PRELIMINARY JURISDICTIONAL DETERMINATION FORM
BACKGROUND INFORMATION
A. REPORT COMPLETION DATE FOR PRELIMINARY JURISDICTIONAL
DETERMINATION (JD): November 5, 2014
B. NAME AND ADDRESS OF PERSON REQUESTING PRELIMINARY JD:
SEPI Engineering & Construction Attn: Chris Flowers
1025 Wade Ave, Raleigh, NC 27605
C. DISTRICT OFFICE, FILE NAME, AND NUMBER:
CESAW-RG-R, 4813 Roger Rd./Wake Forest/Wake County, SAW -2014-02037
D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION:
4813 Rogers Road in Wake Forest, North Carolina
(USE THE ATTACHED TABLE TO DOCUMENT MULTIPLE WATERBODIES AT DIFFERENT
SITES)
State: NC
County/parish/borough: Wake
City: Rolesville
Center coordinates of site (lat/long in degree decimal format):
Lat. 35.929116 °N; Long. -78.471013
Universal Transverse Mercator: 17
Name of nearest waterbody: Sanford Creek
°W.
Identify (estimate) amount of waters in the review area:
Non -wetland waters:
3128 linear feet: 5 width (ft) and/or acres.
Coward in Class: Riverine, Upper Perennial, Streambed AND Riverine, Intermittent, Streambed
Stream Flow: discrete and confined
Wetlands: 0.04 acres.
Cowardln Class: Palustrine Forested
Name of any water bodies on the site that have been identified as Section 10
waters:
Tidal: NA
Non -Tidal: NA
E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT
APPLY):
❑ Office (Desk) Determination. Date:
✓❑ Field Determination. Date(s): September 12, 2014
SUPPORTING DATA. Data reviewed for preliminary JD
(check all that apply - checked items should be included in case file and,
where checked and requested, appropriately reference sources below):
✓❑ Maps, plans, plots or plat submitted by or on behalf of the
applicant/consultant: Chris Flowers, SEPI Engineering
❑✓ Data sheets prepared/submitted by or on behalf of the
appli ant/consultant.
Office concurs with data sheets/delineation report.
❑ Office does not concur with data sheets/delineation report.
❑ Data sheets prepared by the Corps:
❑ Corps navigable waters' study:
❑ U.S. Geological Survey Hydrologic Atlas:
❑ USGS NHD data
❑ USGS 8 and 12 digit HUC maps
❑✓ U.S. Geological Survey map(s). Cite scale & quad name:
❑✓ USDA Natural Resources Conservation Service Soil Survey.
Citation: Wake County Soil Survey
❑ National wetlands inventory map(s). Cite name:
❑ State/Local wetland inventory map(s):
❑ FEMA/FIRM maps:
❑ 100 -year Floodplain Elevation is:
(National Geodectic Vertical Datum of 1929)
❑✓ Photographs: ❑✓ Aerial (Name & Date):
Other (Name & Date): site photos by SEPI March 12, 2014
❑ Previous determination(s). File no. and date of response letter:
❑ Other information (please specify):
2
or
1. The Corps of Engineers believes that there may be jurisdictional waters of the
United States on the subject site, and the permit applicant or other affected party
who requested this preliminary JD is hereby advised of his or her option to
request and obtain an approved jurisdictional determination (JD) for that site.
Nevertheless, the permit applicant or other person who requested this
preliminary JD has declined to exercise the option to obtain an approved JD in
this instance and at this time.
2. In any circumstance where a permit applicant obtains an individual permit, or
a Nationwide General Permit (NWP) or other general permit verification requiring
"pre -construction notification" (PCN), or requests verification for a non -reporting
NWP or other general permit, and the permit applicant has not requested an
approved JD for the activity, the permit applicant is hereby made aware of the
following: (1) the permit applicant has elected to seek a permit authorization
based on a preliminary JD, which does not make an official determination of
jurisdictional waters; (2) that the applicant has the option to request an approved
JD before accepting the terms and conditions of the permit authorization, and
that basing a permit authorization on an approved JD could possibly result in less
compensatory mitigation being required or different special conditions; (3) that
the applicant has the right to request an individual permit rather than accepting
the terms and conditions of the NWP or other general permit authorization; (4)
that the applicant can accept a permit authorization and thereby agree to comply
with all the terms and conditions of that permit, including whatever mitigation
requirements the Corps has determined to be necessary; (5) that undertaking
any activity in reliance upon the subject permit authorization without requesting
an approved JD constitutes the applicant's acceptance of the use of the
preliminary JD, but that either form of JD will be processed as soon as is
practicable; (6) accepting a permit authorization (e.g., signing a proffered
individual permit) or undertaking any activity in reliance on any form of Corps
permit authorization based on a preliminary JD constitutes agreement that all
wetlands and other water bodies on the site affected in any way by that activity
are jurisdictional waters of the United States, and precludes any challenge to
such jurisdiction in any administrative or judicial compliance or enforcement
action, or in any administrative appeal or in any Federal court; and (7) whether
the applicant elects to use either an approved JD or a preliminary JD, that JD
will be processed as soon as is practicable. Further, an approved JD, a proffered
individual permit (and all terms and conditions contained therein), or individual
permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331,
and that in any administrative appeal, jurisdictional issues can be raised (see 33
C.F.R. 331.5(a)(2)). If, during that administrative appeal, it becomes necessary
to make an official determination whether CWA jurisdiction exists over a site, or
to provide an official delineation of jurisdictional waters on the site, the Corps will
provide an approved JD to accomplish that result, as soon as is practicable.
This preliminary JD finds that there "maybe" waters of the United States on the
subject project site, and identifies all aquatic features on the site that could be
affected by the proposed activity, based on the following information:
IMPORTANT NOTE: The information recorded on this form has not
necessarily been verified by the Corps and should not be relied upon for
later jurisdictional determinations.
Si afure a date of
Regulatory roject Manager
(REQUIRED)
4
Signature and date of
person requesting preliminary JD
(REQUIRED, unless obtaining
the signature is impracticable)
SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision.
Additional information may be found at http:/hvuNy.usace.army.mil/Missions/CivilWorks/Regulato!-JProgramandPei-mits.aspx or
Corps regulations at 33 CFR Part 331.
A: INITIAL PROFFERED PERMIT: You may accept or object to the permit.
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all
rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the
permit.
• OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request
that the permit be modified accordingly. You must complete Section II of this form and return the form to the district
engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will
forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your
objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your
objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After
evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in
Section B below.
B: PROFFERED PERMIT: You may accept or appeal the permit
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all
rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the
permit.
• APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein,
you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of
this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days
of the date of this notice.
C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by
completing Section II of this form and sending the form to the division engineer. This form must be received by the division
engineer within 60 days of the date of this notice.
D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new
information.
• ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the
date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD.
• APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers
Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form
must be received by the division engineer within 60 days of the date of this notice.
NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND
REQUEST FOR APPEAL
Applicant: SEPI Engineering and Construction
Chris Flowers
File Number: SAW -2014-02037
Date: November 5, 2014
Attached is:
See Section below
[—]I
INITIAL PROFFERED PERMIT (Standard Permit or Letter ofpermission)
A
F-11
PROFFERED PERMIT (Standard Permit or Letter ofpermission)
B
❑
PERMIT DENIAL
C
❑
APPROVED JURISDICTIONAL DETERMINATION
D
®
PRELIMINARY JURISDICTIONAL DETERMINATION
E
SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision.
Additional information may be found at http:/hvuNy.usace.army.mil/Missions/CivilWorks/Regulato!-JProgramandPei-mits.aspx or
Corps regulations at 33 CFR Part 331.
A: INITIAL PROFFERED PERMIT: You may accept or object to the permit.
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all
rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the
permit.
• OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request
that the permit be modified accordingly. You must complete Section II of this form and return the form to the district
engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will
forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your
objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your
objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After
evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in
Section B below.
B: PROFFERED PERMIT: You may accept or appeal the permit
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all
rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the
permit.
• APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein,
you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of
this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days
of the date of this notice.
C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by
completing Section II of this form and sending the form to the division engineer. This form must be received by the division
engineer within 60 days of the date of this notice.
D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new
information.
• ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the
date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD.
• APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers
Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form
must be received by the division engineer within 60 days of the date of this notice.
E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the
preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed),
by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the
Corps to reevaluate the JD.
SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT
REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial
proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or
objections are addressed in the administrative record.)
ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the
record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to
clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record.
However, you may provide additional information to clarify the location of information that is already in the administrative
record.
POINT OF CONTACT FOR QUESTIONS OR INFO
If you have questions regarding this decision and/or the
appeal process you may contact:
District Engineer, Wilmington Regulatory Division
Raleigh Regulatory Field Office
Attn: James Lastinger, Regulatory Specialist
3331 Heritage Trade Dr., suite 105
Wake Forest, NC 27587
919-554-4884 ext 32
MATION:
If you only have questions regarding the appeal process you may
also contact:
Mr. Jason Steele, Administrative Appeal Review Officer
CESAD-PDO
U.S. Army Corps of Engineers, South Atlantic Division
60 Forsyth Street, Room 10M 15
Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government
consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day
notice of any site investigation, and will have the opportunitX to participate in all site investigations.
Date: I Telephone number:
of appellant or
For appeals on Initial Proffered Permits send this form to:
District Engineer, Wilmington Regulatory Division, Attn: James Lastinger, 69 Darlington Avenue, Wilmington,
North Carolina 28403
For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to:
Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele,
Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
L
Y
a)
N O i U1
Y Y ra
(O C U L
0 O .�
O > u
W m m
_ O
Oa)00
M a-1 N
W
J
co
co
Z)
E Q
O io go m
t- W W Y
m co m U
0 QQ
Y W W Z
co w w
W
N Ln cl�
0LU
o
i
� H H Z)
a
L W
N O W W Z
o -L' Z Z_ cc
W J it cc W
C C > > ;�;
w 1� N
m m m
u N N cr
M c0 v m
N Ql Ql oo N
Dl I- -i Ol r-
00
00 O N Ql O
L0 O 00 1l O
d I- 110 L0 I�
00 't lz� Itt
r�' n � n 00 00 00 00 00
LD LD 1, n N
1- LD N 00 O
ct 1.0 N Cn �t
1- O 00 00 O
N m N N m
0) 01 al 0) Ol
Lf) Lf) Ln LO Lf)
m m m m m
Qj
a
v
U
-1 -E
_0 O
Q C O
> 0 Q O] m
*NOTE: This map is intended for informational purposes only and
does not constitute a certified survey of the area or provide the
required jurisdictional determination.
.�'4 ;
Wim',. F .. �.:♦:.:.:•, - � 4,
-44
•-0 14.:
AN
Streams
Wetlands-
Pond-
F] • •■ - -StreamBuffer
%ox