HomeMy WebLinkAbout20240406 Ver 2_Plan View Williams_20240409Williams Basin Excavation, Bulkhead and Dock Construction
Plan View
Scale: 1 " = 30'
Date: February 3, 2024
Sheet 2 of 4
0 15 30 Feet
Williams Basin Excavation Bulkhead and Dock Construction
Cross Section A Typical
Scale: NTS Dimensions Shown
Date: February 3, 2024
Sheet 3 of 4
30'
Final Project Depth 10' Below NWL
Excavation
Williams Basin Excavation Bulkhead and Dock Construction
Cross Section Bulkhead and Dock
Scale: NTS Dimensions Shown
Date: February 3, 2024
rV- n _t n
Proposed
Fender pile (4)