Loading...
HomeMy WebLinkAbout20070327 Ver 1_More Info Received_20071126~~~o f R+S ~ ~P f ~~ ~~e~ ~~V ~ ~ 2007 G'~~ G3~7 . ,~.... ~. ~ ~ ~. -- -- - -- -- - - -- _ - -- _ ___ ___ DATE . ~!~ ~... l ~~.....~0.. Ul:r~rt - vtRA7 £~ t~UALI~Y ro:.~/~itrG' T l"C%......4.u C~.s...._ .................... _....._~~rLaN~S:~~~~ r~~~ru;~r a1//LLG'. ~~fJ/L_~'~L_...../~/~..--~,/~~Gl'......CO4~2 DiN1~T~J~ .................._......._.__......__.._........Q..r~~J.L...G~......................_.._..................................__... C-~J C~ a ~c~? i G,/d C6/fi ~~ d/= ARMSTRONG GLEN, P.C. P.O. Box 7326 Charlotte, NC 28241 (704) 529-0345 FAX (704) 529-0493 ~:: >'_ ~. ~ i~! __ ._ . SIGNED D7- o3a7 Engineering Report WATER QUALITY MANAGEMENT FOR WACHOVIA WIERBRIDGE FINANCIAL CENTER ASHEVILLE, NORTH CAROLINA PREPARED FOR AGH[7-'r-~TA . s... < 4~~ ~~~ ;,~,~V ~ ~ 2007 '?t.;v1~ ~JATFt ~JIj~+LilY `~-~.Ln~p~:~,'~ TOnadtlvA.i~d3R.4NCH ~ l rrlr~ru .~~ %, PREPARED BY ~ ~ %, ~ssivNQaq ~~ SEAL 16891 •` ~ ~~. :~0; r' •. ' ~i • FNG ME~Q '~~~~ ~~fnrrrrrruaN'~~• V \`,1 ARMSTRONG GLEN, P.C. PO BOX 7326 CHARLOTTE, NORTH CAROLINA 28241 704-529-0345 Wachovia Weirbridge Financial Center Asheville, North Carolina TABLE OF CONTENTS Introductory Letter, ..................................................................................................................1. Site Location Map. .................................................................................................................... 3 Drainage Basin Delineation ................................................................................................... 4 Sand Filter Inspection and Maintenance Agreement ....5 Sand Filter Supplement ........................................................................................................... 9 Calculations 12 Required Items Check List ......................................................................................................15 Construction Drawing ..............................................................................................................17 .~.rmstro C~~en, ~. C. PO Box 7326 9771-D Southern Pine Blvd. Phone (704) 529-0345 Charlotte, NC 28241 Charlotte, NC 28273 Fax (704) 529-0493 November 14, 2007 Annette Lucas Stormwater and Wetland Coordinator 401 Oversight and Express Permits Unit NC DENR Division of Water Quality Wetlands and Storm Water Branch 512 North Salisbury Street Raleigh, NC 27604 Re: Revisions to Existing Approved Storm Water Plan Weirbridge Development Asheville, North Carolina Dear Ms. Lucas: The following engineering report contains calculations, permit application forms, check list, and construction drawings pertaining to the water quality BMP for a new Wachovia branch in Asheville. Phase I of Weirbridge Village was originally permitted with individual sediment ponds. The permanent development of the Wachovia site (Outlot #2) will be constructed with underground detention and sedimentation sand filtration for water quality. This report presents an underground combined sedimentation and sand filtration structure for your consideration. All storm water that falls on the developed portion of Outlot #2 is confined to the site by either grading or curbing. Runoff is guided along gutters, and into one of one of five on-site catch basins. An underground storm pipe system carries storm water to a splitter assembly (SB-4). The splitter guides the initial flow to the sedimentation filtration structure SF-3. Flow goes through the sedimentation side of the structure, and spills through weir slots over to the sand filtration side of SF-3. The filtered storm water is collected in an outlet pipe, which exits the southerly end of SF-3. The filtered water flows through buried pipe to junction box JB-10, and through buried pipe to a drop inlet to be provided by the Weirbridge Village developer. After leaving the drop inlet, it is then discharged into the bottom of a large tree well, where it flows by way of open channel to a culvert beneath the Weirbridge Village entrance road. The buried sedimentation/filtration system is simple and efficient, but routine maintenance is required to prevent binding of the sand media and surcharging of the vault. Routine maintenance will be carried out by Wachovia. An executed Inspection and Maintenance Agreement is provided in this report. A recorded drainage easement is not needed since maintenance is a Wachovia responsibility and the BMP is on Wachovia property. Access to the Wachovia site is by way of a shopping center access road, which is open to the public. We appreciate your consideration of our application for permit revision. Call me if you need additional information. Sincerely, William H. Arms o , P.E., P.L.S. SITE LOCA TION MAP ~ ~ ~ ~~ _..~.-- 20 u - ~.--- , 5 -~~"" -`°. U -`~ _. ~.. ~~~ ~ ~ _. ~~,,,~ i°. , W3i ~ 1 --=' ~- ~~ ~. --- .._-- _ - i l ~ _._.. rj24 -d7'Ni Sand Filter Inspection and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures; - The drainage area will be carefully managed to reduce the sediment load to the sand filter. - Once a year, sand media will be skimmed. - The sand filter media will be replaced whenever it fails to function properly after vacuuming. The sand filter will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of inspection and rnaintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential roblem: How I will remediate the roblem: The entire BMP Trash/debris is resent. Remove the trash debris. The adjacent pavement Sediment is present on the Sweep or vacuum the sediment as (if a Iicable) avement surface. soon as ossible. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to sand filter erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer a lication. Vegetation is too short or too Maintain vegetation at a height of lon . a roximateI six inches. The flow diversion The structure is clogged. Unclog the conveyance and dispose structure of an sediment off-site. The structure is damaged. Make any necessary repairs or replace if damage is too large for re air. The pretreatment area Sediment has accumulated to Search for the source of the a depth of greater than six sediment and remedy the problem if inches. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to revent future erosion roblems. Weeds are resent. Remove the weeds, referabl b hand. If a pesticide is used, wipe it on the tiIants rather than spraying. BMP element: Potential roblem: How I will remediate the roblem: The filter bed and Water is ponding on the Check to see if the collector system underdrain collection surface for more than 24 is clogged and flush if necessary. If system hours after a storm. water still ponds, remove the top few inches of filter bed media and replace. If water still ponds, then consult an ex ert. The outflow spillway Shrubs or trees have started Remove shrubs and trees and pipe to ow on the embankment. immediatel . The outflow pipe is clogged. Provide additional erosion protection such as reinforced turf matting or riprap if needed to revent future erosion roblems. The outflow i e is dams ed. Re air or re lace the i The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: 1 L~-'01-'^ ~ `! a~ t ~ Title: 1 y E ('-~1~ ~ l 1~ t;-N '~ Address: 2>a ~ N ° ~~" ~' ° '~ ~' 1 `t- ~ ~ ~ ~~' 0 ~- Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, ~;Qj~~=,f- ~ ~~,,`)~,~~ , a Notary Public for the State of .f~, ~v~~_y , County of ~~.~' ~ , do hereby certify that personally appeared before me this i ~/ day of , ~, and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires ~~ d ~~ ~ /~ ~ C.7~ Permit Number: (to be provided by DWQ) ~©© ~F W arF9 h r ~~~ ~ y NCDENR ~` STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM SAND FILTER SUPPLEMENT This form must be filled out on fine, printed and submitted with all of the required information. Make sure to also fill out and submit the Required Items Checklist (Section 111) and the I&M Agreement (Section IV) L'PROJECT INFORMATION Project name Wachovia - Wierbridge Contact name William M. Armstrong Phone number 704-529-0345 Date November 14, 2007 Drainage area number 1 II,' DESIGN INFORMATION.: Site Characteristics Drainage area (Ao) 32,970 fl2 OK Impervious area 28,348 ft2 Impervious (IA) 86.0% Design rainfall depth 1.0 in Peak Flow Calculations Does this project require prelpost control of the 1-yr 24-hr peak flow? N Y or N 1-yr, 24-hr runoff depth in 1-yr, 24-hr intensity inlhr Pre-development 1-yr, 24-hr runoff ft3/sec Post-development 1-yr, 24-hr runoff ft3/sec Pre/Post 1-yr, 24-hr peak control ft3/sec Storage Volume Design volume 1,946 ft3 Adjusted water quality volume (WQVAdi) 1,460 fts Volume contained in the sedimentation basin and on top of the sand filter. 1,492 Maximum head on the sedimentation basin and sand filter (hMaxFliter) 5.83 ft Average head on the sedimentation basin and sand filter (hA) 2.92 ft Runoff Coefficient (Rv) 0.82 (unitless) Type of Sand Filter Open sand filter? Y Y or N If this is an open sand filter: The clearance between the bottom of the sand 20 ft filter and the SHWT (dsHwr) Closed/pre-cast sand filter? N Y or N If this is a closed sand filter: The clearance between the bottom of the sand ft filter and the SHWT (dSHWi) If this is a closed, underground closed sand filter: The clearance between the surface of the sand filter and the bottom of the roof of the underground ft StrUCtUre (dSpace) OK OK Form SW401-Sand Filter-Rev.1 Parts I and II. Project Design Summary, Page 1 of 3 Permit Number: (to be provided 6y DWQ) Sedimentation Basin Surface area of sedimentation basin (As) Sand Filter Surface area of sand filter (Ar) Depth of the sand media filter bed (dr) Coefficient of permeability for the sand filter (k) Time to drain the sand filter (t) Time to drain the sand filter (t) Additional Information Does volume in excess of the design volume bypass the sand filter? Is an off-line flow-splitting device used? Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30ft from surface waters (50ft if SA waters)? Is the BMP localed at least 100ft from water supply wells? Are the vegetated side slopes equal to or less than 3:1 Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? What is the width of the sedimentation chamber/forebay (Wsed)? What is the depth of sand over the outlet pipe? Figure 1: Open Sand Filter ZCllllle llfiitt ail {ar F~xi-eba~~) F2oz~~ 128 ftZ OK 128 ft2 OK 1.5 ft 3.5 (ftlday) 40 hours OK 1.67 days Y YorN Y YorN OK N Y or N Excess volume must pass through filter. tt YorN Y YorN Y YorN Y YorN OK Y Y or N OK Oft OK 1.5 ft OK S.i11Ct ~ttt~C C~lta~b~ ~^ -~ C~ritlet T?pe (~F t~H4'V'r .Iti-Situ-Sail; S~aijr- ........ ..................... ``~~Sed F3i~h ~~'at+~r Tal~te Form SW401-Sand Filter-Rev.1 Parts I and II. Project Design Summary, Page 2 of 3 ARMSTRONG GLEN, P.C. X06 6,1~-cFlo~Q P.O. Box 7326 Charlotte, NC 28241 PROJECT NO. Q ~Q -~ S SHEET NO. Z Phone:704-529-0345 CALCULATED BY ~1/YI ~DATE~I~_~~ Fax: 704-529-0493 SCALE ARMSTRONG GLEN, P.C. P.O. Box 7326 Charlotte, NC 28241 Phone: 704-529-0345 Fax: 704-529-0493 w QVA .... Q ADS .._. ✓,. _ JOB PROJECT NO. il ^ SHEET NO. D F 3 CALCULATED BY DATE SCALE Permit No. (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Pagel Plan Sheet No. ~j~` / 1.~lans (1" - 50' or larger) of the entire site with labeled drainage area boundaries System dimensions (length, width, and depth) for both the sedimentation chamber and the filter chamber Maintenance access,- Shl~~~~~j c~h~~ r Ph f r a~n C e G>!Y~'1r'Q Flow splitting device, n - Recorded drainage easement and public right of way (ROW),~r ~~< < 5 l B dG~.'~~ ~'CC~55PlX - Design at ultimate build-out, ~{h.5 i 5 t t - Off-site drainage (if applicable), and 110 ~ n -Boundaries of drainage easement. 2r L ~ S~G~ 2. Plan details (1" = 50' or larger) for the sand filter showing: /System dimensions (length, width, and depth) for both the sedimentation chamber and the filter chamber intenance access, 'Flow splitting device, - Recorded drainage easement and public right of way (ROW), - Design at ultimate build-out, - Off-site drainage (if applicable), and -Boundaries of drainage easement. 3. Section view of the sand filter (1" = 20' or larger) showing: - Depth(s) of the sedimentation chamber and sand filter chamber, -Depth of sand filter media -Connection between the sedimentation chamber and the sand filter chamber, - SHWT level(s) -Outlet pipe, and -Clearance from the surface of the sand filter to the bottom of the roof of the underground structure (if applicable) L-^/YCIOSG= n 4. Supporting calculations (including drainage calculations) ~f C~OSC=L 5, Signed and notarized inspection and maintenance agreement Form SW401-Sand Filter-Rev.1 Part III, Page 1 of 1