Loading...
HomeMy WebLinkAbout20170508 Ver 3_NC DMF Moratorium Response_20240415From: Harrison, James A To: Doliber. Brian C Subject: Re: NC DOT Ferry Summer 2024 Moratorium Relief Request Date: Thursday, April 11, 2024 9:06:02 AM Attachments: imaae001.Dna imaae002.Dna Outlook-Db51hazb.Dna Morning Brian, Thank you for providing those additional details. While I understand that weather, equipment, and other issues can cause further delays, having a tentative schedule that is as comprehensive and detailed as possible provides a better understanding of the work that remains and the time needed to complete the work and provides the justification for the relief. Because it is expected that work would be completed by the end of June, I'd be amenable to granting the relief through the end of June and revisiting the request in early or mid -June if it's looking like additional time is needed. Thanks Brian, and have a good weekend! Jimmy Jimmy Harrison Hahitat and Enhancement Section NC Division of Marine risheries 0ames.harrisonPdeq.nc.gov "Please note that effective 29 May 2025, my email address switched to iames.harrison@dea.nc.�ov** 25 2-9+8-3 8 5 5 (Office) 757-272-5250 (Mohile) "very Pizza can ke a Personal Pizza if you try hard enough and kelieve in yourself" Email correspondence to and from this address is subject to the North Carolina Public Records Law and may he disclosed to third parties. From: Doliber, Brian C<bcdoliber@ncdot.gov> Sent: Wednesday, April 10, 2024 18:04 To: Harrison, James A <James.Harrison@deq.nc.gov> Subject: RE: NC DOT Ferry Summer 2024 Moratorium Relief Request Good evening Jimmy, Checking back on this and also wanted to elaborate on the request as DMF authorization is the only response outstanding that I need to include with the request to the permitting agencies. I asked for that July 31 date so if there were minor changes, we wouldn't have to stop work and wait to get authorizations from every resource and permitting agency. We wouldn't be dredging that whole window, but it would allow forth at little bit of flexibility we always seem to need. That being said, I still plan to send out the actual start and end dates for dredging so everyone is kept in the loop on when actual work takes place. Hope that helps but let me know if I still need to make some revisions to this request. Thank you, Brian Doliber Environmental Program Supervisor/Facility Maintenance Coordinator Ferry Division 252 232 8025 mobile 252 621 6251 office bcdoliber(d)ncdot.gov 159 Lucinda Lane Powells Point, NC 27966 From: Doliber, Brian C Sent: Saturday, April 6, 2024 6:09 PM To: Harrison, James A <James.Harrison@deq.nc.gov> Subject: RE: NC DOT Ferry Summer 2024 Moratorium Relief Request Good afternoon Jimmy, The current plan is for the Marine Maintenance Unit to work on the piles until the week of April 16. They would then begin prepping to mobilize to Southdock for the dredging. The plan is for the dredging to begin the week of April 23 and go through the month of May. They would then demobilize and return to the Shipyard to complete the pile work in June. I asked for the end of July because sticking to an exact schedule with marine maintenance work just isn't possible. Weather influences it a lot and mechanical and/or staffing issues can also come into play semi -frequently. Please let me know if you need anything else. Thankyou, Brian From: Harrison, James A <James.Harrison Co�deq.nc.gov> Sent: Friday, April 5, 2024 7:51 AM To: Doliber, Brian C <bcdoliber @ncdot.gov> Subject: Re: NC DOT Ferry Summer 2024 Moratorium Relief Request Good morning Brian, Could you pass along an expected schedule for all of the work that needs to be done? The DMF is amenable to granting relief through the end of April for the pilings and the dredging to ensure that there wouldn't be any need to halt operations to get the schedule to me. Once I've received a schedule, I can provide better feedback on the requested relief. Thanks Brian, and have a good weekend! Jimmy Jimmy Harrison Hahitat and Enhancement Section NC Division of Marine risheries 0ames.harrison(@deq.nc.gov "Please note that effective 29 May 2025, my email address switched to iames.harrison@dea.nc.gov** 252-948-3855 (Office) 757-272-5250 (Mohile) "very Pizza can 6e a Personal Pizza if you try hard enough and kelieve in ourself" Email correspondence to and from this address is subject to the North Carolina Public Records Law and may he disclosed to third parties. From: Doliber, Brian C <bcdoliberPncdot.gov> Sent: Tuesday, April 2, 2024 08:36 To: Harrison, James A <James.Harrison C@deq.nc.goov> Subject: INC DOT Ferry Summer 2024 Moratorium Relief Request Good morning Jimmy, The INC DOT Ferry Division is requesting moratorium relief from April 8 to July 31, 2024 to perform maintenance and repair on pile clusters at the Manns Harbor Shipyard and complete maintenance dredging in the Southdock ferry basin. Moratorium relief was previously granted for the maintenance and repair of the Shipyard piles through the end of April 2024. Work on the piles is still planned for this month, but repairs to the INC DOT Dredge Manteo are expected to be completed within the next week and the shoaling in the basin at Southdock has become critical. The entrance to the basin is severely pinched and removing the material is necessary to provide safe and reliable travel from Hatteras to Ocracoke. Therefore, as soon as the dredge is ready, the INC DOT Marine Maintenance Unit plans to stop work at the Shipyard and tow the dredge to Southdock to address the shoaling. Once the work is completed there, theywould return to the Shipyard and complete the piling work. While neither project would take more than a month to complete under perfect conditions the dates provided in this request would allow for the flexibility needed to account for weather, mechanical issues, changes in project schedules, and any other unforeseen circumstances. Please let me know if you have any questions. Thank you, Brian Doliber Environmental Program Supervisor/Facility Maintenance Coordinator Ferry Division 252 232 8025 mobile 252 621 6251 office bcdoliber6d)ncdot.gov 159 Lucinda Lane Powells Point, INC 27966 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official.