Loading...
HomeMy WebLinkAbout20240406 Ver 2_Riparian Buffer Authorization Request_20240409Original Submittal 4/9/2024 A. Owner/Applicant Information General Information Q .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Primary Contact Email: * forestwilliams@hotmail.com Please list the contact person's email for questions or payment on this project if needed. Who is submitting the application?* ❑ Owner ❑ Applicant other than Owner p Agent 1. Property Owner Information: 1a. Name on Recorded Deed:* Forest H. Williams 1b. Responsible Party: (for Corporations) 1 c. Mailing Address:* Street Address 552 Rowe Road Address Line 2 City Aurora Postal / Zip Code 27806-9199 1 d. Telephone:* (252)670-1176 3. Agent Information: 3a. Name: 3b. Company Affiliation: 3c. Mailing Address: Street Address Address Line 2 City Postal / Zip Code State / Province / Region NC Country us le. Email Address:* cham.trowell@trilliumnc.org ................................................................................................. State / Province / Region Country 3d. Telephone: 3e. Email Address: 3f. Attach a signed and dated copy of the agent Click the upload button or drag and drop files here to attach document authorization form. PDF only B. Project Information and Prior Project History 1. Project Information 1a. Name of Project:* Williams Basin Excavation, Bulkhead and Dock Construction (Subdivision, facility, or establishment name) 1b. Is this a publicly -funded transportation project?* 1d. Subdivision Name: N/A le. Nearest Municipality: Bayboro 1f. Property Size: 0.70 acres 1g. County (or Counties) where the project is located: * 1 h. Property ID# 6561851033000 Tax PIN or Parcel id 1 i. Deed Information Date of Purchase 5/1 /2003 Type of Book Book# Page# I Deed 398 168 [Map 1j. Attach a copy of the recorded map that indicates when the lot was last platted. Click the upload button or drag and drop files here to attach document PDF only 1 k. How would you like to provide the Latitude and Longitude information? Address Lookup Manually Address Lookup Street Address 401 Spencer Street Address Line 2 City Bayboro Postal / Zip Code 28515 Latitude* 35.1443961 Longitude* 11. Is the project located in any of North Carolina's twenty coastal counties?* State / Province / Region NC Country us -76.7646195 Yes No 1m. Is the project located within a NC Division of Coastal Management Area of Environmental Concern (AEC)? Yes 0 No 2. Surface Waters V ................................................................................................................................................................................................... . 2a. Name of the nearest body of water to proposed project: * Bay River 2b. Water Quality Classification of nearest receiving water: SC;Sw,NSW 2c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 530 (linear feet only) 3. Project Description: 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Site is developed with buildings gravel parking, man made basin, docks, etc. to support existing ongoing commercial fishing operations participating in trawl boat fisheries like shrimping and scalloping. trawl boats are deep draft vessels drawing as much as 8'. 3b. Attach an 8 % x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site. Click the upload button or drag and drop files here to attach document Williams USA Topo.pdf 2.51 MB PDF only 3c. Attach an 8 % x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site. Click the upload button or drag and drop files here to attach document Williams Pamlico Co Soils Map.pdf 782.05KB PDF only 4. Proposed Activity Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used: * The purpose of this development proposal is to deepen an existing manmade basin to -10.0' below the normal water level (NWL) and to construct dock work around the basin to support maintenance and preparation of boats owned by Mr. Williams participating in a variety of trawl fisheries. His vessels draft 6' to 8'. Maintenance activities will pertain to the superstructure of the vessels like outriggers, winches, cables, pilot house, nets, etc. This area of the Bay River has served as a harbor of refuge for commercial fishing trawlers for decades and Mr. Williams has docks and buildings that support this existing use. The channel in the Bay River averages -10.0' below the NWL in this area. The Bay River in this area is designated as SC;Sw;NSW by the Environmental Commission and is permanently closed to shellfish harvest by Shellfish Sanitation. This area of the Bay River is not designated as a primary nursery area (PNA) by the Marine Fisheries Commission. To facilitate trawlers utilizing the existing basin, the applicant proposes to dig from the 10' contour in Bay River an area 30' wide by 130' long into the head of the basin removing an average of -3.0' of muck and clay. An excavator operating from a barge with a spoil containment structure will be used to undertake the excavation work. Mr. Williams obtained a CAMA/Dredge and Fill General Permit (GP) 7H.1500 on October 12, 2022 to dig this area to-6.0'and has completed this work. The spoil material for this project will be loaded directly into a dump truck and hauled to an upland disposal site. A bulkhead 40' long will be built at the NWL along the northern edge of the basin. Four fender piles will be driven equally spaced about 1' off the bulkhead to prevent damage to the bulkhead from vessel strikes. The proposed dock work will be elevated approximately 5' above the existing ground level to facilitate pedestrian access on and off the vessels. Attach a site plan as applicable to the project: Click the upload button or drag and drop files here to attach document Plan View Williams.pdf 764.62KB PDF only 5. Jurisdictional Determinations 5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project (including all prior phases) in the past?* Yes No 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? * 7. Future Project Plans 7a. Is this project a phased project?* Yes No C. Proposed Impacts Inventory Buffer Impacts Project is in which protected Basin?* Neuse River Basin (15A NCAC 02B.0233) Catawba River Basin (15A NCAC 02B.0243) Randleman Lake Watershed (15A NCAC 02B.0250) Tar -Pamlico River Basin (15A NCAC 02B.0259) Jordan Lake Watershed (15A NCAC 02B.0267) Goose Creek Watershed (15A NCAC 02B.0606 & 15A NCAC 02B.0607) Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Site# - Reason Stream Name Buffer Impact* Impact Type Zone 1 Zone 2 Site 1 Basin Permanent (P) Allowable 540.00 0.00 Map label (e.g. Road Crossing 1) Perm or Temp Square Feet Square Feet Site 2 Basin Temporary (T) Allowable 80.00 0.00 Map label (e.g. Road Crossing 1) Perm or Temp Square Feet Square Feet Total Zone 1 Impacts: 620.00 Total Zone 2 Impacts: 0.00 Total Buffer Impacts: 620.00 Comments: Site 1 impacts are from the proposed dock construction. Site 2 are from the proposed bulkhead construction. An area 20' wide x 40' will be disturbed to install the bulkhead tiebacks. D. Impact Justification and Mitigation 1. Avoidance and Minimization ......... ........... ........ ................. ........ ................. .................. .......... ........ .......... ........ ........ ................... ........ .................. .............................. ........ .......... ........ ........ ....................... ................. ........ .....I........ .... ......... ...... la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project. This site was chosen for the mooring of trawlers because of the existing infrastructure and the associated impacts from the development of the infrastructure prior to the development of the Neuse River Buffer (NRB) rule. The site was used as a staging area for commercial fishing operations that has been an ongoing use that existed prior to implementation of the NRB. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. The bulkhead will be structurally tight prior to backfilling activities to prevent seepage of sediment through the bulkhead into adjacent surface waters. The pilings for the dock will be driven in place to minimize disturbance. The area under the elevated dock will remain vegetated. Erosion control measures such as flat slopes, vegetated cover within 7 working days and silt fence will be utilized to prevent the unintentional discharge of sediment into adjacent surface waters. E. Diffuse Flow Plan 1a. What type of SCM are you providing?* Level Spreader Vegetated Conveyance (lower SHWT) Wetland Swale (higher SHWT) Proposed project will not create concentrated stormwater flow through the buffer Other SCM that removed minimum of 30% nitrogen 1 c. Diffuse Flow Documentation Click the upload button or drag and drop files here to attach document Diffuse flow Plan.pdf 57.43KB PDF only F. Supplementary Information Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 021-11.0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? Yes No 2b. Is this an after -the -fact buffer authorization application? Yes No G. Additional Information Please upload any additional information you would like the Division to consider during application review. Additional Attachments: Click the upload button or drag and drop files here to attach document PDF only Additional Comments: H. Sign and Submit By digitally signing below, I certify that: I • I have given true, accurate, and complete information on this form; • I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act') o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the application form." Print Name:* Steve Trowel Signature Submission Date: (Auto populated field) Initial Review Is this accepted into the review process?* Is this project a public transportation project?* ID#* Version: Select Reviewer: Select Reviewing Office* Has payment been received?* Yes No Yes No 20240406 2 Paul Nyarko:Paul.Nyarko Washington Regional Office - (252) 946-6481 No Payment Needed Fee Received Need Fee - send electronic notification