Loading...
HomeMy WebLinkAboutNCC230980_NOT Closeout Documents_20240412 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall,Washington,NC 27889 (252) 946-6481 County: Martin Project: Bailey Road Subdivision Phase 2 River basin: Tar-Pamlico Person financially responsible:CHM Homes,Inc.-Matt Mallory,VP Project#: MARTI-2023-004 Address: 5000 Clayton Road,Maryville,TN 37804 1. Project Location: Bailey Rd,Williamston Pictures: No 2. Weather and soil conditions: cool,breezy,workable conditions Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? N/A Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): nobody Title: Inspection report: Sent Report Date given/sent: March 07,2024 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process Reported by: Robert Pullinger Others present: Date of inspection: February 21,2024 Time arriving on site: 2:10 PM Time leaving site: 2:30 PM cc: