Loading...
HomeMy WebLinkAbout20180181 Ver 3_Scarborough MY3 Credit Release Request Form_20240412 April 12, 2024 CREDIT RELEASE REQUEST FORM To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator From: Cara Conder, Water & Land Solutions, cara@waterlandsolutions.com, 843-446-2312 Through: Water & Land Solutions, LLC We formally request a credit release for the Scarborough site (DWR ID #2018-0181v3) for completion of Task #6 per the approved credit release schedule, which is included in the Attachments with this request. The following documents have been submitted to DWR for Task # 6 and are approved: Monitoring Year 3 Report and bond renewal. Credits requested for release are detailed below: Credit Type % Release Credit Amount (include Units) Notes/Comments Buffer Restoration Buffer Coastal Headwater 5 34,739.10 sq ft Buffer Enhancement Generated Nitrogen Nutrient Offset 10 3,539.09 lbs Delivered Nitrogen Nutrient Offset (Jordan sites only) Generated Nitrogen Nutrient Offset Delivered Phosphorus Nutrient Offset (Jordan sites only) Signature: Attachments: 1) Approved Project Credit Table (include the most recent Asset Table approved by DWR, whether it is the BPDP table or the As-Built table), 2) Approved Credit Release Schedule Include the approved credit release schedule, whether it is the credit release schedule from the MBI/UMBI or from the BPDP, 3 2 Project Mitigation Components 2.1 Project Components The Scarborough Site includes a combination of stream restoration and enhancement activities on 11,306 linear feet of streams and 117.95 acres of wetland re-establishment, enhancement, and preservation. Out of 230.838 acres that are protected with a permanent conservation easement, 15.95 acres (694,782 ft²) are proposed to generate riparian buffer credits along coastal headwater restoration streams and 15.57 acres (35,390.92 lbs. Nitrogen) are proposed to generate nutrient offset credits. Per the MBI (Section IX, E) and the Plan (Section 7.0), 10.19 acres of the 15.57 acres proposed for nutrient offset credits are suitable for being converted into buffer mitigation credits (443,876.40 ft²) at a ratio of 1:1 and at 100% full credit upon DWR approval. The Sponsor may use the 10.19 acres of riparian restoration mentioned above for either nutrient offset credit or buffer mitigation credit, but not both. The Sponsor will maintain two credit ledgers: one for coastal headwater buffer credits and one for Nitrogen nutrient offset credits. The total potential nutrient offset mitigation credits and riparian buffer that the Project generates are summarized in Table 1. Table 1. Proposed Credits 2.2 Design Approach Riparian buffer mitigation and nutrient offset adjacent to streams was approved by DWR via letter on March 29th, 2019 and July 10th, 2019. Scarborough is also a stream and wetland mitigation bank, and restoration of riparian areas was accomplished through the goals and methods outlined by the WLS Neuse 02 Stream & Wetland Umbrella Mitigation Banking Instrument, Scarborough Mitigation Plan (SAW-2017- 02527) and the Scarborough Riparian Buffer and Nutrient Offset Mitigation Banking Instrument. All Riparian Widths Features Mitigation Type Total Acreage Eligible Credit Acreage Credit Per Acre (ft2) Credit Ratio % Full Credit Mitigation Credits (sq. ft.) 0-50'UT1-R1, UT1B, UT2, UT3 Coastal Headwater Restoration 15.95 15.95 43,560 1:1 1 694,782 ft² (15.95 ac) 15.95 Widths Features Credit Type Total Acreage Eligible Credit Acreage Credit Per Acre (lbs) Credit Ratio 0-50'UT1-R2, UT1-R3 Restoration 7.29 7.29 2,273.02 N/A 51-100'UT1-R3 Restoration 2.90 2.90 2,273.02 N/A 101-200'UT1-R3 Restoration 5.38 5.38 2,273.02 N/A TOTAL 15.57 *Coastal headwater riparian buffer restoration credits are calculcated based on the valley length of the reach Nutrient Offset Credits (lbs) 16,570.32 35,390.92 Nutrient Offset Credits 12,228.85 6,591.76 Riparian Buffer Credits Total Coastal Headwater Restoration Credits*694,782 ft² (15.95 ac)