Loading...
HomeMy WebLinkAbout20071993 Ver 1_CAMA Application_20071128a ~ 1- 1 9 9 3 North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor James H. Gregson, Director William G. Ross, Jr., Secretary MEMORANDUM TO: Ms. Cyndi Karoly Env. Biological Supervisor Division of Water Quality, Wetlands Unit FROM: Doug Huggett Major Permits Processing Coordinator Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 27 November 2007 SUBJECT: CAMA Application Review APPLICANT: Jeffery L. Mathis Respond to Doug Huggett Morehead City Office Qr~c~~adr~~ NOV 2 S 2007 DENR - WATER auALITY VYETtAN03 AND STtJRMWl~T6R BRANCH PROJECT LOCATION: Off SR 1769 in the Smithton Community at 78 Oland Drive in Ravenwood Estates near the Town of Belhaven adjacent a man made canal offPungo Creek in Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes to excavate a new 21' x 50' highground boat basin, construct a 14' x 16' boat ramp and an 8' wide x 100' long dock. Please indicate below your position or viewpoint on the proposed project and return this form by 18 December 2007. Please contact Steve Trowell at 252-948-3854, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signed Date 943 Washingtan Square Mall, Washington, North Carolina 27889 Phone: 252-94ti~481 1 FAX: 252-948-0478 1 Interr~t: www.na~astalmanagement.net! N"o`~s ,Cazolina watura!!y An Equal Opportunity 1 Atfinnative Action Employer - 50°~ Recycled 110% Post Consumer Paper DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: Jeffery L. Mathis 2. LOCATION OF PROJECT SITE: Off SR 1769 in the Smithton Community at 78 Oland Drive in Ravenwood Estates near the Town of Belhaven adjacent a man made canal off Pungo Creek in Beaufort County, North Carolina. Photo Index-2006: 118-8803; X-6 2000: 116-1467; R-13; 1995: 116-1265; J-9 State Plane Coordinates - X: 2,697,100 Y: 649,000 Pantego Quad. (lower right corner) 3. INVESTIGATION TYPE: CAMA/Dredge and Fill 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 5/24/07 Was Applicant Present -Yes 5. PROCESSING PROCEDURE: Application Received - 11/9/07 Office -Washington 6. SITE DESCRIPTION: (A) Local Land Use Plan -Beaufort County Land Classification From LUP -Community (uplands), Conservation (Canal) (B) AEC(s) Involved: EW,PTA, CS (D) Water Dependent: YES (D) Intended Use: Private (E) Wastewater Treatment: Existing -Septic Planned - N/A (F) Type of Structures: Existing -House, boathouse, storage building, bulkhead Planned - Excavation of a 21' x 50' boat basin, construction of an 8' x 100' dock and a 14' wide x 16' long boat ramp. (G) Estimated Annual Rate of Erosion: none 7 HABITAT DESCRIPTION: [AREA] DREDGED I~ LI.EI~ X13 (A) Vegetated Wetlands 600 ftz (Shaded) (B) Non-Vegetated Wetlands 416 ft~ 224 ftz (Boat canal bottom Ram ) (C) Other 1,050 ft~ 11,200 ft~ Uplands (D) Total Area Dishirbed: ±.31 acre or +13,490 ftz (E) Primary Nursery Area: No (F) Water Classification: SC NSW Open: NO 8. PROJECT SUMMARY: The applicant proposes to excavate a new 21' x 50' highground boat basin, construct a 14' x 16' boat ramp and an 8' wide x 100' long dock. Jeffery L. Mathis Beaufort County Project Setting The project site is located off SR 1769 at 78 Oland Drive on lot 5 of the Ravenwood Harbour Estates subdivision in the Smithton Community situated on a man made canal system off Pungo Creek in Beaufort County near Belhaven, North Carolina. This canal system is located below the HWY 99 bridge on the north side of Pungo Creek. The site is a developed 1.14 acre highground residential lot vegetated mainly with upland grasses and various scattered hardwood trees. The lot is bordered on two sides, the east and south side, by man made canals. The canal on the east side of the property is approximately 75' wide and connects directly to Pungo Creek while the canal on the south side is a lateral off the aforementioned canal and is approximately 40' wide. Water depths in the larger canal are between 5.5' to 7.4' and 3' to 4' in the lateral canal. The lot has approximately 170' of shoreline along the main canal stabilized with riprap. The shoreline along the lateral canal is stabilized with +280' of wood bulkhead. There is a covered 15' x 35'boat basin perpendicular off the lateral canal. On either side of the covered basin is a roofed area over grass, a simple extension of the roof that covers the basin. Beside the boat basin and shelter is an open sided roofed picnic shelter and a pump house. The lot contains one single-family residence with associated guest house/storage building. The Beaufort County Health Department has turned down any additional septic preventing further subdivision of the property. Pungo Creek is classified as SC NSW by the Environmental Management Commission and as Coastal Waters by the Division of Marine Fisheries. Project Description The applicant proposes to improve boat access and mooring on this single-family lot by excavating a 21' wide x 50' long boat basin off the lateral canal, constructing a 8' wide x 100' long dock along the main canal and a 14' wide x 16' long boat ramp on the main canal. Excavation of the boat basin will occur at he corner of highground created at the confluence of the main and lateral canals. The basin will be excavated to a connecting depth of minus 5' below the normal water level (NWL). The resultant spoil is to be placed a minimum of 30' landward of the canals and spread in an area 80' wide x 140' long once dry. Three mooring piles are to be spaced evenly aligned with the existing/remaining bulkhead in the lateral canal. These piling will provide spring piles for the 21' wide x 50' slip. The new cut is to be stabilized with 70' of new bulkhead. This bulkhead will tie into the existing. An S' wide x 100' long pile supported wooden dock is proposed along the main canal. Approximately 6' of this dock will extend over the canal/NWL. A 14' wide x 16' long boat ramp is proposed in the main canal near the northeast corner of the property. The bank is to be excavated to create the slope. Either side of the cut is to be stabilized with a wooden wall. A concrete pad will then be pushed into place. Anticipated Impacts There will be some localized short-term turbidity during the excavation, dock and bulkhead construction activities. The project will increase the available number of permanent mooring available on this lot to as many as 6 - 25' long vessels. Approximately 12,000 ft2 of uplands will be filled and graded. If the project is completed as proposed, it will result in an increase in the number of vessels mooring in the local canal system and their associated impacts. Steve Trowell -Washington Regional Office - 20 November 2007 NARRATIVE Applicant: Jeffrey L. Mathis Project Location: 78 Oland Drive Ravenwood Estates Belhaven, North Cazolina Waterbodv: Man-made Canal off Pungo Creek Length of Shoreline: 473.29' Submer eg_d Aquatic Vegetation: None present within the project azea. PNA: No Water Classification: SC (Aquatic Life, Secondary Recreational, Salt) NSW (Nutrient Sensitive Waters) A. Proposal: The project includes the excavation of a boat basin, bulkheading, storage and grading of excavated dredge spoil, construction of a 100' dock paralleling the main canal, and the excavation of a boat ramp: 1) Boat Basin Excavation of a 50'L x 21'W x 5'D single slip boat basin, with 71' of bulkhead, a five foot return wall, and three mooring pilings to be placed in approximate alignment with the bulkhead to be removed. Removal of material will be accomplished mechanically using a backhoe. Spoil will be temporarily stored in a high ground location a minimum of 30' landwazd of normal water level (NWL). Shallow bottom excavation will extend approximately five feet waterwazd of the existing bulkhead to a connecting depth of 5' below NWL. High Ground Excavation Average depth of proposed basin: 5' below NWL Height of existing land above NWL: 1.66' above NWL 6.66' =excavation below existing grade Area of excavation: 50'x 21' =1O50sf Total: 1050sf g 6.66' = 6993cf _ 27 = 259cy 259cy High Ground (HG) Spoil Shallow Bottom Excavation fdredei Area along side canal: 50'x 5' = 250sf Area along main canal: 26'x 5' = 130sf Area along NE comer of basin: 6'x 6' = 36sf 416sf Average depth to be excavated: 1'below NWL Total: 416sf g 1' = 416cf _ 27 =15.4cy 15.4cy Shallow Bottom (SB) Dredge Spoil 2) Dock A 100'x 8' wooded dock is proposed along the main canal, paralleling the shoreline. The dock will begin at the edge of the proposed boat basin and extend 100' in a northeasterly direction over an existing riprap shoreline. The dock will extend and average of 5' and a maximum of 6' over water at any point along its alignment. Shading of Shallow Bottom (Estuarine and Public Trust Water) 100'x 5' = SOOsf Total: 500sf SB Shading Shading of High Ground and Associated Disturbance 100'x 3' = 300sf Total: 300sf HG Shading 3) Boat Ramp Positioned approximately 20' from the Drost property will be a 14'wide boat ramp that will extend approximately 16.66' waterward of normal water level (NWL). Sidewalls and returns will be installed to prevent erosion. The return wall adjacent to the Drost property will be approximately 15' from the riparian property line. The ramp will be a 24.5' L x 14' W x 6"D reinforced concrete slab, poured on high ground and pushed into place with a backhoe. The ramp will be a total of 14' W x 24.5' L, of that approximately 16.66' will extend below NWL upon completion. High Ground Excavation Average depth of ramp at NWL: Height of existing land above NWL: 1.83' below NWL 1.66' above NWL 3.49' (3.5') excavation below existing grade at NWL Ave. depth: 3.5'= 2 (sloped grade) =1.75' Area to be excavated above NWL: 14'x 15.33' = 214.63sf Total: 241.63sf z 1.75' = 375.6cf _ 27 =13.91cy (round up) 14cy High Ground Spoil 2 Shallow Bottom Excavation (Dyed ina) Area of excavation: 14'W x 9.16'L =128.24sf Average depth to be excavated: 1.17'below NWL Total: 128.24sf a 1.17' =150.04cf _ 27 = S.SScy S.SScy Shallow Bottom (SB) Dredge Spoil 4) High Ground Grading and Fill High ground disturbance will be associated with the placement of spoil on site and the construction of a new bulkhead. Spoil generated from excavation and dredging activities will be stored on site in a 50'x 50' area, a minimum of 30' landward of NWL. A silt fence will be placed azound the retention area while drying to prevent siltation of the adjacent canal. Approximately 294cy of spoil will be placed within the retention area to a height of approximately 3.2'. Most of the spoil material to be excavated will be dry and will be placed around the perimeter of the retention area to create a protective berm. High Ground Fill from Spoil: 140'z 80' =11,200sf Once dry the dirt spoil will be graded on site within an area approximately 140'x 80', as noted on the enclosed plans. A slight vaziation of the placement may occur. A slit fence will be placed between fill areas and the water. Additional high ground disturbance anticipated with this development will be in conjunction with the construction of the new bulkhead around the boat basin, and the side and return walls at the boat ramp. Disturbance anticipated will extend approximately 20' landwazd of the bulkhead and return walls. All fill and graded areas are to be vegetated and stabilized immediately. High Ground Disturbance and Backfill Associated with the Construction of the Bulkhead: 91'z 20' =1,820sf High Ground Disturbance and Backfill Associated with the Construction of the Side Walls and Return Walls at the Boat Ramp: 15.33'z 2 =30.66' a 20' 613sf B. AI1tICIDated Impacts: High Ground Excavation: Boat basin =1,OSOsf with 259cy of spoil Boat ramp = 241.63sf with 14cv of spoil Total area of Impact =1,291.63sf Total amt. of spoil = 273cy 3 Shallow Bottom Excavation: Boat basin = 416sf with 15.4cy of spoil Boat ramp =128.24sf with S.SScy of spoil Total area of Impact = 544.24sf Total amt. of spoil = 21cy (rounded up) High Ground Fill: 11,200sf High Ground Grading at Basin and Boat Ramp: 2,433sf 4 ~errr-~ ~~uc~nON»r Mayor Development Permit pa.t revts~d ~?J27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 7. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) None Applicant 1: First Name MI Last Name Jeffrey L Mathis ApplipM 2: First Name MI Last Name tf additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box City State 3705 Greenville NC ZIP Country Phone No. FAX No. 27835 US 252 - 714 -1809 ext. 252 - 758 - 9210 Street Address (tf different from above) City State Zlp 16 Pond Lane Grimesland NC 27837- Email i jeffreymathis@embargmail.com I 2. AgenbContracfor Information Business Name N/A AgenU Contractor 1: First Name MI Last Name AgenU Contractor 2: First Name MI Last Name Mailing Address PO Box City State ZIP Phone No. 1 - - ext. Phone No. 2 - - ext. FAX No. Contractor # Street Address (~f different from above) City State ZIP Email <Form continues on back> Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Beaufort 78 Oland Drive Subdivision Name City State Zip Ravenwood Belhaven NC 27810 - Phone No. Lot No.(s) (~f many, attach additional page with List) - - ext. 5, , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Tar-Pamlico Man-made canal off Pungo Creek c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ^Natural ®Manmade ^Unknown Pungo River e. Is proposed work within aty limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or aty limit the proposed ^Yes ®No work falls within. N/A 4. Site Description a. Total length of shoreline on the trail (ft.) b. Size of entire trail (sq.ft.) 437' 49,964sf c. Size of individual lot(s) d. Approximate elevation of trail above NHW (normal high water) or same as b., NWL (normal waterleveq (If many lot sizes, please attach additional page with a list) 3.5' ^NHW or ®NWL e. Vegetation on trail Domestic. grasses and trees including, but not limited to, american holly, live olk, weeping willow, fig, cedar, and pine f. Man-made features and uses now on trail House, storage building, shed, pumphouse, boathouse, bulkheadand, and riprap g. Identify and describe the existing land uses adiacent to the proposed project site. residential h. How does local government zone the trail? i. Is the proposed project consistent with the applicable zoning? N/A (Attach zoning compliance certificate, 'rf applicable) ^Yes ®No ^NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ^Yes ®No k. Has a professional archaeological assessment been done for the trail? If yes, attach a copy. ^Yes ®No ^NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ^Yes ®No ^NA National Register listed or eligible property? <Form continues on next page> Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ^Yes ®No (ii) Are there rroastal wetlands on the site? ^Yes ®No Cii) If yes to either (i) or (ii) above, has a deNneation been conducted? ®Yes ^No (Attach documentation, if availeb/e) n. Describe existing wastewater treatment facilities. Septic o. Describe existing drinking water supply source. Public water supply p. Describe existing storm water management or treatment systems. None 5. Activities and Impacts a. Will the project be for commeraal, public, or private use? ^Commercial ^Public/Govemment ®Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. Private recreational vessels will be moored on site for the private use of family and friends c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. All excavation will be accomplished by using a backhoe. A wooden bulkhead and dock system will be installed by washing in pilings and sheathing with a pump. d. List all development activities you propose. 1) Excavation of a 50'Lx 21' W single slip boat basin with three exterior pilings. Excavation will extend approximately 5' waterward of the proposed basin to a connecting depth of 5' below NWL. 2) A 100'x 8' dock will be constructed, paralleling the main canal with a maximum of six over water. 3) Excavation and construction of a boat ramp. 4) Minor repairs to the existing bulkhead. e. Are the proposed activities maintenance of an existing project, new work, or both? Both f. What is the approximate total disturbed land area resuRing from the proposed project? 14,893 ®Sq.Ft or ^Acres g. Will the proposed project encroach on any public easement, public accessway or other area ^Yes ®No ^NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. surface runoff i. Will wastewater or stormwater be discharged into a wetland? ^Yes ®No ^NA If yes, will this discharged water be of the same salinity as the receiving wateR ^Yes ^No ®NA j. Is there any mitigation proposed? ^Yes ®No ^NA If yes, attach a mitigation proposal. <Form continues on back> Forth DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additionallntormation In addition to this completed application torn, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) - (t) am always applkable to any majordevelopment applkation. Please consult the application Instruction booklet on how to properly prepare the n3quired items bebw. a. A projed narrative. b. An axurate, dated work plat (including plan view and cross-seaional drawings) drawn to scale. Please give the pn3sent status of the proposed projed. Is any portion already complete? If previously authorized work, dearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is suffiaentty detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application ony) or other instrument under which the applicant claims title to the affeded properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit commerrts on the proposed projed to the Division of Coastal Management. Name Donald 8 Debra Drost Phone No. 336-921-4463 Address 649 Triple Cove Drive, Wilkesboro, NC 28697 Name James & Rita Hoggard Phone No. Address 302 South King Street, Windsor, NC 27983 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project trad. Include permit numbers, permittee, and issuing dates. CAMA Minor Permit Exemption h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projeds in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), 'rf necessary. If the projed involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that 1 am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating inforrnation related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application ~ truthful to the best of my knowledge. Date ,,~~ ~'- ?~ ? Print Name tS Signature Please indicate application attachments pertaining to ®DCM MP-2 F~rcavation and Fill Information ^DCM MP-3 Upland Development ®DCM MP-4 Structures Information red project. ^DCM MP-5 Bridges and Culverts Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please indude all supplemerrtal information. Describe below the purpose of proposed excavation and/or fiN activities. All values should be given in feet. Access Other Channel NLW Canal Boat Basin Boat Ramp Rock Groin Rock (excluding ( or Breakwater shoreline NWL stabilization Length 82' 50' 9.16' Width 5.OT 21' 14' Avg. Existing ~ Depth 4 1.66' Ave. 1.1 T NA NA Final Project ' Depth 5 S' Ave. 2.83' NA NA 7. EXCAVATION ^This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. 21cy c. (i) Does the area to be excavated include coastal wetlands/marsh d. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ^CW ^SAV ^SB ^WL ®None (ii) Describe the purpose of the excavation in these areas: Boat Ramp and Boat Basin silt and muck High-ground excavation in cubic yards. 259cy 2. DISPOSAL OF EXCAVATED MATERIAL ^This section not applicable a. Location of disposal area. b. Dimensions of disposal area. On site c. (i) Do you cairn title to disposal area? ®Yes ^No ^NA (ii) If no, attach a letter granting permission from the owner 50'x 50' retention area w/ a 140'x 80' fill area upon drying d. (i) Will a disposal area be available for future maintenance? ®Yes ^No ^NA (ii) If yes, where? Same location e. (i) Does the disposal area incude any coastalwetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ^CW ^SAV ^SB ^WL ®None (iq Describe the purpose of disposal in these areas: f. (i) Does the disposal include any area in the water'? ^Yes ®No ^NA (ii) If yes, how much water area is affected? 3. SHORELINE STABILIZATION ^This section not applicable (If development is a wood groin, use MP-4 -Structures) a. Type of shoreline stabilization: ®Bulkhead ^Riprap ^Breakwater/Sill ®Other: o. Average distance watervvard of NHW or NWL: 0' e. Type of stabilization material: Wood b. Length: Width: d. Maximum distance waterward of NHW or NWL: 0' f. (i) Has there been shoreline erosion during preceding 12 months? ^Yes ®No ^NA (ii) If yes, state amount of erosion and source of erosion amount information. g. Number of square feet of fill to be placed below water level. h. Type of fill material. Bulkhead backfill 0 Riprap dry dredge spoil BreakwatedSill Other i. Source of fill material. N/A 4. OTHER F1LL ACTIVITIES ^This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ®Yes ^No ^NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, (ii) Amount of material to be placed in the water None (iii) Dimensions of fill area (iv) Purpose of fill submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (V11L)? If any boxes are checked, provide the number of square feet affected. ^C1N ^SAV ^SB ^WL None (ii) Describe the purpose of the fill in these areas: Dredge spoil will be placed on high ground and graded on site 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? badchoe, or hydraulic dredge)? Silt fence and revegetation upon completion Badchoe c. (i) Will navigational aids be required as a resuR of the project? d. {i) Will wetlands be crossed in transporting equipment to project ^Yes ®No ^NA site? ^Yes ®No ^NA (ii) If yes, explain what type and how they will be implemented. (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. Date Applicant ame Appli nt net Project Name Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please inGude all supplemental information. 7. DOCKING FACIUTY/MAR/NA CHARACTERISTICS ^This section not applicable a. (i) Is the docking facitity/marina: ^Commeroisl ^PublicJGovemment ®Private/Community c, (i) Dock(s) and/or pier(s) (ii) Number 1 (iii) Length 100' (iv) Width 8' (v) Floating ^Yes ®No e. (i) Are Platforms included? ^Yes ®No If yes: (ii) Number (iii) Length (iv) Width (v) Floating ^Yes ^No Note: Roofed areas era calculated from dripline dimensions. g. (i) Number of slips proposed 3 total (ii) Number of slips existing 2. i. Check the proposed type of siting: ® Land cut and access channel ®Open water; dredging for basin and/or channel ®Open water, no dredging required ^Other, please describe: k- Typical boat length: 30' to 40' m. (i) Will the facility have tie pilings? ®Yes ^No (ii) If yes number of tie pilings? 3 free standing at boat basin and 7 to ten at dock b. (i) Will the facility be open to the general public? ^Yes ^No d. (i) Are Finger Piers incuded? Yes ®No If yes: (ii) Number (iii) length (iV) Width (v) Floating ^Yes ^No f. (i) Are Boatlifts included? ^Yes ®No If yes: (ii) Number (iii) Length (Iv) Width h. Check all the types of services to be provided. ^ Full service, including travel lift and/or rail, repair or maintenance service ^ Dockage, fuel, and marine supplies ® Dockage (',vet slips") only, number of slips: 3 ^ Dry storage; number of boats: ® Boat ramp(s); number of boat ramps: 1 ^ Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Mix I. (i) Will the facil~~'tyy be open to the general public? ^Yes ®No 2. DOCKING FACILJTY/MAR/NA OPERATIONS p This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ^ Office Toilets ^ Toilets for patrons; Number. ;Location: Residence on site with existing facilities ^ Showers ^ Boatholding tank pumpout; Give type and location: None b. Describe treatment type and disposal location for all sanitary wastewater. Septic for residence and vessel will be taken pumpout facility as needed c. Describe the disposal of solid waste, fish offal and trash. off site removal to an approved landfill d. How will overboard discharge of sewage from boats be controlled? Owner will monitor. No on site discharge will be permitted e. (i) Give the location and number of "No Sewage Discharge' signs proposed. N/A Private residential use (ii) Give the location and number of "Pumpout Available" signs proposed. N/A Private residential use f. Describe the spedal design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. None to be conducted on site g. Where will residue from vessel maintenance be disposed of? None to be conducted on site h• Give the number of channel markers and "No Wake" signs proposed. None i. Give the location offuel-handling faclities, and describe the safety measures planned to protect area water quality. None j. What will be the marina policy on overnight and live-aboard dodcage7 N/A Private residential use only k. Describe design measures that promote boat basin flushing? Basin to be dredge to a connecting depth in the adjacent canals I. If this project is an expansion of an existing marina, what types of services are currently provided? N/A Private residential use only m. Is the marina/dodcing faality proposed within a primary or secondary nursery area? ^Yes ®No n. Is the marina/docking faclity proposed within or adjacent to any shellfish harvesting area? ^Yes ®No o. Is the marina/dodking facility proposed within or adjacent to coastal wetiands/marsh (CU1Q, submerged aquatic vegetation (SAV), shell bottom {St3), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ^CW ^SAV ^SB ^WL ®None p. Is the proposed marina/dodcing facility located within or within close proximity to any shellfish leases? ^Yes ®No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ®This section not applicable a. {i) Is the boathouse structure(s): ^Commercal ^PublicJGovemment ^Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, efc. !f a rock gran, use MP-2, Excavation and Fill.) ®This section not applicable a• (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a• Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ^This section notapplicab/e a, is the struaure~sy. ^Commercal ^PublicJGovemment ®Private/Community c• Distance to be placed beyond shoreline 21' along side of slip and in line with the old bulkhead alignment Note: This should be measured from marsh edge, if present. e. Arc of the swing WA 7. GENERAL b• Number 3 d. Description of buoy (color, inscription, size, anchor, etc.) WA a. Proximity of structure(s) to adjacent riparian property lines 15' to the Drost property to the NE and over 200' to the 1io99ard property Note: For buoy or mooring piling, use erc of swing induding length of vessel. c. Width of water body 73' to 75' along main canal and 38' at side canal b. Proximity of structure(s) to adjacent docking facilities. over 50' d. Water depth at watennrard end of structure at NLW or NWL 5' below NWL e. (i) WII navigational aids be required as a result of the project? pYes ®No ^NA (ii) If yes, explain what type and how they will be implemented. 8. OTHER ^This section not applicable a. Give complete description: //- 9 -c~ ? Date Project N e ~~ ~ Cpl' nt a /~~,/ 2~'i~k ~ /~AZ~L,J.s Applicant Signature Y4 S .,~, «a ~F S ~i ~. s ~~ t y~ 4 ~`S `~~ T ~' ' F~ ~~~~ ;,. ~.~.~ .~ ~~, ~.~. ~~ .. _fl._ ~, . i ttt ~; t P` t ~ i ? i `:'a -. -...,.. . ,._,_..... ~~ _.. ~ ~ ~ w ~ ~ ," ~ ~ ~ ~ ~~° , ! i 1 ~ j~ { ~ S j f C b t y~J, _:i ~ ,~ 4' . , A '^ ~ ,l j ~ ~ nxe.+.. « w.W..~ ,...~ ,~.~ ,~, I t 4 ' ~ ~ ~~ ......_ ~ ~.... b~ - - ,_.,~_..,.,.._..,_.a ..~ ~~ .., .,~,. ~...,.~ ._.. _.. ...M _ . ,...~.. ~ ~ ....:~. ~ _ . , ~,.....__..,,,.~ .,, .. ~ .....__._~ _.~_a--,_.__ _,,_....,. ~s K .. . . .. ! f _''~t .. q.... 3 y f`, n ~ 9 o .e'r bE' i•r I i ~ Jy r J ~~~ ', Google Maps ~: ~~, 3~~~~ Page 1 of 1 Save trees. Co green! Download Google Maps for mobile Text maps to 466453 - r~ -- ~. West ~ .,, ;~ ~Q~ r~ ~~ w~~~~s go awaF~rr ° ~ ~. I ~ p ~~~k~f~HarnwnLure ~~ ~. ,- , ~~ vir Ir~i , ' ~~ .~.~ - p ; Lna~enater ~ f, ~ ~~ ;"-,'', t-o .OcSa C ~eston i8 ' ~ c~':~ - 17 ~ ,8aIK5urp ' ~Stsurrton~ ~ s"'' ~ r.~` t~t ,3, Cn~rlo8eav+Ila' ~ ' ! ..~ . `::Waynesbcro ~ ' t r... may, fiQ _ '*~' ~cti ten ~''~.~ ~ J. a. ~E~, ,~ RIC mh and '~ ,~ ~ Sri ~+~° r '; ,,' . ; . ' LynChG'urg ~ ,~3 ''~, a i~ , ~ VI Iftl2Chesteriie~ hBS:rF Salem ..~ =ciea o ,~~. y~ ~ = SlackeDurg ~~'"p _~ ~Ho~evr~l ' ; ~ ..h ~Rearard ~~ Roanoke ~ •~ ~ Aetertifi~rg ~ -~~'r~, ,;1 ~~amaevrg ~'~. it ~~~; ~CAns~ansbi g ~~ New o ~. ~i51 ~,w~ le ~ .,~ ~_ N~LY9 i `1~!irginiat ~ ~~ n ~,. u ~ 3 ~eaeh. nor«s'~ xf '~aa~3.x~ ', 'larhnsvillet? cs ,~, , ~ '~ ~ ^ ai lip ~, ~ ~': '~+` ~ Darvi(la youth"Hi( gosnoke v ~ =a ~Athicv _ ._ f~~' _ _ ~ ~,~Chesapeake 'r"' _ Elizatielh ~ ~'~~' ~~ pRerdsWlie ~ ~~~. ~ "'~ Rro.~ P G~}': ,~ ~ ~. ~ ~,i'~en~derwn ' 0 3 ~~ '~'~ ~_ ~' s ,,,~ite6iiSbOf6 ` ~ (~ ,,:~ Rocky `~~e~t~~ AfbFni3u" ~ ~ a ` ~ C~..re :Durham yt.. Mount ~ o ~ s~~rd ~~ High Porn ±~' ..Chapel Hdka -~ , ~ '~~,d ~~ ~ N . ~-,~r:. ~, L'~ri mn~ Rele~gh $+4 :' ~a-rba~~• Aary ~` 9 Nrrrtl~ ~ ~~s~ ''x'~,+ SNi[san ~"` ` 5tatesviE~e ~e ~ A ~ ~` c ra on Gr~enua~e' .~ `~Carollr~a 4' ~r a ~ ~, tiannaporis ~ ~ ~' '~ ~~ `' Wmterevi7le r~ Nlaeliragton `~ ast6a710 ~ t"~'C?COnCOrd - ¢anford ~ -3C -1~{3oldeboro ""~ .~~ ~a~t ~~ '~ ~ 2~U ; ~~ ~ =~ ~ ~ ~ Saun i1~ '1 -~ , 9flnetnn ~levrBern ,,:„~, ~e `" Charlotte FayettevilE2' ~ `~ ~ y. ~.~ . ,t ,,~ ~~ ~ ~ ~ lAor~,roa ,~. ,~ _ on ~ '~~~~, t '' ~ ._ Rock I^hll, -.-._ _.. _ ,Laurmburg ~ ~ ~ ~ ~leve(odrLr Nav~po~i ~ ~ v ... ~a, ;•ie Kara.. Lumbart~n ~~y hte r~ a ~ Island ~l~~.d~>t- I ~ h t vita P '~ '~'-~ z .. z 'r ;3 ,~ ~ r Y~ , '~ a u ~ ~ ~ ~V1rErtrih~ f~ o~, ~~ ~• ~ ~ ~ 00 '~'"' ?: a icy 3 ,L' a e 1E1ybE8~`~ SOiktTl ~~ _ ~~rJaxl~and ~ o aa~h'~~ ~{~ ~ ~ '' t,,' _R''' _ l~tyr•ie '~ti ,.w"x'~"u+ r ~T.,7'a 1 „ ~ Y~M~ ~'`' OrargaG Tg ~ ~~ u~i' " Geor etc~m . ~~ }jet ~ ~~~~',~a ~ 1 ','r _r s c c f-- 'k. . irei .. x . ~a ~ ss x . s~~ ,- ~.- + / r# d ~~m IIeJ , r ~ tt ,F ~ ~ t € ~, r ,,-,~ ~~.~"~ , ~ '~ 'n~r.esio~ , ~ ~~ ~ '. 1 ~ Ik ,; ,. ~~~~-~~ Vii, ~ ~ ' Cha~'eston ~ ` '~ ;~ :, J~F M~ nt~ s V1G l Al ! 1'!/ Nl -~t~~ s IMAGE (d F 3 f _....._..... .. ...,......, ......,.,.,.... .... .. . p jj $ t ., :. (} f 4 3 r' f { Y t E ~ .~-° r 4 ~`°i fff ~) A~`,~;~~ t~ • Google Maps Page 1 of 1 Save trees. Go green! -~ ~~J~ Download Google Maps fnr mobile i° ~ k ~ ~ Teat maps to 466453 e~ 1 ~ !! ~ ~ ~''U-z.. ~~..~~-~ Zr3.14 ~` ~~ ~ Afligatas { ~ ~- ,~~ ~ ~ .Like r ' i t Ainatawn r' I ` 2&~ ,~ < 4t. _ Pantegn w- i - ", ¢ e f Y g;~ nand ~ '~ `~ - ~ +14'ashlrsgtor~ ~. - , ~ ~~ q~,.: - ~~" fa~r~ r~xrv`k ~ - $2 _ . ~~ -'-~; ~Belhawn ~~ tf -. a. .~7 "~ ~ G7B~064 U i ~r '$ath,~ +' ~ '~'" ~`~~ ~ ~~ ; ~ t t ~ - '.. ~~ ~ s~~~, ~. ~r '` _.. - ., ,r `{ Swan usrter ~' r BeN~Bay 9 F. ' < 3- ~ ~ = ~.,_ -~"„` . ~ ~ ,~ > ,n;~t.~ "` ' r i7oep Bay ~ ~ ~ 5 r,, ~ ~ , Cteek °~- ~~ r. ' Edward F.`'~~`~~ "°"' j ~ rE` ~-- :.. „. I~•ancebc~n _,4urata .- ,aa Lhend ~~ }~~, ~ 'y,, ~~~ e i 1„r, .,C;~. _rnut Hobuakerr ~ _ 4 ~~ ~ ~ ~, - t i fURitS',~dy ,..t~'~~al ~-. ~.~ 4s+~+•13 ~ •f~ r w •. ~ ~ t 17 ranCe'nere pct r ~~t .,.t. '`~• s~ ~' »~~ '~ "' s ~ ~` N ~ ~ w° ~ 8uv Rrvar a S~~t1 ''vv `~ 3.+ ~a sr~ 4,''~~k'M,~ ) ~ ~''~..~ A j~} Gra ,hsb•aro r:.. Ba fboF~ ,s, ~-° ~ ,,.~: _ H;> ~ ~,, "''S'9' ''~ .rte ~ ~ 1 r ~ t ~ 't man f tai ~ ~cra~ ~ ~ ~- ~r FY _ - ~d5rritt ~ `~ '~ ~y.' •C ~ `RK ~~'2 ~ s :: r~~ i ~ ' ~ ,, , ,~ e ,~ ti '`I w,~'PI s- Ri ^ ~"'s vs"Zr,, Sr nv~~# o+ri~~ ~' +'~ ~~ r i ~ t .ti.. r.racsF~ee . Gar w~ o~ k- ' ~~~ sd .,~, i,.~ '>~ x. tr- d Pgay',(Sjanc i"JES ~, c ,~ . ~ ~~ ~ ~ ~' ~~..~~.r ~ ~. _~~.~ ~ ~ i.lr rla A$7Y1 r ~~. 1 i , ° ~ n ~ ®2007 oogle - Maprata~ • ' 78 ~~~ G~2. s,an7 Y~Gf~ ~~ Nl ~}f~S 1Ar9-C~E Z.r~3 Google Maps ~~< w ~Y f ~s`~ `'~~ ~Pa~~~.ksae~xRd ~. ~. :.,~ -n~ t;4i .~~, W~y v ~ ~a.}~ ~ N:~ p i1 biz %'? <y '}`~„\. ~~t e, ~, ~_w _......... ~° to fl ~ ~a ~~ ~ a ~;l i ei, s s d - ~ ~- ~' '~ ~ ti~ ,: . ;; ~~ ~,~ , ~~ ~` ~.. > 99fr~~°~ ~~'Rd. /~ ~: Q~S ~`, 6elhave~ /"s ~ ~. - ~_ ~~ `~ s ~~r - sr ,.~ `',~'. ~? .~. ~ ,. fo erg- ~ ~ i~ ~ ~ ,`~ ,~,~ _ ~ i . r~o. as t. .~ .t1oP c? _ ~ ~~ .~ I , _... ._. s 4,, R~ ~( ~ t,,; ~ "~ICEItEV ~' c-T 7 S~Ct1~4 ~.~~-arntq `~~ ti R C ~ ~~F~ P_ ' ~~ ~ry - 9~ ~ .. - ...~ ~~ . ,av r- ~,~~ .,, ,~ , ,k$;- . r~~4 ~ , ~ ,' t., ~~i '~~~ ®2007 Goo I - M ~~20~~ N`~1~ rEQT'" T 7Fa ~k~ l~r~. h, ~~ v~v /I~G 9? ~ ~~~ ;, - erm.~ of Use ~ h.~c~T. ~~ M~Tths Page 1 of 1 Save trees. Go green! Download Google Maps for mobile TeM maps to 466453 1~IG tU t~ Nj ~~S '> a~3 ~3 E 3 a u c w O V It N n 1 ~ ! ° ' N i o 1 I 3 I ~ r, 9 _ r M I ¢ n° _ i1J o f v 0 I I 1 I I I NORTH CAROLINA MARTIN COUNTY Cec.l O. Smdh and Fred W. Smr:h,x _ _.. l 1 i~De'E rot OT ~ c¢nal 1 .. ' Door, ~ 3a' 12500" =r•3k lY5,00' or~yrc !;c^.00' t iron .ron rron 24,3°75y, ti. I 23, 955 sR. ft' { 23, 593 sq ft 1 2d, 781 sp.ft. N! l I s N ~ > ~ O O ~ I O t Aubrey Wayne Grbbs,eertdy that WidK my 6rrectAn and wpervrsanthK map w¢f drawn trom an octuol t.eld qnd wrvey; thatthc error of closure as calculates by lat.tudes aM departures 6 xro.000;th¢t Ws moo was prepares m accordance wdh G. S.47-30 as ¢mended. W.incss my hand ¢nd seoi the IS lh. d¢y at June,±977. Srgnes _-= -- N C L.censetl Surveyor No L-1252 Subscrr6ed ¢nd sworn to belorc me thrs i5th.doy o! June 1977 Notary Publrc_- -- My commas.on rzRrrei 2.7-1981 o ^i a = m_ s1 ~1 .t ~ 1 ? ~ 131.33 131 ~~~ , r1. 1 1 ' ' . N79=20'E S10'SO£ w ___t79=20 E•_~ 26'R/W X00' v+ 123.55 1 11 O 1 O A C<c r1 O Smrtn ona Free W. Smrth Jr 4 N otr rron p.pe at alt corners - SECTION 5 aii areas by tl.m-d RAVENW000_NARBOR ESTATES Property o/ t9~~ ~ DAY OF _ - flLED ~ ---~ CECIL O. SM11TN ana FRED W. 5Ml H. Jr. Ponteyo Townsh.D- Beaufort County, N.C. _ IN AND is are 1- r 50' PLAT CABINET _. ~ SLIDE/ _P Sbneyea 5-21-•977 )flkk I. MORCAN. PEGISIFR DF OEEOS BEAUFORT ~.. WASNIN6TON, ti. C o. 5O• 100' Iso' f / i LL _ .. Scele n feel ' Sun eyed by A¢Drcy Wayne GADS • PO.l3ox 871 Wd!.¢mstogNG 27892 b n' _~ ;! a m ~~~~ ~~~ N ~ N I~ ~T p _~ 'G ~J J RY ~ _ ~t 2~ a N , :~ ~~ ~~,v 4 j{ ~~ hY~~ ~uiJdc,.~ ~. v~' ~7 ~: ~~' = ~~ x - ul~.~ ~r~{: o;; - ~xi~ra~ ~;E ~1- '~' ~~'"~~ ~ ~~ ~- Id~~ .~i2o(~~ I~~r~tP~ ~, X~ X~` ~- x x __I~~~}~~t+ ii~tl }~~ - x ~'+ ~~ r, X ~~. .q" a `_ - u 4a NA ~ ~i IAQ,t~ Y ~ E`/l•rall?~ ~`L..~ ~I`~•. `. 1 ~' ---r~ ,ter ,,r_______~ X i _. _ ~ / r- . ,; ~ _.Lt,_ ~ ~tiL ~ ~ f ~I ~~ VY OL ~ ~- h ~~ t~5~' i 1 v?- i ~ ~ 1 ( ~ ~~' -- _~__~_ ______n ~_,____-~~ _ ~- .ew!~~' '~:..._. ~ ~i ~ ~~I.~I~ ~~ ~~~~ il-------^--~-1~ ~~ ,~,t~fiUG ~t~,i 1____~ ¢' f a ~~' ~~ I G7~ ~~ i~ .~' f ~,L . ~'. ~ ~' " ~ ~:~ ., ~~ %. J', , J z ~~1 ~~ ± ~a ~ ~--. .. ~7' 13~ ` ~. \; x4-9 ~~~ 1~ '~p0,t Q, ~yK~ r> t7FZlCt~li.(v t--- c~ ~~,~M ~~~?? x~ ~f ~X1~f(~1Ga '- ~u~~r1~-r~ ~~r~r~-~ ~r~~ I~~~C t_i ~ ~~ f~1. ~TIT~ .~~-~f~-coo -1'c~rrl ~ ~ r~o~' - c~a~ ~tT~ , ~1C ~ .~~ : 4 ~{~ `~~ d~ ti 0 .._ vy ~XI~?~l~<o ~~ = th~~ ~Q~.INI' ~ ICI L