Loading...
HomeMy WebLinkAboutCredit Release Task 2final -PickleCreekII.docxn Q; r: I In ')A1r:qW)n PAPA Ar:AQ QAPr) r)qFq1PPr:rrA,1 ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director NORTH CAROLINA Environmental Quality April 3, 2024 Environmental Banc & Exchange, LLC DWR Project #: 2021-0348v3 Attn: Jamey Mceachran Wayne County (via electronic mail: jmceachrangres.us Re: RES Pickle Creek Phase 11 Nutrient Offset Banking Instrument (NOBI) Pickle Creek Phase H Bank Parcel Credit Release — Task 2 (final) Dear Ms. Mceachran, On September 7, 2023, the Division of Water Resources (DWR) issued a partial credit release (10%) for partial completion of the Task 2 milestone with the remaining 10% issued upon fully implementing the riparian restoration efforts within the Miscanthus area. All documentation was required to be included in the As -Built Report. On February 20, 2024, DVVR received documentation from Environmental Banc & Exchange, LLC (EBX) that the remaining areas of Pickle Creek Phase II site had been planted and constructed in its entirety and a monitoring plot had been installed. On February 29, 2024, staff with DVv`R, with assistance from staff with EBX, inspected the site and confirmed that the subject site had been adequately planted in most areas, monitoring plots were installed and the conservation easement boundary for the site was adequately marked. On March 25, 2024, DWR received an As -Built Report for the subject site, which included documentation regarding the efforts completed within the Miscanthus areas of the site. Lastly, DVvTR received a continuation certificate for performance bond (#9409216) issued to EBX from Fidelity and Deposit Company of Maryland, in the amount of $150,000, to cover performance obligations for the construction of the subject site. The term of this bond ends August 30, 2024. In accordance with the NOBI, signed on August 12, 2022, the following Project Milestones have beenfully met and the corresponding credits shall be released: Task/Milestones Credit 2) All riparian site earthwork, planting and installation of monitoring devices 10% Completed for both the Pickle Creek Full Delivery site and the Bank Parcel, Easement boundaries adequately marked, & all applicable permits obtained. A site visit performed by DVvR is required for this task (final) By copy of this correspondence, DWR confirms that you have fully satisfied the above requirements for the above -referenced tract and the following credits are released: 0 10% of the Nitrogen nutrient offset credits (0. 10 x 23,172.844 lb-N = 2,317.284 lb-N) North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1611 Mail Service Center I Raleigh, North Carolina 27699-1611 919.707.9000 4NORT�HCA�RCLINA� DocuSign Envelope ID: 2A3E33DO-BABA-4EA8-94BD-D3531BBEFFA4 Pickle Phase 11 Site EBX April 3, 2024 Please note that nutrient offset credits generated at this site must be used for impacts in HUC 03020201 of the Neuse River Basin excluding the Falls Lake Watershed pursuant to 15A NCAC 02B .0703, which became effective on April 1, 2020. Please feel free to call Katie Merritt, with DVVR, at (919) 707-3637 if you have any questions regarding this correspondence. Sincerely, Cc: DVVR File Copy (Blake Hartshorn) Amy Staley - EBX (via electronic mail) DocuSigned by, 28. Stephanie Goss, Supervisor 401 & Buffer Permitting Branch Page 2 of 2