HomeMy WebLinkAboutNCC241107_Site Plan or Location Map_20240411 ,/ / / /' ,__ -�
CONSTRUCTION SCHEDULE \ I
\ - � / / / / / / / l \
I.Obtain all necessary permits and plan approvals.Erosion and Sediment Conhol(EffiSC)permit and a Certificate of Coverage /// — \ / / / / / \
Z(CAC)must be obmined before any land disturbing activitlea accm.Acopy o[the E&SC permit,the CAC and ahaN copy of the / / / / / / / _.....___..,
`etc;'''
plan must be kept on site,preferably in a permits box,and accessib ..Mg inspection. J / / / \ \
�Dd,Do3 Install gravel construction entrances first,Men sin fences,reinforced eat fence / / / / / / / / \ IVI \
cP P' mrn<ta and wattles. ` / / / / / / /
3.Finish clearing and grabbing any necessary areas on Me lots as they are stoned. \ - • -� / / / / / \ \ L D
0CKFI . , 4.Begin lot grading and excavation adiviti<s —— —/— / / / / /
SR I2DAD S.B<gin or continue with house construction acdviti<a. �� i '� / /�� ,/ / \ I_J� \
' 6.Finish all cough grading and house censwction. // //— / — ' / // / / \ D \ ...i wee/\
J.Install driveways,walks and patios. � — / / / / \ \
DEN ROAa ROCNFIS4 8.Begin fine grading of la areas / i i —— /// /• / / r- r \
GPM p03 ROgO_ 9.Final grassing,mulching end stabilizing of lot Inmost cases this will involve the ivaMllatiw of sod on the lot The ails fence 11 / / i —i/ /—— _ — ———— — \ 117 r� \
`-a' , remain m plat until the lots sodded or grassing is stabilized and takes hold / / -• _ --_ /' / \ Ill IF�I
10.Thecontn<wr<aM1eg<ondnct self-inapectinres nlMLerasion end seaimenmtion<nntrol m<aames and complete the following -
NAVE combinedself-inspectlonfonnfoundonthe DEMLRosione /� / /�/ //—/ �/ �' \ \ 'I�zJlLil:
L
Roqli ntrya:rnvww.a<q n<.gnvrabnnuaiaiaronar<n<rgy-mm<ni1-ana-Jana-reannm<olio[nrmwmenarnmrwater-pmgrammptlea-<nnarmadnn-pr°gm / ' / / _ _ ---____./ ��-LLLJJJ
Twelve months of complete inspection forms shall be kept on site and available for inspection&all times.It is recommrnded� // // / ��� .....-
7 _ —
f'im DO
�,• , copy be kept inapermsts box.ReEG.5.113A-54.Itivough G.S.113A-S7S<ctivns lSA NCAC 04A.0101 througf lSA / / // /' / // 1 \
0
`� NCAC.E.OSO4 General Permit NCG010000NPDES for ConswctionActivities. / /
yo. II.Self-inspections for erosion and sedimentation control measures are to be performed at least once every seven calendar days and' /////// /� /�/' / \�\
AND. within 24 hours of very rain event ofgreatertbenlinch-Any needed repairs shall be made immediately to maintain measures as , / I \ Yates Ranch Road
r . designed.All ESC measures shall be maintained specified in the concoction details on this plan.A rein gauge shall be install / / / // / \\
--1:7
` . az the Prolat site for monitoring. / / / / // /�� / ) —
12.Insp<c0onandfinelaao<ptancelenerawh<ntheprojeeetttmplge,Uepemiineesshallaontaat thl toeloae out the EMS j /
�o . Plan Afla DEMLR informs the pumitkeof N<projeot ploaewlyda inspection report,tM1e permina shall visit / /// , 1:--1
SITE �po "dyvagovz,r0,:tosabmit?ohmic of termination(e-NOT}A$100 annual general permit fee will be charged / / //// / J0 ' Eli
/
until race-Nor naa ban fined ant / // / cr
\ / 1::j
GROUND STABILIZATION -\\> •
132 123 111 z7 zs
VICINITY MAP SITE AREA STABILIZATION EXCEPTIONS / / \ 7 hill]
DESCRIPTION TIME FRAME \\\/// /, A /
N.T.S. tat PERIMETER DIKES, 7 DAYS NONE /// / -) Andalusian Drive ) /
SWALES, DITCHES J El
/
&SLOPES I / /� / / /
HIGH QUALITY 7 DAYS NONE / / / / J
WATER ZONES I /
(HOW) IIISLOPES STEEPER 7 DAYS IF SLOPES ARE \ IEll ®
-- J
THAN 10'OR LESS IN
A"SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY410 I ID 2 1 lE 0 'D /
NCGS 113A-54.1`IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR LENGTH AND ARE ` 149 I I 151 152 p /
all
COMPLETED AS AN EXCEL SPREADSHEET. NOT STEEPER 149 150
AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED THAN 2:1, 14 1 I I /' 154 155 156 157 158 Ix 30 /
EROSION AND DAYS ARE -`7� r/4 O Lot Plan alial
_ /
SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A ALLOWED ' \ / O e
NCAC 04B.0131 STATES THAT-..,DOCUMENTATION SHALL BE ACCOMPLISHED BY SLOPES 3:1 OR 14 DAYS 7 DAYS FOR ----
INITIALING 7) I�+
AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE
APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, FLATTER SLOPES GREATER ( - I I 3a NC waTUrtgL EgSEMErvr III1
4 DAYS NOCT7121 I' I1BEMENr LFOREERS I I 141 140 -T- ------ jy-I a0'NC NgTURA GgS�AgEMB—j4, ao'17134 --- ----- cgI: I \ 12$ 32/ 21 `
DATE: PAGE: I c / --- / I 1 11 127 I 11
S 6 /W Silt 5 k/Wattle oa ster \ C \ I I �RRR.q
.I �' col nr \ R d Pony Lan: 1- / Lot PI
11� .11-11'ususe in sin sou.a waffles. \...tr..to the dtiired length such that logs do @ e \ \ I 56 /' / • p �_ I GIJ
Q
ekes b o 651 Stokes 3. Silt seek6Vattiels)@ea be installed a nestaspa.s marorlledpabaMw yond Me toe of a ` \\zz\\ 1 168 170 \ 1 I 1 1 �� Lot pn I\I 20 .•i Lot Plan
SECTION SECTION
CID
Pat areas should be located at.edge of. �"". \� I \\ / t2 4 I I III / I I 1 1 1 w� 1 33c� RFgsEMM a
I I / / I I 1 I II 43 I 3v4n 13 w --
-
land
e.The ends of the silt nn_
sockiw
ld be turned slightly upslope
aO <O annoffkem a undtheend°Me E
,.
N." skt runoff
ag N. A `N 55vv / / 1 / I II B" atP,n
,Il al 4. Oak or other durable hardwood stakes WM a 2
inch x 2 inch cross section should be OW. kin._ / / //1/ 1 1 / l I ) I 1 6
maximum interval of 4 fee
maximum
urvrRENCT�ei/i Mulch Corn at g na a Mm. a <a�llaa<u iu::ale ra nw�ry Inch
__ \\�\ \ ` .\\ 4 \ \ / / //le/// / / / / / ) / q� Apc.F rat plan I
INSTALLATIONHED ntMe sill — _ �\ \ \ \\ -In \ "I / /// ,// D / / / / / / // 2 41 oti 14n / 1
an Inspect n hin the event old
N n _ -� \ •\\ \ \ `_ T°.Purebred / // // AREA / / / / // fiz%/ As-3. �H.THId
ISOMERIC wvm.,.�m.xcowo .n .z tl Aga tl 9rowttewnts \ \ \ \ \ \\ 4¢ / //� nEn / / / �/ bo E "T
1 after // / / Sx1= /
each 1 Inch or
«MP«Ts«xIe22 FLOW RATES '.,""' a. ,anwwb<n .•deAlI.5%n ann, ^\ \\ \\\\\\ \\��\ 5 — - C1rC �z l 47` // I / / / // / // 1//// / U 17APlan
a ol>ost \ t r / / / / / / /
Mulch«c a In.n >oa re „« as,,,
a. li taailarctl:m a o�",different «a wlln a \\ \ \\ N \ -,s,,, -5�- ;; \48� / i / / / 40 / m 5 for unLren<aeds Area T<a. o«a�a'w�.�, `I ('>an.`co)(lit')( ) ° • ` \\ ` \ _� / / / / / � / ,:sheet F Ww� f s t�sn<k/ML<�stn"'1aRi i°aami i��a`mi t`°"1 c > ( I -- \ \\\ \\ \ \ \va \50\ /i / / 7 / l / /// ;'/ / • / 1// Cr• /// cost[< ",".��"<au J I 16. >o. ft na paced \\\ \ �\ _ _-51 I \ // // / ..1 / / / / / / / 1 , l
ma . in .'in .m`�a a 9 in Sin b<-ab tlnn � 1 \ \ \ \ r
Iim)mj /m'iml Ifni/ref OW.) Ii/col maaan��a'hp°•a�n;�antmDl1la,d. 1 1 \ \\ \` \\ �\�� \� -�-j _- -•--��� / //' J / / / / / / //
SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION \ _ A --- 1 / / / / / / / 39 •
L 1 \ N- N\ \ �� \ /— -----�i/i ) l / / / / / / / / .' \� s
��.- \` ` \\ \`\\\POND\ -------J/�/'/ / / / / / /38 \\ \\ �\
DATE: -- �\SO` \ `A e \ i,�/ -\ / / / / I / / / ', / 1 1
PAGE: — \ /'x1�1� \ 1faB/ i i /— I l \ \ l
\\\ \\ / 1 / l I I I I ( l I /
..A.. ..B ..C.. D.. ..E.. ..F .G. H.i
\m \ \\\ \ \ `._ / - / '/ I I I I N 1G (m I0 // / \ 1
t t U U �% I 1 ;71 Ft e 2 -- \ \ - _— 1 1 I 1 1 \ \ \ \o \ I
a \ \ \� �'�..]s \ \ 1 I ( 1 I I 1 Vg 1 \ \
Q •
�_ •
♦ • \ 1 1 \ \ \ 1
taR ii. It @HOUSE I �@ I = 11 1 Hous 2 .. \ I ( \ -/ --\\ \ i- �i� ��� \ \\ \ 1\ \ `\1\1\`\\\ `\ \ \\ \\ \\ \\ �\
_ 'I 1 1 / V -- v % v•\ \ v v v v v \ V v• v v •v v •
�v j \v
LoDRa INLETvv�� OF CURB i ifTA ..'J��.ttr, \ \ \ I / / /- \ \ \,/ / —— -i i% S. \ \ \ \ \ \ \\ •\ \ \ \ \ _— \ \ 1 •
1 \ I \
LEDCE Nine; \\ \ \ \\ 1 1 \ ��\� \ \ \ \ \ \\\ \ \ \\ \ \ \\ ` \\ \ 1 VV
1.If needed,Tree Protection fencing should be installed along the buffer zone,wetland \\1...\ \ \ \_✓ / 1 I 1 \ -� / ___i N. \ \\ \ \ \ \ \ \ \ \ \ \ \ ` \ \ ` _ \- ) I 1 I / •
\`
boundary antllor around protected trues,providing a radius of at least 1.25 feet for each \\ �` \ \ \ / / I\ \ // \\\\ \ \ \� ` \ \ \\ `\\\\ `\\\ ` \\ %7 G\ -�\\ -J I I 1 /
LEGEND inch of Wnk diameter. `\ \ \ `_ / \ \ \ \ \ -- �\
2.Install Silt Fence on the low elevation sides of each lot.Install Silt Fence outlets shown on '\\\ \\ \ / I / / /r�\ . \\\\ \ \ \ \ \ \ `\ \ \ \ \ \ \ ....`-\\ \`\ / I I /
N @ schematiddiegram and field adjusted,i(necessary,for placement at low points,If lots are \ \ \ \ \ / -- \ V/ / / \ \ \ \ \ \ \ \ \ \ \ \ \ \ / /r — \�\ \ N. / 1 /
contiguous and have d'Merent Iona owners or builders,each lot should have individual sin \ \\\\ \ \ \ \ ` \ \ \ \\ \ ` \ \ ♦ \ ` / // `` ___
Flow DIRECTION I 1
SILT FENCE -.—._ -
BLTFENCED LET Fences \ \•
\ 1 I / \ \ \ \ \`\ \ \ `\\ \ \ \ J
3 Install required Silt F within 10 beet r property l t s there8.with N. \ \ \ \ \_J \ \ \ \ \ / \ \
CONSTRUCTION ENTRANCE septicsystem.It' h responsibility f the builder t the- tall ti M etllment \ \ \\ \ I / / \\ \ \ \ \ \ \ \ \ \ \ N. , I/ I I \\\\\\ \
CURB INLET control d impact in pi systemdP repair () \\\\ ��� ���\ \ I `� / \\`��\\\\`\\`\ `\\ \\\\ `\ N. I I I _�\\\\\� �_� 1
4 Al least Construction E l /E f is tub installed 1 \
s Waste bins and other areas dedicated formanaging building material waste shall be at \\ \\\ \ \ \\\ �- J \ I // / \ \ \`\ \\ \ \ `\ \`\ \ ` \ /) I / \\\\\�-_^�1-
least 50 feet away from storm drain inlets n drainage ditch unless it can be shown that \ \ \ \ \\ \ \ I / I / ` \ \\N \ \ \ \\ ` ♦ \ \ \ \,J I ���1\\ \ �-J ,
no other alternative exists.If this separation cannot be achieved,these areas meat be \ \\ \ \ \ \ / `
contained behind Silt Fence. \ \ \ \ \ \ \` \ '', \ \ l ( / ` \ \\ ` \ \ ` \ ` /
6.Inlets downstream of disturbances should be protected;streets should be swept when \ \ \ \ \ \ \\ \7 ` N\ \ \ L I / ) \ \\\\\\\\ \\ \\\` \\\\\ \ / �� II -- `�\`\\\� -� /
sediment from the construction activity is 000AIL \ \ \ - \ \ \ \ \ /
..\NC-Environmental.jpeg 7.Details for Silt Fence,Sill Fence Outlets,Construction Entrances and other measures are \ \ -�- \\
provided on additional sheets.Erosion and sediment control details are not drawn to scale. \ \`\\\ - -`��� \ A I / \`\\ ,\ \ \\ \ \ \ \ / / / / 1 - --\ \ \1\\�— �\
------------- TYPICAL LOT LAYOUT WITH CURB AND GUTTER \ \ \ \\\\` \---\ N` _ - \\ - \ I / \\\``. \ \ \ \ \ \ \ \ / / I I / `� \ \ \ r \ —\ -'
DATE: PAGE: PAGE E 1 of 2
TOTAL DISTURBED ACREAGE: 2.22 ACRES
LOT EROSION CONTROL PLAN
LOTS 11, 12, 14, 15, 18, 19, 30, 31, 33 & 34
MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION VALLEY END
0
Q' �3 General-All measures will be inspected and corrections made after runoff producingrainfalls or at least once perweek minimum.The builder will insure that the construction activities on anyparticular lot do not adverse) affect anyof the installed erosion control measures.If lot construction dictates,measures will be
P Y �r
ov. /. �'°w relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. PHASE THREE
S f�n%� FOR
* ^..r.:STD.�, Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.A#er each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all
/40� 41;1� N. objectionable materials spilled,washed,or tracked onto public roadways. B E N J A M I N STOUT REAL
igj¢_i.M 4EL < '�-`J S:R 5:��K.Sn�-.�. Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure
y' �. - - - that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations.
�! s ra•n - th':,'£ • sodding The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth ESTATE SERVICES, INC.
/ ` 4`,� Rb a- P P Y 9 9 rY GY q
-tjJT -v.,,Ss,p�,L.*`O d stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. ROCKFISH TOWNSHIP CUMBERLAND COUNTY
Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be SCALE:1"=100' MARCH 2024
Construction: Maintenance: repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass.
1.Clear the entrance and exit area of all vegetation,mots.and other objectionable 1.Per NCG-01 inspect at least once a week and after each 1 inch or GRAPHIC SCALE
material and Properly grade it. greater rainfall;make any required repairs immediately. Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed
2.Place the gravel to the specific grade and dimensions shown on the plans,and 2.Maintain the gravel pad in a condition to prevent mud or sediment o 0
smooth It. from leaving the construction site.This may require periodic sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water.
3.Provide drainage to early water to a sediment trap or other suitable outlet. topdressing with 2 inch stone.
4.Use geotextile fabrics in order to improve stability of the foundation in locations 3.Immediately remove all objectionable materials spilled washed or Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout Remove and replace stone as necessary as it becomes clogged with sediment.Remove all subject to seepage or high water table, hacked onto public roadways. fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. ( IN FEET )
1 inch = 100 ft.
CONSTRUCTION ENTRANCE/EXIT MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305
PHONE(910)484-5191 FAX(910)484-0388 LICENSE#F-0106
LAST SAVED:3/7/2024 6:03 PM LAST PLOTTED:4/10/2024 11:45 AM PLOTTED BY.Dennis Gilbert FILENAME:G\CURRENT JOBS\BENJAMIN STOUT REAL ESTATE SERVICES INC\24-2510-02 VALLEY END-EC\PLANS\VALLEYENDEC-L0T511.12.14.15--.DWG