Loading...
HomeMy WebLinkAbout20151268 Ver 1_Staff Comments_20151218Burdette, Jennifer a From: Devane, Boyd Sent: Friday, December 18, 2015 8:09 AM To: Burdette, Jennifer a Subject: MegaPark submittal I've reviewed the stormwater treatment plans and calculations for the road runoff portion (Phase 1) of the MegaPark project and I consider those plans to meet the stormwater requirements for Phase I approval. I've also reviewed the conceptual plans for the two wet detention ponds for Phase 11 and the single pond proposal for Phase 111. The sizing and design of those devices are consistent with our rules and BMP Manual. Do I need to write something more specific for you? If so, just let me know.