HomeMy WebLinkAbout20170508 Ver 3_NC WRC No Objections_20240415From: Wilson, Travis W. To: Doliber. Brian C Subject: RE: NC DOT Ferry Summer 2024 Moratorium Relief Request Date: Tuesday, April 9, 2024 9:44:31 AM Attachments: imaoe001.ono WRC does not object to NCDOT's proposed work. Conversations with the NPS indicate they will be surveying for potential shorebird nest in the upland disposal area. If nest are found coordination will occur between NPS and NCDOT to avoid the nesting area. Travis W. Wilson Eastern DOT Habitat Conservation Coordinator Habitat Conservation Division NC Wildlife Resources Commission 1718 Hwy 56 West Creedmoor, NC 27522 New Phone: 919-707-4057 Fax: 919-528-2524 Travis.Wilson(c)ncwildlife.Orq From: Doliber, Brian C <bcdoliber@ncdot.gov> Sent: Tuesday, April 2, 2024 8:35 AM To: Wilson, Travis W. <travis.wilson@ncwildlife.org> Subject: RE: NC DOT Ferry Summer 2024 Moratorium Relief Request Forgot my attachments. From: Doliber, Brian C Sent: Tuesday, April 2, 2024 8:34 AM To: Wilson, Travis W. <travis.wilsonna ncwildlife.org> Subject: NC DOT Ferry Summer 2024 Moratorium Relief Request Good morning Travis, The NC DOT Ferry Division is requesting moratorium relief from April 8 to July 31, 2024 to perform maintenance and repair on pile clusters at the Manns Harbor Shipyard and complete maintenance dredging in the Southdock ferry basin. Moratorium relief was previously granted for the maintenance and repair of the Shipyard piles through the end of April 2024. Work on the piles is still planned for this month, but repairs to the NC DOT Dredge Manteo are expected to be completed within the next week and the shoaling in the basin at Southdock has become critical. The entrance to the basin is severely pinched and removing the material is necessary to provide safe and reliable travel from Hatteras to Ocracoke. Therefore, as soon as the dredge is ready, the NC DOT Marine Maintenance Unit plans to stop work at the Shipyard and tow the dredge to Southdock to address the shoaling. Once that work is completed there, they would return to the Shipyard and complete the piling work. While neither project would take more than a month to complete under perfect conditions the dates provided in this request would allow for the flexibility needed to account for weather, mechanical issues, changes in project schedules, and any other unforeseen circumstances. Please let me know if you have any questions. Thank you, Brian Doliber Environmental Program Supervisor/Facility Maintenance Coordinator Ferry Division 252 232 8025 mobile 252 621 6251 office bcdoliberCcDncdot.gov 159 Lucinda Lane Powells Point, NC 27966 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.