HomeMy WebLinkAbout20230684 Ver 1_Pre Construction notification_20240329Baker, Caroline D
From: McDonald, Alee <Alee.McDonald@stantec.com>
Sent: Friday, March 29, 2024 1:14 PM
To: Krystynka.b.stygar@usace.army.mil; Homewood, Sue
Subject: [External] Pre -construction Notification: CLT10 Boyd Farm Data Center, Catawba
County, North Carolina
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
This email is being provided as notification that construction is planned to begin on the CLT1 0 Boyd Farm Data Center
which is covered under U.S. Army Corps of Engineers Individual Permit # SAW-2023-00665 and the North Carolina
Department of Environmental Quality (NCDEQ) Individual 401 Water Quality Certification DWR Permit # 20230684. Work
authorized by these permits is proposed to start on April 1, 2024. As required by the Corps permit, contact information for
onsite contractors is provided below:
Microsoft Construction Manager: Arnold Nabong; anabonga-microsoft.com; (703) 727-5621
General Contractor Manager: Brent Cox; bcoxa-morgan-corp.com; (865) 279-9992
Environmental Consultant: Amber Coleman; amber. colemana-stantec. com; (919) 457-8230
Thank You,
Alee McDonald
Alee McDonald, Pws
Environmental Scientist
Mobile: 860-874-6008
alee.mcdonald@stantec.com
Stantec
521 East Morehead Street Suite 425
Charlotte NC 28202-2695
lialialialialia
The content of this email is the confidential property of Stantec and should not be copied, modified, retransmitted, or used for any purpose except with Stantec's written authorization. If you are not the
intended recipient, please delete all copies and notify us immediately.
Please consider the environment before printing this email.