 556.55 39,566 39,244 559.15 49,033 154,381 556.60 39,749 41,227 559.20 49,219 156,837 556.65 39,931 43,219 559.25 49,406 159,303 556.70 40,114 45,220 559.30 49,592 161,778 556.75 40,297 47,230 559.35 49,779 164,262 556.80 40,479 49,249 559.40 49,965 166,756 556.85 40,662 51,278 559.45 50,152 169,259 556.90 40,844 53,316 559.50 50,339 171,771 556.95 41,027 55,362 559.55 50,525 174,293 557.00 41,209 57,418 559.60 50,712 176,824 557.05 41,389 59,483 559.65 50,898 179,364 557.10 41,569 61,557 559.70 51,085 181,913 557.15 41,749 63,640 559.75 51,271 184,472 557.20 41,929 65,732 559.80 51,458 187,041 557.25 42,109 67,833 559.85 51,644 189,618 557.30 42,289 69,943 559.90 51,831 192,205 557.35 42,469 72,062 559.95 52,017 194,801 557.40 42,649 74,190 560.00 52,204 197,407 557.45 42,829 76,327 560.05 52,389 200,022 557.50 43,009 78,473 560.10 52,575 202,646 557.55 43,189 80,628 560.15 52,760 205,279 557.60 43,369 82,792 560.20 52,945 207,922 557.65 43,549 84,965 560.25 53,131 210,574 557.70 43,729 87,147 560.30 53,316 213,235 557.75 43,909 89,338 560.35 53,501 215,905 557.80 44,089 91,537 560.40 53,686 218,585 557.85 44,269 93,746 560.45 53,872 221,274 557.90 44,449 95,964 560.50 54,057 223,972 557.95 44,629 98,191 558.00 44,809 100,427 558.05 44,992 102,672 Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 185 Summary for Pond BMP-2: BMP #2 Inflow Area = 6.846 ac, 45.49% Impervious, Inflow Depth = 4.19" for 100yr 6hr event Inflow = 61.09 cfs @ 2.95 hrs, Volume= 2.392 af Outflow = 33.25 cfs @ 3.08 hrs, Volume= 2.392 af, Atten= 46%, Lag= 7.8 min Primary = 28.56 cfs @ 3.07 hrs, Volume= 2.337 af Routed to nonexistent node POST-POI#1 Secondary = 4.71 cfs @ 3.09 hrs, Volume= 0.056 af Routed to nonexistent node POST-POI#1 Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Peak Elev= 579.33' @ 3.07 hrs Surf.Area= 14,368 sf Storage= 47,605 cf Plug-Flow detention time= 656.5 min calculated for 2.390 af(100% of inflow) Center-of-Mass det. time= 660.2 min ( 855.7 - 195.5 ) Volume Invert Avail.Storage Storage Description #1 575.00' 57,570 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 575.00 7,651 0 0 576.00 9,115 8,383 8,383 577.00 10,693 9,904 18,287 577.50 11,523 5,554 23,841 578.00 12,385 5,977 29,818 579.00 13,864 13,125 42,943 580.00 15,391 14,628 57,570 Device Routing Invert Outlet Devices #1 Primary 574.40' 24.0" Round RCP Round 24" L= 88.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 574.40' / 574.00' S= 0.0045 '/' Cc= 0.900 n= 0.013 Concrete sewer w/manholes & inlets, Flow Area= 3.14 sf #2 Device 1 575.00' Sand Filter Head (feet) 0.00 0.01 6.00 Disch. (cfs) 0.000 0.081 0.081 #3 Device 1 577.50' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 0.50 Width (feet) 3.00 3.00 #4 Device 1 578.00' 48.0" x 48.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads #5 Secondary 579.00' 10.0' long x 16.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 186 Primary OutFlow Max=28.31 cfs © 3.07 hrs HW=579.27' (Free Discharge) L1=RCP_Round 24" (Barrel Controls 28.31 cfs @ 9.01 fps) 2=Sand Filter (Passes < 0.08 cfs potential flow) 3=Custom Weir/Orifice (Passes < 9.09 cfs potential flow) 4=Riser (Passes < 75.22 cfs potential flow) Secondary OutFlow Max=4.21 cfs @ 3.09 hrs HW=579.29' (Free Discharge) LS=Broad-Crested Rectangular Weir(Weir Controls 4.21 cfs @ 1.45 fps) Pond BMP-2: BMP #2 /� Hydrograph / Inflow 61.09 cfs �Q - •outflow / y T i I bfi&��iA� -v.V46 Ia - ■Primary — ■Secondary ::t I 1 ]— 4 -1 H Peak E =57-9. 33' - 557:- 4 1 1 1 1 Storage=47AO5 cf 50 4533.25 cfs 7, 40� ' LI I— L _1 1 - 2- 228.56 cfs 25- ]— 4 - 1 - 20 15 -' z 4.71 cfs 5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 187 Pond BMP-2: BMP #2 Stage-Discharge ❑Total ❑Primary 581 �'' ❑Secondary 580 Broad-Crested Rectangular Weir 579 Riser 0 578 Custom Weir/Orifice w 577 576 Sand Filter 0 10 20 30 40 50 60 70 80 90 100 Discharge (cfs) Pond BMP-2: BMP #2 Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-ft) 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 11,000 12,000 13,000 14,000 15,000 Surface ` . ( ❑Storage 581 580:-/ i 579:-/ I I w 577� I I ///i���� II 576: J J Custom Stage Data 575 , , , , , , , , L . ./ 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 55,000 Storage(cubic-feet) Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 188 Hydrograph for Pond BMP-2: BMP #2 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 575.00 0.00 0.00 0.00 5.00 1.99 28,362 577.88 2.40 2.40 0.00 10.00 0.00 23,477 577.47 0.08 0.08 0.00 15.00 0.00 22,019 577.34 0.08 0.08 0.00 20.00 0.00 20,561 577.21 0.08 0.08 0.00 25.00 0.00 19,103 577.08 0.08 0.08 0.00 30.00 0.00 17,645 576.94 0.08 0.08 0.00 35.00 0.00 16,187 576.80 0.08 0.08 0.00 40.00 0.00 14,729 576.66 0.08 0.08 0.00 45.00 0.00 13,271 576.51 0.08 0.08 0.00 50.00 0.00 11,813 576.36 0.08 0.08 0.00 55.00 0.00 10,355 576.21 0.08 0.08 0.00 60.00 0.00 8,897 576.06 0.08 0.08 0.00 65.00 0.00 7,439 575.90 0.08 0.08 0.00 70.00 0.00 5,981 575.73 0.08 0.08 0.00 75.00 0.00 4,523 575.56 0.08 0.08 0.00 80.00 0.00 3,065 575.39 0.08 0.08 0.00 85.00 0.00 1,607 575.21 0.08 0.08 0.00 90.00 0.00 149 575.02 0.08 0.08 0.00 95.00 0.00 0 575.00 0.00 0.00 0.00 100.00 0.00 0 575.00 0.00 0.00 0.00 105.00 0.00 0 575.00 0.00 0.00 0.00 110.00 0.00 0 575.00 0.00 0.00 0.00 115.00 0.00 0 575.00 0.00 0.00 0.00 120.00 0.00 0 575.00 0.00 0.00 0.00 Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 189 Stage-Discharge for Pond BMP-2: BMP #2 Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 575.00 0.00 0.00 0.00 580.20 66.77 32.06 34.70 575.10 0.08 0.08 0.00 580.30 71.57 32.44 39.13 575.20 0.08 0.08 0.00 580.40 76.55 32.82 43.73 575.30 0.08 0.08 0.00 580.50 81.60 33.19 48.41 575.40 0.08 0.08 0.00 580.60 86.78 33.55 53.23 575.50 0.08 0.08 0.00 580.70 92.21 33.92 58.29 575.60 0.08 0.08 0.00 580.80 97.79 34.28 63.51 575.70 0.08 0.08 0.00 580.90 103.51 34.63 68.88 575.80 0.08 0.08 0.00 581.00 109.37 34.98 74.39 575.90 0.08 0.08 0.00 576.00 0.08 0.08 0.00 576.10 0.08 0.08 0.00 576.20 0.08 0.08 0.00 576.30 0.08 0.08 0.00 576.40 0.08 0.08 0.00 576.50 0.08 0.08 0.00 576.60 0.08 0.08 0.00 576.70 0.08 0.08 0.00 576.80 0.08 0.08 0.00 576.90 0.08 0.08 0.00 577.00 0.08 0.08 0.00 577.10 0.08 0.08 0.00 577.20 0.08 0.08 0.00 577.30 0.08 0.08 0.00 577.40 0.08 0.08 0.00 577.50 0.08 0.08 0.00 577.60 0.39 0.39 0.00 577.70 0.96 0.96 0.00 577.80 1.70 1.70 0.00 577.90 2.57 2.57 0.00 578.00 3.55 3.55 0.00 578.10 5.99 5.99 0.00 578.20 9.64 9.64 0.00 578.30 14.09 14.09 0.00 578.40 19.22 19.22 0.00 578.50 24.74 24.74 0.00 578.60 25.23 25.23 0.00 578.70 25.71 25.71 0.00 578.80 26.18 26.18 0.00 578.90 26.64 26.64 0.00 579.00 27.10 27.10 0.00 579.10 28.39 27.55 0.85 579.20 30.38 27.99 2.40 579.30 32.84 28.42 4.42 579.40 35.68 28.85 6.83 579.50 38.82 29.27 9.55 579.60 42.23 29.68 12.55 579.70 45.73 30.09 15.64 579.80 49.39 30.50 18.89 579.90 53.39 30.90 22.50 580.00 57.59 31.29 26.30 580.10 62.08 31.68 30.40 Detention Davis Village Type 11 6-hr 100yr 6hr Rainfall=5.55" Prepared by WK Dickson Printed 4/12/2024 HydroCAD® 10.20-4a s/n 12908 ©2023 HydroCAD Software Solutions LLC Page 190 Stage-Area-Storage for Pond BMP-2: BMP #2 Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 575.00 7,651 0 580.20 15,391 57,570 575.10 7,797 772 580.30 15,391 57,570 575.20 7,944 1,559 580.40 15,391 57,570 575.30 8,090 2,361 580.50 15,391 57,570 575.40 8,237 3,178 580.60 15,391 57,570 575.50 8,383 4,009 580.70 15,391 57,570 575.60 8,529 4,854 580.80 15,391 57,570 575.70 8,676 5,714 580.90 15,391 57,570 575.80 8,822 6,589 581.00 15,391 57,570 575.90 8,969 7,479 576.00 9,115 8,383 576.10 9,273 9,302 576.20 9,431 10,238 576.30 9,588 11,189 576.40 9,746 12,155 576.50 9,904 13,138 576.60 10,062 14,136 576.70 10,220 15,150 576.80 10,377 16,180 576.90 10,535 17,226 577.00 10,693 18,287 577.10 10,859 19,365 577.20 11,025 20,459 577.30 11,191 21,570 577.40 11,357 22,697 577.50 11,523 23,841 577.60 11,695 25,002 577.70 11,868 26,180 577.80 12,040 27,375 577.90 12,213 28,588 578.00 12,385 29,818 578.10 12,533 31,064 578.20 12,681 32,325 578.30 12,829 33,600 578.40 12,977 34,890 578.50 13,125 36,195 578.60 13,272 37,515 578.70 13,420 38,850 578.80 13,568 40,199 578.90 13,716 41,563 579.00 13,864 42,943 579.10 14,017 44,337 579.20 14,169 45,746 579.30 14,322 47,170 579.40 14,475 48,610 579.50 14,628 50,065 579.60 14,780 51,536 579.70 14,933 53,021 579.80 15,086 54,522 579.90 15,238 56,039 580.00 15,391 57,570 580.10 15,391 57,570