Loading...
HomeMy WebLinkAbout20061214 Ver 2_More Info Received_20071127WITHERS L~~~ RAVEN EL ENGINEERS I PLANNERS I SURVEYORS November 26, 2007 ~ ... ------~~~ P,,~V L 7 2007 ~EhiR - WATER ~?i1ALI fiY NC-Division of Water Quality ~v~'tn.NOS:~!o srrnp,~~~~~ Attn: Ms. Annette Lucas 2321 Crabtree Blvd.; Suite 250 Raleigh, North Carolina 27604 Re: Woodcreek - Tract F Phase -Stormwater Management Plan Request for more information: Stormwater Management Plan - Response to DWQ Comments W&R Project #: 02040232.55 DWQ Project #: 06-1214, Ver. 2 Dear Ms. Lucas, Our office received a letter from you dated November 5, 2007 in which you requested more information for the Woodcreek - Tract F Stormwater Management Plan. Please find listed below and enclosed the additional items that are necessary forthe DWQto complete the review of the plan. Listed below are responses to the additional information that you requested. 1. The drawdown rates forall three of the proposed BMPs appearto be fasterthan two days. Please reevaluate the orifice sizes of these structures and provide orifice sizes that will draw down the water quality volume in two to five days. Response: The orifice sizes forthe BMPs have been adjusted so thatthey are between 2 and 5 days (BMP 1= 2-in orF. ~a? 49 hrs; BMP 2 = 2-in orF @ 73.5 hrs; BMP 3 = i.5-in orf. ~a 81 hrs). The drawdown spreadsheets have been enclosed. 2. Please explain how maintenance access will be provided for BMP 3. Response: A io ft wide berm has been included around the edge of the wetland that can be used for maintenance purposes. Maintenance access is provided by traversing down the 3:1 side slopes onto the so ft wide berm. The upper edge of the wetland can be accessed by usingthe drainage easements that encompass the contributing pipe system. 3. Please provide details forthe swale that drains BMP 3. Response: Details for the swale have been included on the attached BMP 3 detail sheet (Sht No.15). Estimated Swale velocities for designated storm events are also included on the detail. 4. Please adjust the grading for BMP 3 so that side slopes do not exceed 3:1. ui MacKenan Drive i Cary, NC 275u i tel: 919.469.3340 i fax: 919.467.6008 i www.withersraveneLcom 7040 Wrightsville Avenue i Suite lol i Wilmington, NC z84o3 i tel: 9io.z56.9z77 i fax: 91o.z56.z584 loz7 Sabbath Home Rd, SW i Supply, NC z846z i tel: 91o.84z•939z i fax: 91o.84z.8o19 Page z November z6, zoo7 Response: The side slopes for BMP 3 have been adjusted so that they do not exceed 3:1. Please feel free to call if you have questions or require additional information to complete your review (Direct Line: 23$-0323)• Sincerely, WITHERS & RAVENEL, INC. C. Heath Wadsworth, PE Attachments: 1) Orifice drawdowns (BMP #1, #2, and #3) 2) BMP design details (BMP #1, #2, and #3) M p~-ta.l~} VZ Project Name: Woodcreek - Tract F Phase City/State: Holly Springs, NC Project #: 2040232.6 Date: 26-Nov-07 STORMWATER BMP F-1 -CONSTRUCTED WETLAND (85% TSS Removal 8~ 40% TN Removal) Orifice Calculator Variables WQ Volume: Head: Draw down time: 0.213625 Acre-ft 0.50 ft 49 hrs 9305.505 cf 0.25 ft 176400 s Constants g= Cd = 32.2 ft/sz 0.6 Orifice Area = Orifice Diameter = 0.021912 sq. ft 2.00 in 3.155293 sq. in Y Project Name: Woodcreek - Tract F Phase City/State: Holly Springs, NC Project #: 2040232.6 Date: 26-Nov-07 STORMWATER BMP F-2 -CONSTRUCTED WETLAND (85% TSS Removal & 40% TN Removal) Orifice Calculator Variables 0.391125 Acre-ft 0.75 ft 73.5 h rs 17037.41 cf 0.375 ft 264600 s Constants g= Cd = 32.2 ft/s2 0.6 WQ Volume: Head: Draw down time: Orifice Area = Orifice Diameter = 0.021838 sq. ft 2.00 in 3.144606 sq. in Project Name: Woodcreek - Tract F Phase City/State: Holly Springs, NC Project #: 2040232.6 Date: 26-Nov-07 STORMWATER BMP F-3 -CONSTRUCTED WETLAND (85% TSS Removal & 40% TN Removal) Orifice Calculator Variables WQ Volume: Head: Draw down time: 0.197 Acre-ft 0.50 ft 81 h rs 8581.32 cf 0.25 ft 291600 s Constants g= Cd = 32.2 ft/s2 0.6 Orifice Area = 0.012224 sq. ft 1.760212 sq. in Orifice Diameter= 1.50 in