HomeMy WebLinkAbout20040271 All Versions_Mitigation Plans_20050215va SfATf a~
~,~ r, ~.,,,,
~~ ~~~
i Rc^~_ , . .. 1 _ .
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY LYNDO TIPPET
GOVERNOR SECRETARY
January 20, 2005
County - TIP ~1 ICB I-85
Ms. Sue Homewood
NCDENR - DW
585 Wau St.
' on-Salem, NC 27107
Dear Ms. Homewood,
In an effort to bring the mitigation plan into uniformity with the Corps 404 permit, we are
asking that the 401 DWQ permit be modified to have all of the wetland mitigation through the
Ecosystem Enhancement Program (EEP). The Corps 404 permit has all wetland mitigation going
through the EEP.
If you have any questions, comments or need additional information, please contact me at
(336) 703-6500. Thank you for your cooperation in this matter.
Respectfully,
Diane K. Hampton, P.E. /
Division Environmental Engineer
Enclosures
D n
CF: Mr. Pat Ivey, P.E., Division Engineer [~
Mr. Keith Raulston, P.E., Division Construction Engineer ~'~` 1.`~` ,,~.~.
PDEA FEB ~ D
File '~' ~~f~~
DENfi - I~r`AiEr'~' 4UALITy
WEIIAIVDS,gND STORA~yyprER 6RAWCH
Division of Highways • Division Nine • 375 Silas Creek Parkway, Winston-Salem, NC 27127
Telephone (336) 703-6500 • Fax (336) 703-6693 • Courier Box 13-12-04