HomeMy WebLinkAbout20071498 Ver 1_Approval Letter_20071031O?O? W A T ?R?G
CC ? Y
October 31, 2007
DWQ Project # 071498
Pender County
Town of Ocean Isle Beach
Attn: Daisy Ivey, Town Administrator
3 West Third Street
Ocean Isle Beach, NC 28469 f7 f% A Subject Property: 2007 Maintenance Dredging Cf, 10 6 MVW
Approval of 401 Water Quality Certification with Additional Conditions
Dear Ms. Ivey:
You have our approval, in accordance with the attached conditions and those listed below, to
perform maintenance dredging on a man-made canal system and on entrance channels off of the
Atlantic Intracoastal Waterway (AIWW), as described within the CAMA application dated
September 4, 2007 and received by the N.C. Division of Water Quality (DWQ) Wilmington
Regional Office (WiRO) on October 10, 2007. After reviewing your application, we have
decided that the impacts are covered by General Water Quality Certification Number 3642 (GC
3642). This Certification can also be found on line at:
http://h2o.enr.state.nc.us/ncwetlands/certs.html. The Certification allows you to use the CAMA
Major Permit when issued by the Division of Coastal Management. In addition, you should
obtain or otherwise comply with any other required federal, state or local permits before you go
ahead with your project including (but not limited to) Erosion and Sediment Control, Non-
discharge, and stonnwater regulations. Also, this approval to proceed with your proposed
impacts or to conduct impacts to waters as depicted in your application shall expire upon
expiration of the 404 or CAMA Permit.
This approval is for the purpose and design that you described in your application. If you change
your project, you must notify us and you may be required to send us a new application. If the
property is sold, the new owner must be given a copy of this Certification and approval letter and
is thereby responsible for complying with all conditions. If total fills for this project (now or in
the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may
be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the
conditions listed in the attached certification and any additional conditions listed below.
The Additional Conditions of the Certification are:
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general
conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts
N,_o',r?'thCarolina
,Naturallb,
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Division of Water Quality
North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service
Internet: www.ncwaterquality.orx Location: 512 N. Salisbury St. Raleigh, NC 27604 Fax (919) 733-2496 1-877-623-6748
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
2
Town of Ocean Isle Beach
2007 Maintenance Dredging
DWQ Project # 071706
are approved including incidental impacts:
Amount Approved
(Units) Plan Location or Reference
Stream N/A (feet)
404 Wetlands N/A acres
Coastal Wetlands N/A (acres)
Open Water
(dredging) (77055 sq ft) 1.77 acres Attached site plans (detailed
plat in folder)
Open Water (fill) N/A (acres)
2. Erosion & Sediment Control Practices
Erosion and sediment control practices must be in full compliance with all specifications
governing the proper design, installation and operation and maintenance of such Best
Management Practices in order to protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed,
installed, operated, and maintained in accordance with the most recent version of the
North Carolina Sediment and Erosion Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion
control measures must be such that they equal, or exceed, the requirements specified
in the most recent version of the North Carolina Sediment and Erosion Control
Manual. The devices shall be maintained on all construction sites, borrow sites, and
waste pile (spoil) projects, including contractor-owned or leased borrow pits
associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be designed,
installed, operated, and maintained in accordance with the most recent version of the
North Carolina Surface Mining Manual.
d. The reclamation measures and implementation must comply with the reclamation in
accordance with the requirements of the Sedimentation Pollution Control Act.
No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian
areas beyond the footprint of the impacts depicted in the CAMA Major application. All
construction activities, including the design, installation, operation, and maintenance of
sediment and erosion control Best Management Practices, shall be performed so that no
violations of state water quality standards, statutes, or rules occur.
4. No Sediment & Erosion Control Measures w/n Wetlands or Waters
Sediment and erosion control measures shall not be placed in wetlands or waters to the
maximum extent practicable. If placement of sediment and erosion control devices in
wetlands and waters is unavoidable, they shall be removed and the natural grade restored
3
Town of Ocean Isle Beach
2007 Maintenance Dredging
DWQ Project # 071706
within six months of the date that the Division of Land Resources has released the
project.
5. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or
applicable Buffer Rules, and any subsequent modifications, the applicant is required to
return the attached certificate of completion to the 401/Wetlands Unit, North Carolina
Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650.
Violations of any condition herein set forth may result in revocation of this Certification and may
result in criminal and/or civil penalties. The authorization to proceed with your proposed
impacts or to conduct impacts to waters as depicted in your application and as authorized by this
Certification shall expire upon expiration of the 404 or CAMA Permit.
If you do not accept any of the conditions of this Certification (associated with the approved
wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60
days of the date that you receive this letter. To ask for a hearing, send a written petition, which
conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative
Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its
conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean
Water Act. If you have any questions, please telephone Ian McMillan in the Central Office in
Raleigh at 919-733-1786 or Chad Coburn in the DWQ Wilmington Regional Office at 910-796-
7215.
S' cerely,
Coleen H. Sullins, Director
Division of Water Quality
Enclosures: GC 3642
Certificate of Completion
cc: David Timpy - USACE Wilmington Regulatory Field Office
Ian McMillan - DWQ 401 Unit
Doug Huggett - DCM Morehead
Debra Wilson - DCM Wilmington
Central Files/WiRO
Certification of Completion
DWQ Project No.:
Applicant:
Project Name:
Date of Issuance of Wetland Permit:
County:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit,
North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be
returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send
certificates from all of these.
Applicant's Certification
1,
used in the observation of the
compliance and intent of the 401
and other supporting materials.
Signature:
Agent's Certification
1,
used in the observation of the
compliance and intent of the 401
and other supporting materials.
Signature:
Date:
If this project was designed by a Certified Professional
I, , as a duly registered Professional (i.e., Engineer,
Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically,
weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
, hereby state that, to the best of my abilities, due care and diligence was
construction such that the construction was observed to be built within substantial
Water Quality Certification and Buffer Rules, the approved plans and specifications,
Date:
, hereby state that, to the best of my abilities, due care and diligence was
construction such that the construction was observed to be built within substantial
Water Quality Certification and Buffer Rules, the approved plans and specifications,
Signature: Registration No. Date
WQC #3642
rft?
CAMA PERMIT CERTIFICATION FA
This General Certification is issued in conformity with requirement of Section 401, Public
Laws 92-500 and 95-217 of the United States and subject to the North Carolina Division of Water
Quality Regulations in 15 NCAC 2H, Section .0500 and 15 NCAC 2B .0200 for the discharge of
fill material as described in General Permit 198000291 and for the Riparian Area Protection Rules
(Buffer Rules) in 15A NCAC 2B .0200. This Certification replaces Water Quality Certification
Number 3025 issued on September 6, 1995, Water Quality Certification Number 3112 issued on
February 11, 1997, Water Quality Certification Number 3274 issued June 1, 2000 and Water
Quality Certification Number 3371 issued March 18, 2002 and WQC Number 3400 issued March
18, 2002. This WQC is rescinded when the Corps of Engineers re-authorizes any of these
Nationwide or Regional General Permits or when deemed appropriate by the Director of DWQ.
The State of North Carolina certifies that the specified category of activity will not violate
applicable portions of Sections 301, 302, 303, 306 and 307 of the Public Laws 92-500 and 95-217
if conducted in accordance with conditions hereinafter set forth.
Conditions of Certification:
1. Activities authorized by CAMA major permits require written concurrence from the
Division of Water Quality as well as compliance with all conditions of this General
Certification;
2. Activities authorized by Coastal Area Management Act (CAMA) Minor or General
Permits do not require written authorization from the Division of Water Quality as long
as they comply with all other conditions of this General Certification;
3. In accordance with North Carolina General Statute Section 143-215.3D(e), any
request for written concurrence for a 401 Water Quality Certification must include the
appropriate fee. If a project also requires a CAMA Permit, one payment to both
agencies shall be submitted and will be the higher of the two fees. The fee shall be
collected and distributed between the two agencies in accordance with agreements
reached between the Division of Water Quality and the Division of Coastal
Management;
In accordance with 15A NCAC 2H .0506 (h) compensatory mitigation may be
required for impacts to 150 linear feet or more of streams and/or one acre or more of
wetlands. In addition, buffer mitigation may be required for any project with Buffer
Rules in effect at the time of application for buffer impacts resulting from activities
classified as "allowable with mitigation" within the "Table of Uses" section of the
Buffer Rules or require a variance under the Buffer Rules. A determination of buffer,
wetland and stream mitigation requirements shall be made for any Certification for
this Nationwide Permit. The most current design and monitoring protocols from DWQ
shall be followed and written plans submitted for DWQ approval as required in those
protocols. When compensatory mitigation is required for a project, the mitigation
plans must be approved by DWQ in writing before the impacts approved by the
Certification occur. The mitigation plan must be implemented and/or constructed
before any permanent building or structure on site is occupied. In the case of public
WQC #3642
road projects, the mitigation plan must be implemented before the road is opened to
the travelling public;
5. Compensatory stream mitigation shall be required at a 1:1 ratio for not only perennial
but also intermittent stream impacts that require application to DWQ in watersheds
classified as ORW, HQW, Tr, WS-1 and WS-II unless the project is a linear, publicly-
funded transportation project, which has a 150-foot per-stream impact allowance;
6. Impacts to any stream length in the Neuse and Tar-Pamlico River Basins (or any
other major river basins with Riparian Area Protection Rules [Buffer Rules] in effect at
the time of application) requires written concurrence from DWQ in accordance with
15A NCAC 213.0200. New development activities located in the protected 50-foot
wide riparian areas (whether jurisdictional wetlands or not) within the Neuse and Tar-
Pamlico River Basins shall be limited to "uses" identified within and constructed in
accordance with 15A NCAC 2B .0200. All new development shall be located,
designed, constructed, and maintained to have minimal disturbance to protect water
quality to the maximum extent practicable through the use of best management
practices. Activities listed as "exempt" from these rules do not need to apply for
written concurrence under this Certification;
7. All sediment and erosion control measures placed in wetlands or waters shall be
removed and the original grade restored after the Division of Land Resources has
released the project;
8. If an environmental document is required, this Certification is not valid until a Finding
of No Significant Impact (FONSI) or Record of Decision (ROD) is issued by the State
Clearinghouse;
9. That appropriate sediment and erosion control practices which equal or exceed those
outlined in the most recent version of the "North Carolina Sediment and Erosion
Control Planning and Design Manual" or the "North Carolina Surface Mining Manual"
whichever is more appropriate (available from the Division of Land Resources (DLR)
in the DENR Regional or Central Offices) shall be in full compliance with all
specifications governing the proper design, installation and operation and
maintenance of such Best Management Practices in order to assure compliance with
the appropriate turbidity water quality standard;
10. Measures shall be taken to prevent live or fresh concrete from coming into contact
with freshwaters of the state until the concrete has hardened;
11. Additional site-specific conditions may be added to projects which have applied for
CAMA major permits which are proposed under this Certification in order to ensure
compliance with all applicable water quality and effluent standards;
12. When written concurrence is required, the applicant is required to use the most
recent version of the Certification of Completion form to notify DWQ when all work
included in the 401 Certification has been completed;
13. Concurrence from DWQ that this Certification applies to an individual project shall
expire three years from the date of the cover letter from DWQ or on the same day as
the expiration date of the corresponding General Permit 198000291, whichever is
sooner.
Non-compliance with or violation of the conditions herein set forth by a specific fill project
shall result in revocation of this Certification for the project and may result in criminal and/or civil
penalties.
WQC #3642
The Director of the North Carolina Division of Water Quality may require submission of a
formal application for individual certification for any project in this category of activity that requires
written concurrence under this certification, if it is determined that the project is likely to have a
significant adverse effect upon water quality or degrade the waters so that existing uses of the
wetland or downstream waters are precluded.
Public hearings may be held for specific applications or group of applications prior to a
Certification decision if deemed in the public's best interest by the Director of the North Carolina
Division of Water Quality.
Effective date: 19 March 2007
DIVISION OF WATER QUALITY
By
Aavl- au?-?
Alan W. Klimek
Director
WQC # 3642
a
Ugig
Z
V
Q
W
co
w
J
N
Z
Q
W
V
0
0
a
3
0
Q
z
A
0
Q
qV
i
H
0
Z
n
Z
v
Q
W
m
w
N
Z
a
W
V
0
Y
M
V
s
¦
aa?
IM
Z
0
0)
.c
L
v
to
.a+
IM
2
ti
O
O
N
SJiUN N S HYI JU A. VM I j
?,,,,?,?? S11Y11(7 JJ03a0 ? Oc ?lvhvJ aA-q
C b f121MIca _3'
1.SI?
Z
¢?a
H
U) W
:) Z
aaa
Ur- r
r
u
' o
cV
U
I j
i i
i;
1 ?
/ I
Ili
N'
I! I
I =7:3=
?r _1j Ii I
6
3 a?
I I'?
?? II
to
? i ? 1 ?==?II1iI
Ii 2 =i
? ? ? ??_II 111
=Mr
J
I ; I?'II. E,T,L
i
1 iUti NUJ 1trJnicjs UNV
NYJ 3JP t d1 YJ - NV ld
1 4 A S'YNV Nb1J
I ?
r I_
1 L
"'I "TET-TTEL
TTIIihl1?[ll:j=[I i f
=L V ' IU i L ICj '
it 0
Gi Ot3 r
>av lu.I t'
)aYIN-,
IvN3nJ i'
a3n? ??
k I - ? Ill`
-? C
I -? I--
Ila -.-.LI ; ,,usu 1 1 1 1 1 1 i?y.r-1 j
i ; IL:LII.1T?11IIL II-i?II_..1 -_ ?
J1I111111UL11tI 111 a , I
1[L 71T[-I 1L?LTi a _ -i
j 11?ITill ED71 !IL T
?! __ _ _u_1
'11iT lI' L l T, - nrl
f?II ?l? 1L 1111.]Ti 9 k
?'_- lC1i.I
t. _ J1 L'I.1 LLI I 1 r `LI L! :TI1_r i-?
l m?. .le. F
?rf 1J T,LT[rJ L11i'._i_1J ?_
j i?TL17Tl' !?i ? 11J l f C Li C l l r! !_TI .
j? 71111 .1[1111--F
1TLF?'
t e...y
rr LI I I:IIT
I L11 T11 111, 1!HA_1,11111 L1 l_l_?. _ ? 1:
7 f LIEU -1L1.1?II ALF, 11 Jl[I -er_
1L?IL11?Il11?1111II:L11i CII,s1an1II Ll!?? _ ?)1 ? ??
111111I1111JDI?ll1?11I,?i?'1L?IIIIITli? i--J-
IL1111III[I?T11? 11??1? i111?17-Till?ii?11iIIll?! 1
111.i[1 Ill.; !l1 L11II1 11i?1I1T 1LLIllTIi_ii?11?1 CC?-' ?'
i1LIlT.??ILI ? 11 ? ??I 111iC1? ?lT ,IL:I?T rr' [- ?
[L1JIIlLiLIiCI]IIJ;;!?L?7i[l_! i!llJT?_I ?!ILl ?=1 ?=_1
TI111Lll.):,lIL1ll,?lll[r?11LJI[I .I, II 11?? !I I ? !?J ? -
LJIII1l11i Lli l1ILL',? i IIJI![Lli? _ ' !
L1lli11? I , I'?lill[II ??' I - I .
7_1
¢ 3 r
cc 0
u
Q
,
y
p aS
m
n i
II !
a' 9E Y 1rr ?-7. j
? ! i
f ?; i 1 A II I ilj? ?!
\
? !ICI ?l
a ,
h
r
•
?? 3.9,' I,
/
X
f 1P i ? ?,^\ 1 ' a
t
a
m Y+
r 9E
p ... {I t ?_- ^1
dm r ?
?`aYR?beFgeA?ee? `*
si aE?iz???F9;E
? dF a4 ?e'?e i?
SA?F?iY< ??h?Y
Gc
aS
A
? nyf9,er a
Yf?B?e
i yy
ll
F
,. + C
jYr__ `_ I
..
Y
?4 ?
m BYIE l
Y ? i,
€
g
v
33
k
`
eet Y
r s F
p UY
m
I3^ l e?' •;
o•
. .?n?YY •:? Y Y
IT
+_L
8 p ed ?i i?l ?? .
?. A# G'T N ? ?YriF Fn ` I I I
a;
.7 ,,, z r
a I
l z o !.. ? y \i ?" \ i
r l"a ,; $ ?, O F 11
°g ?n ?i y i i I i I
nt I3 `til ° a f 4TOWN OF OCEAN ISLE -
?• BEACH
+ $ ? OCEAN I:.tE flEAp1, NORTH I;AR(1LNA ,! CPIfFP '~"~?°?"
l
l ?i1Fy ? oz 2007 MAINTENANCE DREDGING -"NATURAL' CANALS UC 'qBLd rnauTMAw .... ? ? - -
°?.a_a EROSION AND SEDIMENT CONTROL PLAN, SPILLWAY DETAILS, 8 NOTES 1CH TANNED -
tl3NNY1 N`7
INYW No"i
aT.1?O
tll
ws nrwu
r,
NYId 3003HO lIV83AO - gg t
S-NNYO .-iyunlVN. - 'JNI003tl(l 30NVN3-LNIVW LOOZ
VNMSYD HIWN X?V38 3151 NV3:)O s
HOV30 3151 NY300 JO NMOl
n
s C t s
f dE83t?fig ? ? '" °°
Z
s
a
w
o tl
C d
0
J
it
w
00
?A
3 E b [ A{Kb ^h
K'F :' a i RG ?g' ky?I< aJ
as S c ?? td i?TYI 9?
}3 ? i ?K ..b t' k?bP Sb X
Aga bF 1d
h? Y? L yi [1[' bt tlq?t' 3? 5L,?
.r y b.
C? 43 k° Y? bY3tbgL
?. dY 4? pk ?;• ?? 46 A? 1SR ?i
_ r
h
8
r
F
8
?Y
S
1
8 E?
r E?
f
ILlrry. '..cr
Nt? tirr'.?,
P Yy °oy t TOWN OF OCEAN ISLE BEACH
'? t N y OCEAN ISLE BEACH. NORIII CAROLINA of
?' aaxy: p?s 2007 MAINTENANCE DREDGING NATURAL' CANALS oc
ENLARGED PLANS - ENTRANCE CANALS #3 & #8. CANAL #20,
LYI .. ,. & DREDGE DETAILS .,_
N
D 1 t `
ng ~?
o3 .y
mF I IF
m
m
i
P^
r °PR
t
>r
?K
?k
w
TRO UT MAN ••?"•?+
TANNER ?V
ka?:v8y d3j ? n?,. `
??
r ? ?: ? , z
I a?;
n ? , ,,
Jr ,? _?