HomeMy WebLinkAbout20060684 Ver 1_Year 4 Bankfull Monitoring Report_20151106RECEIVED N C Dept of ENR r NOV 0 9 2015 City of Greensboro REGIONREGION LSALEM AL OFFICE North Carolina Engineering & Inspections TO: NCDENR, DIV. OF WATER RESOURCES DATE: NOVEMBER 6, 2015 WINSTON-SALEM REGIONAL OFFICE PROJECT: DWQ #06-0684 450 W. HANES MILL ROAD, SUITE 300 RE: NEW GARDEN ROAD WINSTON-SALEM, NC 27105 STREAM RESTORATION ATTENTION: SUE HOMEWOOD MONITORING RECORD WE ARE SENDING YOU: ® ATTACHED THE FOLLOWING ITEMS: ❑ SHOP DRAWINGS ❑ CHANGE ORDER ❑ UNDER SEPARATE COVER VIA ❑ PRINTS ❑ SPECIFICATIONS ❑ PLANS ❑ LETTER ® OTHER COPIES DATE REVISION DESCRIPTION 1 08/19/2015 LEVEL 1 STREAM RESTORATION MONITORING SECOND BANKFULL MONITORING REPORT THESE ARE TRANSMITTED AS CHECKED BELOW: ❑ FOR APPROVAL ❑ APPROVED AS SUBMITTED ® FOR YOUR USE ❑ AS REQUESTED ❑ FOR REVIEW ❑ RESUBMITTED ❑ FOR DISTRIBUTION ❑ OTHER COMMENTS: COPY To USACE. FILE ❑ APPROVED AS NOTED ❑ RETURNED FOR CORRECTIONS ❑ RETURNED AFTER LOAN SIGNED GUY B. INGLE PO Box 3136 = Greensboro, NC 27402-3136 , www greensboro-nc gov 336 -373 -CITY (2489) , TTY # 333-6930 (-I CITY OF GREENSBORO ENGINEERING DIVISION NEW GARDEN ROAD WIDENING, PHASE II PROJECT # P-3741 CULVERT REPLACEMENT AND STREAM RELOCATION/RESTORATION HORSEPEN CREEK MAIN TRIBUTARY #2 AND TRIBUTARY A LEVEL 1 STREAM RESTORATION MONITORING SECOND BANKFULL MONITORING REPORT NOVEMBER 4, 2015 Prepared By: US Infrastructure of Carolina, Inc. 125 South Elm Street, Suite 510 Greensboro, North Carolina 27401 N.C. License #C-1950 RECEIVED N.C. Dept. of ENIR NOV 0 9 2015 Level 1 Stream Restoration Monitoring REGION LOFFICE Horsepen Creek Main Tributary #2 and Tributary A SECOND BANKFULL MONITORING REPORT New Garden Road Widening Phase II City of Greensboro, North Carolina Engineering Division Project No. P-3741 November 4, 2015 Prepared by: US Infrastructure of Carolina, Inc. 125 South Elm Street, Suite 510 Greensboro, North Carolina 27401 N.C. License #C-1950 Table of Contents Page Introduction..................................................................................................................................... l Methods............................................................................................................................................1 PhotoReference Sites.................................................................................................................... l Results...............................................................................................................................................1 PhotoReference Sites.................................................................................................................... l Summary..........................................................................................................................................4 Comments......................................................................................................................................4 Figures Figure1: Site Location Map..............................................................................................................2 Figure 2: As -Built Cross Sections and Photo Location Map............................................................3 AppendixA.....................................................................................................................................5 Photopage 1 — Second Bankfull Monitoring Photographs Second Bankfull Monitoring Report New Garden Road Widening Phase II Project No. P-3741 Introduction The New Garden Road Widening Phase II Project is located in Greensboro, North Carolina as shown on the Site Location Map (Figure 1) on the next page. Construction of this project necessitated the relocation of portions of two tributaries to Horsepen Creek, Main Tributary #2 (South) and Tributary A (North). The relocation of these stream reaches was completed in March 2011. The stream relocations were permitted through the U.S. Army Corps of Engineers (Action I.D. SAW 2007-03980) and the North Carolina Department of Environment and Natural Resources (DWQ Project #06-0684) and required a Level 1 Stream Restoration Mitigation and Monitoring Plan for this project. This level of monitoring includes the establishment of photo reference sites, plant survival monitoring, channel stability monitoring, and two bankfull monitoring events. The following visual inspection during the second bankfull monitoring event was conducted to evaluate and document the conditions of the relocated stream channels during a bankfull event after the completion of construction. Methods Photo Reference Sites Photographs were taken during: 1) Second Bankfull Event on November 2, 2015 In stream structures including rock vanes, root wads, and grade control sills were photographed. Stream banks were also photographed for visual comparison. Results Photo Reference Sites All areas of the project were photo documented. In stream structures including rock vanes, root wads, and grade control sills were photographed. Stream banks were also photographed for visual comparison. Representative photographs are included in Photopage 1 (Appendix A). The locations and directions of each of these photographs are shown in Figure 2 (Page 3). 1 Second Bankfull Monitoring Report New Garden Road Widening Phase II Project No. P-3741 Legend 2,000 1,000 0 2,000 Feet Project Outer Boundary REFERENCE USGS 7.5 TOPOGRAPHIC MAP SERIES, GREENSBORO NC QUADRANGLE, DATED 1994 I Carolina Wetland Services, Inc. Figure Site Location Map New Garden Road Widening IJ �+ 550 E. Westinghouse Blvd. As -Built Report "J CWS Charlotte, NC 28273 Greensboro, North Carolina Applicant No: I Date: ISheet of Second Bankfull Monitoring Report New Garden Road Widening Phase II Project No. P-3741 3 J z z wa: Q Q z J 0 � O r e F F w d Q C 47 V c Z n 5z3 UO U W > n U U W C) Ua&� �cai N tzt z vii o. O" z3 E -o WEo� x °a z`' x&�� Q o W z �O ���� } 0W Q j O �.Q z W pWZU 0 < Q z 0i Q � / V \ o / Q O \ U / Q I U > I I \ Lu C Z ) U > / N Cm m Q w / CO rn 0 a I o0 I °z LU \ O U QQ I 0 Y pa 3 I a C 00 Q ¢ Q N� O U> U I W LO I (0 O I Q U I O I U I to \ O y d1 D 0 WZ U I U \ o > > W a Q \ W o \ N w u \ oo \\ \ o I=w ° 3 w \ i n C O ° p < N \ it O w U Z } O \ i0i ❑ Z O U O O Q \ 0 > W J QJ O \ a > N y C O m \ \ C4 W > Y H Fmn H \ m O U Z m d Z v W Q ui J I I I I I LL � 3 Second Bankfull Monitoring Report New Garden Road Widening Phase II Project No. P-3741 Summary Comments The channels (Main Tributary #2 and Tributary A) relocated as part of the New Garden Road Widening Phase II Project appear to be geomorphically and hydraulically stable during the observed bankfull event. Other than ongoing monitoring and observation there are no recommendations to perform any remediation at this time. 4 Second Bankfull Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Project No. P-3741 Appendix A Photopage 1 — Second Bankfull Monitoring Photographs AI it �'" •\ row Jp� A -1 tze Iy�v two. VIPD-19,Y t '3 - '711 � Q.{�..►,' �` . .1.� . ♦ � � moi. � _ ..t „ ., j -t„ j'aw 'per Second Bankfull Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Project No. P-3741 Y•� ;max. .5:�: F, ♦ 777777EEEE�IIII Photo 11: Main Tributary #2 — Sanitary Sewer Line, left bank looking across Photo 12: Main Tributary #2 — Permanent Cross Section A, left bank looking downstream 4i X,j .4 t rs �CTsr ' } " " ► f"[ " i Al �I' ; Y� ..� �•��. f tr .✓ fix. •�. ti r _w ' ^�.� jl �?����C. _•� ,. Pte.- � 'i: ;�, • 0-- •'� ,. •'�.� ate,,. r� a,_ v