HomeMy WebLinkAboutNCC200493_NOT Closeout Documents_20240411 -PEx
/ P 1873 WATER RESOURCES
V
1�y'C ADO
April 10, 2024
Toll Brothers of North Carolina II, Inc.
Ted Pease
250 Gibraltar Road
Horsham, PA 19044
Re: Certificate of Completion
Project Name: Cedar Crossing
Project Location: 433 New Hill Olive Chapel Road
Project Number: 18-038
Submitted By: Jones & Cnossen Engineering
Submitted Date: May 1, 2019
Completion Date: April 10, 2024
THIS IS TO CERTIFY that on the above referenced project the grading has been completed,
temporary S&E measures have been removed, and permanent ground cover sufficient to
restrain erosion has been established as outlined on the approved S&E Plan and in accordance
with the Town of Apex S&E ordinance.
Permanent ground cover sufficient to restrain erosion has been established. No additional self-
monitoring or self-inspections are required. Project is in compliance and released under the
SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction
Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The
NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this
correspondence must be uploaded as part of completing the NOT process.
The owner of the site will be responsible for regular erosion control maintenance after this
release to the developer.
James Misciagno, CES, CPESC
Stormwater Field Services Supervisor
Town of Apex Stormwater Engineering
TOWN OF APEX
The Peak of Good Living
PO Box 25o Apex, NC 27502 I (919) 362-8166 I www.apexnc.org