Division of Water Resources
Pre -Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
October 2, 2023 Ver 4.3
Initial Review
Has this project met the requirements for acceptance in to the review process?
Yes No
Is this project a public transportation project?*
Yes No
Change only If needed.
Does this project involve maintenance dredging funded by the Shallow Draft Navigation Channel Dredging and Aquatic Weed Fund or involve the distribution or transmission of energy or
fuel, including natural gas, diesel, petroleum, or electricity?
Yes No
BIMS # Assigned Version# *
20240533 1
Is a payment required for this project?*
No payment required
Fee received
Fee needed - send electronic notification
Reviewing Office*
Central Office - (919) 707-9000
Information for Initial Review
la. Name of project:
Dunn Creek Culvert Replacement
1a. Who is the Primary Contact? *
Town of Wake Forest, ATTN: Chris Glass, PE, PLA
1b. Primary Contact Email: *
cglass@wakeforestnc.gov
Date Submitted
4/10/2024
Nearest Body of Water
Dunn Creek (Hatters Branch)
Basin
Nauss
Water Classification
C;NSW
Site Coordinates
Latitude:
35.981128
A. Processing Information
Is this project connected with ARPA funding?
Yes No
County (or Counties) where the project is located:
Wake
Is this a NCDMS Project
Yes No
Longitude:
-78.489263
What amount is owed?*
$240.00
$323.00
Select Project Reviewer*
Rob Ridings:rob.ridings
1c. Primary Contact Phone:*
(919)435-9510
$570.00
$767.00
O
Is this project a public transportation project?*
Yes No
Is this a NCDOT Project?*
Yes No
1a. Type(s) of approval sought from the Corps:
Section 404 Permit (wetlands, streams and waters, Clean Water Act)
Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
Has this PCN previously been submitted?
Yes
No
1b. What type(s) of permit(s) do you wish to seek authorization?
Nationwide Permit (NWP)
Regional General Permit (RGP)
Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
Yes No
Nationwide Permit (NWP) Number:
NWP Numbers (for multiple NWPS):
14 - Linear transportation
1d. Type(s) of approval sought from the DWR:
401 Water Quality Certification - Regular 401 Water Quality Certification - Express
Non-404 Jurisdictional General Permit Riparian Buffer Authorization
Individual 401 Water Quality Certification
le. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification: Yes No
For the record only for Corps Permit: Yes No
1f. Is this an after -the -fact permit application? *
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1h. Is the project located in any of NC's twenty coastal counties?
Yes No
1j. Is the project located in a designated trout watershed?
Yes No
B. Applicant Information
'Id. Who is applying for the permit?
Owner Applicant (other than owner)
le. Is there an Agent/Consultant for this project?'�
Yes No
2. Owner Information
2a. Name(s) on recorded deed:
Town of Wake Forest
2b. Deed book and page no.:
2c. Contact Person:
Chris Glass, PE, PLA
2d. Address
Street Address
301 S Brooks Street
Address Line 2
City
Stale / Province / Region
Wake Forest
North Carolina
Postal/Zip Code
Country
27587
USA
2e. Telephone Number:
(919)435-9510
2g. Email Address:*
cglass@wakeforestnc.gov
4. Agent/Consultant (if applicable)
4a. Name:
Emma Radford, WPIT, CA
4b. Business Name:
Kimley-Horn
4c.Address
Street Address
421 Fayetteville Street
Address Line 2
Suite 600
city
Raleigh
Postal / Zip Code
27601
4d. Telephone Number:
(919)677-2215
4f. Email Address:*
emma.radford@kimley-horn.com
C. Project Information and Prior Project History
1. Project Information
1b. Subdivision name:
(if appropriate)
1c. Nearest municipality / town:
Wake Forest
2. Project Identification
2a. Property Identification Number:
See Figure 1: Vicinity Map
2c. Project Address
Street Address
N/A (Linear Transportation Project)
Address Line 2
city
Postal / Zip Code
3. Surface Waters
3a. Name of the nearest body of water to proposed project:
Dunn Creek (Hatters Branch)
3b. Water Resources Classification of nearest receiving water:
C;NSW
3c. What river basin(s) is your project located in?*
Neuse
3d. Please provide the 12-digit HUC in which the project is located.
030202010702
4. Project Description and History
2f. Fax Number:
State / Province / Region
NC
Country
USA
4e. Fax Number:
2b. Property size:
0.77
State / Province / Region
Country
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: *
The approximately 0.77-acre project corridor is located generally east of downtown Wake Forest in Wake County, NC. The project corridor currently exists as a maintained roadway
corridor with pockets of forested area on both sides. The project vicinity is primarily composed of single-family residential neighborhoods to the west of the Wake Forest Reservoir.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?
Yes No Unknown
O
4f. List the total estimated acreage of all existing wetlands on the property:
4g. List the total estimated linear feet of all existing streams on the property:
128 LF
4h. Explain the purpose of the proposed project:*
The purpose of the proposed project is to replace two existing, failing culverts carrying Dunn Creek north to south, perpendicular to East Juniper Ave in Wake Forest, Wake County, NC.
4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: *
The project proposes to replace and extend the two failing, corrugated metal pipe (CMP) culverts that currently exists under East Juniper Avenue with two 8' wide by 6' tall reinforced
concrete box culverts, embedded one foot into the channel of Dunn Creek (Hatters Branch). The proposed project is necessary to relieve the failing infrastructure of the two existing
culverts and to limit the number of overtopping events ultimately to prevent future erosion and improve safety of the roadway crossing.
Additionally, the Town is proposing roadway improvements including the addition of curb and gutter, as well as a 5' grass strip and 10' wide multi -use path (MUP) to improve pedestrian
safety along the northern and southern sides of East Juniper Avenue. The proposed Multi -Use Path (MUP) will be connected to the existing Dunn Creek Greenway intersecting the project
corridor. Construction equipment typical of infrastructure projects will be utilized including bulldozers, excavators, graders, dump trucks, concrete trucks, and pavers.
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
Yes
No
Comments:
Kimley-Horn staff delineated the project corridor on August 8, 2023 and identified one stream, Dunn
Creek (Hatters Branch).
5b. If the Corps made a jurisdictional determination, what type of determination was made? *
Preliminary Approved Not Verified Unknown N/A
Corps AID Number:
SAW-2023-01945
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known): Mackenzie Richards, PWS and Caroline Vinter, WPIT
Agency/Consultant Company: Kimley-Horn
Other:
O Unknown
5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR
A Preliminary Jurisdictional Determination (PJD) concurrence email (SAW-2023-01945) was issued by Dicky Harmon of the U.S. Army Corps of Engineers (USAGE) on November 9, 2023.
A Buffer Determination Letter was issued by Rob Ridings of the North Carolina Division of Water Resources (NCDWR) on October 3, 2023. The issued Buffer Determination Letter and
PJD email concurrence for the project are attached as part of this permit application package. Two Pre -Application meetings to discuss the project were held with Dicky Harmon of the
USACE and Rob Ridings of the NCDWR on February 16 and March 14, 2024.
6. Future Project Plans
6a. Is this a phased project?*
Yes O No
6b. If yes, explain.
The proposed Multi -Use Path (MUP) will be connected to the existing Dunn Creek Greenway intersecting the project corridor. These activities are considered Phase 1 of the project. Phase
2 will be constructed as a separate project by the Town of Wake Forest or a developer as a part of the Town's CTP Plan. Phase 2 is located wholly in uplands and will include extending the
MUPs, constructed as part of Phase 1, west along East Juniper Avenue to Traditions Grande Boulevard.
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
N/A
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
Wetlands Streams -tributaries Buffers
Open Waters Pond Construction
3. Stream Impacts
F
S1
3a. Reason for impact (?)
Impact Site 1: Culvert
Replacement and Extension
3b.lmpact type*
Permanent
3c. Type of impact*
Culvert
3d. S. name*
Dunn Creek (Hatters Branch)
3e. Stream Type*
?)
Perennial
3f. Type of
Jurisdiction*
Both
3g. S. width
10
Average (reeq
3h. Impact
length*
36
(linear reef)
g2
Impact Site 1: Rip -Rap
Placement (P-NNL)
Permanent
Bank Stabilization
Dunn Creek (Hatters Branch)
Perennial
Both
10
Average (feet)
46
(linear feet)
5�Impact Site 1: Temporary Temporary Other Dunn Creek (Hatters Branch) Perennial Both 10 16
Construction Access Average (feet) (linear feet)
3i. Total jurisdictional ditch impact in square feet:
0
3i. Total permanent stream impacts:
82
3i. Total stream and ditch impacts:
98
3i. Total temporary stream impacts:
16
3j. Comments:
Impacts to streams and protected riparian buffers have been avoided and minimized to the extent practicable. At Impact Site 1, a total of 36 LF (0.01
acre) of permanent stream impacts and 46 LF (0.008 acre) of permanent -no net loss (P-NNL) stream impacts to Dunn Creek (Hatters Branch) within the
project corridor as a result of the replacement and extension of the existing, failing culverts and associated keyed -in rip rap inlet and outlet to the channel
and banks. The associated riprap will provide bank stabilization and help prevent future erosion. The new culverts will be buried a minimum of 1 foot and
will allow for natural flow and movement of aquatic species. Additionally, a total of 16 LF (0.003 acre) of temporary stream impacts would result from the
proposed project to facilitate the construction access necessary to install the proposed culverts and rip rap and for temporary dewatering to allow for
work in the dry.
6. Buffer Impacts (for DWR)
6a. Project is in which protect basin(s)?
Check all that apply.
Neuse Tar -Pamlico
Catawba Randleman
Goose Creek Jordan Lake
Other
6b. Impact Type
6c. Per or Temp
6d. Stream name
6e. Buffer mitigation required?
6f. Zone 1 impact
6g. Zone 2 impact
Impact Site 1: Crossing
P
Dunn Creek (Hatters Branch)
No
6,381
2,630
Impact Site 1: Temporary Construction Access
T
Dunn Creek (Hatters Branch)
No
411
200
6h. Total buffer impacts:
Zone 1 Zone 2
Total Temporary impacts: 411.00 200.00
Zone 1
Zone 2
Total Permanent impacts: 6,381.00
2,630.00
Zone 1
Zone 2
Total combined buffer impacts: 6,792.00
2,830.00
6i. Comments:
At Impact Site 1, a total of 6,381 square feet of unavoidable permanent impacts to buffer zone 1 and 2,630 square feet of permanent impacts to buffer
zone 2 of Dunn Creek (Hatters Branch) will result from the proposed project as a result of the culvert replacement and extension, and permanent
drainage easement, as well as the perpendicular construction of the proposed MUPs along the northern and southern side of East Juniper Avenue.
Additionally, a total of 411 square feet of temporary impacts to buffer zone 1 and 200 square feet of temporary impacts to buffer zone 2 of Dunn Creek
(Hatters Branch) will result from the construction access necessary to install the proposed culverts and riprap, and to construct the proposed Iv1UPs.
E. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
The proposed project has been designed to minimize impacts to jurisdictional features to the extent practicable. Dunn Creek (Hatters Branch) will be
diverted using a 15 foot temporary drainage pipe outlet into a diversion channel with the aid of impervious dikes to allow for work in the dry. The projects
culvert replacement is necessary in order to limit overtopping events due to the failing drainage infrastructure and to spatially accommodate the
headwalls and wing walls being installed to enhance slope and channel stability around the culvert outlet and inlets, as well as reduce stream and
riparian buffer impacts. Additionally, rip rap stabilization at the proposed culvert inlet and outlet have been sized to avoid erosive flow through the pipe
and channelization of the stream. The new culverts would allow full conveyance of the 25-year event without roadway overtopping.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
Impacts to streams and riparian buffers within the project corridor will be minimized throughout the construction process by avoiding these features with
equipment, materials, and access corridors where practicable. Where feasible, staging and construction access routes will be located in upland areas
throughout the project corridor. Silt fencing will be installed as part of the standard BMP and in accordance with the erosion control plan sheets.
Temporary sediment control measures will be used to reduce stormwater impacts to receiving waters and minimize runoff from the construction sites.
During the construction process, a stream diversion operation sized by ordinary daily flow will be used to allow for in -stream and channel repair work in
the dry.
O
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
Yes No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
Compensatory mitigation is not proposed for streams as part of this permit application due to minimal permanent impacts to streams (<0.02 acre; <300 LF) resulting from the proposed
project.
Compensatory mitigation is not proposed for streams as part of this permit application due to minimal permanent impacts to streams (<0.02 acre; <300 LF) resulting from the proposed
project. Compensatory mitigation is also not proposed for impacts to the Neuse River Basin riparian buffers as a result of this project. According to NCDWR's Neuse River Basin Buffer
Table of Uses, the buffer impacts associated with the construction of greenways, trails, sidewalks, and/or linear bike/pedestrian transportation systems where built upon area is added to
the riparian buffer, equal to or less than 10 feet wide with two foot wide shoulders are "Allowable Upon Authorization". Additionally, buffer impacts associated with the construction of
perpendicular roadway crossings impacting greater than one -tenth of an acre but equal to or less than one-third of an acre of riparian buffer are considered "Allowable Upon Authorization".
Compensatory mitigation is also not proposed for impacts to the Neuse River Basin riparian buffers as a result of this project. According to NCDWR's Neuse River Basin Buffer Table of
Uses, the buffer impacts associated with the construction of greenways, trails, sidewalks, and/or linear bike/pedestrian transportation systems where built upon area is added to the
riparian buffer, equal to or less than 10 feet wide with two foot wide shoulders are "Allowable Upon Authorization". Additionally, buffer impacts associated with the construction of a
perpendicular roadway crossings impacting greater than one-third acre of riparian buffer are considered "Allowable Upon Authorization". As such, no mitigation is required for the proposed
riparian buffer impacts.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
Yes No
What type of SCM are you providing?
Level Spreader
Vegetated Conveyance (lower SHWT)
Wetland Swale (higher SHWT)
Other SCM that removes minimum 30 % nitrogen
Proposed project will not create concentrated stormwater flow through the buffer
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?
Yes No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
Yes No
Comments:
G. Supplementary Information
1. Environmental Documentation
la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? *
Yes No
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina)
Environmental Policy Act (NEPA/SEPA)?*
Yes No
Comments:*
No NEPA or SEPA Documents were required for this project.
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
Yes No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality? *
Yes No
3b. If you answered "no," provide a short narrative description.
The proposed is a single and complete project. Construction of the proposed project will not result in cumulative impacts or additional development.
O
n
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project? *
Yes No N/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?
Yes No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?
Yes No
5d. Is another Federal agency involved?*
Yes No
5e. Is this a DOT project located within Division's 1-8?
Yes No
5f. Will you cut any trees in order to conduct the work in waters of the U.S.?
Yes No
5g. Does this project involve bridge maintenance or removal?
Yes No
5h. Does this project involve the construction/installation of a wind turbine(s)?*
Yes No
Unknown
5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
Yes No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
As of April 1, 2024, the US Fish and Wildlife Service (USFWS) Information for Planning and Consulting (IPaC) tool lists the red -cockaded woodpecker,
Neuse River waterdog, Carolina madtom, Atlantic pigtoe, dwarf wedgemussel, and Michaux's sumac, with potential to occur within the project vicinity.
IPaC also lists the tricolored bat (Perimyotis subfiavus), a proposed endangered species, and the bald eagle (Haliaeetus leucocephalus), which is
protected under the Bald and Golden Eagle Protection Act, with potential to occur within the project vicinity. A review of the NC Natural Heritage
Program (NCNHP) element occurrence database (updated January 2024) identified no known occurrences of any federally listed species in or within 1.0
mile of the project corridor.
Red -cockaded Woodpecker (RCW)
Suitable habitat for the red -cockaded woodpecker is not present within the project corridor. Forested areas within the study area are mostly composed of
hardwoods and immature pines that are dense, overgrown with invasives, and fragmented. In addition, a review of the NCNHP database records
(updated January 2024) indicates there are no known occurrences of RCW in or within 1.0 mile of the project corridor. Due to lack of suitable habitat and
the lack of known occurrences, it has been determined that the proposed project would have "No Effect" on RCW.
Aquatic Species
Suitable habitat for the Neuse River waterdog, Carolina madtom, Atlantic pigtoe, and dwarf wedgemussel, is present within Dunn Creek (Hatters Branch)
in the project corridor. A review of the NCNHP database records (updated January 2024) indicates there are no known occurrences of any of the
federally listed aquatic species listed above in or within 1.0 mile of the project corridor. According to the NCNHP records, the nearest known population
of Neuse River waterdog is located approximately 6 river miles downstream from the project corridor in the Neuse River. The nearest known population
of Carolina madtom is located approximately 12 river miles downstream from the project corridor in the Neuse River. The nearest known population of
Atlantic pigtoe is located approximately 20 river miles downstream from the project corridor in Walnut Creek. The nearest known population of dwarf
wedgemussel is located approximately 17 river miles downstream from the project corridor in the Neuse River. Due to the lack of known occurrences
and the distance from the project corridor to the nearest known population, no direct impacts to the aquatic species listed above are anticipated.
However, due to the presence of suitable habitat in the project corridor, the biological conclusion for Neuse River waterdog, Carolina madtom, Atlantic
pigtoe, and dwarf wedgemussel for the proposed project is "May Affect, Not Likely to Adversely Affect".
Michaux's Sumac
Suitable habitat for Michaux's sumac is present within the project corridor along the roadside corridors within the project corridor. Although potentially
suitable habitat is present, the regular mowing maintenance schedule and herbicide application observed within these areas would likely inhibit the
plant's success. Kimley-Horn biologists conducted pedestrian surveys for Michaux's sumac within areas of suitable habitat on August 9, 2023, and no
individuals were observed. In addition, a review of the NCNHP database records (updated January 2024) indicates there are no known occurrences of
Michaux's sumac in or within 1.0 mile of the project corridor. Due to the lack of known occurrences and the lack of observed individuals, it has been
determined that the proposed project will have "No Effect" on Michaux's sumac.
Tricolored Bat
The tricolored bat is currently proposed for listing and is not currently protected under the Endangered Species Act (ESA). A review of the NCNHP
database records (updated January 2024) indicates that there are no known occurrences of the tricolored bat in or within 1.0 mile of the project study
area. If listed prior to construction of the project, the Town of Wake Forest will coordinate with the USFWS as appropriate to resolve Section 7 for the
tricolored bat.
Bald Eagle
Habitat for the bald eagle primarily consists of mature forest in proximity to large bodies of open water for foraging. Large dominant trees are utilized for
nesting sites, typically within 1.0 mile of open water. A desktop-GIS assessment of the project study area, as well as the area within a 1.13-mile radius
(1.0 mile plus 660 feet) of the project limits, was performed in January 2024 using 2021 color aerials. Multiple water bodies large enough or sufficiently
open to be considered potential feeding sources were identified. Kimley-Horn biologists conducted pedestrian surveys for the bald eagle within the
project study area and within the 1.13-mile radius on January 24, 2024, and no individuals were observed. Additionally, a review of the NCNHP database
records (updated January 2024) indicates there are no known occurrences of the bald eagle within 1.0 mile of the project corridor. Due to the lack of
habitat and the lack of known occurrences, it has been determined that this project will not affect the bald eagle.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat? *
Yes No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?
The NOAA Essential Fish Habitat Mapper was reviewed on April 1, 2024. No essential fish habitat was found within the project corridor or within the
project vicinity
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?
Yes No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources? *
Kimley-Horn conducted a desktop-GIS assessment of the project corridor on April 1, 2024, using the North Carolina State Historic Preservation Office
(NCSHPO) HPOWEB GIS Service database. This assessment was undertaken in order to identify any known National Register (NR), National Register
Study List (SL), and Determined to be Eligible (DOE) for listing properties or historic districts in or within 1.0 mile of the project corridor.
No known historic or cultural resources were identified within the project corridor. However, seven historical and cultural resources were identified within
1.0 mile of the project corridor:
Royall Cotton Mill Commissary (NR) - located approximately 0.81 mile northwest of the project corridor
W.E.B. DuBois School (NR) - located approximately 0.65 mile northwest of the project corridor
Glen Royall Mill Village Historic District (NRHD) - located approximately 0.89 mile northwest of the project corridor
Dr. Calvin Jones House (NR) - located approximately 0.96 mile west of the project corridor
Raleigh & Gaston Rail Corridor (DOE) - located approximately 0.72 mile northwest of the project corridor
Olive Branch Baptist Church (SL) - located approximately 0.84 mile west of the project corridor
Wake Forest Historic District (NR) - located approximately 0.92 mile northwest of the project corridor
73 other historical and cultural resources currently listed as "Blockface", "Survey Only", "Surveyed Only, Gone", and "Surveyed Area", were identified
within 1.0 mile of the project corridor. Due to the listing status, these resources do not currently receive protection under the National Historic
Preservation Act. If the listing status changes to NR, SL, or DOE prior to construction, the potential for impacts to these resources may need to be re-
evaluated; however, due to the distance from the project corridor and the existing uses within the vicinity of the project corridor, it is assumed that the
proposed project will have no effect on these 'Survey Only' resources.
Due to the lack of known historic and cultural resources within the project corridor and the distance from any known historic and cultural resources, as
indicated by the NCSHPO HPOWEB GIS Database (accessed April 2024), it is anticipated that the proposed project will not have a direct impact on any
known NR, SL, or DOE resources.
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? *
Yes No
8b. If yes, explain how project meets FEMA requirements:
Kimley-Horn has completed a HEC-RAS analysis to evaluate the impacts of the proposed culverts under East Juniper Avenue. The FEMA preliminary
model and peak flow discharges for Dunn Creek (Hatters Branch) were used as the base model for this analysis. It was determined that the proposed
project would not result in any increase water surface elevations during the base flood event. If this cannot be achieved, the appropriate FEMA
certifications will be applied for prior to construction.
8c. What source(s) did you use to make the floodplain determination? *
The FEMA Digital Flood Insurance Map (DFIRM) Panel 3720185100L (effective 07/19/2022) indicate the project corridor is within a special flood hazard
area (Regulatory Floodway Zone AE).
Miscellaneous
u
Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when
possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred.
Click the upload button or drag and drop files here to attach document
01_DunnCreek_Juniper_CoverLetter.pdf
548.65KB
03_SIGNED_Dunn Creek Culvert Replacement - USACE_KHA_Agent Authorization Form.pdf
86.16KB
04_DunnCreek_Figures.pdf
2.64MB
05_Dunn Creek Culvert Replacement —Delineation Concurrence SAW-2023-01945.pdf
638.97KB
06_DunnCreekCulvert-BufferDeterm.pdf
243.24KB
07_Figure5_lmpactSite1_Dunn Creek.pdf
3.19MB
08_2024.04.10_DunnCrk_Culvert_75%_Plan Sheet.pdf
File must be PDF or KMZ
12.55MB
Comments
To assist in your review of this NWP application, the following information has been included:
-cover letter
-Signed Agent Authorization Form
-Project Figures
-Preliminary Jurisdictional Determination Email Concurrence (SAW-2023-01945)
•NCDWR Buffer Determination Letter
-Permit Impact Drawings
-Project Site Plans
•NCDWR 401 Application Fee $323
If you need any additional information to assist in your review of this NWP application, feel free to contact me at (919) 677-2215 or Emma.Radford@Kimley-Horn.com.
Signature
0
By checking the box and signing below, I certify that:
• The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Emma Radford, WPIT, CA
Signature
Date
4/10/2024