Loading...
HomeMy WebLinkAboutWQ0045164_Application (FTSE)_20240325State of North Carolina Department of Environmental Quality DWR Division of Water Resources �•�� IT 4 TRACK SEWER SYSTEM EXTENSION APPLICATION Dlvlslon of Water Resources FTA 10-23 & SUPPORTING DOCUMENTATION r, Gi:0:ial (; ff I Application Number: l'/O 01 51(tag be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: I. Applicant's name: Sheetz, Inc (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ® Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ❑ Municipal ❑ Other 3. Signature authority's name: Brian Dinges per l5A NCAC 02T .0106(b� r Title: Vice President 5 4. Applicant's mailing address: 5700 6" Avenue r ln City: Altoona State: PA Zip: 16602- �h 5. Applicant's contact information: rr T c? pp Phone number: (919) 264-8593 Email Address: bdowns a,sheetz.com u�a r'O ti f� 11. PROJECT INFORMATION: 1. Project name: Sanford Sheetz Center Church Rd. fi 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Pert-nit/Project ❑ ARPA funded If a modification, provide the existing permit number: WQ00 and issued date:. , For modifications, also attach a detailed narrative description as described in Item G of the checklist. If new construction, but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Lee Countv 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.4365" Longitude;-79.2196' 5. Parcel ID (if applicable): 9631-433-6709-00; 9631-43-6903-00; 9631-43-3781-00 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Oliver Kaiia License Number: 055420 Firm: Bohler Engineering, NC PLLC Mailing address: 4130 Parklake Ave, Suite 200 City: Raleigh State: NC Zip: 27612-4462 Phone number: (219) 578-9000 Email Address: okaija(cDbohlereng com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Big Buffalo Creek WWTP Permit Number: NCO024147 Owner Name: City of Sanford V. RECEIVING DOWNSTREAM SEWER INFORMATION: 1. Permit Number(s): WQ 2. Downstream (Receiving) Sewer Information: 8 inch _, : Gravity F.' Force Main 3. System Wide Collection System Permit Number(s) (if applicable): WQCS0047 FORM: FTA 10-23 Page I of 5 State of North Carolina Department of Environmental Quality DW. R Division of Water Resources MAPFA TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 10-23 & SUPPORTING DOCUMENTATION Owner Name(s). City of Sanford FORM: FTA 10-23 Page 2 of 5 VI. GENERAL REQUIREMENTS I. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? El Yes ❑No ®N'A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑ No ® N/A 3. If the Applicant is a HomelProperty Owners' Association, has an HOA.'POA Operational Agreement (FORM: HOA) and supplementary documentation as required by 15A NCAC 02T.0115(c) been attached? ❑ Yes [—]No ® NIA 4. Origin of wastewater: (check all that apply): ❑ Residential (Individually Owned) ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential (Leased) ® Retail with food preparationisery ice ❑ Hotel and/or Motels ❑ School!" preschool.," day care ❑ Medical l dental.-` veterinary facilities ❑ Swimming Pool/Clubhouse ® Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices?" factories ❑ Nursing Home ® Other (Explain in Attachment) 5. Nature of wastewater: % Domestic 100 % Commercial % Industrial (See 15A NCAC 02T _0103(20)) If Industrial, is there a Pretreatment Program in effect? ❑ Yes❑ No 6. Has a flow reduction been approved under 1 ANNCAC 02TO 1 14(f? El Yes ®No ➢ If yes, provide a copy of flow reduction approval letter with this application 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow e.b No. of Units Flow Other - Sheetz Gas Station 2,000 gal/day 1 2,000 GPD gall GPD gall GPD gall GPD gall GPD gall GAD Total GPD a See I5A NCAC 02T .01 14(b), (d), (e, 1) and (e)(2) for caveats to wastewater design flow rates (i.e. proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in C.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01 14] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 2,000 GPD (per 15A NCAC 02T .01 14 and C, ._143-2I5 ) ➢ Do not include future flows or previously pennitted allocations If permitted flow is zero, please indicate why: ❑ Pump Station?Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line. Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow. ❑ Flow has already been allocated in Permit Number: Issuance Date: ❑ Rehabilitation or replacement of existing sewers with no new flow expected ❑ Other (Explain): FORM: FTA 10-23 Page 3 of 5 VI1. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): I. Summarize gravity sewer to be permitted: ➢ Section II & 111 of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC Vill. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump StationslForce Mains): PROVIDE A SEPARATE COPY OF THIS PAGE FOR k?ACH PUMP STATION INCLUDED IN THIS PROJECT I. Pump station number or name: Sanford Sheetz Center Church Rd 2. Approximate Coordinates (Decimal Degrees): Latitude: 35.4365' Longitude:-79.2196° 3. Total number of pumps at the pump station 3. Design flow of the pump station: 0.020 millions gallons per day (firm capacity) ➢ This should reflect the total GPM for the pump station with the largest pump out of service. 4. Operational point(s) per pump(s): 14 gallons per minute (GPM) at 31 feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 1.25 403 PVC If any portion of the force main is less than 4-inches in diameter, please identify the method of solids reduction per MDCPSFM Section 2.0I . Lb. ® Grinder Pump ❑ Mechanical Bar Screen ❑ Other (please specify) 6. Power reliability in accordance with 15A NCAC 02T _0305(h)( I): ® Standby power source or ❑ Standby pump ➢ Must have automatic activation and telemetry - 15A NCAC 02T.0305(h)(1)(B), ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility and may not be portable Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C): ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - or ❑ Portable pumping unit with plugged emergency pump connection and telemetry: ➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump station storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided as part of this permit application in the case of a multiple station power outage. FORM: FTA 10-23 Page 4 of 5 lX. SETBACKS & SEPARATIONS — (02B.0200 & ISA NCAC 02T.0305(o): I. Does the project comply with all separations/alternatives found in 15A NCAC 02T .0305(f) & (? ® Yes ❑ No 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 18 inches zWater mains (vertical - water over sewer preferred, including in benched trenches) 18 inches zWater mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-1 waters of Class I or Class 11 impounded reservoirs used as a source of drinking water, and associated wetlands. 100 feet **Waters classified WS (except WS-1 or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands associated with these waters (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches, as well as wetlands associated with these waters or classified as WL. 10 feet Any building foundation (horizontal) 5 feet Any basement (horizontal) 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ If noncompliance with 02T 93_ h_or (e.}, see Section X.l of this application *15A NCAC 02T. 02— M contains alternatives where separations in 02T.0305(f) cannot be achieved. Please check "yes" above if these alternatives are used and provide narrative information to explain. "Stream classifications can be identified using the Division's NC Surface Water Classifications webpg e 2. Does this project comply with the minimum separation requirements for water mains? ®Yes ❑ No ❑ N/A ➢ If no, please refer to 15A NCAC 18C.0906(f) for documentation requirements and submit a separate document, signed/sealed by an NC licensed PE, verifying the criteria outlined in that Rule. 3. Does the project comply with separation requirements for wetlands? ® Yes ❑ No ❑ N/A ➢ Please provide supplementary information identifying the areas of non-conformance. D See the Division's draft separation requirements for situations where separation cannot be met. ➢ No variance is required if the alternative design criteria specified is utilized in design and construction. 4. Is the project located in a river basin subject to any State buffer rules? ❑ Yes Basin name: ® No If yes, does the project comply with setbacks found in the river basin rules per 15A NCAC 02B _0200? ❑ Yes ❑ No ➢ This includes Trout Buffered Streams per 15A NCAC 2B4O202 5. Does the project require coverage;`authorization under a 404 Nationwidefindividual permits ❑ Yes ® No or 401 Water Quality Certifications? ➢ Please provide the permit numberipermitting status in the cover letter if coverage?authorization is required. 6. Does project comply with 15A NCAC 02T 0105LcIL6) (additional permitslcertifications)? ® Yes ❑ No Per 15A NCAC 02T.0I05(c)(6), directly related environmental permits or certification applications must be being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 7. Does this project include any sewer collection lines that are deemed "high -priority?" ❑ Yes ® No Per 15A NCAC 02T.0402, "high -priority sewer" means any aerial sewer, sewer contacting surface waters, siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer. Siphons and sewers suspended through interference/conflict boxes require a variance approval. If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit. FORM: FTA 10-23 Page 5 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains tlatest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If no, for projects requiring. a single variance, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued concurrently with the a roval of the permit, and Vrojects reguiring a variance approval may be subject to longer review times. For proiects reguiring two or more variances or where the variance is determined by the Division to be a significant portion of the project, the full technical review is required. Professional Engineer's Certification: , attest that this application for S6.fI t�k1r CkW* RA (Professional Engineer's name from Application Item Ill.1.) (Project Name from Application Item [I, I) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Minimum Design_Criteria for,Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permittin of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and sea] signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. Misrepresentation of the application information, including failure to disclose any design non-compliance with the applicable Rules and design criteria, may subject the North Carolina -licensed Professional Engineer to referral to the licensing board. (21 NCAC 56.0701) :........................................................... ............ ..... ... North Carolina Professional Engineer's seal, signature, and date: `♦♦.s�- N.CAR94��i,� 10 SEAL ` 055420 — 10 P♦ ftR A.0, % ..... z /29 Applicant's Certification per 15A NCAC 02T .0106(b): r• I, _ n C 1 ar\ UI{1 , attest that this application for Ja,-hr Seek , , c r,c c , (Signature Authority Name fm4n Application Item 1.3 ; (Project Name from Application Item I1.1) attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. 1 will make no claim against the Division of Water Resources should a condition of this permit be violated. 1 also understand that if all required parts of this application package are not completed and that if all required supporting infonnation and attachments are not included, this application package will be returned to me as incomplete. NOTE In accordance with General Statutes 143-215.4A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: ` Date-4) 31 � FORM: FTA 10-23 Page 6 of 5 BOHLER ENGINEERING NC, PLLC Professional Engineering Services VIA: Fed Ex TO: Raleigh Regional Office RE: Water Quality Section 3800 Barrett Drive Raleigh, NC 27609 4130 ParkLake Avenue, Suite 200, Raleigh, NC 27612 Telephone: (919) 578-9000 LETTER OF TRANSMITTAL Sanford Shcctz Sanford, NC Lee County ATTN: Tanvir Pasha DATE: March 22, 2024 JOB NO: NCR211038 WE ARE SENDING YOU ❑ Shop drawings ❑ Copy orletter ®Allached ❑ Prints ❑ Change order COPIES DESCRIPTION 'r'.ts�13 �i «}lt-g 1 Sanford Sheetz FTA - Signed till' 7�i, Kd� 1 FTSE 1 8.5xII- Aerial Map 1 8.5x11 - USGS Map NEE 1 Full Size —USGS Map D� tafz, 1 Sewer Narrative 1 Cover Sheet & Transmittal MqR 25Z�2� R�Ir.IrT 1 Sanford Sheetz CD Approval Email 1 Comment Response Letter These Are Transmitted: ® For approval El For your use ❑As requested ❑ For review and comment ❑Approved as submitted ❑Approved as noted ❑ Returned for corrections REMARKS: Included please find our Fast -Track Server resubmittal for the proposed `Sanford Sheetz Center Church Rd Pump Station' along Center Church Road in Lee County. Please note that the application fee of $600 and the business registration with the NC Secretary of State were provided/sent with the original submittal on February 8, 2024. If you have any questions or require additional information, please do not hesitate to contact this office at (919) 578- 9000. Thank you, Oliver Kaija, PE okaija@bohlereng.com DocuSign Envelope ID: AEA7ADCE-96A4-448E-8112-9A240F0258C7 State of North Carolina Department of Environmental Quality Division of Water Resources W.R MAR W974 Flow Tracking for Sewer Extension Applications Division of Water Resources Rab,-igh 1-ze9 0x-1a1 U!" ;'w (FTSE 10-23) Application Number: FT-371 vv Entity Requesting Allocation: tvlty of �5antord Project Name for which flow is being requested: Sanford Sheetz_Center Church Rd. More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for al! pump stations along the route of the proposed wastewater flow I. Complete this section only if you are the owner of the wastewater treatment plant. -"i��' '� Zry.t� 8 a. WWTP Facility name: Big Buffalo Wastewater Treatment Plant .r'p' b. WWTP Facility Permit #: NCO024147 All f lows are in MGD c. WWTP facility permitted flow: 12.0000 d. Estimated obligated flow not yet tributary to the WWTP: 1.7196 e. WWTP facility's actual average flow: 4.0280 f. Total flow for this specific request: 0.00200 g. Total actual and obligated flows to the facility: 5.7496 h. Percent of permitted flow used: 48% 11. Complete this section for each pump station you are responsible for along the route of this proposed List pump stations located between the project connection point and the WWTP. (A) (B) (C) (D) = (g+C) Pump Pump Firm Design Approx. Obligated, Total Current Station Station Capacity Average Current Not Yet Flow Plus (Name or Permit Daily Flow2 Avg. Daily Tributary Obligated Number) Number (Firm/nn. Flow, Daily Flow, Flow MGD MGD MGD MGD MGD #N/A #NIA #N/A #NIA #NIA #NIA #NIA #NIA #NIA #NIA #NIA #N/A #NIA #NIA #NIA #NIA #NIA #N/A #NIA #N/A #N/A #N/A #NIA #N/A 1. The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. 2. Design Average Flow is the firm capacity of the pump station divided by the peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. 3. A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is 5 0. Downstream Facility Name (Sewer): City of Sanford Collection System Downstream Permit Number: WQCS00047 Ill. Certification Statement (E)=(A-D) Available Capacity` MGD #N/A #N/A #N/A #N/A 1, Paul Weeks, Jr. PE, certify to the best of my knowledge that the addition of the volume of Page 1 of 6 FTSE 10-23 DocuSign Envelope ID: AEA7ADCE-96A4-448E-8112-9A240F0258C7 wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and 11 plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. IP DocuSigned by: atU At.. U1uks Y, P.f. . BBG39E666784469, Signing Official Signature Utilities & Engineering Director Title of Signing Official 02/06/24 Date Page 2 of 6 FTSE 10-23 F� R - File an Annual Report/Amend an Annual Report - Upload a PDF Filing • Order a Document Online - Add Entity to My Email Notification List View Filings • Print a Pre -Populated Annual Report form - Print an Amended a Annual Report form Business Corporation Legal Name Sheetz Inc. Information Sosld: 0597312 Status: Current -Active O Date Formed: 7/12/2001 Citizenship: Foreign State of Incorporation: PA Fiscal Month: September Annual Report Due Date: January 15th CurrentAnnual. Report Status: Registered Agent: Corporation Service Company Addresses Reg Office 2626 Glenwood Ave Ste 550 Raleigh, NC 27608 Officers Assistant Secretary Steven P Augustine 5700 Sixth Ave Altoona PA 16602 Assistant Secretary Michael A Lacesa 5700 Sixth Ave Altoona PA 16602 Reg Mailing 2626 Glenwood Ave Ste 550 Raleigh, NC 27608 Vice President Charlie Campbell 5700 Sixth Ave Altoona PA 16602 Vice President Thomas P Luciano 5700 Sixth Ave Altoona PA 16602 Chairman of the Board Stanton R Sheetz 5700 Sixth Ave Altoona PA 16602 Vice President David Woodly 5700 Sixth Ave Altoona PA 16602 Stock Mailing 5700 Sixth Avennue Altoona, PA 16602-1111 Assistant Secretary Anna Caporuscio 5700 Sixth Ave Altoona PA 16602 President Travis T Sheetz 5700 Sixth Ave Altoona PA 16602 Vice President Darrin Pohar 5700 Sixth Ave Altoona PA 16602 Assistant Vice President Gary Zimmerman 5700 Sixth Ave Altoona PA 16602 Principal Office 5700 Sixth Avennue Altoona, PA 16602-1111 Vice President Dan Coffin 5700 Sixth Ave Altoona PA 16602 Vice President Adam Sheetz 5700 Sixth Ave Altoona PA 16602 Vice President Emily Sheetz-Mandel 5700 Sixth Ave Altoona PA 16602 Vice President Stephanie Doliveira 5700 Sixth Ave Altoona PA 16602 Assistant Secretarl Robert Jochen 5700 Sixth Ave Altoona PA 16602 Chief Executive Officer Joseph S Sheetz 5700 Sixth Ave Altoona PA 16602 Assistant Secretary Vice President Kyle Smith Trevor Walter 5700 Sixth Ave 5700 Sixth Ave Altoona PA 16602 Altoona PA 16602 Vice President Ryan Sheetz 5700 Sixth Ave Altoona PA 16602 BOHLER// BOHLER ENGINEERING NC, PLLC NCB&S P-i - u 4130 PARKLAKE AVENUE, SUITE 200 RALEIGH, NC 27612 Phone- (919)578-9000 %r r' F-' , 03113l2024 JJME I NCR211038 R 'Si4 NFQD, frSHEETZ MAR 2 5 2024 MAR-sz�' 2024 ciJ<C'tfrL� NC[N_BohlerEng.com 2304 JEFFERSON DAVIS HWY, 27332 250 125 62.5 0 (Dil 1 "= 250' W J a r� v N N m 0 t c ca m 3 m cn • 40- c c co 2 m U 0 0 3 0 m 'y����. Bianca Buschor��� of From: Sam Tracy <Sam.Tracy@freese.com> Sent: Monday, March 4, 2024 2:28 PM To: Oliver Kaija; SFD23880 - Sanford Construction Drawing iiio r4 `��r`L , 2 Cc: Jessica Escobedo; ncr2l l038@nf.bohlereng.com; 'Doug BenoitttfAary Depina Subject: Sanford Sheetz Construction Drawing Approval EXTERNAL: Use caution with attachments and links. Good afternoon, Oliver — Our office has reviewed the Construction Drawings dated 02/28/2024 for the above referenced project. We have found the proposed project to be acceptable according to the City of Sanford's General Specifications and Design Criteria; and hereby issue this email as our approval of the Construction Drawings. In order to proceed you will need to provide hard copies of the drawings for the City to stamp. After the City has stamped the provided hard copies as being approved for construction, you may coordinate next steps with Mary Depina. Best, Sam p� Samuel E. Tracy, PE Water/Wastewater Utilities Engineer I Freese and Nichols, Inc. l;,+ya Office 919-999-2163 1 Cell 781-223-45541 Sam.Tracvgfreese.com �� IC?Z INKMOLS �wi",Ir? This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. BOHLERI Raleigh Regional Office Water Quality Section 3800 Barrett Drive Raleigh, NC 27609 Dear Mr. Pasha: _e Bohler Engineering NC, PLLC 4130 Parklake Avenue, Suite 200 Raleigh, NC 27612 919-578-9000 March 22, 2024 Via: Electronic Mail/Fedex Re: Comment Response Letter Arista Dev — Sanford Sheetz 2306 Jefferson Davis HWY Sanford, NC 27332 d ,x ff� Lee County red 0, BE #NCR211038 Bohler Engineering is pleased to submit on behalf of Arista Development, LLC, the revised plan set for the Arista Development — Sanford Sheetz. The following is our comment response letter addressing comments received from NCDEQ dated March 8, 2024. Each comment is addressed and responded to as follows: NCDEQ — Tanvir Pasha Comment 1: Is this an ARPA funded project? If so, please include the DWI assigned ARPA project number in your response. Response 1: This project is not ARPA funded. Comment 2: Submit an updated FTA with following being addressed: [FTA 10-23 is now available] Response 2: Information has been moved to current FTA form. Comment 2a: Please correct the approximate coordinates provided in Section 11.4 of the application. According to the LatlLon provided, 35.40121-79.2317, the project area is located in 7001 Lark Ln, Sanford, NC 27332, United States. In addition, update section VI11.2. Response 2a: Long/Lat values have been updated to match subject site. Comment 2b: Section IVA should include exact facility name mentioned in NC0024147 as'Big Buffalo WWTP'. Response 2b: Facility name has boon updated. Comment 3a: Submit an updated FTSE with following being addressed: Project name should match Section 11.1 of the FTA. Response 3a: Project name on both have been updated (and match) to say "Sanford Sheetz Center Church Rd." Comment 3b: Section I.g, the total actual and obligatory flows to the facility is not correct. Response 3b: Flows have been updated Comment 4: According to Section F of the Application Instructions, an 8.5-inch x 11-inch color copy of a USGS Topographic Map and an aerial map should be included with the application. The maps need to clearly identify the project area, including the closest surface waters, general location of the gravity sewer, pumpstations, and force mains, and the downstream connection points for the receiving sewer. Please provide the required maps according to the application requirements. Response 4: Both a full size and an 8.5" x 11" color copy of the USGS topo map and aerial have been included in this submittal. Comment 5: Please submit a detailed narrative on the removal of the existing facility, including additional permit details if available, and the proposed facility with design criteria for the pump station and force main. Kindly follow 15A NCAC 02T .0305 and Minimum Design Criteria for Pump Stations and Force Mains. Response 5: Narrative Is Included with this new submittal. www BohlerEng neering.com BOHLERI Comment Response Letter March 22, 2024 Page 2 of 2 Comment 6: 15A NCAC 02T .0107 Staff Review and Permit Preparation states: • "(2) (e) If an application is accepted and later found to be incomplete, the applicant shall be advised how the application or accompanying supporting information may be modified to make it complete. The staff shall advise the applicant: (2) if all required information is not submitted within 30 days, the project will be returned as incomplete. Any resubmittal of a returned application shall be accompanied with a new application fee! Response 6: Understood. Comment 7: Please provide detailed wastewater design flow rates as per 15A NCAC 02T.0114(c). In Section VI.7, please mention the establishment type, DDF gallons1100 sqf, and unit sqf facility size. Response 7: Included in this submittal is historical data for various Sheetz stones covering the last 12 months of water bills from stores sized between 5,500sf and 6,500 sf. These stores are standalone where the truck diesel, irrigation, car wash, etc is metered separately. The average is 1,865 gpd. Per email coordination on 3113123, NCDEQ approved the historical data for a now rate of 2000 GPM. Comment 8: *Please note that the fee for fast track sewer extension permits has increased to $600 as of October 3, 2023 [as stipulated in the 2023 House Appropriations Act, House Bill 259, Water Quality and Stormwater Fees, Section 12.14(a)] Response 8: Application fee of $600 was sent in with the first submittal. Should you have any questions regarding this project or require additional information, please do not hesitate to contact me at 919-578-9000. Sincerely, Bohler Engineering NC, PLLC Oliver Kaija, PE Project Manager www.BohlerEngineering.com r .i r r MAR C f SANFORD SHEEiZ r4TION & FORCEMAIN C DESIGN PLANS &REPORT Bohler Project #: NCR211038 10 Submission: May 4, 2023 Updated: July 13, 2023 Updated: December 1, 2023 Updated: January 8, 2024 10 Oliver Kaija, PE H L // BOHLER ENGINEERING NC, PLLC 4130 Parklake Avenue, Suite 200, Raleigh, NC 27612 NCBEIS # P-1132 I P: 919-578-9000 1 F: 919-703 2665 www.bohlerengineering.com FABLE OF CONTENTS r 1. GENERAL PROJECT DESCRIPTION........................................................... ..........I .................. APPENDIX A FLOW AND PEAKING FACTOR CALCULATIONS APPENDIX B FRICTION LOSS CALCULATIONS FOR NEW PIPE APPENDIX C TOTAL DYNAMIC HEAD CALCULATIONS FOR NEW PIPE APPENDIX D FRICTION LOSS CALCULATIONS FOR OLD PIPE APPENDIX E TOTAL DYNAMIC HEAD CALCULATIONS FOR OLD PIPE I L E L I L BOHLERI BOHLER ENGINEERING NC, PLLC *. NC- Der" of%«virmmme?:i?� r F L L MAR 2 2 20A 1. GENERAL PROJECT DESCRIPTION The following lift station calculations report is for a proposed lift station at 2304 Jefferson Davis Hwy in Sanford, North Carolina. There is an existing wet well and 2" forcemain that runs along and then crosses Center Church Rd, eventually connecting to an existing gravity system at the northern side of the intersection of Center Church Rd and Jefferson Davis Highway. The existing wet well is being removed and a new pump station is being proposed with a 4' diameter t13.5' deep wet well with an EOne grinder pump. The existing 2" forcemain will be replaced with a ±403' long 1.25" forcemain that follows a similar profile of the existing force main. This pump station is designed for 2,000 GPD average flow. A 2.50 peaking factor has been applied, resulting in an estimated 4.0 GPM peak influent rate. With a total dynamic head of 31-ft, the system will operate at t14GPM. The lift station will have a connection to a Generac 20kW natural gas generator, or approved equal. Once the project is complete, Sheetz will own and maintain the pump station & force main. The existing average daily flow entering the wet well were determined to be t3,881 gallons per day (GPD). This was determined using the daily flows for design provided by 15A NCAC 0.2T .0114 Wastewater Desgin Flow Rates from NCDEQ based on the existing and historical uses within the retail shopping center. The shopping center and its flows are being demolished and replaced by the proposed Sheetz Gas Station. The proposed average daily flow entering the system, based on historical data provided by Sheetz, is anticipated to be t2,000 GPD. Therefore, because the proposed average daily flow entering the system is less than the existing flow, there will be no downstream impact on the existing gravity sewer the force main is connecting to. See Appendix A for calculations. Per email coordiantion with Mary DePina from City of Sanford on 7/11/2023 titled Sheets Center Chuuch Rd. the subject property does not need to provide sewer access to the adjacent property for future connection. Therefore, the proposed pump station was only sized to handle the flow from the proposed Sheetz facility. Appendices C and E shows a comparison of total dynamic head calculations between a new pipe (C factor of 150) and an end of life pipe (C factor of 120). With the new C factor, the pump will operate at t13GPM with a total dynamic head of 36-ft, which is still suitable for the pump. BOHLERI BOHLER ENGINEERING NC, PLLC PAGE 11 All features and structures are designed to meet or exceed City of Sanford and Lee County design standards and the NCDEQ minimum design criteria for Pump Stations and Force Mains updated I March 2008. V- L L E L I L BOHLERI BOHLER ENGINEERING NC, PLLC PAGE 12 w BOHLER ENGINEERING NC, PLLC Professional Engineering Services VIA: Fed Ex TO: Raleigh Regional Office Water Quality Section 3800 Barrett Drive Raleigh, NC 27609 ATTN: Tanvir Pasha RE: 4130 ParkLake Avenue, Suite 200, Raleigh, NC 27612 Telephone: (919) 578-9000 LETTER OF TRANSMITTAL Sanford Sheetz Sanford, NC Lee County DATE: February 8, 2024 JOB NO: NCR211038 WE ARE SENDING YOU ❑ Shop drawings ❑ Copy of letter MAttached ❑ Prints ❑ Change order COPIES 1 Sanford Sheetz FTA - Signed 1 FTSE 1 NC Business Registration Sheetz Inc 1 Aerial Map 1 USGS Map 1 Existing Sewer Network Map 1 Cover Sheet & Transmittal 1 Application Fee These Are Transmitted: ® For approval ❑For your use ❑ For review and comment ❑Approved as submitted ❑ Returned for corrections ❑As requested ❑Approved as noted REMARKS: Included please find our Fast -Track Sewer submittal for the proposed `Sanford Sheetz Pump Station' along Center Church Road in Lee County. There is an existing private pump station that currently services the shopping center located on the site. The existing pump station & force main is being replaced to be able to service the new Sheetz store. The new pump station includes a 4' diameter, 13.5' deep wet well with an EOne grinder pump, and f403 linear feet of 1.25" SCH 40 PVC forcemain. The proposed flows entering the system will replace, and is less than, the existing flows from the shopping center. If you have any questions or require additional information, please do not hesitate to contact this office at (919) 578-9000. Thank you, Oliver Kaija, PE okaija@bohlereng.com RE: [External] Sanford Sheetz - FTA - 2304 Jefferson Davis Hwy, Sanford, NC 27332 Jessica Escobedo <jescobedo@bohlereng.com> Wed 4/3/2024 12:50 PM To:Pasha, Tanvir<tanvir.pasha@deq.nc.gov>;Oliver Kaija <okaija@bohlereng.com> Cc:ncr211038@nf.bohlereng.com <ncr211038@nf.bohlereng.com>;Doug Benoit (doug@aristadevllc.com) <doug @aristadevl Ic.com> CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hi Tanvir, hope you've been well. Just reaching out to see what your timeline is for reviewing the fast track. We resubmitted the package to you 3/22. Thanks, Jessica Escobedo Sr. Design Engineer o 919-578-9000 /jescobefdo(@bohlereng.com HLER/ From: Pasha, Tanvir <tanvir.pasha @deq.nc.gov> Sent: Wednesday, March 13, 2024 2:23 PM To: Oliver Kaija <okaija@bohlereng.com> Cc: ncr211038@nf.bohlereng.com; bdowns@sheetz.com; Doug Benoit (doug@aristadevllc.com) <doug@aristadevllc.com>; Jessica Escobedo <jescobedo@bohlereng.com> Subject: Re: [External] Sanford Sheetz - FTA - 2304 Jefferson Davis Hwy, Sanford, NC 27332 EXTERNAL: Use caution with attachments and links. Hi Oliver, Thanks for sharing this in details. It does satisfy the design flow rate. Please attach the approval certification by City of Sanford. Thanks TP A B M "Tanvir" Pasha (he/him) Environmental Engineer Division of Water Resources — Raleigh Regional Office North Carolina Department of Environmental Quality 3800 Barrett Drive, Raleigh, NC 27609 Office: 919-791-4250; Cell: 984-202-3390 tanvir.pasha@deq.nc.gov Gepuoxten or Fovii"wMY 0"krp From: Oliver Kaija <okaija@bohlereng.com> Sent: Wednesday, March 13, 2024 11:51 AM To: Pasha, Tanvir <tanvir.pasha@deq.nc.gov> Cc: ncr211038@nf.bohlereng.com <ncr211038@nf.bohlereng.com>; bdowns@sheetz.com <bdowns@sheetz.com>; Doug Benoit (doug.@aristadevllc.com) <doug@aristadevllc.com>; Jessica Escobedo <jescobedo@bohlereng.com> Subject: RE: [External] Sanford Sheetz - FTA - 2304 Jefferson Davis Hwy, Sanford, NC 27332 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hello Tanvir, Thank you for the comments. They all seem relatively straightforward as we discussed. For the design flow rates, our team used historical data of other Sheetz facilities between 5,500sf and 6,500sf with the same use/operations to determine the flows of the pump station (the proposed building size of this project is 6,139SF). Attached is an Excel file that lists the last 12 months of water bills from Sheetz stores within the 5.5k — 6.5k building size. The stores included in this file are standalone, where the truck diesel, irrigation, car wash, etc are metered separately. The average is 1,865 GPD, so we would like to propose 2000 GPD, which was reviewed, coordinated and approved by City of Sanford. Would this data satisfy your last comment regarding the design flow rates if we were to leave the FTA as showing 2,000 GPD? Thank you, Oliver Kaija, P.E. Project Manager, Land Development o 919-578-9000 / c 919-611bo 4-4670 / okaija@hlereng.com HLER/ From: Pasha, Tanvir <tanvir.pasha@deq.nc.gov> Sent: Friday, March 8, 2024 12:49 PM To: Jessica Escobedo <jescobedo@bohlereng.com>; bdowns@sheetz.com Cc: Oliver Kaija <okaija@bohlereng.com>; ncr211038@nf.bohlereng.com Subject: Re: [External] Sanford Sheetz - FTA - 2304 Jefferson Davis Hwy, Sanford, NC 27332 EXTERNAL: Use caution with attachments and links. In addition, Please provide detailed wastewater design flow rates as per 15A NCAC 02T.0114(c). In Section VI.7, please mention the establishment type, DDF gallons/100 sqf, and unit sqf facility size. Thanks A B M "Tanvir" Pasha (he/him) Environmental Engineer Division of Water Resources — Raleigh Regional Office North Carolina Department of Environmental Quality 3800 Barrett Drive, Raleigh, NC 27609 Office: 919-791-4250; Cell: 984-202-3390 tanvir.pasha@deq.nc.gov Q_ E Q: Oephroiwn of Fmi�orrrnur Ow �� From: Pasha, Tanvir <tanvir.pasha@deq.nc.gov> Sent: Friday, March 8, 2024 12:31 PM To: Jessica Escobedo <jescobedo@bohlereng.com>; bdownsC@sheetz.com <bdowns@sheetz.com> Cc: Oliver Kaija <okaija@bohlereng.com>; ncr2110386Dnf.bohlereng.com <ncr211038@nf.bohlereng.com> Subject: Re: [External] Sanford Sheetz - FTA - 2304 Jefferson Davis Hwy, Sanford, NC 27332 Hello Brian and Oliver, After reviewing the Fast Track Sewer System Extension Application for Sanford Sheetz, additional information is required in order to further process the application. Please provide the following information by Apri107, 2024, and note that the requested information must be submitted within 30 days of this request, or the applicant will be required to submit a new application and application fee in accordance with 15A NCAC 02T .0107. 1. Is this an ARPA funded project? If so,_ -lease include the DWI assigned ARPA project number in your response. 2. Submit an updated FTA with following being addressed: [FTA 10-23 is now available] a. Please correct the approximate coordinates provided in Section 11.4 of the application. According to the Lat/Lon provided, 35.4012/-79.2317, the project area is located in 7001 Lark Ln, Sanford, NC 27332, United States. In addition, update section V111.2. b. Section IV.1 should include exact facility name mentioned in NC0024147 as 'Big Buffalo WWTP'. 3. Submit an updated FTSE with following being addressed: a. Project name should match Section 11.1 of the FTA. b. Section Lg, the total actual and obligatory flows to the facility is not correct. 4. According to Section F of the Application Instructions, an 8.5-inch x 11-inch color copy of a USGS Topographic Map and an aerial map should be included with the application. The maps need to clearly identify the project area, including the closest surface waters, general location of the gravity sewer, pumpstations, and force mains, and the downstream connection points for the receiving sewer. Please provide the required maps according to the application requirements. 5. Please submit a detailed narrative on the removal of the existing facility, including additional permit details if available, and the proposed facility with design criteria for the pump station and force main. Kindly follow 15ANCAC 02T .0305 and Minimum Design Criteria for Pump Stations and Force Mains. 15A NCAC 02T .0107 Staff Review and Permit Preparation states: • "(2) (e) If an application is accepted and later found to be incomplete, the applicant shall be advised how the application or accompanying supporting information may be modified to make it complete. The staff shall advise the applicant: (2) if all required information is not submitted within 30 days, the project will be returned as incomplete. Any resubmittal of a returned application shall be accompanied with a new application fee." Please contact me with any questions that you may have regarding this request. *Please note that the fee for fast track sewer extension permits has increased to $600 as of October 3, 2023 [as stipulated in the 2023 House Appropriations Act, House Bill 259, Water Quality and Stormwater Fees, Section ]2.14(a)J. Sincerely, A B M "Tanvir" Pasha, MS (helhim) Environmental Engineer Division of Water Resources — Raleigh Regional Office North Carolina Department of Environmental Quality 3800 Barrett Drive, Raleigh, NC 27609 Office: 919-791-4250; Cell: 984-202-3390 tanvir.pasha@deq.nc.gov D_ E_ Ceoityi tntEmironYAertlalquartz From: Jessica Escobedo <jescob ?do@bohlereng.com> Sent: Friday, March 8, 2024 9:59 AM To: Pasha, Tanvir <tanvir.pasha@deq.nc.gov> Cc: Oliver Kaija <okaija@bohlereng.com>; ncr211038@nf.bohlereng.com <ncr211038@nf.bohlereng.com> Subject: [External] Sanford Sheetz - FTA - 2304 Jefferson Davis Hwy, Sanford, NC 27332 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hi Tanvir— Hope you've had a great week. We sent in our NCDEQ fast -track application to your office on February 8 for the Sanford Sheetz site located at 2304 Jefferson Davis Hwy, Sanford, NC 27332. Do you know when we can anticipate receiving comments from you? Thank you, Jessica Escobedo Sr. Design Engineer Bohler Engineering NC, PLLC 4130 Parklake Ave, Suite 200 Raleigh, NC 27612 o 919-578-9000 /jescobedo@bohlereng.com www.BohlerEngineering.com BHLEf# Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system.