Loading...
HomeMy WebLinkAboutDouble Rock_MY1_Credit Release Schedule_signedProject Name: Sponsor Name: USACE Action ID: NCDWQ Action ID: Non-Forested Wetland Credits Warm Water Cool Water Cold Water Riparian Riverine Riparian Non-Riverine Non-Riparian Coastal 4556.1 Scheduled Releases Warm Water Cool Water Cold Water Scheduled Releases Riparian Riverine Riparian Non-Riverine Non-Riparian Scheduled Releases Coastal 1 (Bank/Site Establishment)1, 2 15%778.19 15%15%Dec-22 10/20/2022 2 (Year 0/As-Built)3 15%666.69 15%15%Aug-23 9/27/2023 3 (Year 1 Monitoring)10%444.46 10%10%Mar-24 4 (Year 2 Monitoring)10%444.46 10%15%Mar-25 5 (Year 3 Monitoring)10%444.46 15%20%Mar-26 6 (Year 4 Monitoring)5%222.23 5%10%Mar-27 7 (Year 5 Monitoring)10%444.46 15%15%Mar-28 8 (Year 6 Monitoring)5%222.23 5%NA NA Mar-29 9 (Year 7 Monitoring)10%444.46 10%NA NA Mar-30 Stream Bankfull Standard4 10%444.46 NA NA NA NA NA NA Varies4 Total Credits Release to Date 4,556.10 - Date Wilmington District Mitigation Bank Credit Release Schedule Double Rock Mitigation Site County:Alexander Wildlands Holdings VI, LLC 8-Digit HUC:03050101 Potential Credits from As-Built Survey SAW-2020-01532 Year Project Instituted:2022 2020-1095v1 Date Prepared:2/5/2024 Total Potential Credits Credit Classification Stream Credits Forested Wetland Credits Potential Credits from Mitigation Plan Current and Future Credit Releases Credit Release Milestone Stream Credits Forested Wetland Credits Non-Forested Wetland Credits Projected Release Date Actual Release Date 4 - A 10% reserve of credits to be held back until the bankfull event performance standard has been met. Contingencies (if any): Credit Release 1 is 15% R&EII and 100% Preservation Signature of Wilmington District Official Approving Credit Release 1 - The first credit release milestone is based on the potential credits stated in the approved mitigation plan. 2 - The first credit release shall occur upon establishment of the mitigation bank, which includes the following criteria: 1) Execution of the MBI or UMBI by the Sponsor and the USACE; 2) Approval of the final Mitigation Plan; 3) Mitigation bank site must be secured; 4) Delivery of the financial assurances described in the Mitigation Plan; 5) Recordation of the long-term protection mechanism and title opinion acceptable to the USACE; 6) 404 permit verification for construction of the site, if required. 3 - The second credit release is based on the credit totals from the as-built survey, and may differ slightly from the credit totals stated in the mitigation plan. 3/15/2024 3/15/2024