Loading...
HomeMy WebLinkAboutNCG020739_NOV_20240412 6„o.STATE, ROY COOPER Governor rtf - ;ll ELIZABETHS.BISER `�` i,�x. Secretary --,Q.,.' ) WILLIAME.TOBY VINSON,JR NORTH CAROLINA Interim Director Environmental Quality April 12, 2024 CERTIFIED MAIL: 7022 2410 0003 3233 5885 RETURN RECEIPT REQUESTED S. T. Wooten Corporation Attn: James Washburn, Environmental Compliance Manager P. O. Box 2408 Wilson, NC 27894 Subject: NOTICE OF VIOLATION (NOV-2024-PC-0237) NPDES Stormwater General Permit NCG020000 Womble Mine, Certificate of Coverage 020739 Harnett County Dear Mr. Washburn: ' On March 20, 2024, Melissa Joyner from the Fayetteville Regional Office of the Division of Energy, Mineral and Land Resources (DEMLR), conducted a site inspection for the Womble Mine facility located at 1617 McKoy Town Road, Cameron, Fayetteville, in Harnett County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. The site visit andfile review revealed that the subject facility is covered by NPDES Stormwater General Permit NCG020000 under Certificate of Coverage NCG020739. Permit coverage authorizes the discharge of storrnwater from the facility to receiving waters designated as Buffalo Creek, class WS-III waters in the Cape Fear River Basin. As a result of the site inspection, the following permit conditions violations are noted: 1)Stormwater Pollution Prevention Plan (SWPPP) Per Part B...A Stormwater Pollution Prevention Plan (SWPPP) has not been properly implemented. 2) Qualitative Monitoring Per Part E, Section E-1, E-2...Qualitative monitoring has not been conducted and/or recorded in accordance with permit requirements. 3)Analytical Monitorinq Per Part F, Section F-1-F-10...Analytical monitoring has not been conducted and/or recorded in accordance with permit requirements. Other Observations Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Requested Response You are asked to respond to this office, in writing,within 30 calendar days from receipt of this notice. Your written response should include a reasonable explanation as to why the aforementioned violations have occurred as well as a Plan of Action to prevent these violations from recurring. North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources DE ----) Fayetteville Regional Office 1225 Green Street,Suite 71.41 Fayetteville,North Carolina 28301NOR'),UAROLJNA ne,m toreo+rom )fte, /""1 910.433.3300 Action Items Immediately review and amend the facility's SWPPP as needed and begin incorporating documentation pertaining to the annual update requirements of the permit. Conduct and record monitoring per the conditions of the permit. Thank you for your attention to this matter. This office requires that the violations, as detailed above, be properly resolved. These violations and any future violations are subject to a civil penalty assessment of up to$25,000 per day for each violation.Should you have any questions regarding these matters, please contact Melissa Joyner or myself at(910) 433-3300. Sincerely, Ti othy L. LaB , PE Regional Engineer DEMLR TLL/maj Enclosure: Compliance Inspection Report ec: Toby Vinson, Jr., PE, CPESC, CPM, Interim Director— DEMLR Brad Cole, PE, Chief of Regional Operations— DEMLR Michael Lawyer, CPSWQ—Stormwater Program Supervisor— DEMLR Kieu Tran, Environmental Specialist, Stormwater Program— DEMLR DEMLR NPDES Stormwater Permit Laserfiche File cc: FRO— DEMLR Compliance Inspection Report Permit:NCG020739 Effective: 07/01/21 Expiration: 06/30/25 Owner: S T Wooten Corporation SOC: Effective: Expiration: Facility: Womble Mine County: Harnett 1617 McKoyTown Rd Region: Fayetteville Cameron NC 28326 Contact Person:James Washburn Title: Env. Compliance Mngr Phone:252-290-5912 Directions to Facility: System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 03/20/2024 Entry Time 09:10AM Exit Time: 10:10AM Primary Inspector:Melissa A Joyner l'a.4 1' frb`avi'✓ Phone: Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG020739 Owner-Facility:S T Wooten Corporation Inspection Date: 03/20/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: Melissa Joyner met with Mr.James Washburn, Environmental Compliance Manager at the Womble Mine.The Stormwater Pollution Prevention Plan (SWPPP)was reviewed.The SWPPP has not been annually reviewed and updated(as needed). The rainfall data was being obtained from the Internet.This information will need to be obtained from an on-site rain gauge or from a source within a mile of the mine.There was no detailed site map which needs to be included in the SWPPP with the required information per the conditions of General Permit NCG020000. Employee training was not being conducted. Information should be included under the Spill Prevention and Response Plan about the location and contents of the spill kit. The stormwater facility inspection program was not being conducted quarterly. The facility has a single outfall which has not been inspected in a few years because it is not reportedly accessible. The Inspector was not able to access this outfall during the inspection. The possible presence of non-stormwater being discharged from the outfall has not been annually evaluated. Neither Qualitative nor Analytical Monitoring have occurred.This Outfall needs to be made accessible or another accessible sampling location identified to enable monitoring to occur on a quarterly basis. In order to elecronically upload the quarterly Discharge Monitoring Report(DMR)forms please go to the following link for registration purposes.: https://www.d eq.nc.gov/a baut/divisions/energy-mineral-and-land-resources/stormwater/stormwater-program/npdes-industrial- program/stormwater-electro nic-discharge-monitoring-reports-edmr If there is no discharge at the outfall this should be noted on the DMR. S. T.Wooten is also out of compliance with the Mine Permit(43-42) because permanent boundary markers have not been installed for the affected mine permit boundaries. Page 2 of 3 Permit: NCG020739 Owner-Facillty:S T Wooten Corporation Inspection Date: 03/20/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? • El El LI #Does the Plan include a General Location (USGS)map? • ❑ ❑ ❑ #Does the Plan include a"Narrative Description of Practices"? El El El #Does the Plan include a detailed site map including outfall locations and drainage areas? El • El El #Does the Plan include a list of significant spills occurring during the past 3 years? • ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? • ❑ El El # Does the facility provide all necessary secondary containment? El El • El #Does the Plan include a BMP summary? • ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan (SPRP)? • ❑ ❑ ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? • ❑ ❑ El #Does the facility provide and document Employee Training? El • El ❑ #Does the Plan include a list of Responsible Party(s)? • ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ U ❑ El #Does the Plan include a Stormwater Facility Inspection Program? • El El El Has the Stormwater Pollution Prevention Plan been implemented? ❑ • ❑ ❑ Comment: The Stormwater Pollution Prevention Plan has not been implemented per the conditions of General Permit NCG020000. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? ❑ • ❑ ❑ Comment: Qualitative Monitoring has not been implemented per the conditions of General Permit NCG020000. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ U ❑ El #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ • ❑ Comment: Analytical Monitoring has not been implemented per the conditions of General Permit NCG020000. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? • ❑ ❑ ❑ #Were all outfalls observed during the inspection? ❑ • LI ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ El • El # Has the facility evaluated all illicit(non stormwater)discharges? ❑ • ❑ ❑ Comment: Page 3 of 3