Loading...
HomeMy WebLinkAbout20230684 Ver 1_Pre Construction notification_20240329Baker, Caroline D From: McDonald, Alee <Alee.McDonald@stantec.com> Sent: Friday, March 29, 2024 1:14 PM To: Krystynka.b.stygar@usace.army.mil; Homewood, Sue Subject: [External] Pre -construction Notification: CLT10 Boyd Farm Data Center, Catawba County, North Carolina Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. This email is being provided as notification that construction is planned to begin on the CLT1 0 Boyd Farm Data Center which is covered under U.S. Army Corps of Engineers Individual Permit # SAW-2023-00665 and the North Carolina Department of Environmental Quality (NCDEQ) Individual 401 Water Quality Certification DWR Permit # 20230684. Work authorized by these permits is proposed to start on April 1, 2024. As required by the Corps permit, contact information for onsite contractors is provided below: Microsoft Construction Manager: Arnold Nabong; anabonga-microsoft.com; (703) 727-5621 General Contractor Manager: Brent Cox; bcoxa-morgan-corp.com; (865) 279-9992 Environmental Consultant: Amber Coleman; amber. colemana-stantec. com; (919) 457-8230 Thank You, Alee McDonald Alee McDonald, Pws Environmental Scientist Mobile: 860-874-6008 alee.mcdonald@stantec.com Stantec 521 East Morehead Street Suite 425 Charlotte NC 28202-2695 lialialialialia The content of this email is the confidential property of Stantec and should not be copied, modified, retransmitted, or used for any purpose except with Stantec's written authorization. If you are not the intended recipient, please delete all copies and notify us immediately. Please consider the environment before printing this email.