Loading...
HomeMy WebLinkAbout20050732 Ver 35_Stormwater Info_20151216v MCKINII&CREED v To: NCDENR — Division of Water Resources 401 & Buffer Permitting Unit 512 N. Salisbury St. Archdale Building - 9th floor Raleigh, NC 27604 ATTENTION: Mr. Boyd Devane a�- -Y 3-6 LETTER OF TRANSMITTAL DATE: December 15, 2015 PROJECT NO: 2735-0113 TASK NO: REIMB RE: Briar Chapel — Boulder Point Extension TRANSMTTTAI. NO: 1 PAGE 1 OF 1 WE ARE SENDING: ❑ Originals ❑ Prints ❑ Shop Drawings ❑ Samples ❑ Specifications ® Calculations ❑ Other - Quantity Dwg No. Rev. Description Status 2 Stormwater Design Plans - REVISEDI AV I LZ Y5 L9 U \Y/ G 2 Supporting Calculations - REVISED DEC 1: G 2 BMP #20 Design Supplement DEN _ G 1 8 BUFFER PERMITTING Issue Status Code REMARKS: Boyd, A. Preliminary B. Fabrication Only C. For Information D. Bid E. Construction F. For Review & Comments G. For Approval H. See Remarks Please find the enclosed documents for your review. Please let us know if you have any questions or comments. Thank you. )730 \'arsity Drire, Suite 500 Raleigh, NC 27606 919/233-8091 Fax 919/233.8031 Cc: McKIM & CREED, INC. Signed Gareth Avant, PE vMq<E\4 SCREED ENGINEERS SURVEYORS P L A N N E R S December 15, 2015 Mr. Boyd Devane 512 N. Salisbury St. Archdale Building - 9th floor Raleigh, NC 27604 RE: Briar Chapel Phase — Boulder Point Drive Extension Mr. Devane, Please find enclosed the revised plans, caclulations and supplement form for the proposed design revision to Bioretention Area #20 as previously approved under DWR Project # 05-0732 V31 as issued on July 13, 2015. This design revision was necessitated due to avoidance of conflicts with existing utilities. Contributing drainage areas and impervious areas have remain unchanged from the approved design. Only the location and dimensions of the basin have changed somewhat. This letter is to formally request approval of the stormwater management plan for the enclosed plans in accordance with Water Quality Certification as issued by the Division of Water Resources on January 11, 2008. Please let me know if you have any questions on this. Thank you for your assistance. Venlvre IV Building Suite 500 Sincerely, McKIM & CREED, INC. 1730 Voiyily Drive Raleigh, NC 27606 "Z444604 Gareth Avant, PE 919.233.8091 Project Engineer Fox 919.233.8031 www.mckimcreed.com Permit Number: (to be provided by DWQ) F M -WA h Y r NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Y (Y or N) Project name Briar Chapel Development - Boulder Point Drive Extension Contact name Gareth Avant, PE Phone number 919.233.8091 Date November 18, 2015 Drainage area number 1 - BMP #20 II. DESIGN INFORMATION ft3/sec Site Characteristics Pre/Post 1 -yr, 24 -hr peak control Drainage area 173,790 ft2 Impervious area 79,129 ft2 Percent impervious 45.5% % Design rainfall depth 1.0 inch Peak Flow Calculations Is pre/post control of the 1 -yr, 24 -hr peak flow required? Y (Y or N) 1 -yr, 24 -hr runoff depth 3 in 1 -yr, 24 -hr intensity 0.13 in/hr Pre -development 1 -yr, 24 -hr peak flow ft3/sec Post -development 1 -yr, 24 -hr peak flow ft3/sec Pre/Post 1 -yr, 24 -hr peak control ft3/sec Storage Volume: Non -SA Waters Minimum volume required 6,659.0 ft3 Volume provided 6,789.0 ft OK Storage Volume: SA Waters 1.5" runoff volume ft3 Pre -development 1 -yr, 24 -hr runoff ft3 Post -development 1 -yr, 24 -hr runoff ft3 Minimum volume required 0 ft3 Volume provided ft3 Cell Dimensions Ponding depth of water 10.2 inches OK Ponding depth of water 0.85 ft Surface area of the top of the bioretention cell 8,448.0 ft2 OK Length: 128 ft OK Width: 58 ft OK -or- Radius ft Media and Soils Summary Drawdown time, ponded volume 12 hr OK Drawdown time, to 24 inches below surface 12 hr OK Drawdown time, total: 24 hr In-situ soil: Soil permeability in/hr Planting media soil: Soil permeability 4.55 inthr OK Soil composition % Sand (by volume) 87% OK % Fines (by volume) 10% OK Form SW401-Sioretention-Rev.8 June 25, 2010 Parts I and II. Design Summary. Page 1 of 3 % Organic (by volume) Phosphorus Index (P -Index) of media 3% OK Total: 100% 10 (unitless) OK Permit Number: (to be provided by DWQ) Form SW401-Sioretention-Rev.8 t June 25, 2010 Parts I and II. Design Summary, Page 2 of 3 Permit Number: (to be provided by DWQ) Basin Elevations Temporary pool elevation 522.85 fmsl Type of bioretention cell (answer "Y" to only one of the two following questions): OK Is this a grassed cell? Y (Y or N) OK Is this a cell with trees/shrubs? (Y or N) Planting elevation (top of the mulch or grass sod layer) 522 fmsl Depth of mulch inches Bottom of the planting media soil 520 fmsl Planting media depth 2 ft Depth of washed sand below planting media soil 0.4 It Are underdrains being installed? Y (Y or N) How many dean out pipes are being installed? 12 OK What factor of safety is used for sizing the underdrains? (See 2 OK BMP Manual Section 12.3.6) Additional distance between the bottom of the planting media and 1 ft the bottom of the cell to account for underdrains Bottom of the cell required 518.6 fmsl SHWT elevation fmsl Distance from bottom to SHWT 518.6 ft OK Internal Water Storage Zone (IWS) Does the design include IWS N (Y or N) Elevation of the top of the upturned elbow fmsl Separation of IWS and Surface 522 ft Planting Plan Number of tree species 0 Number of shrub species Number of herbaceous groundcover species Additional Information Does volume in excess of the design volume bypass the Y (Y or N) OK bioretention cell? Does volume in excess of the design volume flow evenly distributed N (Y or N) Excess volume must pass through filter. through a vegetated filter? What is the length of the vegetated filter? ft Does the design use a level spreader to evenly distribute flow? (Y or N) Is the BMP located at least 30 feet from surface waters (50 feet if Y (Y or N) OK SA waters)? Is the BMP localed at least 100 feet from water supply wells? Y (Y or N) OK Are the vegetated side slopes equal to or less than 3:1? Y (Y or N) OK Is the BMP located in a proposed drainage easement with access Y (Y or N) OK to a public Right of Way (ROW)? Inlet velocity (from treatment system) >2 fUsec Insufficient inlet velocity unless energy dissipating devices are being used. Is the area surrounding the cell likely to undergo development in the N (Y or N) OK future? Are the slopes draining to the bioretention cell greater than 20%? N (Y or N) OK Is the drainage area permanently stabilized? Y (Y or N) OK Pretreatment Used (Indicate Type Used with an "X" in the shaded cell) Gravel and grass (81inches gravel followed by 3-5 ft of grass) Grassed Swale OK Forebay X Other Form SW401-Biorelention-Rev.8 June 25, 2010 Parts I and If. Design Summary, Page 3 of 3 Permit 111. REQUIRED ITEMS CHECKLIST . (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. GCA C3.0 1. Plans (1" - 50' or larger) of the entire site showing: Design at ultimate build -out, Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. GCA D3.1 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: Outlet structure with trash rack or similar, - Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. GCA DU 3. Section view of the wet detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and - Inlet and outlet structures. GCA N/A 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specked on the plans prior to use as a wet detention basin. GCA Calc Booklet 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. GCA C3.0 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. GCA Calc Booklet 7. The supporting calculations. GCA Included 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. GCA N/A 9. A copy of the deed restrictions (if required). N/A 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.8-9/17/09 Part III. Required Items Checklist, Page 1 of 1 REVISED BMP #20 CALCULATIONS Briar Chapel Development Boulder Point Drive Extension Chatham County, North Carolina November 18, 2015 Prepared for: DEC 1.6 2015 BRIAR ZCHAPEC DdniVR �wpTER RES01,67 Newland commumnFs NNP Briar Chapel, LLC 16 Windy Knoll Circle Chapel Hill, North Carolina 27516 Prepared By: v� McKIM&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919) 233.8091 Fax: (919) 233.8031 M&C Project No. 02735-0113 ```p�pfnUNr�rq�� N C ' OM3Q i • 11/18/2015 : ti �'.q�PFlENAtiE.. • �1Q�,�• BMP#20 SIZING/STORAGE CALCULATIONS Project Name Briar Chapel - Boulder Point Drive Extension Project Number 02735-0113 Date November 18, 2015 3rd revision 2nd revision 1 st revision X Water Quality Pond Drainage Area Data Project Briar Chapel - Boulder Point Drive Extension Project No. 02735-0113 Date November 18, 2015 Total site area 173,790 square feet = 3.99 acres Impervious areas Drainage area to Existing Proposed s s and Change s Other Drainage Existing Isf] Area Proposed On-site buildings 0 0 0 0 0 On-site streets/parking 0 75,361 75,361 0 0 On-site alleys 0 0 0 0 0 On-site sidewalks 0 0 0 0 0 On-site future (open space) 0 0 0 0 0 Off-site future development 0 0 0 0 0 5% Contingency 0 3,768 3,768 0 0 Total Impervious 0 79,129 79,129 0 0 Non -impervious areas Drainage area to and Other Drainage Area Existing Proposed Change Existing s s rsfI Proposed s On-site grass/landscape 0 98,429 98,429 0 0 On-site woods 0 0 0 0 0 Other undeveloped 0 0 0 0 0 Total off-site non -impervious 0 0 0 0 0 Total non -impervious 0 98,429 98,429 0 0 Total Drainage Area 173,790 173,790 0 0 0 Percent Impervious 0.0 45.5 45.5 n/a n/a Notes: 2015.11.16.Sizing review.xls Site Drainage Area Data Page 2 of 13 Printed 12/15/2015 11:27 AM Water Quality Pond Stormwater Runoff Volume Calculations Project Briar Chapel - Boulder Point Drive Extensic Project No. 02735-0113 Date November 18, 2015 Drainage area 173,790 square feet Impervious area 79,129 square feet Rainfall depth 1.00 inches Percent Impervious 45.5 percent R(v)=0.05+0.009*(Percent impervious) Runoff coefficient - R(v) 0.46 in/in Runoff volume=(Design rainfall)*(R(v))*(Drainage area) Runoff volume 6,658.8 cubic feet Notes: 2015.11.16.Sizing review.xls Runoff Volume Calcs Page 3 of 13 Printed 12/15/2015 11:27 AM Project Project No. Date Water Quality Pond Volume Calculations Stage -Storage Data for Pond - Temporary Pool Briar Chapel - Boulder Point Drive Extension 02735-0113 November 18, 2015 Contour ID Stage Area [sq. ft. Area acres Incremental Incremental Incremental Incremental Area Area volume volume [sq. ft. acres cu. ft acre -ft Cumulative volume cu. ft Cumulative volume acre -ft 522 0 7,526.0 0.173 7,526.0 0.2 0.0 0.0 0.0 0.0 522.85 0.85 8,448.0 0.194 8,448.0 0.0 6,789.0 0.2 6,789.0 0.2 523 1 8,611.0 0.198 8,611.0 0.0 1,279.4 0.0 8,068.4 0.2 524 2 9,744.0 0.224 9,744.0 0.0 9,177.5 0.2 17,245.9 0.2 525 3 10,932.0 0.251 10,932.0 0.0 10,338.0 0.2 27,583.9 0.4 526 4 12,215.0 0.280 12,215.0 0.0 11,573.5 0.3 39,157.4 0.5 2015.11.16.Sizing review.xls Stage Storage (Temp Pool) Page 4 of 13 Printed 12/15/2015 11:27 AM 1S 2S Pre -Development Post-Dev lopment 3P Biorention Pond Subcat Reach on Link 2015.11.16.Bioretention Review Type 1124 -hr 1 -Yr Rainfall=2.96" Prepared by McKim & Creed Printed 12/15/2015 HydroCAD® 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 6 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR -20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment1S: Pre -Development Runoff Area=173,790 sf 0.00% Impervious Runoff Depth>0.61" Tc=15.0 min CN=70 Runoff --3.15 cfs 0.203 of Subcatchment2S: Post -Development Runoff Area=173,790 sf 43.36% Impervious Runoff Depth>1.36" Tc=10.0 min CN=84 Runoff=8.97 cfs 0.453 of Pond 3P: Biorention Pond Peak Elev=523.17' Storage=9,527 cf Inflow --8.97 cfs 0.453 of Outflow=2.30 cfs 0.288 of Total Runoff Area = 7.979 ac Runoff Volume = 0.657 of Average Runoff Depth = 0.99" 78.32% Pervious = 6.249 ac 21.68% Impervious = 1.730 ac 2015.11.16. Bio retention Review Type 1124 -hr 1 -Yr Rainfall=2.96" Prepared by McKim & Creed Printed 12/15/2015 HydroCAD® 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 1S: Pre -Development Runoff = 3.15 cfs @ 12.09 hrs, Volume= 0.203 af, Depth> 0.61" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Yr Rainfall=2.96" Area (sf) CN Description * 173,790 70 173,790 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 Direct Entry, Subcatchment 1S: Pre -Development Hydrograph ©Runoff 3.15 cfs ------------------------------ ------------------ Type 1124,h -r- 3' 1 -Yr Rainfall=2.96" Runoff Area=173,790; sf _ ________________ :____Runoff-Volume=0.203.af_ jj 2 -Runoff Depth>0.61' Tc =15.0 min LL CN=70 1 o 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) . . l 2015.11.16. Bio retention Review Type 11 24 -hr 1 -Yr Rainfall=2.96" Prepared by McKim & Creed Printed 12/15/2015 HydroCAD® 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 2S: Post -Development Runoff = 8.97 cfs @ 12.02 hrs, Volume= 0.453 af, Depth> 1.36" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Yr Rainfall=2.96" Area (sf) CN Description 98,429 74 >75% Grass cover, Good, HSG C 75,361 98 Paved parking, HSG C 173,790 84 Weighted Average 98,429 56.64% Pervious Area 75,361 43.36% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 2S: Post -Development Hydrograph 10- --------------------------- 8.9 cfs -;-------------------------------- ©Runoff 9 Type _ e 11 24 -!hr --------=-----------------=-- a-----------------=--yp ---- 6 1 -Yr Rainfall=2.96" 7 Runoff Area=173;790 sf 6 Runoff; Volume=0.453 of ----------------------------- I -- ----------Runoff-Depth>1.36"-- 3 5 LL c -------------------------------------- ----'------Tc-- .10.0 xnin-- 4 CN=84 3 2- 5 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2015.11.16.Bioretention Review Type 1124-hr 1-Yr Rainfall=2.96" Prepared by McKim & Creed Printed 12/15/2015 HydroCAD® 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 9 Summary for Pond 3P: Biorention Pond Inflow Area = 3.990 ac, 43.36% Impervious, Inflow Depth > 1.36" for 1-Yr event Inflow = 8.97 cfs @ 12.02 hrs, Volume= 0.453 of Outflow = 2.30 cfs @ 12.24 hrs, Volume= 0.288 af, Aften= 74%, Lag= 13.1 min Primary = 2.30 cfs @ 12.24 hrs, Volume= 0.288 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 523.17' @ 12.24 hrs Surf.Area= 8,801 sf Storage= 9,527 cf Plug-Flow detention time= 139.1 min calculated for 0.288 of (64% of inflow) Center-of-Mass det. time= 65.3 min ( 856.1 - 790.8 ) Volume Invert Avail.Storage Storage Description #1 522.00' 39,158 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store . (feet) (sq-ft) (cubic-feet) (cubic-feet) 522.00 7,526 0 0 523.00 8,611 8,069 8,069 524.00 9,744 9,178 17,246 525.00 10,932 10,338 27,584 526.00 12,215 11,574 39,158 Device Routing Invert Outlet Devices #1 Primary 518.20' 18.0" Round Pond Outlet L= 137.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 518.20'/ 517.52' S=0.0050'/' Cc= 0.900 n= 0.013, Flow Area= 1.77 sf #2 Device 1 522.85' 24.0" W x 6.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #3 Device 1 524.00' 36.0" x 36.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=2.29 cfs @ 12.24 hrs HW=523.17' (Free Discharge) L1 =Pond Outlet (Passes 2.29 cfs of 14.43 cfs potential flow) 2=Orifice/Grate (Orifice Controls 2.29 cfs @ 1.81 fps) 3=Riser ( Controls 0.00 cfs) 2015.11.16.Bioretention Review Type 1124 -hr 1 -Yr Rainfall=2.96" Prepared by McKim & Creed Printed 12/15/2015 HydroCAD® 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 10 Pond 3P: Biorention Pond Hydrograph 10 ®InFlow 8.97 cfs 0 Primary 9 ------------------ ----------_--- Inflow Area=3.990-ac_ ________-_Peak_E-le_v_=523.17'-_ .----------------- ----------- --- r----- Storage=9,527 cf OOOOOOOI/l/l/111/l/l/l/l101/l/l/l//�1��'�%%%/ ������OOOOOOOOOOBO000000000000 -----------00-000-- - - - --OOOOOOOOG" 2015.11.16.Bioretention Review Type 1124 -hr 10 -Yr Rainfall=5.17" Prepared by McKim & Creed Printed 12/15/2015 HydroCAD® 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 11 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR -20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment1S: Pre -Development Runoff Area=173,790 sf 0.00% Impervious Runoff Depth>1.97" Tc=15.0 min CN=70 Runoff=10.96 cfs 0.654 of Subcatchment2S: Post -Development Runoff Area=173,790 sf 43.36% Impervious Runoff Depth>3.19" Tc=10.0 min CN=84 Runoff=20.32 cfs 1.061 of Pond 3P: Biorention Pond Peak Elev=524.08' Storage=17,991 cf Inflow=20.32 cfs 1.061 of Outflow=10.31 cfs 0.890 of Total Runoff Area = 7.979 ac Runoff Volume = 1.715 of Average Runoff Depth = 2.58" 78.32% Pervious = 6.249 ac 21.68% Impervious = 1.730 ac 2015.11.16. Bio retention Review Type 1124 -hr 10 -Yr Rainfall=5.17" Prepared by McKim & Creed Printed 12/15/2015 HydroCAD® 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 15 Pond 3P: Biorention Pond Hydrograph -- -----------------------6lnflow 20.32 CfS --------------------------- oPrimary 22 21 ---------------------------- ---Inflow Area=3:990-ac-- 19 ' P_eak_E;le_v- 524-08-'- --- r--- 17 16 Storage=17,991 cf 15 ---------------------------- ---------------------------------- 14 w 13 „ ---------------------- 10.31 cfs ---------------.---------:-------- 3 LL1q --_----_-__________________ i�_-_,_----__--------_-----_-_-_-_-_ Dq j %77"M �OOp 0000000�000000000�00000%� D���OO�O��O����O�o0000000000000G- 2015.11.16.Bioretention Review Type ll 24 -hr 100 -Yr Rainfall= 7.62 " Prepared by McKim & Creed Printed 12/15/2015 HydroCAD® 10.00 s/n 04927 @2011 HydroCAD Software Solutions LLC Page 19 Summary for Pond 3P: Biorention Pond [82] Warning: Early inflow requires earlier time span Inflow Area = 3.990 ac, 43.36% Impervious, Inflow Depth > 5.37" for 100 -Yr event Inflow = 33.15 cfs @ 12.01 hrs, Volume= 1.784 of Outflow = 17.05 cfs @ 12.13 hrs, Volume= 1.609 af, Atten= 49%, Lag= 7.4 min Primary = 17.05 cfs @ 12.13 hrs, Volume= 1.609 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 524.81' @ 12.13 hrs Surf.Area= 10,709 sf Storage= 25,555 cf Plug -Flow detention time= 69.7 min calculated for 1.608 of (90% of inflow) Center -of -Mass det. time= 35.7 min ( 795.8 - 760.1 ) Volume Invert Avail.Storage Storage Description #1 522.00' 39,158 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 522.00 7,526 0 0 523.00 8,611 8,069 8,069 524.00 9,744 9,178 17,246 525.00 10,932 10,338 27,584 526.00 12,215 11,574 39,158 Device Routing Invert Outlet Devices #1 Primary 518.20' 18.0" Round Pond Outlet L= 137.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 518.20'/ 517.52' S= 0.0050 T Cc= 0.900 n= 0.013, Flow Area= 1.77 sf #2 Device 1 522.85' 24.0" W x 6.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #3 Device 1 524.00' 36.0" x 36.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=17.04 cfs @ 12.13 hrs HW=524.80' (Free Discharge) L =Pond Outlet (Barrel Controls 17.04 cfs @ 9.64 fps) 2=Orifice/Grate (Passes < 12.55 cfs potential flow) 3=Riser (Passes < 28.11 cfs potential flow) 2015.11.16.Bioretention Review Type 1124 -hr 100 -Yr Rainfall=7.62" Prepared by McKim & Creed Printed 12/15/2015 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 20 Pond 3P: Biorention Pond Hydrograph ® Inflow 36 --------- ------------ 33.15 CfS =---- -----------'------ ------ ©Primary 34 Inflow.Area=3._990 ac 32 30 Peak E'lev=524.81' 26 26 Storage=25,555 cf 24— ---------------------------- -------------------------- -------- 22 20 --- - - - - ---- ,-- -; ---- 17.05 cfs --------------------------------- 3 18 - - o---------------- ,--- -- ---- �� ---------------------------------- M 16 14 12 6 ------------'------- --- - ------------ ----------------- 4 2. 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2015.11.16.13ioretention Review Type 1124 -hr 10-YrRainfall=5.17" Prepared by McKim & Creed Printed 12/15/2015 HydroCAD® 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment 1S: Pre -Development Runoff = 10.96 cfs @ 12.08 hrs, Volume= 0.654 af, Depth> 1.97' Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Yr Rainfall=5.17' Area (sf) CN Description * 173,790 70 173,790 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 Direct Entry, Subcatchment 1S: Pre -Development Hydrograph ------------------------------------- --------------------- 10 96 c fs ---------- o Runoff 7 3 6 ; _ _ _,_ - _ -- _ -- -------- - - - - -- - LL _ 5 4 _ _ _ - _ _ _ _ r _ _ _ _�_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 3 --------------------------- 2 Type II 24 -hr 10 -Yr Rainfall=5.17 ' Runoff Area= -173;790. sf Runoff Volume=0:654 of -- ------Runoff-Depth>1.97"- ------------------Tc=15.0 min- --------- CN=70- in- ----.----CN=70- ---------------------------------- LO r 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2015.11.16.Bioretention Review Type 1124 -hr 10 -Yr Rainfall=5.17" Prepared by McKim & Creed Printed 12/15/2015 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment 2S: Post -Development Runoff = 20.32 cfs @ 12.01 hrs, Volume= 1.061 af, Depth> 3.19" Runoff by SCS TR -20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Yr Rainfall=5.1 T' Area (sf) CN Description 98,429 74 >75% Grass cover, Good, HSG C 75,361 98 Paved parking, HSG C 173,790 84 Weighted Average 98,429 56.64% Pervious Area 75,361 43.36% Impervious Area Tc Length Slope Velocity Capacity Description -__(min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, 21 20 ' 19 18 17 16 15 14 13 12 0 11 LL 10 7 1 Subcatchment 2S: Post -Development Hydrograph - 20.32 cfs ----------------- O Runoff ----------------------------- -------------------- Type-II-24=hr-- 10-Yr Rainfall'=5.17" Runoff Area=173;790; sf --------=----'---------------- ---- Runoff Volume=1.06-1''-af-- ----------------------------- '. -�, ----------Runoff-Depth>3.19"-- ------------------------------ ------------- ------ --- - ---- -- ---------------------------------- ____T -c -10.O min-- CN=84 _ _ _ _ _ _ _ _ _ _ _ _ _ - J _ _ _ _ _ _ _ _ _I_ - _ _ 1 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _,_ - _ _ - _ �j - - - - _ _ _ _ _ _ _- _ - _ _ _ _ _ _._ _ _ _ _ _ _ _ _ _ _ _ _ 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) . • 1 2015.11.16.Bioretention Review Type 1124 -hr 10 -Yr Rainfall=5.17" Prepared by McKim & Creed Printed 12/15/2015 HydroCAD® 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 14 Summary for Pond 3P: Biorention Pond Inflow Area = 3.990 ac, 43.36% Impervious, Inflow Depth > 3.19" for 10 -Yr event Inflow = 20.32 cfs @ 12.01 hrs, Volume= 1.061 of Outflow = 10.31 cfs @ 12.14 hrs, Volume= 0.890 af, Atten= 49%, Lag= 7.8 min Primary = 10.31 cfs @ 12.14 hrs, Volume= 0.890 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 524.08' @ 12.14 hrs Surf.Area= 9,834 sf Storage= 17,991 cf Plug -Flow detention time= 85.5 min calculated for 0.887 of (84% of inflow) Center -of -Mass det. time= 39.0 min ( 811.1 - 772.1 ) Volume Invert Avail.Storage Storage Description #1 522.00' 39,158 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 522.00 7,526 0 0 523.00 8,611 8,069 8,069 524.00 9,744 9,178 17,246 525.00 10,932 10,338 27,584 526.00 12,215 11,574 39,158 Device Routing Invert Outlet Devices #1 Primary 518.20' 18.0" Round Pond Outlet L= 137.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 518.20'/ 517.52' S= 0.0050 T Cc= 0.900 n= 0.013, Flow Area= 1.77 sf #2 Device 1 522.85' 24.0" W x 6.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #3 Device 1 524.00' 36.0" x 36.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=10.21 cfs @ 12.14 hrs HW=524.07' (Free Discharge) L =Pond Outlet (Passes 10.21 cfs of 15.93 cfs potential flow) 2=Orifice/Grate (Orifice Controls 9.46 cfs @ 4.73 fps) 3=Riser (Weir Controls 0.75 cfs @ 0.87 fps) aENERAL NOTES: 1. ALL DIMENSIONS AND GRADES SHOWN ON THE PLANS SHALL BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. CONTRACTOR SHALL NOTIFY OWNER IF ANY DISCREPANCIES EXIST PRIOR TO CONSTRUCTION. NO ADDITIONAL COMPENSATION WILL BE PAID TO CONTRACTOR FOR ANY WORK DONE DUE TO DIMENSIONS OR GRADES SHOWN INCORRECTLY ON THESE PLANS IF SUCH NOTIFICATION HAS NOT BEEN GIVEN. 2. CONTRACTOR SHALL N011FY "NORTH CAROLINA ONE CALL AT 1-800-632-4949 AT LEAST 48 HOURS PRIOR TO BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR TO CONTACT ANY LOCAL UTILITIES THAT PROVIDE THEIR OWN LOCATOR SERVICES INDEPENDENT OF "NORTH CAROLINA ONE CALL". 3. OVERHEAD ELECTRIC LINES MAY EXIST ON THE SITE CONTRACTOR SHALL CONTACT DUKE POWER AT (336) 634-4633 PRIOR TO COMMENCING ANY ACTIVITY WITHIN 200 -FT OF DUKE POWER RIGHT OF WAY. 4, PRIOR TO CONSTRUCTION, CONTRACTOR SHALL ARRANGE AND ATTEND A PRECONSTRUCTiON CONFERENCE WITH CHATHAM COUNTY, OWNER AND ENGINEER. 5� EXISTING UTILITIES AND STRUCTURES SHOWN, BOTH UNDERGROUND AND ABOVE GROUND, ARE BASED ON BEST AVAILABLE RECORD DRAWINGS. 6. SOIL UNDER BUILDINGS, PAVED AREAS AND WITHIN SLOPES GREATER THAN 3:1 (H:V) SHALL BE APPROVED, PLACED AND COMPACTED AS RECOMMENDED BY THE GEOTECHNICAL ENGINEER. THESE SOILS SHALL BE COMPACTED TO THE STANDARD PROCTOR MAXIMUM DRY DENSITY UNLESS OTHERWISE RECOMMENDED BY THE GEOTECHNICAL ENGINEER. 7� ALL GRADED AREAS SHALL BE SLOPED SUCH THAT NO AREAS OF STANDING WATER OCCUR AND ALL AREAS POSITIVELY DRAIN TO DRAINAGE STRUCTURES, SWALES OR STORMWATER MANAGEMENT FACILITIES. 8. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL PROPERTY CORNERS AND SHALL REPLACE ALL MARKERS REMOVED IF DAMAGED DURING CONSTRUCTION. 9. CONTRACTOR IS RESPONSIBLE FOR ALL DEWATERING AS NECESSARY THROUGHOUT CONSTRUCTION. 10� CONTRACTOR IS RESPONSIBLE FOR ADHERING TO ALL PERMIT CONDITIONS, MONITORING AND REPORTING REQUIREMENTS, 11� REFER TO SHEET D2.1 FOR PROPOSED ROAD CROSS SECTION DETAILS AND PAVEMENT SCHEDULE. 11 GRADED SLOPES STEEPER THAN 11 SHALL BE STABILIZED WITH CURLEX SINGLE NET (CURLEX 1) MATTING BY AMERICAN EXCELSIOR COMPANY OR APPROVED EQUAL OR AS APPROVED BY THE GEOTECHNICAL ENGINEER. 11 STREAM AND WETLAND LOCATIONS ARE BASED ON DELINEATIONS PROVIDED BY SOIL AND ENVIRONMENTAL CONSULTANTS IN RALEIGH, NO - CONTACT SEAN CLARK AT 919-846-5900� 14� NO PORTION OF THIS PROPERTY IS LOCATED IN SPECIAL FLOOD HAZARD AREA "AE" AS SHOWN ON FEMA FIRM MAP #3710976500J DATED FEBRUARY 2, 2007� 15. EXISTING INFRASTRUCTURE AS SHOWN MAY BE UNDER CONSTRUCT10N AND SHALL BE FIELD VERIFIED BY CONTRACTOR. -BRIAR CHAPEL PARKWAY AND BOULDER POINT DRIVE EXTENSION SEALED JANUARY 1, 2012 16. BEFORE STARTING ANY CONSTRUCTION OF IMPROVEMENTS WITHIN ANY NCDOT STREET OR HIGHWAY RIGHT-OF-WAY, CONTACT NCDOT DISTRICT OFFICE AND OBTAIN ALL PERMITS AND ENCROACHMENTS AND KEEP COPIES ON CONSTRUCTION SITE AT ALL TIMES. ALSO CONTACT NCDOT DISTRICT OFFICE 24 HOURS IN ADVANCE BEFORE PLACING CURB AND GUTTER AT (336) 629-1421 0 0 0 e�) FU77JRE ROAD--\-, STAGE 2 CONSTRUCTION SEQUENCE I . THE INTENT OF THE CONSTRUCTION SEQUENCE IS TO PROVIDE THE CONTRACTOR WITH A GENERAL GUIDE FOR CONSTRUCTION PURPOSES. THIS SEQUENCE IS NOT INTENDED TO OUTLINE ALL CONSTRUCTION ACTIVITIES ON THIS PROJECT. 2� ALI EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH TH� CHATHAM COUNTY SOIL EROSION AND SEDIMENTATION CONTROL ORDINANCE. 3. ALL EROSION CONTROL MEASURES SHALL BE INSPECTED WEEKLY AND AFTER RAINFALL EVENTS, NEEDED REPAIRS SHALL BE MADE IMMEDIATELY. 4� IF IT IS DETERMINED DURING CONSTRUCTION THAT SIGNIFICANT SEDIMENT IS LEAVING THE SITE, DESPITE PROPER IMPLEMENTATION AND MAINTENANCE, THE CONTRACTOR IS OBLIGATED TO TAKE ADDITIONAL CORRECTIVE ACTION. CONTACT CHATHAM COUNTY ENVIRONMENTAL QUALITY DEPARTMENT, OWNER'S REPRESENTATIVE AND ENGINEER WITH ANY ADDITIONAL MEASURES NEEDED. 5� CONTRACTOR SHALL ESTABLISH GROUNDCOVER ON DISTURBED AREAS WITHIN THE NUMBER OF CALENDAR DAYS AFTER COMPLETION OF GRADING PER THE SCHEDULE BELOW. GRADUAL SLOPES: (14) CALENDAR DAYS MODERATE SLOPES: (10) CALENDAR DAYS STEEP SLOPES: (7) CALENDAR DAYS SLOPES ARE AS DEFINED IN THE CHATHAM COUNTY SOIL EROSION AND SEDIMENTATION CONTROL ORDINANCE. 6� CONTRACTOR TO POST EROSION CONTROL PERMIT PROMINENTLY ON SITE AT ALL TIMES. 7� TEMPORARY CONSTRUCTION ENTRANCES, TEMPORARY DIVERSION DITCHES, SILT FENCING, TREE PROTECTION FENCING AND TEMPORARY SKIMMER BASINS WERE INSTALLED AS PART OF THE BC WESTERN STORAGE POND AND BC PHASE 15 CLEARING AND GRUBBING PLANS. CONTRACTOR SHALL INSPECT THESE DEVICES TO ENSURE COMPLIANCE PRIOR TO FINAL GRADING OPERATIONS. & BEGIN FINAL GRADING OPERATIONS FOR ROADWAY. 9� AS ELEVATIONS ARE BROUGHT TO FINAL GRADES AND STORM PIPING IS INSTALLED IN ROADWAY SECTIONS, CONTRACTOR SHALL INSTALL HARDWARE CLOTH AND GRAVEL INLET PROTECTION AS SHOWN ON PLANS. 10� CONTRACTOR SHALL ENSURE THAT ALL SEDIMENT LADEN RUNOFF IS DIRECTED TO ROADWAY INLET PROTECTION PRIOR TO REMOVAL OF ANY SKIMMER SEDIMENT BASINS. NO BASINS SHALL BE REMOVED UNTIL INSPECTED AND APPROVED BY CHATHAM COUNTY SESC STAFF. 11. PERFORM SEEDING AND MULCHING AS REQUIRED IN ACCORDANCE WITH THE TEMPORARY AND PERMANENT SEEDING SCHEDULES LOCATED ON SHEET D1.2 AND NOTE #5 OF THIS SEQUENCE 12. ONCE GROUNDCOVER HAS BEEN ESTABLISHED AND OTHER CONSTRUCTION IS COMPLETE, CONTACT CHATHAM COUNTY SOIL EROSION AND SEDIMENTATION AND ENGINEER FOR SITE INSPECTION BEFORE REMOVING ANY TEMPORARY EROSION CONTROL MEASURES OR CONVERTING BASINS TO PERMANENT BMPs. LIMITS OE -DISTURBANCE NOTES: 1� SILT FENCE AND TREE PROTECTION FENCE LINES ALSO DELINEATE THE LIMITS OF DISTURBANCE. ALL SILT FENCING OR TREE PROTECTION FENCING SHALL BE INSTALLED INSIDE LIMITS OF DISTURBANCE. 2. LIMITS OF DISTURBANCE BEYOND PREVIOUSLY APPROVED AREAS: Q.83 ACRES Ilk STORM DRAINAGE NOTES 1. STORM DRAINAGE PIPES SHALL BE, RCP/CLASS III UNLESS OTHERWISE NOTED IN THESE PLANS. ALL PIPES INSIDE THE PUBLIC RIGHT-OF-WAY SHALL ADHERE TO PIPE DEPTH, COVER AND MATERIAL REQUIREMENTS IN ACCORDANCE WITH THE NCDOT PIPE MATERIAL SELECTION GUIDE AS LOCATED ON THE NCDOT HYDRAULICS WEBSITE. 2. ALL CONCRETE SHALL MEET A MINIMUM 3,000 PSI COMPRESSIVE STRENGTH. 3. ALL PIPE IN STORM DRAIN STRUCTURES SHALL BE STRUCK EVEN WITH INSIDE WALL. 4, THE INTERIOR SURFACES OF ALL STORM DRAINAGE STRUCTURES SHALL BE POINTED UP AND SMOOTHED TO AN ACCEPTABLE STANDARD USING MORTAR MIXED TO MANUFACTURER'S SPECIFICATIONS. 5. ALL BACKFILL SHALL BE NON-PLAST1C IN NATURE, FREE FROM ROOTS, VEGETA11ON MATTER, WASTE CONSTRUCTION MATERIAL OR OTHER OBJECTIONABLE MATERIAL. UTILIZED MATERIAL SHALL BE CAPABLE OF BEING COMPACTED BY MECHANICAL MEANS AND SHALL HAVE NO TENDENCY TO FLOW OR BEHAVE IN A PLASTIC MANNER UNDER THE TAMPING BLOWS OR PROOF ROLLING, 6. MATERIALS DEEMED AS UNSUITABLE FOR BACKFILL PURPOSES BY THE OWNER'S REPRESENTATIVE SHALL BE REMOVED AND REPLACED WITH SUITABLE MATERIAL. 7� BACKFILLING OF TRENCHES SHALL BE ACCOMPLISHED IMMEDIATELY AFTER PIPE IS LAID. THE FILL AROUND THE PIPE SHALL BE THOROUGHLY COMPACTED TO 95% OF THE MAXIMUM DRY DENSITY OBTAINABLE WITH THE STANDARD PROCTOR TEST. THE TOP EIGHT (8) INCHES SHALL BE COMPACTED TO 100% STANDARD PROCTOR. 8. UNDER NO CIRCUMSTANCES SHALL WATER BE ALLOWED TO RISE IN UNBACKFILLED TRENCHES AFTER PIPE HAS BEEN PLACED. 9� ALL FLARED END SECTIONS DISCHARGING INTO WATER QUALITY PONDS WILL HAVE A CONCRETE PAD POURED UNDERNEATH THE FLARED END SEC11ON IN ACCORDANCE WITH PROVIDED CONSTRUCTION DETAILS. 10� RIM ELEVATIONS OF STORM DRAIN STRUCTURES SHALL BE FIELD VERIFIED. 11. STORM DRAINAGE WITHIN PRIVATE EASEMENTS TO BE OWNED, OPERATED AND MAINTAINED BY HOME OWNER'S ASSOCIATION OR AGENT THEREOF. 12. LENGTHS SHOWN FOR STORM DRAINAGE PIPES ARE MEASURED FROM CENTER OF STORM STRUCTURES AND TO ENDS OF FLARED END SECTIONS, SLOPES CALCULATED ARE BASED ON THIS LENGTH, 13. CB DENOTES CATCH BASINS TO BE INSTALLED IN THE CENTERS OF PAVED ALLEYS AND NON -PAVED AREAS, REFER TO NCDOT DETAILS 840.19 AND 840.24 ON SHEET D-2.2. 14� CI DENOTES CURB INLETS TO BE INSTALLED IN THE CURB LINES OF ROADWAYS. REFER TO NCDOT DETAILS 840.02 AND 840.03 ON SHEET D-2.2. ;LiUjq,,jr it ,_klr jj 161M MIM �= -MMUMNAMM WIMM11FAIMIM Im F YOU HAVE QUESTIONS OR CAN10 I ACCESS -TME FORM, PLEASE CONTACT THIS OFFICE AT (919) 791-4200. NPDES GROUNDCOVER STABILIZATION TIMEFRAMES SITE AREA STABILIZATION TIMEFRAME DESCRIPTION EXCEPTIONS PERIMETER DIKES, 7 DAYS NONE SWALES, DITCHES, (ft) SLOPE SLOPES CB -BPD -17 SDMH-8PD- 16 5J4. 00 HIGH QUALITY WATER 7 DAYS NONE (HOW) ZONES SHEET SLOPES STEEPER 7 DAYS 14 DAYS FOR SLOPES THAN 3:1 10' OR LESS IN DBL CI -BPD- 1 HW -BPD -6 522.20 LENGTH AND NOT 18" 56 9 STEEPER THAN 2:1 SLOPES 3:1 OR 14 DAYS 7DAYS FOR SLOPES FLATTER CLASS /V GREATER THAN 50' IN LENGTH ALL OTHER AREAS 14 DAYS NONE, EXCEPT FOR WITH SLOPES FLATTER 0�41z PERIMETERS AND HOW THAN 4:1 ZONES STORM DRAINAGE SUMMARY TABLE UPSTREAM DOWNSTREAM UPSTREAM DOWNSTREAM PIPE PIPE LENGTH W STRUCTURE STRUCTURE IN VER T IN VER T DIAMETER MATERIAL (ft) SLOPE RIPRAP FOREBA Y SEE BIORE7FN 77ON AREA CB -BPD -17 SDMH-8PD- 16 5J4. 00 53J. 00 15" RCP 679 1 � 4 77. SHEET 1" = 50" V DESIGNED BSS DBL CI -BPD- 1 HW -BPD -6 522.20 522.00 18" 56 9 0. 35Y. AM 1 PRO]. IVIGR, C CLASS /V DBL Cl -BPD --2 DBL Cl -BPD -1 522.JO 522.20 Rcp 18 24.5 0�41z -=7' 1-1=1-, DBL Cl -BPD -J DBL CI -BPD -4 529.65 529� 45 15 RCP 24.5 0.827. D6 _P �F ,,,�19PD -, D _,.�26.,PD,, 4-0 RCP 1J6,9 0.507 - PRINCIPLE SPILLWAY EX. CB -BPD -8 518.20 51752 18" MAINTAIN EX. 7EMPORARY , ,, k, 15 f CONSM C77ON ENTRANCE \AA, 01)Z. _wu OzIrf UU ff W 141.D 0� UJA Uuffffyu 0UULUr_N DBL Of -BPD -3 If/ -_ - -_ __ ., I I " �, '� 11, `� ­:::��­­ - - - I r"', 1'�, f0 EX7ENSfON CONSTRUC77ON A C 77 V7 77ES. 'V HARDWARE CL07H AND -7\ > samm, i EX. -BPD-8 GRAVEL INLET PRO 7EC 77ON CY X I _. ot STRUCTURE SHALL 7 -------- 534 CONFORM TO NCOO T S 7D. t DETAIL 840.04 SHT 11,, 11 CB-BF`D_9 RIM ELEV = 521.63 0 S1RUC7`URE SHALL CONFORM TO J INV = 5IZ421 III" i4lj� 5, NC00 T SID. DET NEW INVIN = 5IZ52 AIL 840.04 SHT I DBL Cf -BPD -4 7_75 \�\RIM ELEV = 532.47 N51 EX. IN V 52347 EX LIMITS OF 61S7i)RBANCE MAIN I AIN EX. TEMPORARY C0NS7RUC77ON EN7RANCE DURING BOULDER POINT PYTFAMION rnNcZTR11r77f)N LEGEND: VICINITY MAP NOT TO SCALE -SF/TPF---- 5 3 535 --- 101102&i�*411011 TEMPORARY CONSTRUCTION ENTRANCE COMBINATION SILT/TREE PROTECTION FENCE TEMPORARY DIVERSION DITCH EXISTING CONTOUR PROPOSED CONTOUR m m m m m m m m M LIMITS OF DISTURBANCE CALL N.C. ONE CALL CIENTER BEFORE YOU DIG STOP 1-800-632-4949 AVOID UTIUTY DAMAGE _� 49FAMAmfiffoemkimp0ma HARDWARE CLOTH & GRAVEL INLET PROT. ARC PIPE INLET PROTECTION CHECK DAM 50' 0 50' 100' AMPAmummmammmmm� SCALE: 1"=50' (Horiz.) '17 CON 7RAC TOR SHALL INSTALL CONCRE7E ENCASEMENT PER CHA THAM COUNTY STANDARD DETAILS IF VER77CAL SEPARA77ON IS LESS THAN W SEE DETAIL SHEET D2.1 BIORE7EN770N AREA #20 SEE DETAIL SHEET DJ. I b1KU(;1UKL `�HALL UUMUKAf IU mm- -1r, NCOOT S7D. DETAIL 840.04 SH T 1 _0 RIM 5JZ 50 SOMH-BPD-161 RIM 5JZ 94 t -4- FES-BP SCOUR HOLE SHALL BE CONS PER THE DIMENSIONS SHOWN ON 7141S SHEET RIPRAP SHALL BE CLASS B OV PLACED A T A DEPTH OF' 24 ER LAYER OF RL TER FABRIC. PERMANENT SUGH AS 77JRF REINFORCEMENT MA T77NG, v 4 NA GREEN SC250 OR EQUAL SHALL BE // f y F ILL SLOPE A T BUFFER SHALL BE 1. 75. 1 PLACE TO THE TOE OF THE FILL SLOPE FILL SLOPE A T BUFFER SHALL BE 1. 75. SLOPE SHALL BE ARMORED PER DESIGN SLOPE SHALL BE ARMORED PER DESIGN AS RECOMMENDED BY MAINTAIN EX. 7EMPORA�Y EX. FES -BPD -10 I III 1"'\ - - D AS RECOMMENDED BY 7�' J \INV 517. 10 GE07ECHNICAL ENGINEER CONS7RUC77ON ENTRANCE 11 1 1 1 \ \ t, I I 11, " R 'GE07ECHNICAL ENGINEE 'CIAL CARE' A 0\ DURING BOULDER POINT CON7RACTOR SHALL TAKE SPE DBL EXTENSION C0NS7RUC77ON A C 77 W TIES. TO NOT IMPACT BEYOND L1,M1 7S OF V A Cf -BPD -2 0 CON7RACTOR SHALL TAKE SPECIAL CARE SILT FENCE17REE PRO7EC71ON I\\\ 9PD 1 1 DBL Of-, TO NO T IMPA C T BE YOND LIA41 IS OF 0) FENCING BOUNDARY IN ORDER TO REMAIN,\ A SILT FENCEITREE PRO 7EC 77ON OUTSIDE OF LIMITS OF EX. RIPARIAN BUFFIER FENCING BOUNDARY IN ORDER TO REMAIN\'\ W, OUTSIDE OF LIMITS OF EX� RIPARIAN BUFFER',, V\10' "v ,V V v V\ RCPICLASS N N EX. FES IAIA� INV 512. 73 N, v N\I v \NX V /V/ , W. V q 'N A011'\ X 0 Al \\\,\ \ \0� �\V 0, v /f A Irp­/ /h V :"v\ 1/ "0, V v SEAL) Fl PFVT'FD P P POTF tjTj� MY (7()NFI Trj­ F , NTIAI, I'S A I 10R(_UNtltRU(_I1(_jN REV� 40. DESCRIPTIONS DATE REVISIONS SEAL \p\ CA �0� �Ass/o* , 4&0 4 -AL 036348 1111812015 A C ////m I I tw\0 OAF 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233-8091, Fax: (919Y233-8031 F 1222 by Newland commmm I I A ill p " , is j 1, m T Ip = AM "UTTJ G 114 FAA ST/kGE 2 GRADING, DRAINAGE & ER(D"S10 N Cf-'% k I OINTFROX PLAINI DATE: /1 1, 1 \ \ 11 � \ , \ , V V, W V MCE PRO]. # 02735-0113 /Xr. RIPRAP FOREBA Y SEE BIORE7FN 77ON AREA HORIZONTAL:: SEC77ON DETAIL' BSS 6�R�Wlj SHEET 1" = 50" V DESIGNED BSS LEGEND: VICINITY MAP NOT TO SCALE -SF/TPF---- 5 3 535 --- 101102&i�*411011 TEMPORARY CONSTRUCTION ENTRANCE COMBINATION SILT/TREE PROTECTION FENCE TEMPORARY DIVERSION DITCH EXISTING CONTOUR PROPOSED CONTOUR m m m m m m m m M LIMITS OF DISTURBANCE CALL N.C. ONE CALL CIENTER BEFORE YOU DIG STOP 1-800-632-4949 AVOID UTIUTY DAMAGE _� 49FAMAmfiffoemkimp0ma HARDWARE CLOTH & GRAVEL INLET PROT. ARC PIPE INLET PROTECTION CHECK DAM 50' 0 50' 100' AMPAmummmammmmm� SCALE: 1"=50' (Horiz.) '17 CON 7RAC TOR SHALL INSTALL CONCRE7E ENCASEMENT PER CHA THAM COUNTY STANDARD DETAILS IF VER77CAL SEPARA77ON IS LESS THAN W SEE DETAIL SHEET D2.1 BIORE7EN770N AREA #20 SEE DETAIL SHEET DJ. I b1KU(;1UKL `�HALL UUMUKAf IU mm- -1r, NCOOT S7D. DETAIL 840.04 SH T 1 _0 RIM 5JZ 50 SOMH-BPD-161 RIM 5JZ 94 t -4- FES-BP SCOUR HOLE SHALL BE CONS PER THE DIMENSIONS SHOWN ON 7141S SHEET RIPRAP SHALL BE CLASS B OV PLACED A T A DEPTH OF' 24 ER LAYER OF RL TER FABRIC. PERMANENT SUGH AS 77JRF REINFORCEMENT MA T77NG, v 4 NA GREEN SC250 OR EQUAL SHALL BE // f y F ILL SLOPE A T BUFFER SHALL BE 1. 75. 1 PLACE TO THE TOE OF THE FILL SLOPE FILL SLOPE A T BUFFER SHALL BE 1. 75. SLOPE SHALL BE ARMORED PER DESIGN SLOPE SHALL BE ARMORED PER DESIGN AS RECOMMENDED BY MAINTAIN EX. 7EMPORA�Y EX. FES -BPD -10 I III 1"'\ - - D AS RECOMMENDED BY 7�' J \INV 517. 10 GE07ECHNICAL ENGINEER CONS7RUC77ON ENTRANCE 11 1 1 1 \ \ t, I I 11, " R 'GE07ECHNICAL ENGINEE 'CIAL CARE' A 0\ DURING BOULDER POINT CON7RACTOR SHALL TAKE SPE DBL EXTENSION C0NS7RUC77ON A C 77 W TIES. TO NOT IMPACT BEYOND L1,M1 7S OF V A Cf -BPD -2 0 CON7RACTOR SHALL TAKE SPECIAL CARE SILT FENCE17REE PRO7EC71ON I\\\ 9PD 1 1 DBL Of-, TO NO T IMPA C T BE YOND LIA41 IS OF 0) FENCING BOUNDARY IN ORDER TO REMAIN,\ A SILT FENCEITREE PRO 7EC 77ON OUTSIDE OF LIMITS OF EX. RIPARIAN BUFFIER FENCING BOUNDARY IN ORDER TO REMAIN\'\ W, OUTSIDE OF LIMITS OF EX� RIPARIAN BUFFER',, V\10' "v ,V V v V\ RCPICLASS N N EX. FES IAIA� INV 512. 73 N, v N\I v \NX V /V/ , W. V q 'N A011'\ X 0 Al \\\,\ \ \0� �\V 0, v /f A Irp­/ /h V :"v\ 1/ "0, V v SEAL) Fl PFVT'FD P P POTF tjTj� MY (7()NFI Trj­ F , NTIAI, I'S A I 10R(_UNtltRU(_I1(_jN REV� 40. DESCRIPTIONS DATE REVISIONS SEAL \p\ CA �0� �Ass/o* , 4&0 4 -AL 036348 1111812015 A C ////m I I tw\0 OAF 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233-8091, Fax: (919Y233-8031 F 1222 by Newland commmm I I A ill p " , is j 1, m T Ip = AM "UTTJ G 114 FAA ST/kGE 2 GRADING, DRAINAGE & ER(D"S10 N Cf-'% k I OINTFROX PLAINI DATE: APRIL 17, 2015 ILE NUMB= V MCE PRO]. # 02735-0113 /Xr. HORIZONTAL:: DRAWN BSS 6�R�Wlj 1" = 50" DESIGNED BSS VERTICAL: C3 CHECKED G AM 1 PRO]. IVIGR, C N/A ISSUED FOR CONSTRUCTION B SCALE _ 1 " — 20' SHOULDER ELEV.-526.50 i B 11.5" as ti �- 12 (MIN) II , CONCRETE CRADLE (MIN 2000 PSI CONCRETE) I�RETE 18—IN RCF PRESSURE FIFE SELECT FILL PLACED AND COMPACTED AT 95% STANDARD PROCTOR MAX DRY DENSITY AT PLUS 2%-3% OF OPTIMUM MOISTURE CONTENT TO TOP OF PIPE SELECT FILL PLACED AND COMPACTED AT 95% STANDARD PROCTOR MAX DRY DENSITY AT OPTIMUM TO PLUS 3% OF OPTIMUM MOISTURE CONTENT TO MIDPOINT OF PIPE PRIOR TO TRENCH EXCAVATION CRADLE ET I L NTS RUBBER CASKET i CONCRETE PRESSURE, PIPEJOINT DETAIL m PLACE CEMENT MORTAR IN JOINT SPACE SECTION H 1. ALL CONCRETE TO BE 3000 PSI @ 28 DAYS. 2. ALL STORM DRAIN CLEANOUTS ARE TO BE SPACED AT 75' MAX. 3. CONTRACTOR SHALL CALL ENGINEER FOR ON—SITE INSPECTION OF BIORETENTION AREA DURING CONSTRUCTION. 4. BIORETENTION AREA TO BE PROTECTED FROM SEDIMENT ACCUMULATION DURING ALL PHASES OF CONSTRUCTION. 5. BIORETENTION MEDIA SHALL NOT TO BE PLACED UNTIL 100% OF DRAINAGE AREA TO POND IS STABILIZED WITH HARDSCAPE, TURF, ETC. 6. BIORETENTION MEDIA IS TO BE PLACED AND RAKED IN BY HAND, AT NO TIME SHALL LARGE EQUIPMENT DRIVE OVER THE MEDIA AFTER IT HAS BEEN PLACED. THE MEDIA SHALL NOT BE COMPACTED OVER 85%. STANDARD PROCTOR IN ORDER TO MAINTAIN PROPER INFILTRATION RATES. 7. MAXIMUM TIME WATER SHOULD POND IS 12 HOURS. 8. IF SOD IS TO BE INSTALLED, ONLY SOD GROWN IN SANDY SOILS ARE TO BE ALLOWED. SOD GROWN IN CLAY SOILS WILL NOT BE ALLOWED. ENGINEEREDT1 1. THE PLANTING SOIL SHALL MEET THE FOLLOWING CRITERIA: A)PH RANGE: 5.5 — 6.5 ASTM D472 B)ORGANIC MATTER: 3 — 5% AASHTO T194 C)SAND CONTENT 85 — 88% AA HTO T88 D)FINES (SILT AND CLAY) CONTENT 8 — 12% AA HTO T88 E) PHOSPHOROUS INDEX (P--1) 10 -- 30 NCDA 2r BIORETENTION MEDIA SHALL HAVE A MINIMUM INFILTRATION RATE OF 1.0"/HR. 3. BIORETENTION MEDIA, SHALL HAVE A MAXIMUM INFILTRATION RATE OF 6.0"/HR. 4, THE MEDIA SHALL BE A UNIFORM MIX, FREE OF STONES, STUMPS, ROOTS OR OTHER SIMILAR OBJECTS LARGER THAN TWO INCHES. NO MATERIALS OR SUBSTANCES SHALL BE MIXED OR DUMPED WITHIN THE BIORETENTION AREA THAT MAY BE HARMFUL TO PLANT GROWTH, OR PROVE A HINDRANCE TO THE PLANTING OR MAINTENANCE OPERATIONS. THE PLANTING SOIL SHALL BE FREE OF BERMUDA GRASS, QUACKGRASS, JOHNSON GRASS, OR OTHER NOXIOUS WEEDS. 5. PLANTING MEDIA SHALL BE TESTED PRIOR TO INSTALLATION TO MEET THE CRITERIA LISTED ABOVE AND RESULTS SENT TO CIVIL ENGINEER FOR REVIEW AND APPROVAL. 6. BIORETENTION MEDIA SHALL BE 'BIORETENTION MIX' FROM WADE MOORE EQUIPMENT COMPANY, INC. IN LOUISBURG, NC. (919) 496-3794. s y 1 —YR V� HDPE FLAT ROOF HDPE FLAT ROOF TRASH RACK .1 TRASH RACK ❑00000000F]�� �_........, y 3' BERM V�iDTH BIORETENTION SURFACE AND SIDE 11000000EIF-10TOP ELEV.=524.00 TOP EL. 522.50SLOPES TO DE522.85 i3 NTH _YR Nf BERMUDA SOODD GCRRO IN — N�624' WIDE x 6" TALL OPENING aNON—CLAYEY SOILS SCREW IN CLEANOUT ❑ 2 SIDES /V` ..✓ ' v / SOLID 6" PVC APA COUPLING 3' 3' PRECAST �,, • 1 �. ✓ .3 FLUSH AND H GRAIDE COWCRE7F RISER HDPE FLAT ROOF ,� �. r / A� TRASH RACK r r ✓ ,✓'FINISHED GRADE EL. 522.0 r , J., IN SITU MATERIAL dr „, ✓ i i A,( w. 24 IN. ,.. _ IPRAP 22 IN CLAS B R � 6" HDPE kms" ti INV. IN (KEYED INDJA 516rwJV �g(� .. f FILTER FABRIC LINING 6 IN. PERFORATED' HDPE NTH 1/2 IN IN SITU MATERIAL f 15" RCP FROM SITE «, 57 STONE. HOLES �`—'' INV. IN 522.00cx is r i,7 a7<.Y, ..._ ,- -, s. .:?�;; .r,;�� � x... ✓'"� "<',. :.r� ""-.,Y:"s,r�,� :'i✓;y�"; .ii ,.ri'>.i!s,�y,r%" iii .... '...:. .. .. .. , .. .'r ... ,�y a FILTER FABRIC LINING ; yy o n a a 4 10 IN. r ✓k"2'`1 .y .,.Z .q ✓, r✓ ?',s. ...... '. _.. .... .._.. ... .. .. .. S4.��CA. TEt 6TI4.i ,.._ „-..'s. ,;-*;." ,;"3s✓✓✓` ✓r,x✓;,'3�..'a. y✓ r•'`r ✓4 ✓ .Z?,. z✓,, ,"�"; t t✓ Z'`Z�;!•i•?�s �7�✓�s'I�;✓, SHED RE . 0� _.._rq 4 IN. MASHED SAND SAND _..._ _ .-. �:.... :..._..,... _.._ s„ «: 1 5, V i O IN. 7 5 N. aY$ 10 IN. WASHED STONE 6"PVC ELBOiW III=III ���Ililal�" E �r SELECT FILL PLACED AND COMPACTED AT 95% STANDARD PROCTOR MAX DRY DENSITY AT OPTIMUM TO PLUS 3% OF OPTIMUM MOISTURE CONTENT TO MIDPOINT OF PIPE PRIOR TO TRENCH EXCAVATION CRADLE ET I L NTS RUBBER CASKET i CONCRETE PRESSURE, PIPEJOINT DETAIL m PLACE CEMENT MORTAR IN JOINT SPACE SECTION H 1. ALL CONCRETE TO BE 3000 PSI @ 28 DAYS. 2. ALL STORM DRAIN CLEANOUTS ARE TO BE SPACED AT 75' MAX. 3. CONTRACTOR SHALL CALL ENGINEER FOR ON—SITE INSPECTION OF BIORETENTION AREA DURING CONSTRUCTION. 4. BIORETENTION AREA TO BE PROTECTED FROM SEDIMENT ACCUMULATION DURING ALL PHASES OF CONSTRUCTION. 5. BIORETENTION MEDIA SHALL NOT TO BE PLACED UNTIL 100% OF DRAINAGE AREA TO POND IS STABILIZED WITH HARDSCAPE, TURF, ETC. 6. BIORETENTION MEDIA IS TO BE PLACED AND RAKED IN BY HAND, AT NO TIME SHALL LARGE EQUIPMENT DRIVE OVER THE MEDIA AFTER IT HAS BEEN PLACED. THE MEDIA SHALL NOT BE COMPACTED OVER 85%. STANDARD PROCTOR IN ORDER TO MAINTAIN PROPER INFILTRATION RATES. 7. MAXIMUM TIME WATER SHOULD POND IS 12 HOURS. 8. IF SOD IS TO BE INSTALLED, ONLY SOD GROWN IN SANDY SOILS ARE TO BE ALLOWED. SOD GROWN IN CLAY SOILS WILL NOT BE ALLOWED. ENGINEEREDT1 1. THE PLANTING SOIL SHALL MEET THE FOLLOWING CRITERIA: A)PH RANGE: 5.5 — 6.5 ASTM D472 B)ORGANIC MATTER: 3 — 5% AASHTO T194 C)SAND CONTENT 85 — 88% AA HTO T88 D)FINES (SILT AND CLAY) CONTENT 8 — 12% AA HTO T88 E) PHOSPHOROUS INDEX (P--1) 10 -- 30 NCDA 2r BIORETENTION MEDIA SHALL HAVE A MINIMUM INFILTRATION RATE OF 1.0"/HR. 3. BIORETENTION MEDIA, SHALL HAVE A MAXIMUM INFILTRATION RATE OF 6.0"/HR. 4, THE MEDIA SHALL BE A UNIFORM MIX, FREE OF STONES, STUMPS, ROOTS OR OTHER SIMILAR OBJECTS LARGER THAN TWO INCHES. NO MATERIALS OR SUBSTANCES SHALL BE MIXED OR DUMPED WITHIN THE BIORETENTION AREA THAT MAY BE HARMFUL TO PLANT GROWTH, OR PROVE A HINDRANCE TO THE PLANTING OR MAINTENANCE OPERATIONS. THE PLANTING SOIL SHALL BE FREE OF BERMUDA GRASS, QUACKGRASS, JOHNSON GRASS, OR OTHER NOXIOUS WEEDS. 5. PLANTING MEDIA SHALL BE TESTED PRIOR TO INSTALLATION TO MEET THE CRITERIA LISTED ABOVE AND RESULTS SENT TO CIVIL ENGINEER FOR REVIEW AND APPROVAL. 6. BIORETENTION MEDIA SHALL BE 'BIORETENTION MIX' FROM WADE MOORE EQUIPMENT COMPANY, INC. IN LOUISBURG, NC. (919) 496-3794. s y 1 —YR V� HDPE FLAT ROOF HDPE FLAT ROOF TRASH RACK .1 TRASH RACK ❑00000000F]�� �_........, y 3' BERM V�iDTH BIORETENTION SURFACE AND SIDE 11000000EIF-10TOP ELEV.=524.00 TOP EL. 522.50SLOPES TO DE522.85 i3 NTH _YR Nf BERMUDA SOODD GCRRO IN — N�624' WIDE x 6" TALL OPENING aNON—CLAYEY SOILS SCREW IN CLEANOUT ❑ 2 SIDES /V` ..✓ ' v / SOLID 6" PVC APA COUPLING 3' 3' PRECAST �,, • 1 �. ✓ .3 FLUSH AND H GRAIDE COWCRE7F RISER HDPE FLAT ROOF ,� �. r / A� TRASH RACK r r ✓ ,✓'FINISHED GRADE EL. 522.0 r , J., IN SITU MATERIAL dr „, ✓ i i A,( w. 24 IN. ,.. _ IPRAP 22 IN CLAS B R � 6" HDPE kms" ti INV. IN (KEYED INDJA 516rwJV �g(� .. f FILTER FABRIC LINING 6 IN. PERFORATED' HDPE NTH 1/2 IN IN SITU MATERIAL f 15" RCP FROM SITE «, 57 STONE. HOLES �`—'' INV. IN 522.00cx is r i,7 a7<.Y, ..._ ,- -, s. .:?�;; .r,;�� � x... ✓'"� "<',. :.r� ""-.,Y:"s,r�,� :'i✓;y�"; .ii ,.ri'>.i!s,�y,r%" iii .... '...:. .. .. .. , .. .'r ... ,�y a FILTER FABRIC LINING ; yy o n a a 4 10 IN. r ✓k"2'`1 .y .,.Z .q ✓, r✓ ?',s. ...... '. _.. .... .._.. ... .. .. .. S4.��CA. TEt 6TI4.i ,.._ „-..'s. ,;-*;." ,;"3s✓✓✓` ✓r,x✓;,'3�..'a. y✓ r•'`r ✓4 ✓ .Z?,. z✓,, ,"�"; t t✓ Z'`Z�;!•i•?�s �7�✓�s'I�;✓, SHED RE . 0� _.._rq 4 IN. MASHED SAND SAND _..._ _ .-. �:.... :..._..,... _.._ s„ «: 1 5, V i O IN. 7 5 N. aY$ 10 IN. WASHED STONE 6"PVC ELBOiW REVISIONS SEAL SEAL \�dtttttRkilCARO ltlCfptfpp 4..,�\� �•�ey Q��.531 (�`�sf � �/iii C� s 036348 11/18/2015 : h / t frttitt�sitte SIM a 1730 Varsity Drive, Suite 500 Raleigh,.27606 (919)233-8091, I SLOPE 1PERFORATIONS wt Ear a; �tCTION THIS w • • il" � DIAMETER II Ili DEG. ON FOOT SPACING INV. AS NOTED ON PLAN SHEET r CHATHAMBRIAR CHAPEL BOULDER POiiiiF DRIVE EXTEPNISION1 CAROLINA —5 FT. x 5 FT. x 1 FT. THICK CAST IN PLACE ANTIFLOTATION BLOCK �®6 DARS {G60) C� 45 DEG. AROUND BASE THAT PENETRATE THROUGH RISER COMPACTED ABC STONE WRAPPED IN NON—WOVEN FILTER FABRIC DATE: APRIL 17, 2015 FILE NUMBER ��: I HORIZONTAL: B A REV.NO. REVISED PER POTENTIAL UTILITY CONFLICTS 2055.11.18 i°-.`.1IfItf(W4tIN%IIll hTT,IN ,01%09OP DESCRIPTIONS I DATE REVISIONS SEAL SEAL \�dtttttRkilCARO ltlCfptfpp 4..,�\� �•�ey Q��.531 (�`�sf � �/iii C� s 036348 11/18/2015 : h / t frttitt�sitte SIM a 1730 Varsity Drive, Suite 500 Raleigh,.27606 (919)233-8091, I SLOPE 1PERFORATIONS wt Ear a; �tCTION THIS w • • il" � DIAMETER II Ili DEG. ON FOOT SPACING INV. AS NOTED ON PLAN SHEET r CHATHAMBRIAR CHAPEL BOULDER POiiiiF DRIVE EXTEPNISION1 CAROLINA —5 FT. x 5 FT. x 1 FT. THICK CAST IN PLACE ANTIFLOTATION BLOCK �®6 DARS {G60) C� 45 DEG. AROUND BASE THAT PENETRATE THROUGH RISER COMPACTED ABC STONE WRAPPED IN NON—WOVEN FILTER FABRIC DATE: APRIL 17, 2015 FILE NUMBER ��: I HORIZONTAL: DRAWNC EBSS I 1 AS NOTED DESIGNED Bi ? D3. S R ISSUED FOR CONSTRUCTION ;