Loading...
HomeMy WebLinkAboutNCC241117_ESC Approval Submitted_20240412 srAtl• A, 1 d,F aa,nt4. .`,_, F`w �,,. ROY COOPER ' � - i L .z x Governor , '- 1��i I DIONNE DELLI-GATTI ' Secretary Qx. BRIAN WRENN NORTH CAROLINA Director Environmental Quality April 30, 2021 LETTER OF APPROVAL WITH MODIFICATIONS Skybrook, LLC Attention: Brian Pace,Partner 6719-C Fairview Road Charlotte,North Carolina 28210 RE: Project Name: Skybrook Corners Acres Approved: 7 Project ID: CABAR-2021-058 County: Cabarrus, City: Concord Address: Popular Tent &Huntersville Concord Road River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: Skybrook, LLC Date Received by LQS: April 20, 2021 Plan Type: Review Dear Mr. Pace: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three(3)years following the date of approval,if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov.After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, on or after May 1, 2019,a$100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. D E ) North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources r/ Mooresville Regional Office 1610 East Center Avenue,Suite 301 1 Mooresville,North Carolina Z8115 47f1:-,.St 0LNA Wind/ it orEnvlrvnment10ueiliy 704.663.1699 Letter of Approval with Modifications Skybrook, LLC April 30, 2021 Page 2 of 3 Title 15A NCAC 4B .0118(a)and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC,once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties.If,following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, ei/bid4e,/ted g4afteea,, Christopher Graybeal Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGO1 Fact Sheet c: Inspection Department Letter of Approval with Modifications Skybrook, LLC April 30, 2021 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Skybrook Corners Project ID: CABAR-2021-058 County: Cabarrus 1. Additional silt fence should be installed along the down slope perimeter of the stock pile ten feet from the toe of the stock pile 2. If installation of the permanent storm water conveyance pipe is to occur prior to installation of the temporary storm water diversion ditch, then all possible efforts must be made to minimally disturb the immediate surrounding area until that portion of construction is completed. -P '73 '73 "• P H CD P c, c) O ''O 0 0 n o 0 o �d 8 . O A7 cm? CD - n O� cm or o o 7:11i CD C P (') -. 0 o 0 *11 H o ^ ra., � � �' C y CD �. cr j CDCD p 6iii 1..11. "1-'--- CZD , --- Z - GREAT '' '._:-. n0p.,..., 0cC8(--Dr0,-' 0LA ~, ~ # - c tiP '� Z I> ' , , SID CA ....,., ---.., NY ,. I ft,711 lit ------------ o CD- rt CD CD v) n P 5 :-'' 7:) O O✓ H �, , C • cG ID U' w O O• H ,�• n ¢• � � �, � r m P „cCD ¢, CD It� CD CD CD -P O cA `-O `� A� CD CD rp--t O A CD L C/