HomeMy WebLinkAbout20240534 Ver 1_BP13.R024 Bat Questionaire_20240411Questionnaire: Existing Structure: Can the existing bridge deck be removed during the inactive bat season/winter months (October 16 - March 31)? (If not, please explain) Yes, if the project is let as planned. Trees': Can the trees in the project footprint be cut during the inactive bat season/winter months (October 16 — March 31)? (If not, please explain) Yes, if the project is let as planned on Oct. 2, 2024 *Tree clearing that occurs during the tree -roosting bat active season (April 1 — Oct 15) will require a formal Sec. 7 Consultation (BA). This process takes an additional 9-12 months to acquire a Biological Opinion from the USFWS. Alternate dates below are provided as possible conservation measures to include in a BA: -can tree clearing be avoided during the maternity season (May 15 — August 15)? -can tree clearing be avoided during the pupping season (June 1 —July 31)? Blasting: Will blasting be used for this project? Is not anticipated If so, will blasting occur after tree clearing? Utilities*: Will any clearing for utilities be necessary? Yes If so, can the trees in the project footprint be cut during the winter months (October 16 — March ,, )? (If not, please explain) *Tree clearing that occurs during the tree -roosting bat active season (April 1 — Oct 15) will require a formal Sec. 7 Consultation (BA). This process takes an additional 9-12 months to acquire a Biological Opinion from the USFWS. Alternate dates below are provided as possible conservation measures to include in a BA: -can tree clearing be avoided during the maternity season (May 15 — August 15)? -can tree clearing be avoided during the pupping season (June 1 —July 31)? Noise: What type of noise sources will be used during project construction? (Highlight all that apply) Pile driver Scraper Impact wrench Guardrail installation/pile driver Paver Concrete truck Rock drill Jackhammer Concrete mixer Pneumatic wrench Drill rig Auger drill rig Vibratory pile driver Crane Backhoe Pneumatic chipper Pumps, generators, Ground compactor Hydromulcher compressors Skidder Slurry machine Front end loader Roller Pneumatic riveter Gradall Concrete Vibrator Circular saw hand held hain saw Concrete saw Mounted impact hammer hoe- I Road grader (Compressor ram Lighting: Will temporary lighting for nighttime construction be necessary during the active bat season between April 1 and October 15? Nc Does permanent lighting exist in the project area and if so, will it be removed, or will new lighting be added as a result of the project? No permanent lighting exist nor is any new permanent lighting planned.