Loading...
HomeMy WebLinkAboutNCC200493_NOT Closeout Documents_20240411 -PEx / P 1873 WATER RESOURCES V 1�y'C ADO April 10, 2024 Toll Brothers of North Carolina II, Inc. Ted Pease 250 Gibraltar Road Horsham, PA 19044 Re: Certificate of Completion Project Name: Cedar Crossing Project Location: 433 New Hill Olive Chapel Road Project Number: 18-038 Submitted By: Jones & Cnossen Engineering Submitted Date: May 1, 2019 Completion Date: April 10, 2024 THIS IS TO CERTIFY that on the above referenced project the grading has been completed, temporary S&E measures have been removed, and permanent ground cover sufficient to restrain erosion has been established as outlined on the approved S&E Plan and in accordance with the Town of Apex S&E ordinance. Permanent ground cover sufficient to restrain erosion has been established. No additional self- monitoring or self-inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. The owner of the site will be responsible for regular erosion control maintenance after this release to the developer. James Misciagno, CES, CPESC Stormwater Field Services Supervisor Town of Apex Stormwater Engineering TOWN OF APEX The Peak of Good Living PO Box 25o Apex, NC 27502 I (919) 362-8166 I www.apexnc.org