Loading...
HomeMy WebLinkAbout20131200 Ver 2_Stormwater Approval_20150410WDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor April 10, 2015 Mr. Jeff Brown 2659 Sandy Plains Road Tryon, North Carolina 28782 Mr. Roger Smith, Registered Agent Tryon Equestrian Partners, LLC 360 Ken Miller Road Rutherfordton, North Carolina 28139 Subject: STORMWATER MANAGEMENT PLAN TRYON EQUESTRIAN CENTER Dear Messrs. Brown and Smith: Donald R. van der Vaart Secretary DWR Project # 13-1200 Polk County On February 17, 2014, the Division of Water Resources (DWR) issued a 401 Water Quality Certification to impact 0.49 acre of wetland and 150 linear feet of stream or waters in order to construct the proposed development in Polk County. In order to meet Condition 6 of the 401 Certification for this project, a stormwater management plan was submitted to the DWR on October 1, 2014. Because you propose to use a proprietary stormwater management system known as the "Isolator Row," the DWR has delegated the review of the stormwater management plan to the NC Division of Energy, Mineral and Land Resources (DEMLR), the agency that handles reviews of these types of devices. The first stormwater management plan submittal was received by DEMLR on October 1, 2014. The deficiencies in that stormwater management plan were communicated to your consultant, Mr. David Odom, PE, of Odom Engineering, PLLC, on October 20, 2014. On October 27, 2014, DEMLR received a revised stormwater management plan. DEMLR has determined that the revised stormwater management plan remains incomplete. On February 1, 2015, DEMLR received a revised stormwater management plan, dated January 5, 2015. DEMLR has determined that the revised stormwater management plan meets Condition 6 of the 401 Certification for this project. . Division of Energy, Mineral, and Land Resources Energy Section • Geological Survey Section • Land Quality Section 1612 Mail Service Center, Raleigh, North Carolina 27699-1612.919-707-9200 / FAX: 919-715-8801 512 North Salisbury Street, Raleigh, North Carolina 27604 • Internet: http://portal.ncdenr.org/web/Ir/ An Equal Opportunity 1 Affirmative Action Employer - 50% Recycled 110% Post Consumer Paper Mr. Jeff Brown April 10, 2015 Page 2 of 3 Conditions of Approval: 1. The SMP approved by DEMLR consists of the following: Drainage area Type of practice Impervious surface Total drainage area draining to practice of practice (square feet) (square feet) 2&3B Isolator Row 338,897 977,922 3A Isolator Row 83,200 554.954 4 Isolator Row 138,521 368,953 6 Isolator Row 202,118 642,074 7 Wet Pond/Level Spreader 157,167 506,167 8 Isolator Row 467,399 1,335,114 The stormwater control measures listed above and all associated stormwater conveyances, inlet and outlet structures, and the grading and drainage patterns depicted on plan sheets dated October 16, 2014. The plans and specifications approved by DEMLR are incorporated by reference into this approval and are enforceable by DEMLR and DWR provided however that any modification of the design for the stormwater management system that is accepted by DEMLR or DWR shall take precedence over the original plans and specifications. 2. The maximum allowable drainage and the maximum impervious areas for the stormwater control measures shall be per the table above. Any changes to these maximum areas shall require the applicant to submit and receive approval for a revised stormwater management plan by DEMLR or DWR. 3. The footprint of all stormwater management devices as well as an additional 10 -foot wide area on all sides of the devices shall be located in public rights-of-way, dedicated common areas or recorded easement areas. The final plats for the project showing all such rights- of-way, common areas and easement areas shall be in accordance with the approved plans. 4. Maintenance activities for the wet pond shall be performed in accordance with the notarized O&M agreements signed by Mr. Jeff Brown on January 5, 2015. Maintenance activities for the Isolator Row systems shall be performed in accordance with the notarized O&M agreements signed by Mr. Jeff Brown on October 15, 2014. The O&M agreements shall transfer with the sale of the land or transfer of ownership/responsibility for the BMP facility. DWR shall be notified promptly of every transfer. 5. The applicant and/or authorized agent shall provide a completed Certificate of Completion form to the DWR within thirty (30) days of project completion (available at http://Portal.ncdenr.org/web/wq/swp/ws/401/certs and permits/apply/forms). Mr. Jeff Brown April 10, 2015 Page 3 of 3 ank you for your attention to this matter. If you have any questions or wish to discuss these mdtters further, please do not hesitate to contact me at (919) 807-6381. Sincerely, Annette M. Lucas, PE Environmental Engineer AML/aml cc: USACE Asheville Regulatory Field Office Mr. David Odom, PE, Odom Engineering, PLCC (via email) Mr. Kelly Hefner, PE, Advanced Drainage Systems, Inc. (via email) Dr. Bill Hunt, PE, PhD, NCSU-BAE (via email) Mr. Andrew Anderson, EI, NCSU-BAE (via email) Mr. Ken Pickle, PE, DEMLR (via email) Mr. Boyd DeVane (via email) 401 & Buffer Permitting Unit file, DWR ARO 401 file (via email) Filename: 232200TryonHorseFarm(Polk) Approve SW.docx