HomeMy WebLinkAbout20071181 Ver 1_Information Letter_20071017,.a STAR' u
,..vm w.
Mtu
~~ pNM ~~
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY
GOVERNOR
October 12, 2007
Mr. John Hennessy
NC Division of Water Quality
401 Wetlands Certification Unit
1650 Mail Service Center
Raleigh, NC 27699-1650
LYNDO TIPPETT
SECRETARY
~ ~~ 1./ ;'
~,
OCT 1 7 2007
~IANQ~S AtVD TQRMIN~ ~ SRANCH
o ~. ~ c ~ I
SUBJECT: WQC No. 3704 request for T.I.P. No. B-4246, Randolph County.
REFERENCE: NW 23/33 permit application, dated June 28, 2007
Dear Mr. Hennessy:
The following was submitted in an October 12, 2007 email. This letter serves to officially
request the information stated in the following email.
A July 3, 2007 permit application was made by the NCDOT for Section 404 Nationwide permits
23 & 33. Since all general conditions are being adhered to, no written concurrence from the
DWQ was requested. However, the USACE issued a GP 31, necessitating written concurrence
for a Section 401 WQC No. 3704.
Per your phone conversation with Elizabeth Lusk, please process NCDOT's permit application
for this project for a WQC No. 3704 from the DWQ (debit for a Minor Water Quality
Certification from WBS Element #33589.1.1). All actions proposed in the July application are
still valid.
This project has a let date of February 19, 2008, with a review date of January 2, 2007.
MAILING ADDRESS:
NC DEPARTMENT OF TRANSPORTATION TELEPHONE: 919-715-1500
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS FAX: 919-715-1501
1598 MAIL SERVICE CENTER WEBSITE: WWW.NCDOT.ORG
RALEIGH NC 27699-1598
LOCATION:
2728 CAPITAL BLVD., SUITE 240
RALEIGH NC 27604
Thanks for your assistance with this. Please contact Greg Price at 715-5533 if any more
information. is needed.
Sincere
~.
Gregory .Thorpe, Ph.D
Environmental Management Director, PDEA
Cc: Mr. Travis Wilson, NCWRC
Mr. Gary Jordan, USFWS
Dr. David Chang, P.E., Hydraulics
Mr. Mark Staley, Roadside Environmental
Mr. Greg Perfetti, P.E., Structure Design
Mr. Victor Barbour, P.E., Project Services Unit
Mr. Tim Johnson, P.E., Division 8 Engineer
Mr. Art King, Division 8 Environmental Officer
Mr. Jay Bennett, P.E., Roadway Design,
Mr. Majed Alghandour, P.E., Programming and TIP
Mr. Art McMillan, P.E., Highway Design
Mr. Scott McLendon, USAGE
Mr. Wade Kirby, PDEA Project Planning Engineer
2