Loading...
HomeMy WebLinkAboutNCC241180_ESC Approval Submitted_20240417 Engineering Department Wake Forest Town Hall—3rd Floor 301 S Brooks Street TOWN of Wake Forest, NC 27587 WAKE FOREST P:919-435-9510 www.wakeforestnc.gov EROSION AND SEDIMENT CONTROL LAND DISTURBING PERMIT LETTER OF APPROVAL January 18,2024 MSD2 Wake Forest LLC ATTN: Michael Ambrosino 155 First Street Mineola, NY 11501 RE: Project Name: Holding Village-Lightbridge Academy Construction Plans Permit Number: 2024-00000135 Location: 1840465430(Unverified) Acres Approved:1.6 Submitted By: Erik Messina Date Approved: January 18,2024 Dear Michael Ambrosino: This office has reviewed the subject erosion and sedimentation control plan.We find the plan to be acceptable and hereby issue this Letter of Approval. Final signature copies shall be submitted to the Town of Wake Forest,as well as,a digital copy at least one week prior to the pre-construction meeting.The land disturbance permit will be issued at the pre-construction meeting.The land disturbance permit shall expire two(2)years from the date of issuance and can be renewed in one-year increments. Per Section 12.3.2 of the Unified Development Ordinance(UDO),a copy of the approved erosion control plan shall be on file at the job site.Also,this letter gives the notice of our right to periodically inspect the job site to ensure compliance with the approved plan as outlined in the UDO. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If,following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973,this office may require revisions to the plans and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal,State,and Local water quality laws, regulations,and rules.This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form.You are requested to file an amended form if there are any changes in the information. Please set up a pre-construction conference with all parties involved through the Engineering Department.A pre-construction meeting must be held with the Town prior to starting any work, including installation of erosion control measures,demolition,any clearing and grubbing or earth moving activities. Created with idtPlans Review Holding Village - Lightbridge Academy Construction Plans Page 1 of 2 1/18/24 Be aware that your project is subject to the NPDES General Stormwater Permit NCG01000 (Construction Activities).The Town will no longer distribute the NCG01 permit,you will have to obtain the permit from NC DEMLR.To receive a Certificate of Coverage,you must submit an electronic Notice of Intent with this approval letter.You must obtain the Certificate of Coverage prior to scheduling the pre- construction meeting.You will also need to have copies of the compliance plans sheets, (Ground Stabilization and Material Handling, and Inspection, Recordkeeping,and Reporting), if they were not included in the approved erosion and sediment control plan.The NCG01 permit require that the following documentation be kept on file at the job site: • The approved E&SC plans as well as any approved deviations • The NCG01 permit and the Certificate of Coverage • Records of inspections made during the previous 12 months Sincerely, GI9a46;t4- Jessica Watkins Engineering Technician Created with idtPlans Review Holding Village - Lightbridge Academy Construction Plans Page 2 of 2 1/18/24