Loading...
HomeMy WebLinkAboutNC0025879_2023 System Performance Annual Report_20240313Svstem Pertormonce Anqual Report General Information: Facility Name- Town Of Robbinsville Sewage System 6 Knight Street Robbinsville, NC 28771 Town Of Robbinsville Wastewater Treatment Plant (WWTp) 197 Sandhole Road Robbinsville NC,28771 2023 T II. Permit Numbers: r NPDES Permit #NC0025879 . Lime Stabilization Permit #WQ0039348 . Collection System Permit #WQCS00158 Descriotion Of Facilities A. Collection Svstem The Town of Robbinsville service area covers approximately 17 miles' The Town provides service to areas from Tallulah to Tapoco Road. The entire iz-mile system is gravity fed to the lift station at 6 Knightstreet.ThereistwoPumpstationswithinthecollectionsystemandthereisapproximately306 MH's system wide. The Towns collection system is considered fairly new' Most of the Iines have been replaced with ductile iron pipe (DIP)or potyvinyl chloride (PVC)'{here are very few terracotta lines teft within the system- ripe size rang". i.otrl 4 inches to 8 inches. There are approximately 554 sewer customers. B. llastewater Treatment Plant filY.dP) r! Thepresent,nu,t.,o,ffi)isa.630milliongalIonsperday(MGD)Extended aeration of r..onOu.yi.eatme* plant serving the Town -o-f Robbins.ville and the county overall the town services approximately 554 sewer custoirers' 1n2023 the facility treated an average daily flow of 293,500 gallons per day. The plant.orsistsoia step-bar screen with-a screw conveyor for preliminary treatment. fi.rt anJsJconJ ,i"g. aeration basins along with a circular clarifier for secondary treatment. Disinfection is done by UV effluent' Residuils are held in two 75'000 gallon aerobic Alderman Debbie Beasley 828- 735-0498 Alderman Kenneth Hyde 828-735-9594 Alderman Vacant Mayor Shaun Adams 828-73s-9382 Public Works Director Chadd Carpenter (ORC) CS 828-73s-01 80 Wastewater Treatment Plant Operator Lamar Williams (ORC) WWTP 828-73s-0809 Public Works C-surface water Operator Eddie Sharpe ( BORC) CS 828-735-0085 il1. U. digesters until dewatering is completed by a .75 meter belt press. Dewatered sludge is then stabilized by using alkaline stabilization and heat treatment process. The WWTP produced approximately 122 ton ofdewatered sludge in 2023. Performance measures A. Collection system o The Town of Robbinsville preventative maintenance program consist of high-pressure jetting and visual inspection. This year 14,775lineal feet ofpipe was cleaned and inspected; this is approximately l67o of the sewer system. r Maintenance crew inspected system and aerial lines every rainfall. Inspected system twice annually maintenance keeps a log of all sewer cleanings and aerials every time they are cleaned and inspected. r The collection system recorded 0 reportable sanitary sewer overflow (SSO) in 2023. B. Wsstewoter treatment plant (ryWTP) o The wastewater treatment plant had one Notice of Violation (NOV) for temp, the downstream effluent for the months ofAugust and September because they were not done, The ORC didn't receive the new permit and didn't know the changes. Since then the issues have been corrected and we are in compliance. The wastewater treatment plant (WWTP) continues to provide effective/ efficient treatment services to the community averaging BOD and TSS removal efficiencies well above the NCDENR and EPA requirements. Flow to the wastewater treatment plant is below capacity for the plant with an average flow 293,500 gallons per day in2023. The wastewater treatment plant remained in compliance for all permitted parameters., Certification I certify under penalty oflaw that this report is complete and accurate to the best ofmy knowledge. I further certify that this report has been made available to the users and customers ofthe Town of Robbinsville sewer system. 'g -t ..2 ci Chadd Carpenter,ORC Public Works Director Town of Robbinsville Date