Loading...
HomeMy WebLinkAbout20040271 All Versions_Mitigation Plans_20050215va SfATf a~ ~,~ r, ~.,,,, ~~ ~~~ i Rc^~_ , . .. 1 _ . STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY LYNDO TIPPET GOVERNOR SECRETARY January 20, 2005 County - TIP ~1 ICB I-85 Ms. Sue Homewood NCDENR - DW 585 Wau St. ' on-Salem, NC 27107 Dear Ms. Homewood, In an effort to bring the mitigation plan into uniformity with the Corps 404 permit, we are asking that the 401 DWQ permit be modified to have all of the wetland mitigation through the Ecosystem Enhancement Program (EEP). The Corps 404 permit has all wetland mitigation going through the EEP. If you have any questions, comments or need additional information, please contact me at (336) 703-6500. Thank you for your cooperation in this matter. Respectfully, Diane K. Hampton, P.E. / Division Environmental Engineer Enclosures D n CF: Mr. Pat Ivey, P.E., Division Engineer [~ Mr. Keith Raulston, P.E., Division Construction Engineer ~'~` 1.`~` ,,~.~. PDEA FEB ~ D File '~' ~~f~~ DENfi - I~r`AiEr'~' 4UALITy WEIIAIVDS,gND STORA~yyprER 6RAWCH Division of Highways • Division Nine • 375 Silas Creek Parkway, Winston-Salem, NC 27127 Telephone (336) 703-6500 • Fax (336) 703-6693 • Courier Box 13-12-04