HomeMy WebLinkAboutNCC240882_ESC Approval Submitted_20240410 2/20/24,8:32 AM Mail-Kearns,Charles R(Ryan)-Outlook
TY+,No
�� aTy� (GRTIPIED
� � \RBORISr
tt. or: '! Forsyth ` �%
-4l
_ c e ,
T County P06
professional grounds
Government 4, ISA management society
From:SVC_DoNotReply-DEQPermits<DoNotReply-DEQPermits@deq.nc.gov>
Sent: Monday, February 19, 2024 12:05 PM
To:Weavil, Christopher S (Chris)<weavilcs@forsyth.cc>;Jordan Consultants,ASLA, PA<jordanla@bellsouth.net>
Subject: NC DEMLR- FROF Application Approval with Modifications Needed CRM:0104085
,:4 ..111
te,, , >,1
,,..,,$,, ,
,_,...if a
s T 1
i.
ti*FS Px@ rz Te Y
' QtJAM V1O -
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Roy Cooper
Governor
Elizabeth S. Biser
Secretary
William Vinson Jr. (Acting)
Director
02-19-2024
Forsyth County Parks & Recreation
201 North Chestnut Street
Winston Salem, NC 27101
RE: Project Name: Playground Equipment Replacement @ Tanglewood Park, Shelter No.4
Acres Approved:0.32
Application ID: PA-002995
Permit Number: FORSY-2024-0108
Address: River Birch Circle
City:Clemmons
County: Forsyth
River Basin:Yadkin - Pee Dee
Stream Classification:WS-IV:Water Supply IV
Plan Type: New Plan
Dear Forsyth County Parks & Recreation,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby
issue this Letter of Approval. The Certificate of Approval must be posted at the job site. This plan approval shall expire
three (3)years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title
https://outlook.office365.com/mail/inbox/id/AAQkADAzYmE1 MTUxLTNINzctNGlzMi1 hYTBmLTM5NzQyMTBhNDY3MgAQAPBJfJEw0PhWnI0F2mNV... 2/4
2/20/24,8:32 AM Mail-Kearns,Charles R(Ryan)-Outlook
15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent
(eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit.After the form
is reviewed and found to be complete, you will receive a link with payment instructions for the $120 annual permit
fee.After the fee is processed, you will receive the COC via email.As the Financially Responsible Party shown on the FRO
form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing
activity.The eNOlform may be accessed atdeq.nc.gov/NCG01. Please direct questions about the eNOlform
to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the
new responsible party must obtain a newCOC.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site:
1.The approved E&SC plan as well as any approved deviation.
2.The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also,this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with
the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural
resources and adjoining properties. If,following the commencement of this project,the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General
Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to insure
compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity.
This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility/Ownership Form,which you provided. You are requested to file an amended form if there is any change in
the information included on the form. This permit allows for a land-disturbance, as called for on the application and plan,
not to exceed the approved acres. Exceeding the acreage can be a violation of this permit and may require a revised plan
and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this
project.
General Comments:
1. Please print this email as your Letter of Approval for your NCG010000 Certificate of Coverage application.
2.Please notify this office prior to your pre-construction conference for this project by calling (336) 776-9800 and asking to
speak with the Land Quality inspector for your county. Permission must be obtained and granted from NC DEQ DEMLR
prior to the removal of any ESC measures. [GS 113A-51, 15A NCAC 4B .0120]
3.Any off-site borrow and waste required for this project must come from a site with an approved erosion control plan, a
site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid Waste Management.
Trash/debris from demolition activities or generated by any activities on site must be disposed of at a facility regulated by
the Division of Solid Waste Management or per Division of Solid Waste Management or Division of Water Resources rules
and regulations. [15A NCAC 4B .0110]
4.Additional measures may be required -The applicant is responsible for the control of sediment on-site. If the approved
erosion and sedimentation control measures prove insufficient,the applicant must take those additional steps necessary to
stop sediment from leaving this site. [15A NCAC 4B .0115]
5.The NCG01 has a $120 yearly fee and our office often receives closure inspection requests days prior to yearly NCG01
fee payment due dates. Be advised the project requires a closure inspection report by DEMLR prior to filing the Notice of
Termination (NOT)to terminate NCGO1 coverage. The closure inspection should not be requested until after the site has
achieved full vegetative stabilization and measures have been removed. The removal of temporary ESC measures,
including basins, requires prior approval. Often, a full growing season is necessary between initial seeding/mulching and
https://outlook.office365.com/mail/inbox/id/AAQkADAzYmE1 MTUxLTNINzctNGIzMi 1 hYTBmLTM5NzQyMTBhNDY3MgAQAPBJfJEw0PhWnI0F2mNV... 3/4
2/20/24,8:32 AM Mail-Kearns,Charles R(Ryan)-Outlook
removal of measures. Please plan your construction accordingly to avoid contacting our office prematurely for a closure
inspection. Also be advised you may be asked for representative site pictures prior to a closure inspection. [General
Comment]
Your cooperation is appreciated.
Sincerely,
Nicole Chiles, El - Assistant Regional Engineer
Winston Salem Regional Office
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Attachments: Certificate of Approval
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
DE Q d Winston-Salem Regional Office 1450 West Hanes Mill Road,Suite 300 1 Winston-Salem NC,27105
ofEm:a.. O\ /' 336 776 9800
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.
https://outlook.office365.com/mail/inbox/id/AAQkADAzYmE1 MTUxLTNINzctNGlzMi 1 hYTBmLTM5NzQyMTBhNDY3MgAQAPBJfJEw0PhWnl0F2mNV... 4/4