Loading...
HomeMy WebLinkAboutSW5231201_Response To Comments_20240410 II • ArchitectureEngineering An Employee Owned Company Environmental 10/ 1 Land Surveying Companies April 1, 2024 Brianna Holland, Environmental Engineer DEMLR Post-Construction Stormwater Program North Carolina Department of Environmental Quality Division of Energy, Mineral, and Land Resources Raleigh Regional Office 1612 Mail Service Center 512 North Salisbury Street Raleigh,NC 27699-1612 Re: Mavis Tires#2094 Stormwater Permit No. SW5231201 Dear Ms. Holland: We are in receipt of your comments dated March 19, 2024, requesting additional information regarding the project noted above. Our responses are indicated below in bold italic text and are as follows: 1. As designed, the SCM is just a sand filter and not a dry detention basin & sand filter(the sand filter SCM includes the sand layer in addition to the storage provided above the sand layer in the sand chamber and sediment chamber). Please revise the submittal materials as needed to reflect this. Response: Narrative has been revised to remove discussion of dry detention pond. 2. Since this project drains to the Tar River(a Nutrient Sensitive Watershed), please ensure that the project is also compliant with the Tar-Pamlico Nutrient Strategy Rules 15A NCAC 02B .0731. Response: The sand filter reduces the nitrogen load to 7.63 lbs and the phosphorus load to 0.52 lbs. The remaining required reduction will be accomplished by purchasing nutrient credits from an acceptable NC credit bank. 3. Per the provided USGS topographic map, surface water exists within the project area. Revise the package accordingly to account for this surface water and provide vegetated setbacks. All surface water that appears on the latest USGS topographic map must be accounted for and depicted on the plans per 15A NCAC 02H .1017 (10). Please do the following: 3420 Toringdon Way,Suite 210 • Charlotte,North Carolina 28277 • T(704)565-7070 • www.blcompanies.com :41 Companks Response: The site boundary on the USGS map was drawn incorrectly. There is no surface water on the site. a. Please include the on-site surface water area in Section IV, 6 of the Application. This information should also be included on Line 4 of the Cover Page of the Supplement- EZ Form. Response: The site boundary on the USGS map was drawn incorrectly. There is no existing surface water on the site. b. Please recalculate the total project area as shown in Section IV, 7 of the Application. This information should also be updated on Line 2 of the Cover Page of the Supplement-EZ Form, on Lines 5 & 6 of the Drainage Areas Page of the Supplement- EZ Form, and in the table in Section IV, 10 of the Application. Response: Property area has been updated to be the area treated by BMP(2.08Ac) c. Please recalculate the project percent impervious area as shown in Section IV, 8. This information should also be updated on Line 18 of the Drainage Areas Page of the Supplement-EZ Form and in the table in Section IV, 10 of the Application. Response: Property area has been updated to be the area treated by BMP(2.08Ac) and percent impervious revised appropriately. d. Provide vegetated setbacks on the plans per 15A NCAC 02H .1017 (10). Response: A 50 foot setback from the existing pond on the adjacent parcel has been provided. 4. Per the provided narrative, "Mavis Tire will occupy 0. 99 acres of the size while the balance of the site will remain under separate ownership and be developed at a later date."Note that if the property is being subdivided, deed restrictions will need to be recorded limited the amount of BUA that is allowed on this adjacent property, or the offsite area will need to be accounted for as 100% BUA in the sizing of the SCM. Response: The remainder of the drainage area to the pond on Lot 2 has been designed to 100%BUA. 5. Per General MDC 8 and 9: All SCMs and associated maintenance accesses shall be located in permanent recorded easements. The SCM shall be shown and labeled within the easement.The SCM system includes the side slopes, forebay, riser structure, SCM device, and basin outlet, dam embankment, outlet, and emergency spillway. Maintenance accesses shall extend to the nearest public right-of-way. Revise the easement to meet these requirements. Page 2 of 8 RN 1 Companies See 15A NCAC 02H .1050 (8) and(9) for additional information on maintenance accesses and easements. Response: The maintenance access easement for the BMP runs from the SWM Easement through the proposed storm drain easement and uses the common access easement to the R/W 6. PD-1 Drainage Area Map—Please ensure the drainage areas provided correspond to the proposed contours and stormwater piping system provided. It appears that there is currently a discrepancy. Note that drainage areas do not always directly correspond to property lines. Response: Offsight drainage has been added to more accurately describe the drainage to and through the site. 7. Please correct the following issues with the Supplement-EZ Form: a. Cover Page: i. Line 7—Per 15A NCAC 02H .1017(10)the minimum required vegetated setback width is 30 ft. Response: 50'Buffer has been shown. ii. Lines 8 & 9—Please revise as needed. Response: Revised b. Drainage Areas Page: i. Complete the requested information in the "Entire Site" Column. Note that the "Entire Site" Column is intended to represent the entire project area, and not just the drainage area to the SCM, which is provided in the adjacent column. Response: Entire Site column has been added. ii. Line 19—Per the provided narrative, this value is 1 inch. Response: Revised iii. Line 20—Per the provided narrative, this value is 4,839 cf. Response: Revised iv. Line 21 -Per the provided narrative, the "Simple"method was utilized. Response: Revised Page 3 of 8 :41 Companies c. Sand Filter Page: i. Line 4—Are there contaminated soils located on-site? If there are,you are not allowed to use SCMs that allow for infiltration(per General MDC 2). Response: There are no contaminated soils. ii. Line 9—Please show the drawdown orifice used to dewater the SCM in the plans. Note this is distinct from the drawdown orifice shown at the water quality elevation, as this is intended to dewater the SCM completely during maintenance. Pumps are recommended instead of drawdown orifices. Response: Pump will be used for dewatering iii. Line 11 —The maintenance access must comply with MDC 8. Response: Maintenance complies with MDC 8 iv. Line 18—This is required in order to ensure compliance with Sand Filter MDC 1. Response: Per the geotechnical report no ground water was encountered in any onsite boring, therefore it is believed ground water is at an elevation below 298.Additional SHWT test has been requested and will be forwarded to you as soon as it is complete. v. Line 26—This could not be confirmed as a sediment chamber stage storage table was not provided. Response: Forebay Stage Storage chart included in Appendix B vi. Line 27—The physical depth of the sediment chamber is the depth from the lowest bypass invert(Line 35) to the excavated bottom of the sediment chamber (Line 25). Response: Top of Forebay Wall is 305 to the bottom of the forebay at 303 is 24". vii. Line 28 —Per Line 24 there is no permanent pool. Response: Corrected viii. Line 29—Revise this item or the plans for consistency. The elevation is listed as 304.60 on the plan view and 305.50 on the detail, so it is unclear what the correct elevation is. Page 4 of 8 w1 Companies Response: 305.50 is correct ix. Line 30—Provide. This is required in order to ensure compliance with Sand Filter MDC 2. Response: Volume has been included. x. Line 32—This could not be confirmed as a sand chamber stage storage table was not provided. Response: Stage storage table has been included in appendix B. xi. Line 33 —The physical depth of the sand chamber is the depth from the lowest bypass invert (Line 35)to the lowest excavated point of the sand chamber(below the underdrains). Response: 48" xii. Line 34—The ponding depth of the sand chamber is the depth from the lowest bypass invert(Line 35) to the top of the sand layer(Line 31). Response: 12" xiii. Line 35 —This appears to be 305.35 per riser structure detail provided on the plans. Response: Revised to 306.50 xiv. Line 36—This appears to be an outlet control structure/riser structure. Response: Revised xv. Line 37— Stormwater flow may be distributed over the surface of the sand chamber via a level spreader, a pipe distribution system, or a series of weirs. Response: Distributed by the forebay weir xvi. Line 39—This value refers to the depth of the sand layer being provided above the underdrain pipe. Response: 24" 8. General MDC 4—Please provide calculations showing that the inlets and outlet of the SCM are stable in accordance with this MDC. Page 5 of 8 :41 Companies Response: These have been included in Appendix C. 9. Per 15A NCAC 02H .1003 (5), stormwater outlets shall be designed so that they do not cause erosion downslope of the discharge point during the peak flow from the 10-year storm event as shown by engineering calculations. Response: Rip Rap calculations for the ourlet pipe have been included in Appendix C. 10. Per Sand Filter MDC 1, the minimum separation between the lowest point of the sand filter system and the SHWT shall be two feet for open bottom designs. Provide documentation that the SHWT was determined within the footprint of the SCM and show the SHWT elevation on the cross-sectional detail of the plans. Per the boring location diagram provided, it does not appear that the location of the SCM was investigated. Response: SHWT investigation has been ordered and will be provided upon its completion. Per the geotechnical report no ground water was encountered in any onsite boring, therefore it is believed ground water is at an elevation below 298 which would be 2'below the bottom of the trench. 11. Per Sand Filter MDC 2: Please ensure that the volume stored in each chamber of the sand filter is equivalent. Please provide a separate stage-storage table for the sediment chamber portion and a sand chamber portion so that the volumes can be compared. Response: Sediment Chamber is designed to hold 20% of the water quality value as stated in the NCDEQ SWM Manual. Stage Storage charts for forebay and main chamber have been included in Appendix B. 12. The Sand filter Area calculations provided in the narrative seem to have had a printing issue and were not shown. Please ensure the minimum surface area is provided, guidance can be found in the manual with Sand Filter MDC 3. Response: This has been fixed. 13. Please provide a clean-out pipe at the low points of the underdrain lines on the plans per Sand Filter MDC 9. Note that cleanout pipes shall be capped. Response: Cleanout pipes have been added. 14. The provided O&M Form is outdated and therefore incomplete. Please use the most up to date form, which can be found on our website at the following address: https://www.deq.nc.gov/about/divisions/energy-mineral-and-land- resources/stormwater/stormwater-program/stormwater-design-manual (O&M EZ Form). Page 6 of 8 RN I Componios NOTE: It is recommended to get a second copy of this form signed&notarized for the Applicant's records (it will be helpful when they go to record it with the Register of Deeds). Response:Acknowledged 15. Please ensure the electronic repository is complete. The following items were noticed to be missing: • Official documentation supporting the titles and positions held by the persons listed in Contact Information, item la per 15A NCAC 2H.1003(e). (Required per Section VI, 11) Response: Official Documentation has been provided • Official documentation displaying the corporation is active and in good standing with the NC Secretary of State. (Required per Section VI, 11) Response: Official Documentation has been provided in this submittal • A partial Supplement-EZ was uploaded. Response: Supplemental EZ form has been uploaded • O&M Agreement Response: Updated O&M Agreement has been uploaded 16. Provide PDFs of all revisions, 2 hardcopies of revised plan sheets, 1 hardcopy of other documents, and a response to comments letter briefly describing how the comments have been addressed. a. PDFs must be uploaded using the form at: https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload b. Hard copies must be mailed or delivered to the following address: i. For FedEx/UPS: Brianna Holland f512 N. Salisbury Street, Office 625Y Raleigh,NC 27604 ii. For USPS: Brianna Holland 1612 Mail Service Center Raleigh,NC 27699-1612 Page 7 of 8 IV I Companies iii. Hand Delivery: Please reach out to me prior to hand delivering a submission to make sure that I (or someone else in my group)will be able to receive the submission. Do not leave the package in the foyer with the security guard. We trust this addresses your concerns. Should you require additional information, feel free to contact me at 704-851-7102. Sincerely, Andrew R. Mueller, P.E. Senior Engineer Page 8 of 8