Loading...
HomeMy WebLinkAbout20240034 Ver 2_03a_Oringally Submitted_NWP_ChathamSt_20231220_20240409Kimley»>Horn December 20, 2023 Ms. Rachel Capito U.S. Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 Mr. Rob Ridings NC Division of Water Resources 401 & Buffer Transportation Permitting 512 North Salisbury Street Raleigh, NC 27604 RE: Nationwide Permit 14 Application West Chatham Street — Connecting Cary Sidewalks (SAW-2023-00461) Cary, Wake County, North Carolina Dear Ms. Capito and Mr. Ridings: On behalf of our client, the Town of Cary, Kimley-Horn is submitting the attached application for authorization under Nationwide Permit (NWP) 14 for the above -referenced project in Wake County. The Town of Cary is proposing the construction of seven sidewalk projects as part of the Cary Community Plan which highlights the importance of a multi -modal transportation system to provide a safe and accessible transportation network for all users. The West Chatham Street project is one of the seven sidewalk projects and will construct a sidewalk to fill in gaps along the eastern side of West Chatham Street in Cary, Wake County, NC. The project study area is an assemblage of NCDOT rights - of -way and portions of five parcels along West Chatham Street (Connecting Cary "Project G"). Kimley-Horn staff conducted a delineation on January 10, 2023, and identified one stream (S1) and one wetland (W1) within the project study area. A Preliminary -Jurisdictional Determination Request (SAW-2023-00461) was submitted to Mr. Lyle Phillips of the USACE on February 20, 2023, and documentation is pending. Additionally, Mr. Rob Ridings of the NCDWR issued a Buffer Determination Letter for the project on February 21, 2023. Unavoidable permanent impacts to streams and the associated Neuse River Basin Buffer Zones will result from the proposed sidewalk alignment. Permanent (21 LF; 0.0015 acres) and permanent no -net loss (14 LF; 0.0014 acres) stream impacts to stream S1 are proposed at the Connecting Cary Project G Stream Impact Site 2 (referenced as Site 2 on attached Permit Drawings and Impact Summary Tables) as a result of the proposed culvert extension and associated rip -rap placed around the culvert outlet. A total of 5 LF (0.0005 acres) of temporary impacts to stream S1 will result from the construction access necessary to install the proposed culvert and associated rip -rap. All temporarily impacted streams will be returned to pre-existing conditions upon completion of construction. Due to the minimal permanent stream impacts (<0.02 acre) resulting from the proposed project, compensatory stream mitigation has not been proposed Ki m ey >>> H o r n Page 2 Additionally, at Connecting Cary Project G Buffer Impact Site 2, a total of 1,966 square feet of unavoidable permanent impacts to buffer zone 1 and 1,406 square feet of permanent impacts to buffer zone 2 of stream S1 will result from the proposed construction of the sidewalk path and shoulder. Additionally, a total of 439 square feet of temporary impacts to buffer zone 1 and 248 square feet of temporary impacts to buffer zone 2 will result from the construction access necessary to install the proposed culvert and associated rip -rap, as well as construction of the sidewalk. According to NCDWR's Neuse River Basin's Table of Uses, the buffer impacts resulting from sidewalks that are "equal to or less than 10 feet wide with two -foot wide shoulders... and located outside Zone 1 unless there is no practical alternative" are considered "allowable upon authorization". Therefore, no compensatory buffer mitigation is proposed as part of this application. To assist with the processing of this application, the following information is included: • ePCN Application Form • Signed Agent Authorization Form • Project Figures • USACE Preliminary -Jurisdictional Determination Request (SAW-2023-00461) • NCDWR Buffer Determination Letter • Project Permit Drawings • Plan Sheets • NCDWR 401 Application Fee ($323) If there is any additional information you need to assist in the processing of this NWP application, please do not hesitate to contact me at (919) 677-2215 or Emma.Radford@Kimley-Horn.com. Sincerely, Emma Radford, WPIT, CA Environmental Scientist on� ,ti au,�n NORTH CAROLINA Environmental Quality Water Resources Office Use Only Corps Action ID no. [Click to enter.] Date received: [Click to enter.] DWR project no. Dlick enter.] Date received: [Click to enter.] Site Coordinates: Latitude (DD.DDDDDD): 35.775169 Longitude (DD.DDDDDD): 78.801772 Form Version 4.3, April 20, 2022 Pre -Construction Notification (PCN) Form (Ver. 4.2, January 31, 2022)) For Nationwide Permits and Regional General Permits and corresponding Water Quality Certifications Please note: fields marked with a red asterisk are required. The form is not considered complete until all mandatory questions are answered. The PCN help document may be found at this link: httas://edocs.dea. nc.aov/WaterResources/DocView.asax?dbid =0&id=2196924&cr=1 Please ensure you have submitted a pre -filing meeting request at least 30 days prior to submitting this form, as DWR will not be able to accept your application without documentation of this important first step. The Division has developed a Pre -filing Meeting Request email address 401 PreFile(a)ncdenr.clov to accept the federally required pre -filing meeting request and provide confirmation receipt of submittal . This receipt or similar documentation will satisfy 40 C.F.R. Section 121.4(a) which states "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency." In accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5), all certification requests must include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Attach documentation of Pre -Filing Meeting Request to this Application. Date of Pre -filing Meeting Request (MM/DD/YYYY) : 11/13/2023 Page 1 of 25 PCN Form Version 4.3- April 20, 2022 A. Processing Information County (counties) where project is located: Wake Additional (if needed). Is this a NCDMS project? (Click yes only if NCDMS is the applicant or co- ❑ Yes ❑ No applicant) Is this a public transportation project? (Publicly funded municipal, state, or federal road, rail, ❑x Yes ❑ No or airport project) Is this a NCDOT project? ❑ Yes ❑x No If yes, NCDOT TIP or state project number: Click to enter. If yes, NCDOT WBS number: Click to enter. ❑x Section 404 Permit (wetlands, streams, waters, Clean Water Act) la. Type(s) of approval sought from the Corps: ❑ Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted? ❑ Yes ❑x No Please provide the date of the previous submission. Click to enter a date ❑x Nationwide Permit (NWP) 1 b. What type(s) of permit(s) do you wish to seek El Regional General Permit (RGP) authorization? ❑ Standard (I P) This form may be used to initiate the standard/ individual permit process with the USACE. Please contact your Corps representative concerning submittals for standard permits. All required items can be included as attachments and submitted with this form. 1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑x No NWP number(s) (list all numbers ): 14 RGP number(s) (list all numbers ): Click to enter. Are you a federal applicant? ❑ Yes ❑x No If yes, please provide a statement concerning compliance with the Coastal Zone Management Act Click to enter text. 1d. Type(s) of approval sought from DWR (check all that apply): ❑ 401 Water Quality Certification — Regular ❑ 401 Water Quality Certification— Express ❑ Non-404 Jurisdictional General Permit ❑x Riparian Buffer Authorization ❑x Individual 401 Water Quality Certification Is this a courtesy copy notification ❑ Yes ❑x No 1e. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: ❑ Yes ❑x No For the record only for Corps Permit: ❑ Yes ❑x No 1f. Is this an after -the -fact permit/certification application? ❑ Yes ❑x No Page 2 of 25 PCN Form Version 4.3- April 20, 2022 1g. Is payment into a mitigation bank or in -lieu fee program proposed for ❑ Yes ❑x No mitigation of impacts? If yes, attach the acceptance letter from mitigation bank or in -lieu fee program. 1 h. Is the project located in any of NC's twenty coastal counties? * ❑ Yes ❑x No 1 i. Is the project located within an NC DCM Area of Environmental ❑ Yes ❑x No ❑ Unknown Concern (AEC)? * 1j. Is the project located in a designated trout watershed? * ❑ Yes ❑x No If yes, you must attach a copy of the approval letter from the appropriate Wildlife Resource Commission Office. Trout information may be found at this link: http://www.saw.usace.army.mil/Missions/Requlatory-Permit- Program/Agency-Coordination/Trout.aspx Page 3 of 25 PCN Form Version 4.3- April 20, 2022 B. Applicant Information Town of Cary — Transportation 1 a. Who is the primary contact? Department; ATTN: Ms. Chelsea Stern 1 b. Primary Contact Email: Chelsea.Stern@carync.gov 1 c. Primary Contact Phone: (###)###-#### (919) 462-3829 1 d. Who is applying for the permit/certification? (check ❑ Owner ❑x Applicant (other than owner) all that apply) 1 e. Is there an agent/consultant for this project? ® Yes ❑ No 2. Landowner Information 2a. Name(s) on Recorded Deed: Click to enter. 2b. Deed Book and Page No.: Click to enter. 2c. Contact Person (for corporations): Click to enter. 2d. Address Street Address: Click to enter. Address line 2: Click to enter. City: Click to enter. State/ Province/ Region: Click to enter. Postal/ Zip Code: Click to enter. Country: Click to enter. 2e. Telephone Number: (###)###-#### Click to enter. 2f. Fax Number: (###)###-#### Click to enter. 2g. Email Address: Click to ente 3. Applicant Information (if different from owner) 3a. Name: Ms. Chelsea Stern 3b. Business Name (if applicable): Town of Cary — Transportation Department 3c. Address: Street Address: 316 North Academy Street Address line 2: Click to ente, . City: Cary State/ Province/ Region: NC Postal/ Zip Code: 27513 Country USA 3d. Telephone Number: (###)###-#### (919) 462-3829 3e Fax Number: (###)###-#### N/A 316 North Academy Street Page 4 of 25 PCN Form Version 4.3- April 20, 2022 3f. Email Address: Chelsea.Stern@carync.gov 4. Agent/ Consultant (if applicable) 4a. Name: * Emma Radford, WPIT, CA 4b. Business Name: Kimley-Horn 4c. Address: * Street Address: 421 Fayetteville Street Address line 2: Suite 600 City: Raleigh State/ Province/ Region: NC Postal/ Zip Code: 27601 Country: USA 4d. Telephone Number: * (###)###-#### (919)677-2215 4e Fax Number: (###)###-#### N/A 4f. Email Address: Emma.radford@kimley-horn.com Agent Authorization Letter: Attach a completed/signed agent authorization form or letter. A sample form may be found at this link: https://www.saw. usace.army. mil/Missions/Regulatorv-Permit-Program/Permits/2017-Nationwide-Permits/Pre- construction-Notification/ Page 5 of 25 PCN Form Version 4.3- April 20, 2022 C. Project Information and Prior Project History 1. Project Information 1 a. Name of project: * Connecting Cary Sidewalks (Project G) — West Chatham Street 1 b. Subdivision name (if appropriate): Click to enter. 1 c. Nearest municipality/town: * Town of Cary 2. Project Identification 2a. Property identification number (tax PIN or parcel ID): N/A (Linear Transportation Project) 2b. Property size (in acres): 1.75 acres 2c. Project Address: Street Address: N/A (Linear Transportation Project) Address line 2: Click to enter. City: Click to enter. State/ Province/ Region: NC Postal/ Zip Code: Click to enter. Country: Click to enter 2d. Site coordinates in decimal degrees (using 4-6 digits after the decimal point): * Latitude (DD.DDDDDD): * 35.775169 Longitude (-DD.DDDDDD): *-78.801772 3. Surface Waters 3a. Name of nearest body of water to proposed project: * MacGregor Downs Lake (Entire lake and connecting stream to Swift Creek) 3b. Water Resources Classification of nearest receiving WS-III;NSW water: * The Surface Water Classification map may be found at this link: httgs://ncdenr.mar)s.arcgis.com/apes/webappviewer/index.html?id=6el 25ad7628f494694e259c80dd64265 Neuse 3c. In what river basin(s) is your project located? Choose additional (if needed) 3d. Please provide the 12-digit HUC in which the project is 030202011001 located: The Find Your HUC map may be found at this link: httr)s://ncdenr.maps.arcqis.com/apes/Publiclnformation/index.html?appid=ad3a85aOc6d644aOb97cdO69db238ac3 Page 6 of 25 PCN Form Version 4.3- April 20, 2022 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: * The project study area is an assemblage of NCDOT rights -of -way and portions of five parcels along West Chatham Street. The project study area and its surrounding vicinity are primarily composed of maintained roadway corridor (West Chatham Street and Southwest Maynard Road), undeveloped forestland, and maintained land. 4b. Have Corps permits or DWR certifications been obtained for this ❑ Yes ❑x No ❑ Unknown project (including all prior phases) in the past? If yes, please give the DWR Certification number and/or Corps [Click j enter.] Action ID (ex. SAW-0000-00000): JClick to enter.] Attach any pertinent project history documentation 4b2. Is any portion of the work already complete? * ❑ Yes ❑x No If yes, describe the completed work. N/A 4c. List of other certifications or approvals/denials received from other federal, state or local agencies for work described in this application not related to the 404 or 401. N/A 4d. Attach an 8'Y2 x 11" excerpt from the most recent version of the USGS topographic map indicating the location of the project site. 4e. Attach an 8'Y2 x 11" excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. 4f. List the total estimated acreage of all existing wetlands on the <0.01 acres property: 4g. List the total estimated linear feet of all existing streams (intermittent 40 linear feet and perennial) on the property: 4g1. List the total estimated acreage of all existing open waters on the 0 acres property: 4h. Explain the purpose of the proposed project: The purpose of this project is to construct a sidewalk to fill in gaps along the eastern side of West Chatham Street in Cary, Wake County, NC. 4i. Describe the overall project in detail, including the type of equipment to be used: The Town of Cary is proposing the construction of seven sidewalk projects as part of the Cary Community Plan which highlights the importance of a multi -modal transportation system to provide a safe and accessible transportation network for all users. The West Chatham Street project is one of the seven sidewalk projects and will construct a sidewalk to fill in gaps along the eastern side of West Chatham Street in Cary, Wake County, INC. The project study area is an assemblage of NCDOT rights -of -way and portions of five parcels along West Chatham Street. The propsosed project will install a total of approximately 550 linear feet (LF) of 5' wide sidewalk on the east side of W Chatham Street (SR 1011) from the driveway south of Trimble Avenue to Southwest Maynard Road (SR 1415). The first section of proposed sidewalk will start at the driveway south of Trimble Avenue and connect to the existing sidewalk just north of Trimble Avenue. The second section of proposed sidewalk will connect to the sidewalk at an existing driveway and will continue north to connect with the existing sidewalk at SW Maynard Road. The project will be constructed using excavators, skid -steers, pavers, and other construction equipment typically used for sidewalk projects. 4j. Attach project drawings/site diagrams/depictions of impact areas for the proposed project. Page 7 of 25 PCN Form Version 4.3- April 20, 2022 4k. Will this activity involve dredging in wetlands or waters? ❑ Yes ❑x No If yes, describe the type of dredging, the composition of the dredged material, and the locations of disposal area. UllCK to enter tex, Page 8 of 25 PCN Form Version 4.3- April 20, 2022 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or in ® Yes ❑ No ❑ Unknown proposed impact areas? Comments: Kimley-Horn staff conducted a delineation on January 10, 2023 and identified one stream (S1) and one wetland (W1) within the project study area. 5b. If the Corps made a jurisdictional determination, ❑ Preliminary ❑ Approved ❑ Emailed concurrence what type of determination was made? * ❑x Not Verified ❑ Unknown ❑ n/a Corps AID number (ex. SAW-0000-00000): SAW-2023-00461 Name (if known): Emma Radford, WPIT, CA and Brandon 5c. If 5a is yes, who delineated the jurisdictional Wyatt, WPIT areas? Agency/Consultant Company: Kimley-Horn Other: Click to enter. 5d. List the dates of the Corps jurisdictional determination or State determination if a determination was made by either agency. A Preliminary -Jurisdictional Determination Request (SAW-2023-00461) was submitted to Mr. Lyle Phillips of the USACE on February 20, 2023 and documentation is pending. Additionally, Mr. Rob Ridings of the NCDWR issued a Buffer Determination Letter for the project on February 21, 2023. 5d1. Attach jurisdictional determinations. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑x No 6b. If yes, explain. N/A Are any other NWP(s), regional general permit(s), or individual permit(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossings for linear projects that require Department of the Army authorization but don't require pre -construction notification. N/A 7. Addresses of adjoining property owners, lessees, etc. whose property adjoins the waterbody (if more than can be entered here, please attach a supplemental list) N/A 8. Scheduling of activity: N/A Page 9 of 25 PCN Form Version 4.3- April 20, 2022 D. Proposed Impacts Inventory 1. Impacts Summary 1 a. Where are the impacts associated with your project (check all that apply): ❑ Wetlands ❑x Buffers ❑ Pond Construction ❑x Streams - tributaries ❑ Open Waters 2. Wetland Impacts If there are wetland impacts proposed on the site, complete this table for each wetland area impacted. 2a. Site # 2a1. Impact Reason/Type 2b. Impact Duration 2c. Wetland Type 2d. Wetland Name 2e. Forested ? 2f. Jurisdiction Type 2g. Impact Area (ac) W1 Choose one emp/ Perm Choose onE :,lick to enter Y/h" ;hoose one Click to enter W2 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W3 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W4 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W5 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W6 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W7 Choose one : emp/ Perm Choose onE Click to enter Y/I choose one Click to enter W8 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W9 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W10 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W11 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W12 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W13 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W14 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W15 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter 2g1. Total temporary wetland impacts Click to enter. ac 2g2. Total permanent wetland impacts Click to enter. ac 2g3. Total wetland impacts Click to entf ac 2h. Type(s) of material being discharged and the amount of each type in cubic yards: Click to enter text 2i. Comments: No wetland impacts will result from the proposed project. Page 10 of 25 PCN Form Version 4.3- April 20, 2022 3. Stream Impacts If there are perennial or intermittent stream/ tributary impacts (including temporary impacts) proposed on the site, complete this table for all stream/ tributary sites impacted. ** All Perennial or Intermittent streams must be verified by DWR or delegated local government 3a 3b. 3c. 3d. 3e. 3f. 3g. 3h. Site #* Impact Impact Impact Type* Stream Name* Stream Jurisdiction Stream Width Impact length Reason* Duration* Type* Type* (avg ft) * (linear ft) * S1 Culvert Permanent Crossing/ Connecting Perennial Both 4 21 LF (0.0015 Extention Culvert Cary Project G acres) Stream Imapct Site 2: Stream S1 S2 Rip -Rap Permanent Bank Connecting Perennial Both 4 14 LF (0.0014 Placement Stabilization Cary Project G acres) (P-NNL) Stream Imapct Site 2: Stream S1 S3 Temporary Temporary Other Connecting Perennial Both 4 5 LF (0.0005 Construction Cary Project G acres) Access Stream Imapct Site 2: Stream S1 S4 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S5 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S6 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S7 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S8 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S9 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S10 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S11 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S12 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S13 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S14 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S15 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S16 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S17 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S18 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S19 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S20 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter 3i1. Total jurisdictional ditch 0 linear ft impact: 3i2. Total permanent stream 21 LF (0.0015 acres) PERM, 14 LF (0.0014 acres) P-NNL linear ft impacts: M. Total temporary stream 5 LF (0.0005 acres) linear ft impacts: Page 11 of 25 PCN Form Version 4.3- April 20, 2022 34. Total stream and ditch 40 linear ft impacts: 3j. Comments: Unavoidable permanent impacts to streams and the associated Neuse River Basin Buffer Zones will result from the proposed sidewalk alignment. Permanent (21 LF; 0.0015 acres) and permanent no -net loss (14 LF; 0.0014 acres) stream impacts to stream S1 are proposed at the Connecting Cary Project G Stream Impact Site 2 (referenced as Site 2 on attached Permit Drawings and Impact Summary Tables) as a result of the proposed culvert extension and associated rip -rap placed around the culvert outlet. A total of 5 LF (0.0005 acres) of temporary impacts to streams S1 will result from the construction access necessary to install the proposed culvert and associated rip -rap. All temporarily impacted streams will be returned to pre-existing conditions upon completion of construction. Page 12 of 25 PCN Form Version 4.3- April 20, 2022 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S., individually list all open water impacts in the table below. 4a. Site #* 4a1. Impact Reason 4b. Impact Duration* 4c. Waterbody Name* 4d. Activity Type* 4e. Waterbody Type* 4f. Impact area (ac)* 01 Click to enter. Temp/ Perm Click to enter. Choose one :hoose one Click to enter. 02 Click to enter. Temp/ Perm Click to enter. Choose one :hoose one Click to enter. 03 Click to enter. Temp/ Perm Click to enter. Choose one Choose one Click to enter. 04 Click to enter. Temp/ Perm Click to enter. Choose one Choose one Click to enter. 05 Click to enter. Temp/ Perm Click to enter. Choose one Choose one Click to enter. 4g. Total temporary open water impacts Click to enter. ac 4g. Total permanent open water impacts Click to enter ac 4g. Total open water impacts Click to enter ac 4h. Comments: No Open Waters will be impacted as a result in this project. 5. Pond or Lake Construction If pond or lake construction is proposed, complete the table below. (*This does NOT include offline stormwater management ponds.) 5a. 5b. 5c. 5d. 5e. Pond ID Proposed use or Wetland Impacts (ac) Stream Impacts (ft) Upland # purpose of pond Impacts (ac) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one Click to Click to Click to Click to Click to Click to Click to enter. enter. enter. enter. enter. enter. entF P2 Choose one Click to Click to Click to Click to Click to Click to Click to enter. enter. enter. enter. enter. enter. ente P3 Choose one Click to Click to Click to Click to Click to Click to Click to enter. enter. enter. enter. enter. enter. enter. 5f. Total Click to Click to Click to Click to Click to Click to Click to enter. enter. enter. enter. enter. enter. enter. 5g. Comments: Click to enter. 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no.: Click to enter. 5i. Expected pond surface area (acres): Click to enter. 5j. Size of pond watershed (acres): Click to enter. 5k. Method of construction: Click to enter. Page 13 of 25 PCN Form Version 4.3- April 20, 2022 6. Buffer Impacts (DWR requirement) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts. 6a. Project is in which protected basin(s)? (Check all that apply.) ❑x Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Jordan ❑ Goose Creek ❑ Randleman ❑ Other: .,;K to entE Site #* 6b. Impact Type* 6c. Impact Duration* 6d. Stream Name* 6e. Buffer Mitigation Required?* 6f. Zone 1 Impact* (sq ft) 6g. Zone 2 Impact* (sq ft) B1 Crossing/ Culvert/ Bridge Permanent Connecting Cary Project G Buffer Imapct Site 2: Stream S1 No 1,966 1,406 B2 Other Temporary Connecting Cary Project G Buffer Imapct Site 2: Stream S1 No 439 248 B3 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B4 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B5 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B6 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B7 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B8 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B9 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B10 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B11 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B12 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B13 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B14 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B15 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B16 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B17 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B18 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B19 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B20 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. 6h. Total temporary impacts: Zone 1: 439 sq ft Zone 2: 248 sq ft 6h. Total permanent impacts: Zone 1: 1,966 sq ft Zone 2: 1,406 sq ft 6h. Total combined buffer impacts: Zone 1: 2,405 sq ft Zone 2: 1,654 sq ft Page 14 of 25 PCN Form Version 4.3- April 20, 2022 6i. Comments: At Connecting Cary Project G Buffer Impact Site 2, a total of 1,966 square feet of unavoidable permanent impacts to buffer zone 1 and 1,406 square feet of permanent impacts to buffer zone 2 of stream S1 will result from the proposed construction of the sidewalk path and shoulder. Additionally, a total of 439 square feet of temporary impacts to buffer zone 1 and 248 square feet of temporary impacts to buffer zone 2 will result from the construction access necessary to install the proposed culvert and associated rip -rap, as well as construction of the sidewalk. Please attach supporting documentation (impact maps, plan sheets, etc.) for the proposed project. Page 15 of 25 PCN Form Version 4.3- April 20, 2022 E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts through project design: Impacts to streams and protected riparian buffers have been avoided and minimized to the greatest extent practicable through intentional design of the alignment. The proposed sidewalk alignment was designed largely within the existing transportation facility, fill slopes have been tighted to a 2:1 ratio, and the alignment was located to minimize stream and riparian buffer impacts to the greatest extent practicable. Rip rap stabilization at the proposed culvert outlet has been sized to dissipate erosive flow through the pipe and prevent channelization of the stream. Stream and riparian buffers impacts are proposed only along the southern side of West Chatham Street. All wetland impacts have been avoided as part of the proposed project. 1 b. Specifically describe measures taken to avoid or minimize proposed impacts through construction techniques: Impacts to streams and protected riparian buffers within the corridor will be minimized to the extent practicable throughout the construction process by avoiding these features with equipment, materials, and access corridors where possible. Where feasible, staging and construction access routes will be located in upland areas throughout the corridor. Silt fencing will be installed around the limits of disturbance to help ensure that all construction equipment will remain within the project area throughout the construction process. Temporary sediment control measures will be used to reduce stormwater impacts to receiving waters and minimize runoff from the construction sites. During the construction process, streams will be diverted by means of stream diversion operation or pump -around operation sized by ordinary daily flow to allow for work in the dry. 2. Compensatory Mitigation for Impacts to Waters of the U.S., Waters of the State, or Riparian Buffers 2a. If compensatory mitigation is required, by whom is it required? ❑ DWR ❑ Corps (check all that apply) 2b. If yes, which mitigation option(s) will be used for this ❑ Mitigation Bank project? (check all that apply) ❑ In Lieu Fee Program ❑ Permittee Responsible Mitigation 3. Complete if using a Mitigation Bank (Must satisfy NC General Statute143-214.11 (d1).) 3a. Name of mitigation bank: UICK to enter. 3b. Credits purchased/requested: Type: Choose one Quantity Click to enter. Type: Choose one Quantity Click to enter. Type: Choose one Quantity Click to enter. Attach receipt and/or approval letter. 3c. Comments: Due to the minimal permanent stream impacts (<0.02 acre) resulting from the proposed project, compensatory stream mitigation has not been proposed. 4. Complete if Using an In Lieu Fee Program 4a. Attach approval letter from in lieu fee program. 4b. Stream mitigation requested: Click to ente linear feet 4c. If using stream mitigation, what is the stream temperature: Choose one Page 16 of 25 PCN Form Version 4.3- April 20, 2022 NC Stream Temperature Classification Maps can be found under the Mitigation Concepts tab on the Wilmington District's RIBITS website: (Please use the filter and select Wilmington district) https://rib its. usace.army. miI/ribits apex/f?p=107:27:2734709611497::NO:RP:P27 BUTTON KEY:O 4d. Buffer mitigation requested (DWR only): Click to enter. square feet 4e. Riparian wetland mitigation requested: Click to enter. acres 4f. Non -riparian wetland mitigation requested: Click to enter. acres 4g. Coastal (tidal) wetland mitigation requested: Click to enter. acres 4h. Comments: Click to enter. 5. Complete if Providing a Permittee Responsible Mitigation Plan 5a. If proposing a permittee responsible mitigation plan, provide a description of the proposed mitigation plan, including mitigation credits generated. Click to enter. 5b. Attach mitigation plan/documentation. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — DWR requirement 6a. Will the project result in an impact within a protected riparian buffer ❑ Yes ❑ No that requires buffer mitigation? If yes, please complete this entire section — please contact DWR for more information. 6b. If yes, identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required in the table below. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 click to enter. Click to enter. Choose one .;lick to enter. Zone 2 slick to enter. Click to enter. Choose one Click to enter. 6f. Total buffer mitigation required Click to enter. 6g. If buffer mitigation is required, is payment to a mitigation bank or Fpyes El No NC Division of Mitigation Services proposed? 6h. If yes, attach the acceptance letter from the mitigation bank or NC Division of Mitigation Services. 6i. Comments: Compensatory mitigation is not proposed for impacts to the Neuse River Basin riparian buffers as a result of this project. According to NCDWR's Neuse River Basin's Table of Uses, the buffer impacts resulting from sidewalks that are "equal to or less than 10 feet wide with two -foot wide shoulders... and located outside Zone 1 unless there is no practical alternative" are considered "allowable upon authorization". Therefore, no compensatory buffer mitigation is proposed as part of this application. Page 17 of 25 PCN Form Version 4.3- April 20, 2022 F. Stormwater Management and Diffuse Flow Plan (DWR requirement) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers ® Yes ❑ No identified within one of the NC Riparian Buffer Protection Rules? 1 b. All buffer impacts and high ground impacts require diffuse flow or other form of stormwater treatment. If the project is subject to a state implemented riparian buffer protection program, include a plan that fully documents how diffuse/dispersed flow will be maintained. All Stormwater Control Measures (SCM) must be designed in accordance with the NC Stormwater Design Manual (https://deci.nc.gov/about/divisions/energv-mineral-land-resources/energv-mineral-land-permit- quidance/stormwater-bmp-manual). Associated supplement forms and other documentation must be provided. ❑ Level Spreader What Type of SCM are you ❑ Vegetated Conveyance (lower seasonal high water table- SHWT) providing? ❑ Wetland Swale (higher SHWT) (Check all that apply) ❑ Other SCM that removes minimum 30% nitrogen ❑x Proposed project will not create concentrated stormwater flow through the buffer For a list of options to meet the diffuse flow requirements, click here. Attach diffuse flow documentation. 2. Stormwater Management Plan 2a. Is this an NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? ❑ Yes ❑x No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? El Yes ❑x No To look up low density requirements, click here: http://reports.oah.state. nc.us/ncac/title%2015a%20-%20environmental%20civaIity/chapter%2002%20- %20environmental%20man agement/subchapter%20h/15a%20ncac%2002h%20.1003.pdf 2c. Does this project have a stormwater management plan (SMP) 0 Yes ElNo reviewed and approved under a state stormwater program or state - approved local government stormwater program? ❑ n/a — project disturbs < 1 acre Note: Projects that have vested rights, exemptions, or grandfathering from state or locally implemented stormwater programs or projects that satisfy state or locally -implemented stormwater programs through use of community in -lieu programs should answer "no" to this question. 2d. Which of the following stormwater management program(s) apply? 0 Local Government (Check all that apply.) ❑ State If you have local government approval, please include the SMP on their overall impact map. 0 Phase II ❑ USMP Local Government Stormwater Programs 0 NSW ❑ Water Supply Page 18 of 25 PCN Form Version 4.3- April 20, 2022 Please identify which local government stormwater program you are using. Town of Cary State Stormwater Programs * ❑ Phase II ❑ HQW or ORW ❑ Coastal Counties ❑ Other Comments: Click to enter. Page 19 of 25 PCN Form Version 4.3- April 20, 2022 G. Supplementary Information 1. Environmental Documentation 1 a. Does the project involve an expenditure of public (federal/state/local) ® Yes ❑ No funds or the use of public (federal/state) land? * 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental ❑ Yes ❑x No Policy Act (NEPA/SEPA)? * 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the ❑ Yes ❑ No NEPA or SEPA final approval letter.) Comments: The Town of Cary is appropriating American Rescue Plan Act (ARPA) Federal Funds for the design, right-of-way, and construction of the improvements. ARPA funding is excluded from NEPA documentation. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), Federally Non -Jurisdictional Wetlands /Classified Surface Waters ❑ Yes ❑x No (15A NCAC 2H. 1400) DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * 2b. If you answered "yes" to the above question, provide an explanation of the violation(s): Click to enter. 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby ❑ Yes ❑x No downstream water quality? * 3b. If you answered "no", provide a short narrative description: Click to enter. 3c. If yes, provide a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWR policy. (Attach .pdf) 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? * I ❑ Yes ❑x No ❑ N/A 4b. If yes, describe in detail the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. Click to enter. Page 20 of 25 PCN Form Version 4.3- April 20, 2022 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected ® Yes ❑ No species or habitat? (IPAC weblink: https://www.fws.aov/ipac/ ffws.aovl) 5b. Have you checked with the USFWS concerning Endangered Species ❑ Yes ❑x No Act impacts? * 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another federal agency involved? * ❑ Yes ❑x No ❑ Unknown If yes, which federal agency? Click to enter. 5e. Is this a DOT project located within Divisions 1-8? * ❑ Yes ❑x No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? * ®Yes El No 5g. Does this project involve bridge maintenance or removal? * ❑ Yes ❑x No 5g1. If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.? Representative photos of signs of bat use ❑ Yes ❑ No can be found in the NLEB SLOPES, Appendix F, pages 3-7. Representative photos of signs of bat use can be found in the NLEB SLOPES, Appendix F, pages 3-7. Link to NLEB SLOPES document: http:Hsaw-reg.usace.army.mil/NLEB/1-30-17-signed NLEB-SLOPES&apps.Ddf If you answered yes to 5g1, did you discover any signs of bat use? * ❑ Yes ❑ No ❑ Unknown If yes, please show the location of the bridge on the permit drawings/ project plans 5h. Does this project involve the construction/ installation of a wind turbine(s)? * ❑ Yes ❑x No If yes, please show the location of the wind turbine(s) on the permit drawings/ project plans (attach .pdf) 5i. Does this project involve blasting and /or other percussive activities that will be conducted by machines, such as jackhammers, ® Yes ElNo mechanized pile drivers, etc.? If yes, please provide details to include type of percussive activity, purpose, duration, and specific location of this activity on the property (attach .pdf) Page 21 of 25 PCN Form Version 4.3- April 20, 2022 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? As of November 29, 2023, the USFWS IPaC lists seven federally protected species with potential to occur within the vicinity of the site. IPaC also lists the tricolored bat (Perimyotis subflavus), a proposed endangered species, with potential to occur within the project vicinity. Additionally, the bald eagle (Haliaeetus leucocephalus), which is protected under the Bald and Golden Eagle Protection Act (BGPA), is known to occur within the project vicinity. Kimley-Horn reviewed the NCNHP element occurrence database (updated October 2023) to determine if there are any known occurrences of federally listed species in the project study area or project vicinity. The NCNHP database records indicate no known occurrences of any federally protected species in or within 1.0 mile of the project study area. Red -cockaded woodpecker — Suitable habitat for the red -cockaded woodpecker (RCW) is not present within the project study area due to the lack of mature pine trees with open understories. A review of the NCNHP database records (updated October 2023) indicates that there are no known RCW occurrences in or within 1.0 mile of the project study area. Due to the lack of suitable habitat and the lack of known occurrences, it has been determined that the proposed project will have "No Effect" on RCW. Neuse River waterdog — Suitable habitat for the Neuse River waterdog is not present due to the lack of well - oxygenated, medium-sized, perennial streams with continuous flow within the project study area. The short reach of perennial stream identified within the project study area is an upper order, narrow channel which has recently been impacted as a result of culvert replacement and rip rap stabilization within and downstream of the project area. A review of the NCNHP database records (updated October 2023) indicates that there are no known Neuse River waterdog occurrences in or within 1.0 mile of the project study area. According to the NCNHP records, the nearest known population of Neuse River waterdog is located approximately 21 river miles downstream from the project study area in Swift Creek. Due to the lack of suitable habitat, the lack of known occurrences, and the distance from the nearest known population, it has been determined that the proposed project will have "No Effect" on the Neuse River waterdog. Carolina madtom — Suitable habitat for the Carolina madtom is not present due to the lack of well -oxygenated, medium-sized, perennial streams with continuous flow within the project study area. The short reach of perennial stream identified within the project study area is an upper order, narrow channel which has recently been impacted as a result of culvert replacement and rip rap stabilization within and downstream of the project area. A review of the NCNHP database records (updated October 2023) indicates that there are no known Carolina madtom occurrences in or within 1.0 mile of the project study area. According to the NCNHP records, the nearest known population of Carolina madtom is located approximately 31 river miles downstream from the project study area in Swift Creek. Due to the lack of suitable habitat, the lack of known occurrences, and the distance from the nearest known population, it has been determined that the proposed project will have "No Effect" on the Carolina madtom. Atlantic pigtoe — Suitable habitat for the Atlantic pigtoe is not present due to the lack of well -oxygenated, medium-sized, perennial streams with continuous flow within the project study area. The short reach of perennial stream identified within the project study area is an upper order, narrow channel which has recently been impacted as a result of culvert replacement and rip rap stabilization within and downstream of the project area. A review of the NCNHP database records (updated October 2023) indicates that there are no known Atlantic pigtoe occurrences in or within 1.0 mile of the project study area. According to the NCNHP records, the nearest known population of Atlantic pigtoe is located approximately 15 river miles downstream from the project study area in Swift Creek. Due to the lack of suitable habitat, the lack of known occurrences, and the distance from the nearest known population, it has been determined that the proposed project will have "No Effect" on the Atlantic pigtoe. Page 22 of 25 PCN Form Version 4.3- April 20, 2022 Dwarf wedgemussel — Suitable habitat for the dwarf wedgemussel is not present due to the lack of well - oxygenated, medium-sized, perennial streams with continuous flow within the project study area. The short reach of perennial stream identified within the project study area is an upper order, narrow channel which has recently been impacted as a result of culvert replacement and rip rap stabilization within and downstream of the project area. A review of the NCNHP database records (updated October 2023) indicates that there are no known dwarf wedgemussel occurrences in or within 1.0 mile of the project study area. According to the NCNHP records, the nearest known population of dwarf wedgemussel is located approximately 15 river miles downstream from the project study area where Lake Benson meets Swift Creek. Due to the lack of suitable habitat, the lack of known occurrences, and the distance from the nearest known population, it has been determined that the proposed project will have "No Effect" on the dwarf wedgemussel. Yellow lance — Suitable habitat for the yellow lance is not present due to the lack of well -oxygenated, medium- sized, perennial streams with continuous flow within the project study area. The short reach of perennial stream identified within the project study area is an upper order, narrow channel which has recently been impacted as a result of culvert replacement and rip rap stabilization within and downstream of the project area. A review of the NCNHP database records (updated October 2023) indicates that there are no known yellow lance occurrences in or within 1.0 mile of the project study area. According to the NCNHP records, the nearest known population of yellow lance is located approximately 17 river miles downstream from the project study area in Swift Creek. Due to the lack of suitable habitat, the lack of known occurrences, and the distance from the nearest known population, it has been determined that the proposed project will have "No Effect" on the yellow lance. Michaux's sumac — Suitable habitat for Michaux's sumac is present along the maintained roadsides and utilities easements within the project study area. These areas are maintained, but infrequently enough to provide habitat for woody shrubs and undergrowth. A review of the NCNHP database records (updated October 2023) indicates that there are no known Michaux's sumac occurrences in or within 1.0 mile of the project study area. Kimley-Horn biologists conducted pedestrian surveys for Michaux's sumac within areas of suitable habitat on May 16, 2023, and no individuals were observed. Due to the lack of known occurrences and the lack of observed individuals, it has been determined that the proposed project will have "No Effect" on Michaux's sumac Bald eagle — A desktop-GIS assessment of the project study area, as well as the area within a 1.13-mile radius (1.0 mile plus 660 feet) of the project study area, was performed in November 2022 using 2021 color aerials. Multiple water bodies large enough or sufficiently open to be considered potential feeding sources were identified. Foraging habitat is present within the vicinity of the project study area; therefore, a pedestrian survey of the project study area and the area within 660 feet of the project study area was conducted on December 1, 2022. No bald eagle nests or individuals were observed. A review of the NCNHP database records (updated October 2023) indicates that there are no known bald eagle occurrences in or within 1.0 mile of the project study area. Due to the lack of known occurrences, the lack of observed individuals and nests, and the minimal impact anticipated to result from the construction of the project, it has been determined that the proposed project will not affect the bald eagle. Tricolored bat - On September 14, 2022, the U.S. Fish and Wildlife Service announced a proposal to list the tricolored bat (Perimyotis subflavus - PESU) as endangered under the Endangered Species Act. The USFWS has not provided an official effective listing date, but it is anticipated to occur in the second half of 2023. A review of the NCNHP database records (updated October 2023) indicates that there are no known occurrences of the tricolored bat in or within 1.0 mile of the project corridor. If listed, the applicant will coordinate with the USFWS to resolve Section 7 considerations for the tricolored bat, as appropriate. Attach consultation documentation. 6. Essential Fish Habitat (Corps Requirement) Page 23 of 25 PCN Form Version 4.3- April 20, 2022 6a. Will this project occur in or near an area designated as an Essential Fish Habitat? ❑ Yes ❑x No Is there submerged aquatic vegetation (SAV) around the project vicinity? El Yes ❑x No El Unknown Will this project affect submerged aquatic vegetation? ❑ Yes ❑x No ❑ Unknown Explain: Click to entr 6b. What data source(s) did you use to determine whether your site would impact Essential Fish Habitat? The NOAA Essential Fish Habitat Mapper was reviewed on November 29, 2023. No essential fish habitat was found within the project sstudy area or within the project vicinity. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data): http://,qis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural ❑ Yes ❑x No preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data source(s) did you use to determine whether your site would impact historic or archeological resources? A review of the State Historic Preservation Office (NCSHPO) HPOWEB GIS Service database performed on November 29, 2023 and did not identify any historic resources in or within 1.0-mile the project study area. Fourteen historical resources currently listed as "Survey Only" and "Survey Only, Gone" were found in or within 1.0-mile of the project study area. Due to the listing status of `Survey Only', these resources do not currently receive protection under the National Historic Preservation Act. If the listing status changes to NR, SL, or DOE prior to construction, the potential for impacts to these resources may need to be re-evaluated; however, due to the distance from the Site and the existing uses within the vicinity of the Site, it is assumed that the proposed project will have no effect on these `Survey Only' resources. Due to the minimal visual and ground disturbing impact resulting from the proposed sidewalk, as well as the existing roadway right-of-way throughout the corridor, it is anticipated that the proposed project will have no effect on any archaeological resources within the project study area or project vicinity. 7c. Attach historic or prehistoric documentation. 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain? 1 ❑ Yes ❑x No 8b. If yes, explain how the project meets FEMA requirements. ;lick to enter. 8c. What source(s) did you use to make the floodplain determination? The FEMA Digital Flood Insurance Map (DFIRM) Panel 3720075300K (effective July 19, 2022) was accessed on November 29, 2023. No FEMA-regulated floodways of Special Floddway Hazard Areas are present within the project study area. Page 24 of 25 PCN Form Version 4.3- April 20, 2022 H. Miscellaneous Comments: Clink to PntPr Attach pertinent documentation or attachments not previously requested I. Signature * ❑x By checking the box and signing below, I, as the project proponent, certify to the following: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete, to the best of my knowledge and belief; • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time; • The project proponent hereby agrees that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • The project proponent hereby agrees to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • The project proponent hereby understands that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • As the project proponent, I intend to electronically sign and submit the PCN/online form. Full Name: Emma Radford, WPIT,CA Signature: * Click to enter. Date: 12/20/2023 Page 25 of 25 PCN Form Version 4.3- April 20, 2022 DocuSign Envelope ID: D244B812-72DB-4069-AFE2-BBD87102E5AA AGENT AUTHORIZATION FORM Name: Chelsea Stern Address: 316 N Academy St, Cary, NC 27513 Phone: 919-462-3829 Project Name/Description: Connecting Cary Sidewalks — West Chatham Street Date: January 28, 2022 The Department of the Army U.S. Army Corps of Engineers, Wilmington District Field Office: Raleigh Regulatory Field Office Re: Wetland Related Consulting and Permitting To Whom It May Concern: The Town of Car v hereby designates and authorizes Kimley-Horn and Associates, Inc. to act in my/our behalf as my/our agent solely for the purpose of processing Jurisdictional Determinations, Section 404 permits/Section 401 Water Quality Certifications applications, and Neuse River Basin Riparian Buffer Determinations, and to furnish upon request supplemental information in support of applications, etc. from this day forward until successful completion of the permitting process or revocation by the owner. In addition, I, the undersigned, a duly authorized owner of record of the property/properties identified herein, do authorize representatives of the Wilmington District, U.S. Army Corps of Engineers (Corps) to enter upon the property herein described for the purpose of conducting on -site investigations and issuing a determination associated with Waters of the U.S. subject to Federal jurisdiction under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. Authorized this the 17 day of Janua Chelsea Stern Print Property Owner's Name Cc: Shelton Sullivan NC Division of Water Resources 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1650 2023 DoeuSigned by: CDctig� �St�ti Property Owner's Signature � � 1 v, d 19hPpe� d �� Legend Project Study Area Town of �a��pert Dr n�Wake County\ • CASWELL I PERSON GRANNIE ALAMANCE ORANGE DURHAM --;� WAKE CHATHAM NORTHAMPTON VANCE WARREN KE HALIFAX FRANKLIN Ten NASH Project Location JOHNSTON Wake County ina vA pnry I ftli141 L MR, Marylan1 I Delaware LEE HARNETT Georgia MOORE WAYNE Atlantic Ocean HOKE CUMBERLAND SAMPSON DUPLIN Figure 1: Vicinity Map Kimley>>> Horn Cary Connecting Sidewalks - W Chatham St Cary, Wake County, NC January 2023 �ou8p r� rJ, l -- r 1 �. Legend rq Project Study Area n. Kimley>>> Horn G�FF� . O♦ P . '1PALME7' Feet 0 300 600 Figure 2: USGS Topographic Map Cary Connecting Sidewalks - W Chatham St Cary, Wake County, NC January 2023 Tracy, Ct c '. t(, 11, Berent*oo ,'1 p w-, r Virginia P Feet ` 0 200 400 Legend S1 Potentially Jurisdictional Streams r � r 1 t ' 1 • 1 I 1 - 1 r } 1 . 61eB r eec . H rB 1 i 1 ' { *I: Ge13 Ge t Go Legend ' rq Project Study Area - Feet Y 0 300 600 Figure 4: NRCS Soil Survey Map Kimley>>> Horn Cary Connecting Sidewalks - W Chatham St Cary, Wake County, NC January 2023 ROY COOPER Governor ELIZABETH S. B1SER Secretary RICHARI7 E. ROGERS, JR. Director NORTH CAROLINA Environmental Quality February 21, 2023 To: Emma Radford, WPIT, CA, Kimley-Horn and Associates From: Rob Ridings, NC Division of Water Resources, Transportation Permitting Branch Subject: Connecting Cary Sidewalks Projects, Wake & Chatham Counties. Determination for Applicability to the Neuse Buffer Rules (15A NCAC 2B.0714) or Jordan Buffer Rules (15A NCAC 2B.02667). Dear Ms. Radford: The NC Division of Water Resources Transportation Permitting Branch reviewed your Buffer Determination Package for the above projects. The drainage features are mapped and rated on the referenced packages on maps received by DWR on February 21, 2023. NCD WR has confirmed that the drainage features annroximated on the Determination Package are as follows: Jenks Carpenter Road, Wake County Sl (Lat 35.786562, Long-78.856308): Intermittent. Subject to Neuse Buffer Rules. Chatham Street, Wake County Sl (Lat 35.771446, Long-78.803782): Perennial. Subject to Neuse Buffer Rules. SE Cary Parkway, Wake County *No Streams found present in Project Area Boundaries, thus no Neuse Buffers. Boundary Street, Wake County *No Streams found present in Project Area Boundaries, thus no Neuse Buffers. Pittard Sears Road, Chatham County Sl: (Lat 35.8352491, Long-78.9263297): Intermittent. Subject to Jordan Buffer Rules. S2: (Lat 35.835231, Log-78.924624): Intermittent. Subject to Jordan Buffer Rules. Pond 1 (inline with Sl): Subject to Jordan Buffer Rules. No other mapped stream or buffer sites were included in this request package. Also, this letter only addresses applicability to the Neuse and Jordan Buffer Rules at the sites specifically referenced and does not apply to reaches of the channels further downstream, or upstream, outside the project area in the referenced package, or to any other drainage features in the vicinity. This letter only addresses the applicability to the buffer rules and does not approve any activity within the buffer, Waters of the United States, or Waters of the State. Any impacts to wetlands, streams and buffers must comply with North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1611 Mail Service Center I Raleigh, North Carolina 27699-1611 NOR1H CAROL Na 919.707.9000 the Neuse Buffer Rules, 404/401 regulations, water supply regulations (15A NCAC 2B .0216), and any other required federal, state and local regulations. Please be aware that even if no direct impacts are proposed to the protected buffers, sheet flow of all new stormwater runoff as per 15A NCAC 213.0714 and/or 15A NCAC 213.0267 is required. The owner (or future owners) or permittee should notify NCDWR (and other relevant agencies) of this determination in any future correspondences concerning this property and/or project. This on -site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by NCDWR or Delegated Local Authority that a surface water exists and that it is subject to the mitigation rules may request a determination by the Director. A request for a determination by the Director shall be referred to the Director in writing c/o Amy Chapman, NCDWR Transportation Permitting Branch, 1617 Mail Service Center, Raleigh, NC 27699-1617. Individuals that dispute a determination by NCDWR or Delegated Local Authority that "exempts" a surface water from the buffer rules may ask for an adjudicatory hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition with the office of Administrative Hearings within sixty (60) days of receipt of this notice and the date the affected party (including downstream and adjacent landowners) is notified of this decision. A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:OOam and 5:OOpm, except for official state holidays. The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings. The petition may be faxed -provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Telephone: (919) 431-3000, Facsimile: (919) 431-3100 A copy of the petition must also be served on DEQ as follows: Mr. Sam M. Hayes, General Counsel Department of Environmental Quality 1601 Mail Service Center This determination is final and binding unless you ask for a hearing within 60 days. If you have any additional questions or require additional information please contact Rob Ridings at 919-707-8786 or rob.ridings(a ncdenr.gov. D � ��� North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1611 Mail Service Center I Raleigh, North Carolina 27699-1611 NOR1H CARou Na 919.707.9000 urisdictional Determination Reauest U5 Army Corps of Engineers. Wilmington District This form is intended for use by anyone requesting a jurisdictional determination (JD) from the U.S. Army Corps of Engineers, Wilmington District (Corps). Please include all supporting information, as described within each category, with your request. You may submit your request via mail, electronic mail, or facsimile. Requests should be sent to the appropriate project manager of the county in which the property is located. A current list of project managers by assigned counties can be found on-line at: http://www. saw.usace. army.mil/Missions/RegulatoryPermitPro gram/Contact/CountyLocator. as]2 by calling 910-251-4633, or by contacting any of the field offices listed below. Once your request is received you will be contacted by a Corps project manager. ASHEVILLE & CHARLOTTE REGULATORY FIELD OFFICES US Army Corps of Engineers 151 Patton Avenue, Room 208 Asheville, North Carolina 28801-5006 General Number: (828) 271-7980 Fax Number: (828) 281-8120 RALEIGH REGULATORY FIELD OFFICE US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 General Number: (919) 554-4884 Fax Number: (919) 562-0421 INSTRUCTIONS: WASHINGTON REGULATORY FIELD OFFICE US Army Corps of Engineers 2407 West Fifth Street Washington, North Carolina 27889 General Number: (910) 251-4610 Fax Number: (252) 975-1399 WILMINGTON REGULATORY FIELD OFFICE US Army Corps of Engineers 69 Darlington Avenue Wilmington, North Carolina 28403 General Number: 910-251-4633 Fax Number: (910) 251-4025 All requestors must complete Parts A, B, C, D, E, F and G. NOTE TO CONSULTANTS AND AGENCIES: If you are requesting a JD on behalf of a paying client or your agency, please note the specific submittal requirements in Part H. NOTE ON PART D — PROPERTY OWNER AUTHORIZATION: Please be aware that all JD requests must include the current property owner authorization for the Corps to proceed with the determination, which may include inspection of the property when necessary. This form must be signed by the current property owner(s) or the owner(s) authorized agent to be considered a complete request. NOTE ON PART D - NCDOT REQUESTS: Property owner authorization/notification for JD requests associated with North Carolina Department of Transportation (NCDOT) projects will be conducted according to the current NCDOT/USACE protocols. NOTE TO USDA PROGRAM PARTICIPANTS: A Corps approved or preliminary JD may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should also request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. Version: May 2017 Page 1 Jurisdictional Determination Request A. PARCEL INFORMATION Street Address: N/A (Linear Transportation Proiect City, State: Cary, NC County: Wake County Parcel Index Number(s) (PIN): N/A (Linear Transportation Project) B. REQUESTOR INFORMATION Name: Kimley-Horn; ATTN: Emma Radford, WPIT Mailing Address: 421 Fayetteville Street, Suite 600 Raleigh, NC 27601 Telephone Number: (919) 677-2215 Electronic Mail Address: Emma.Radford@kimley-horn.com Select one: ❑ I am the current property owner. ❑ I am an Authorized Agent or Environmental Consultant) Interested Buyer or Under Contract to Purchase Other, please explain. C. PROPERTY OWNER INFORMATION Name: Town of Cary; ATTN: Chelsea Stern Mailing Address: 316 North Academy Street Cary, NC 27513 Telephone Number: (919) 469-4030 Electronic Mail Address: Chelsea.Stern@townofcary.org ' Must provide completed Agent Authorization Form/Letter. 2 Documentation of ownership also needs to be provided with request (copy of Deed, County GIS/Parcel/Tax Record). Version: May 2017 Page 2 Jurisdictional Determination Request D. PROPERTY ACCESS CERTIFICATION',4 By signing below, I authorize representatives of the Wilmington District, U.S. Army Corps of Engineers (Corps) to enter upon the property herein described for the purpose of conducting on - site investigations, if necessary, and issuing a jurisdictional determination pursuant to Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. I, the undersigned, am either a duly authorized owner of record of the property identified herein, or acting as the duly authorized agent of the owner of record of the property. Emma Radford, WPIT Print Name Capacity: ❑ Owner Z Authorized Agents Date Signature E. REASON FOR JD REQUEST: (Check as many as applicable) ❑ I intend to construct/develop a projector perform activities on this parcel which would be designed to avoid all aquatic resources. ❑ I intend to construct/develop a projector perform activities on this parcel which would be designed to avoid all jurisdictional aquatic resources under Corps authority. ❑✓ I intend to construct/develop a projector perform activities on this parcel which may require authorization from the Corps, and the JD would be used to avoid and minimize impacts to jurisdictional aquatic resources and as an initial step in a future permitting process. ❑ I intend to construct/develop a project or perform activities on this parcel which may require authorization from the Corps; this request is accompanied by my permit application and the JD is to be used in the permitting process. ❑ I intend to construct/develop a projector perform activities in a navigable water of the U.S. which is included on the district Section 10 list and/or is subject to the ebb and flow of the tide. ❑ A Corps JD is required in order obtain my local/state authorization. ❑ I intend to contest jurisdiction over a particular aquatic resource and request the Corps confirm that jurisdiction does/does not exist over the aquatic resource on the parcel. ❑ I believe that the site may be comprised entirely of dry land. ❑ Other: s For NCDOT requests following the current NCDOT/USACE protocols, skip to Part E. a If there are multiple parcels owned by different parties, please provide the following for each additional parcel on a continuation sheet. s Must provide agent authorization form/letter signed by owner(s). Version: May 2017 Page 3 Jurisdictional Determination Request F. JURISDICTIONAL DETERNIINATION (JD) TYPE (Select One) 0 I am requesting that the Corps provide a preliminM JD for the property identified herein. A Preliminary Jurisdictional Determination (PJD) provides an indication that there may be "waters of the United States" or "navigable waters of the United States"on a property. PJDs are sufficient as the basis for permit decisions. For the purposes of permitting, all waters and wetlands on the property will be treated as if they are jurisdictional "waters of the United States". PJDs cannot be appealed (33 C.F.R. 331.2); however, a PJD is "preliminary" in the sense that an approved JD can be requested at any time. PJDs do not expire. ❑ I am requesting that the Corps provide an approved JD for the property identified herein. An Approved Jurisdictional Determination (AJD) is a determination that jurisdictional "waters of the United States" or "navigable waters of the United States" are either present or absent on a site. An approved JD identifies the limits of waters on a site determined to be jurisdictional under the Clean Water Act and/or Rivers and Harbors Act. Approved JDs are sufficient as the basis for permit decisions. AJDs are appealable (33 C.F.R. 331.2). The results of the AJD will be posted on the Corps website. A landowner, permit applicant, or other "affected party" (33 C.F.R. 331.2) who receives an AJD may rely upon the AJD for five years (subject to certain limited exceptions explained in Regulatory Guidance Letter 05- 02). ❑ I am unclear as to which JD I would like to request and require additional information to inform my decision. G. ALL REQUESTS Map of Property or Project Area. This Map must clearly depict the boundaries of the review area. ✓❑ Size of Property or Review Area 1 • 75 acres. ❑ The property boundary (or review area boundary) is clearly physically marked on the site. Version: May 2017 Page 4 Jurisdictional Determination Request H. REQUESTS FROM CONSULTANTS Project Coordinates (Decimal Degrees): Latitude: 35.775169 Longitude:-78.801772 A legible delineation map depicting the aquatic resources and the property/review area. Delineation maps must be no larger than I Ix 17 and should contain the following: (Corps signature of submitted survey plats will occur after the submitted delineation map has been reviewed and approved).6 ■ North Arrow ■ Graphical Scale ■ Boundary of Review Area ■ Date ■ Location of data points for each Wetland Determination Data Form or tributary assessment reach. For Approved Jurisdictional Determinations: Jurisdictional wetland features should be labeled as Wetland Waters of the US, 404 wetlands, etc. Please include the acreage of these features. Jurisdictional non -wetland features (i.e. tidal/navigable waters, tributaries, impoundments) should be labeled as Non -Wetland Waters of the US, stream, tributary, open water, relatively permanent water, pond, etc. Please include the acreage or linear length of each of these features as appropriate. Isolated waters, waters that lack a significant nexus to navigable waters, or non - jurisdictional upland features should be identified as Non -Jurisdictional. Please include a justification in the label regarding why the feature is non jurisdictional (i.e. "Isolated", "No Significant Nexus", or "Upland Feature"). Please include the acreage or linear length of these features as appropriate. For Preliminary Jurisdictional Determinations: Wetland and non -wetland features should not be identified as Jurisdictional, 404, Waters of the United States, or anything that implies jurisdiction. These features can be identified as Potential Waters of the United States, Potential Non -wetland Waters of the United States, wetland, stream, open water, etc. Please include the acreage and linear length of these features as appropriate. Completed Wetland Determination Data Forms for appropriate region (at least one wetland and one upland form needs to be completed for each wetland type) 6 Please refer to the guidance document titled "Survey Standards for Jurisdictional Determinations" to ensure that the supplied map meets the necessary mapping standards. hM2://www.saw.usace.4rmy.mil/Missions/Regulatoly-Permit- Pro gram/Jurisdiction/ Version: May 2017 Page 5 Jurisdictional Determination Request Completed appropriate Jurisdictional Determination form • PJDs, please complete a Preliminary Jurisdictional Determination Form' and include the Aquatic Resource Table • AJDs• please complete an Approved Jurisdictional Determination Form'. 14 Vicinity Map IZI Aerial Photograph USGS Topographic Map Soil Survey Map Other Maps, as appropriate (e.g. National Wetland Inventory Map, Proposed Site Plan, previous delineation maps, LIDAR maps, FEMA floodplain maps) Landscape Photos (if taken) NCSAM and/or NCWAM Assessment Forms and Rating Sheets 7 NC Division of Water Resources Stream Identification Forms Other Assessment Forms ' www.saw.usace.army.mil/Portals/59/docs/regulatory/readocs/JD/RGL 08-02 App A Prelim JD Form fillable.pdf 8 Please see hM2://www.saw.usace.gM.mil/Missions/Re atory-Permit-Proaam/Jurisdiction/ Principal Purpose: The information that you provide will be used in evaluating your request to determine whether there are any aquatic resources within the project area subject to federaljurisdictionunder the regulatory authorities referenced above. Routine Uses: This information may be shared with the Department of Justice and other federal, state, and local government agencies, and the public, and may be made available as part of a public notice as required by federal law. Your name and property location where federal jurisdiction is to be determined will be included in the approvedjurisdictional determination (AJD), which will be made available to the public on the District's website and on the Headquarters USAGE website. Disclosure: Submission of requested information is voluntary; however, if information is not provided, the request for an AJD cannot be evaluated nor can an AJD be issued. Version: May 2017 Page 6 Appendix 2 - PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PJD: B. NAME AND ADDRESS OF PERSON REQUESTING PJD: Emma Radford,WPIT;421 Fayetteville Street, Suite 600, Raleigh, NC27601 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: (USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR AQUATIC RESOURCES AT DIFFERENT SITES) State: NC County/parish/borough: Wake City: Cary Center coordinates of site (lat/long in degree decimal format): Lat.: 35.775169 Long.:-78.801772 Universal Transverse Mercator: 17 Name of nearest waterbody: Swift Creek E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): ❑ Office (Desk) Determination. Date: ❑ Field Determination. Date(s): TABLE OF AQUATIC RESOURCES IN REVIEW AREA WHICH "MAY BE" SUBJECT TO REGULATORY JURISDICTION. Site number Latitude (decimal degrees) Longitude (decimal degrees) Estimated amount of aquatic resource in review area (acreage and linear feet, if applicable) Type of aquatic resource (i.e., wetland vs. non -wetland waters) Geographic authority to which the aquatic resource "may be" subject (i.e., Section 404 or Section 10/404) W1 35.774606 -78.802008 <0.01 acres Wetland Section 404 S1 35.771445 -78.803781 16 LF Non -wetland (Stream) Section 404 1) The Corps of Engineers believes that there may be jurisdictional aquatic resources in the review area, and the requestor of this PJD is hereby advised of his or her option to request and obtain an approved JD (AJD) for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they may be appropriate. 2) In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre - construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an AJD for the activity, the permit applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit authorization based on a PJD, which does not make an official determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an AJD could possibly result in less compensatory mitigation being required or different special conditions; (3) the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) undertaking any activity in reliance upon the subject permit authorization without requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way by that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an AJD or a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that there "may be" waters of the U.S. and/or that there "may be" navigable waters of the U.S. on the subject review area, and identifies all aquatic features in the review area that could be affected by the proposed activity, based on the following information: SUPPORTING DATA. Data reviewed for PJD (check all that apply) Checked items should be included in subject file. Appropriately reference sources below where indicated for all checked items: ■❑ Maps, plans, plots or plat submitted by or on behalf of the PJD requestor: Map: 0 Data sheets prepared/submitted by or on behalf of the PJD requestor. ❑ Office concurs with data sheets/delineation report. ❑ Office does not concur with data sheets/delineation report. Rationale: ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ❑ U.S. Geological Survey Hydrologic Atlas: El ■❑ U.S USGS NHD data. USGS 8 and 12 digit HUC maps. Geological Survey map(s). Cite scale & quad name: (1:24,000) Cary ■❑ Natural Resources Conservation Service Soil Survey. Citation: Wake County, 1970 ❑ National wetlands inventory map(s). Cite name: ❑ State/local wetland inventory map(s): ❑ FEMA/FIRM maps: ❑ 100-year Floodplain Elevation is: .(National Geodetic Vertical Datum of 1929) ■❑ Photographs: ■❑ Aerial (Name & Date): NC Statewide Orthoimagery, 2021 or ❑ Other (Name & Date): ❑ Previous determination(s). File no. and date of response letter: ❑ Other information (please specify): IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corps and should not be relied upon for later jurisdictional determinations. Signature and date of Regulatory staff member completing PJD Signature and date of person requesting PJD (REQUIRED, unless obtaining the signature is impracticable)' ' Districts may establish timeframes for requestor to return signed PJD forms. If the requestor does not respond within the established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action. DocuSign Envelope ID: D244B812-72DB-4069-AFE2-BBD87102E5AA AGENT AUTHORIZATION FORM Name: Chelsea Stern Address: 316 N Academy St, Cary, NC 27513 Phone: 919-462-3829 Project Name/Description: Connecting Cary Sidewalks — West Chatham Street Date: January 28, 2022 The Department of the Army U.S. Army Corps of Engineers, Wilmington District Field Office: Raleigh Regulatory Field Office Re: Wetland Related Consulting and Permitting To Whom It May Concern: The Town of Car v hereby designates and authorizes Kimley-Horn and Associates, Inc. to act in my/our behalf as my/our agent solely for the purpose of processing Jurisdictional Determinations, Section 404 permits/Section 401 Water Quality Certifications applications, and Neuse River Basin Riparian Buffer Determinations, and to furnish upon request supplemental information in support of applications, etc. from this day forward until successful completion of the permitting process or revocation by the owner. In addition, I, the undersigned, a duly authorized owner of record of the property/properties identified herein, do authorize representatives of the Wilmington District, U.S. Army Corps of Engineers (Corps) to enter upon the property herein described for the purpose of conducting on -site investigations and issuing a determination associated with Waters of the U.S. subject to Federal jurisdiction under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. Authorized this the 17 day of Janua Chelsea Stern Print Property Owner's Name Cc: Shelton Sullivan NC Division of Water Resources 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1650 2023 DoeuSigned by: CDctig� �St�ti Property Owner's Signature � � 1 Legend O Project Study Area I Town of �a��pert Dr n�Wake County\ • CASWELL I PERSON GRANNIE ALAMANCE ORANGE DURHAM --;� WAKE CHATHAM NORTHAMPTON VANCE WARREN KE HALIFAX FRANKLIN Ten NASH Project Location JOHNSTON Wake County ina vA pnry I ftli141 L Marylan1 I Delaware LEE HARNETT Georgia MOORE WAYNE Atlantic Ocean HOKE CUMBERLAND SAMPSON DUPLIN Figure 1: Vicinity Map Kimley > Horn Cary Connecting Sidewalks - W Chatham St ] Cary, Wake County, NC January 2023 Legend rq Project Study Area Kimley >>) Horn 1 SAND -- � Pf f �� PAIMErr0 �. Feet 0 300 600 Figure 2: USGS Topographic Map Cary Connecting Sidewalks - W Chatham St Cary, Wake County, NC January 2023 �. Mr _ TryCt Q .y PIP 6 A 1 yr. Virginia f�f�"may. ' y ". � � .'�� • --�y�� _ � •�' ` ':Y .w•y Y•nt •�i • L Wi' a°. r K Bohte <h v �� r•` A. JA �. • � y: ti' .-0 gee viFeet ' a _ 4..s 1 200 400 Legend .3 ,�, , •,�... � _ '� . 1' }41 Potentially Jurisdictional Streams fg . 0": Potentially Jurisdictional Wetlands �' i,Fr G( "e B2:,... IGeC2` � M GeB2 Ge-.B2 -y _ � 1 eCO -... 14rB2 C2 car., G i� G Legend. r'r1 Project Study Area M Feet 0 300 600 Figure 4: NRCS Soil Survey Map Kimley >>Morn Cary Connecting Sidewalks - W Chatham St Cary, Wake County, NC January 2023 North Carolina Division of Water Quality - Stream Identification Form, Version 4.11 Date: 1/10/2023 Project/Site: Connecting Cary Sidewalks W Chatham St - Stream S1 Latitude: 35.771446 Evaluator: I=, Radford, W C. Vinter County: Wake County Longitude:-78.803782 (Kimley-H-Horn) Total Points: 30.5 Stream Determination (circle one) Other Stream is at least intermittent Ephemeral Intermitten erennial e.g. Quad Name: Cary if >_ 19 or perennial if >_ 30 A. Geomorphology Subtotal = 14.5 Absent Weak Moderate Strong Score 1a. Continuity of channel bed and bank 0 1 2 3 2 2. Sinuosity of channel along thalweg 0 1 2 3 2 3. In -channel structure: ex. riffle -pool, step -pool, ripple- poolsequence 0 1 2 3 1 4. Particle size of stream substrate 0 1 2 3 2 5. Active/relic floodplain 0 1 2 3 2 6. Depositional bars or benches 0 1 2 3 2 7. Recent alluvial deposits 0 1 2 3 2 8. Headcuts 0 1 2 3 0 9. Grade control 0 0.5 1 1.5 0.5 10. Natural valley 0 0.5 1 1.5 1 11. Second or greater order channel No = 0 Yes = 3 0 B. Hydrology Subtotal = 12. Presence of Baseflow 0 1 2 3 3 13. Iron oxidizing bacteria 0 1 2 3 0 14. Leaf litter 1.5 1 0.5 0 0.5 15. Sediment on plants or debris 0 0.5 1 1.5 1 16. Organic debris lines or piles 0 0.5 1 1.5 1.5 17. Soil -based evidence of high water table? No = 0 Yes = 3 3 C. Biology Subtotal = 18. Fibrous roots in streambed 3 2 1 0 3 19. Rooted upland plants in streambed 3 2 1 0 3 20. Macrobenthos (note diversity and abundance) 0 1 2 3 0 21. Aquatic Mollusks 0 1 2 3 0 22. Fish 0 0.5 1 1.5 0 23. Crayfish 0 0.5 1 1.5 0 24. Amphibians 0 0.5 1 1 1.5 0 25. Algae 0 0.5 1 1.5 1 26. Wetland plants in streambed FACW = 0.75; OBL = 1.5; Other = 0 0 'perennial streams may also be identified using other methods. See p. 35 of manual. Notes: Stream S1 is a perennial channel originating offsite and daylighting within the study area at a culvert outlet under W Chatham Street. Stream S1 has recently undergone culvert construction and riprap placement in and around the channel below the culvert outlet. Stream S1 has continuous baseflow and weak in - channel structure. The left bank is moderately incised, and the right bank has an active floodplain. Algae and organic debris were observed in the channel. U.S. Army Corps of Engineers OMB Control #: 0710-0024, Exp:1113012024 WETLAND DETERMINATION DATA SHEET— Eastern Mountains and Piedmont Region Requirement Control Symbol EXEMPT: See ERDC/EL TR-12-9; the proponent agency is CECW-CO-R (Authority: AR 335-15, paragraph 5-2a) Project/Site: Connecting Cary Sidewalks - W Chatham St City/County: Cary/Wake County Sampling Date: 01/10/2023 Applicant/Owner: Town of Cary State: NC Sampling Point: W1-UP Investigator(s): E. Radford, WPIT & C. Vinter (Kimley-Horn) Section, Township, Range: N/A Landform (hillside, terrace, etc.): Hillslope Local relief (concave, convex, none): Convex Slope (%): 0-5% Subregion (LRR or MLRA): LRR P, MLRA 136 Lat: 35.7747179 Long:-78.8020124 Datum: NAD83 Soil Map Unit Name: GeC - Georgeville Silt Loam NWI classification: None Are climatic / hydrologic conditions on the site typical for this time of year? Yes X No (If no, explain in Remarks.) Are Vegetation Soil or Hydrology significantly disturbed? Are "Normal Circumstances" present? Yes X No Are Vegetation Soil or Hydrology naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS — Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Yes No X Is the Sampled Area Hydric Soil Present? Yes No X within a Wetland? Yes No X Wetland Hydrology Present? Yes No X Remarks: The upland data point for wetland W1 was taken approximately 15 feet from and 3 feet higher in elevation than wetland W1 on an adjacent roadside hillslope. HYDROLOGY Wetland Hydrology Indicators: Secondary Indicators (minimum of two required) Primary Indicators (minimum of one is required: check all that apply) _Surface Soil Cracks (136) _Surface Water (Al) _True Aquatic Plants (B14) _Sparsely Vegetated Concave Surface (138) _ High Water Table (A2) —Hydrogen Sulfide Odor (Cl) —Drainage Patterns (1310) _Saturation (A3) _Oxidized Rhizospheres on Living Roots (C3) _Moss Trim Lines (1316) —Water Marks (131) —Presence of Reduced Iron (C4) _ Dry -Season Water Table (C2) _Sediment Deposits (132) _Recent Iron Reduction in Tilled Soils (C6) _Crayfish Burrows (C8) _ Drift Deposits (133) _Thin Muck Surface (C7) _Saturation Visible on Aerial Imagery (C9) _Algal Mat or Crust (134) _Other (Explain in Remarks) _Stunted or Stressed Plants (D1) _Iron Deposits (135) _Geomorphic Position (D2) _ Inundation Visible on Aerial Imagery (137) _Shallow Aquitard (D3) —Water-Stained Leaves (139) _ Microtopographic Relief (D4) Aquatic Fauna (1313) FAC-Neutral Test (D5) Field Observations: Surface Water Present? Yes No X Depth (inches): Water Table Present? Yes No X Depth (inches): Saturation Present? Yes No X Depth (inches): Wetland Hydrology Present? Yes No X (includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Remarks: No primary or secondary hydrology indicators were observed. ENG FORM 6116-4, JUL 2018 Eastern Mountains and Piedmont — Version 2.0 VEGETATION (Four Strata) - Use scientific names of plants. Sampling Point: W1-UP Absolute Dominant Indicator Tree Stratum (Plot size: 30 ) % Cover Species? Status Dominance Test worksheet: 1 Number of Dominant Species 2. That Are OBL, FACW, or FAC: 1 (A) 3. Total Number of Dominant 4. Species Across All Strata: 5 (B) 5. Percent of Dominant Species 6. That Are OBL, FACW, or FAC: 20.0% (A/B) 7. Prevalence Index worksheet: =Total Cover Total % Cover of: Multiply by: 50% of total cover: 20% of total cover: OBL species 0 x 1 = 0 Sapling/Shrub Stratum (Plot size: 30 ) FACW species 40 x 2 = 80 1. Ligustrum sinense 10 Yes FACU FAC species 0 x 3 = 0 2. Rubus argutus 5 Yes FACU FACU species 35 x 4 = 140 3. UPL species 0 x 5 = 0 4. Column Totals: 75 (A) 220 (B) 5. Prevalence Index = B/A = 2.93 6. Hydrophytic Vegetation Indicators: 7. _ 1 - Rapid Test for Hydrophytic Vegetation 8. 2 - Dominance Test is >50% 9. 3 - Prevalence Index is <_3.0' 15 =Total Cover 4 - Morphological Adaptations' (Provide supporting 50% of total cover: 8 20% of total cover: 3 data in Remarks or on a separate sheet) Herb Stratum (Plot size: 30 ) -Problematic Hydrophytic Vegetation' (Explain) 1. Ranunculus abortivus 40 Yes FACW 'Indicators of hydric soil and wetland hydrology must be 2. Cirsium vulgare 20 Yes FACU present, unless disturbed or problematic. Definitions of Four Vegetation Strata: 3. Festuca spp. 20 Yes 4. Tree - Woody plants, excluding vines, 3 in. (7.6 cm) or 5. more in diameter at breast height (DBH), regardless of 6 height. 7. Sapling/Shrub -Woody plants, excluding vines, less 8. than 3 in. DBH and greater than or equal to 3.28 ft (1 9 m) tall. 10. Herb -All herbaceous (non -woody) plants, regardless 11. of size, and woody plants less than 3.28 ft tall. 80 =Total Cover Woody Vine - All woody vines greater than 3.28 ft in 50% of total cover: 40 20% of total cover: 16 height. Woody Vine Stratum (Plot size: 30 ) 1. 2. 3. 4. 5. Hydrophytic =Total Cover Vegetation 50% of total cover: 20% of total cover: Present? Yes No X Remarks: (Include photo numbers here or on a separate sheet.) No tree or woody vine stratums were observed. ENG FORM 6116-4, JUL 2018 Eastern Mountains and Piedmont - Version 2.0 SOIL Sampling Point: W1-UP Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix Redox Features (inches) Color (moist) % Color (moist) % Types Loc2 Texture Remarks 0-1 7.5YR 3/1 100 Loamy/Clayey 1-18 5YR 4/4 100 Loamy/Clayey roadside fill observed Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. 2Location: PL=Pore Lining, M=Matrix. Hydric Soil Indicators: Indicators for Problematic Hydric Soils3: _ Histosol (Al) _ Polyvalue Below Surface (S8) (MLRA 147, 148) _ 2 cm Muck (A10) (MLRA 147) _ Histic Epipedon (A2) —Thin Dark Surface (S9) (MLRA 147, 148) —Coast Prairie Redox (A16) —Black Histic (A3) _ Loamy Mucky Mineral (F1) (MLRA 136) (MLRA 147, 148) —Hydrogen Sulfide (A4) _ Loamy Gleyed Matrix (F2) —Piedmont Floodplain Soils (F19) —Stratified Layers (A5) _ Depleted Matrix (F3) (MLRA 136, 147) _ 2 cm Muck (A10) (LRR N) _ Redox Dark Surface (F6) —Red Parent Material (F21) _ Depleted Below Dark Surface (A11) _ Depleted Dark Surface (F7) (outside MLRA 127, 147, 148) _Thick Dark Surface (Al2) _ Redox Depressions (F8) _Very Shallow Dark Surface (F22) _Sandy Mucky Mineral (S1) _ Iron -Manganese Masses (F12) (LRR N, _Other (Explain in Remarks) —Sandy Gleyed Matrix (S4) MLRA 136) —Sandy Redox (S5) _ Umbric Surface (F13) (MLRA 122, 136) 3Indicators of hydrophytic vegetation and —Stripped Matrix (S6) _ Piedmont Floodplain Soils (F19) (MLRA 148) wetland hydrology must be present, Dark Surface (S7) Red Parent Material (F21) (MLRA 127, 147, 148) unless disturbed or problematic. Restrictive Layer (if observed): Type: Depth (inches): Hydric Soil Present? Yes No X Remarks: No surface water, saturation, or water table were observed within the soil profile. ENG FORM 6116-4, JUL 2018 Eastern Mountains and Piedmont —Version 2.0 U.S. Army Corps of Engineers OMB Control #: 0710-0024, Exp:1113012024 WETLAND DETERMINATION DATA SHEET — Eastern Mountains and Piedmont Region Requirement Control Symbol EXEMPT: See ERDC/EL TR-12-9; the proponent agency is CECW-CO-R (Authority: AR 335-15, paragraph 5-2a) Project/Site: Connecting Cary Sidewalks - W Chatham St City/County: Cary/Wake County Sampling Date: 01/10/2023 Applicant/Owner: Town of Cary State: NC Sampling Point: W1-WET Investigator(s): E. Radford, WPIT & C. Vinter (Kimley-Horn) Section, Township, Range: N/A Landform (hillside, terrace, etc.): Terrace/Depression Local relief (concave, convex, none): Concave Slope (%): 0-2% Subregion (LRR or MLRA): LRR P, MLRA 136 Lat: 35.774606 Long:-78.802008 Datum: NAD83 Soil Map Unit Name: GeC - Georgeville Silt Loam NWI classification: None Are climatic / hydrologic conditions on the site typical for this time of year? Yes X No (If no, explain in Remarks.) Are Vegetation Soil or Hydrology significantly disturbed? Are "Normal Circumstances" present? Yes X No Are Vegetation Soil or Hydrology naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS — Attach site map showing sampling point locations, transects, important features, etc. Hydrophytic Vegetation Present? Yes X No Is the Sampled Area Hydric Soil Present? Yes X No within a Wetland? Yes X No Wetland Hydrology Present? Yes X No Remarks: Wetland W1 is a small depressional wetlandlocated between W Chatham Street and multiple impervious parking lots. Wetland W1 drains into a culvert inlet under W Chatham St. HYDROLOGY Wetland Hydrology Indicators: Secondary Indicators (minimum of two required) Primary Indicators (minimum of one is required; check all that apply) _ Surface Soil Cracks (136) X Surface Water (Al) _True Aquatic Plants (1314) _ Sparsely Vegetated Concave Surface (138) _ High Water Table (A2) —Hydrogen Sulfide Odor (Cl) —Drainage Patterns (1310) _Saturation (A3) _Oxidized Rhizospheres on Living Roots (C3) —Moss Trim Lines (1316) —Water Marks (131) —Presence of Reduced Iron (C4) _ Dry -Season Water Table (C2) _Sediment Deposits (132) _Recent Iron Reduction in Tilled Soils (C6) _Crayfish Burrows (C8) X Drift Deposits (133) _Thin Muck Surface (C7) _ Saturation Visible on Aerial Imagery (C9) _Algal Mat or Crust (134) _Other (Explain in Remarks) _Stunted or Stressed Plants (D1) —Iron Deposits (135) _ Geomorphic Position (D2) —Inundation Visible on Aerial Imagery (137) —Shallow Aquitard (D3) X Water -Stained Leaves (139) _ Microtopographic Relief (D4) Aquatic Fauna (1313) FAC-Neutral Test (D5) Field Observations: Surface Water Present? Yes X No Depth (inches): Water Table Present? Yes No X Depth (inches): Saturation Present? Yes No X Depth (inches): Wetland Hydrology Present? Yes X No (includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Remarks: No saturation, surface water, or water table were observed at the data point; however, ponding was observed elsewhere within wetland W1. Hydrology within wetland W1 is primarily driven by impervious runoff. ENG FORM 6116-4, JUL 2018 Eastern Mountains and Piedmont —Version 2.0 VEGETATION (Four Strata) - Use scientific names of plants. Sampling Point: W1-WET Tree Stratum (Plot size: 30 ) 1. Acer rubrum 2. Liriodendron tulipifera 3. Salix nigra 4. Ulmus americana 5. 6. 7. Absolute Dominant Indicator % Cover Species? Status 5 Yes FAC 5 Yes FACU 5 Yes OBL 5 Yes FACW 20 =Total Cover 50% of total cover: 10 20% of total cover: 4 Sapling/Shrub Stratum (Plot size: 30 ) 1. Ligustrum sinense 15 Yes FACU 2. Ilex opaca 5 Yes FACU 3. 4. 5. 6. 7. 8. 9. 20 =Total Cover 50% of total cover: 10 20% of total cover: Herb Stratum (Plot size: 30 ) 1. Microstegium vimineum 20 Yes 2. Chasmanthium nitidum 20 Yes 3. Solidago bicolor 10 No 4. Aster spp. 5 No 5. 6. 7. 8. 9. 10. 11. 55 =Total Cover 50% of total cover: 28 20% of total cover: Woody Vine Stratum (Plot size: 30 ) 1. Smilax rotundifolia 10 Yes 2. 3. 4. 5. 4 FAC FACW UPL ff FAC 10 =Total Cover 50% of total cover: 5 20% of total cover: 2 Remarks: (Include photo numbers here or on a separate sheet.) Dominance Test worksheet: Number of Dominant Species That Are OBL, FACW, or FAC: 6 (A) Total Number of Dominant Species Across All Strata: 9 (B) Percent of Dominant Species That Are OBL, FACW, or FAC: 66.7% (A/B) Prevalence Index worksheet: Total % Cover of: Multiply by: OBL species 5 x 1 = 5 FACW species 25 x 2 = 50 FAC species 35 x 3 = 105 FACU species 25 x 4 = 100 UPL species 10 x 5 = 50 Column Totals: 100 (A) 310 (B) Prevalence Index = B/A = 3.10 Hydrophytic Vegetation Indicators: _ 1 - Rapid Test for Hydrophytic Vegetation X 2 - Dominance Test is >50% 3 - Prevalence Index is !2.0' 4 - Morphological Adaptations' (Provide supporting data in Remarks or on a separate sheet) Problematic Hydrophytic Vegetation' (Explain) 'Indicators of hydric soil and wetland hydrology must be present, unless disturbed or problematic. Definitions of Four Vegetation Strata: Tree - Woody plants, excluding vines, 3 in. (7.6 cm) or more in diameter at breast height (DBH), regardless of height. Sapling/Shrub - Woody plants, excluding vines, less than 3 in. DBH and greater than or equal to 3.28 ft (1 m) tall. Herb - All herbaceous (non -woody) plants, regardless of size, and woody plants less than 3.28 ft tall. Woody Vine - All woody vines greater than 3.28 ft in height. Hydrophytic Vegetation Present? Yes X No ENG FORM 6116-4, JUL 2018 Eastern Mountains and Piedmont -Version 2.0 SOIL Sampling Point: W1-WET Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix Redox Features (inches) Color (moist) % Color (moist) % Types Loc2 Texture Remarks 0-4 7.5YR 4/2 95 7.5YR 5/6 5 C M Loamy/Clayey Prominent redox concentrations 4-8 2.5YR 5/2 70 7.5YR 5/6 30 C M Loamy/Clayey Prominent redox concentrations 8-18 5G 7/2 35 7.5YR 5/8 30 C M Loamy/Clayey Dense. Some fill material observed. Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. 2Location: PL=Pore Lining, M=Matrix. Hydric Soil Indicators. Indicators for Problematic Hydric Soils3: _ Histosol (Al) _ Polyvalue Below Surface (S8) (MLRA 147, 148) _ 2 cm Muck (A10) (MLRA 147) Histic Epipedon (A2) _Thin Dark Surface (S9) (MLRA 147, 148) _Coast Prairie Redox (A16) —Black Histic (A3) —Loamy Mucky Mineral (F1) (MLRA 136) (MLRA 147, 148) —Hydrogen Sulfide (A4) —Loamy Gleyed Matrix (F2) —Piedmont Floodplain Soils (F19) —Stratified Layers (A5) X Depleted Matrix (F3) (MLRA 136, 147) _ 2 cm Muck (A10) (LRR N) _ Redox Dark Surface (F6) —Red Parent Material (F21) _ Depleted Below Dark Surface (A11) _ Depleted Dark Surface (F7) (outside MLRA 127, 147, 148) _Thick Dark Surface (Al2) _Redox Depressions (F8) _Very Shallow Dark Surface (F22) _Sandy Mucky Mineral (S1) _Iron -Manganese Masses (F12) (LRR N, _Other (Explain in Remarks) Gleyed Matrix (S4) MLRA 136) —Sandy —Sandy Redox (S5) _ Umbric Surface (F13) (MLRA 122, 136) 3Indicators of hydrophytic vegetation and —Stripped Matrix (S6) _ Piedmont Floodplain Soils (F19) (MLRA 148) wetland hydrology must be present, Dark Surface (S7) Red Parent Material (F21) (MLRA 127, 147, 148) unless disturbed or problematic. Restrictive Layer (if observed): Type: Depth (inches): Hydric Soil Present? Yes X No Remarks: No saturation, surface water, or water table were observed at the data point; however, ponding was observed elsewhere within wetland W1. Some mottled fill and gleyed soil colors were observed starting at 8 inches below the soil surface. The soil matrix was split from 8-18 inches of depth with soil colors of approximately 35% 5G 7/1 and 35% 5G 7/2. ENG FORM 6116-4, JUL 2018 Eastern Mountains and Piedmont —Version 2.0 O O PERMIT DRAWINGS CONNECTING CARY SIDEWALKS CARY, NC PROJECT A: ST4001 BOUNDARY ST FROM LOUBEN VALLEY CT TO N HARRISON AVE PROJECT B: ST1303 GREEN LEVEL CHURCH RD FROM BROOKS PARK LN TO GREEN HOPE SCHOOL RD, AND GREENWAY CONNECTION ON GREEN HOPE SCHOOL RD PROJECT C: ST1304 JENKS CARPENTER RD FROM DESHIRE MIST LN TO HIGH PROJECT REFERENCE NO. SHEET NO. 01775066 / DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION 75% PLANS PROJECT D: ST4004 SE CARY PKWY FROM 300 FT EAST OF TRYON RD TO LOCHMERE DR PROJECT E: ST4009 PITTARD SEARS RD FROM THE AMERICAN TOBACCO TRAILHEAD TO 500 FT WEST OF MCCONNEL LN PROJECT F: ST4010 WELDON RIDGE BLVD FROM 200 FT SOUTHEAST OF CARY GLEN BLVD TO ALDEN BRIDGE DR PROJECT G: ST4009 W CHATHAM ST FROM 300 FT SOUTHWEST OF TRIMBLE AVE TO SW MAYNARD RD SUMMARY TABLE SURFACE WATER IMPACTS PERMANENT PERMANENT STREAM TEMPORARY PERMANENT PERMANENT STREAM TEMPORARY SITE NUMBER STREAM IMPACTS STREAM STREAM IMPACTS STREAM IMPACTS (LOSS (NO LOSS OF IMPACTS (LF) IMPACTS (LOSS (NO LOSS OF IMPACTS (SF) OF WATER) (LF) WATER) (LF) OF WATER) (SF) WATER) (SF) 1 8 0 0 6 0 0 2 21 14 5 66 61 21 TOTAL 29 14 5 72 61 21 SUMMARY TABLE WETLAND IMPACTS SITE NUMBER PERMANENT (SF) TEMPORARY (SF) 1 890 545 2 0 0 TOTAL 890 545 SUMMARY TABLE BUFFER IMPACTS SITE NUMBER PERMANENT (SF) TEMPORARY (SF) ZONE 1 ZONE 2 ZONE 1 ZONE 2 1 1609 828 143 168 2 1966 1406 439 248 TOTAL 3575 1 2234 1 582 416 BEFORE YOU DIG STOP CALL 1 800 632-4949 �C. ONE -CALL CENTER IT'S THE LAW -fnQOJECT KELLY CHAPEL 7 � � � J = cr_ r; rej ��J~l w �U W Ix DDU e�� �eveL W -O � r � \1 54 ti0 540 gpIgTIO � RIMMON I PKWY F GREEN HOPE SCHOOL RD 540 wO REEK vE` `-t II SITE B FROJEC7 - `�o �cy� uF ,,u, , /� a7 / IMPACT SITE 1 - SEE SHEET 2-3 PERMANENT ZONE 1: 1,609 SF TEMPORARY ZONE 1: 143 SF PERMANENT ZONE 2: 828 SF TEMPORARY ZONE 2: 168 SF PERMANENT STREAM (LOSS OF WATER): 6 SF PERMANENT STREAM (NO LOSS OF WATER): 0 SF TEMPORARY STREAM: 0 SF PROJECT LOCATIONS This document, together with the concepts and designs presented herein, as an without written authorization and adaption by Kimley- Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. for which it was prepared. Reuse of and improper reliance on this document instrument of service, is intended only for the specific purpose and client. LAKE CRABTREE O� r r� ,rZSI I Pp�� I OHO R� T IMPACT SITE 2 - SEE SHEET 4-5 PERMANENT ZONE 1: 1,966 SF TEMPORARY ZONE 1: 439 SF PERMANENT ZONE 2: 1,406 SF TEMPORARY ZONE 2: 248 SF PERMANENT STREAM (LOSS OF WATER): 66 SF PERMANENT STREAM (NO LOSS OF WATER): 61 SF TEMPORARY STREAM: 21 SF N AsLury PROJECT G f "SW MAYNARD SE CARY PKWY i ROJECT P 1 i 64 i /�j P R� N SE CARYI PKWY Note: Not to Scale PLANS PREPARED FOR THE TOWN OF CARY BY: ■ Kim eye>> Horno2023 NC LICENSE #F-0102 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NORTH CAROLINA 27601 PHONE: (919) 677-2000 OWNER: TOWN OF CARY 316 N. ACADEMY STREET CARY, NC 27513 CHELSEA STERN (919) 469-4030 CHELSEA.STERN@CARYNC.GOV ENGINEER: KIMLEY-HORN AND ASSOCIATES, INC. 421 FAYETTEVILLE STREET SUITE 600 RALEIGH, NC 27601 CALEB LOWMAN, P.E. 919.677.2108 CALEB.LOWMAN@KIMLEY-HORN.COM SURVEYOR: WETHERILL ENGINEERING, INC. 1223 JONES FRANKLIN ROAD RALEIGH, NC 27606 TONY ALFORD, PLS 919.851.8077 TALFORD@WETHERILLENG.COM GRAPHIC SCALE io o zo PLANS 10 0 20 PROFILE (HORIZONTAL) 1 0 2 PROFILE (VERTICAL) O O PERMANENT STREAM IMPACTS (LOSS OF WATER) PERMANENT STREAM IMPACTS (NO LOSS OF WATER) TEMPORARY STREAM IMPACTS D ETAI L 1 -. PIPE OUTLET CHANNEL STABILIZATION OO ` oIto Scale) X Natural Bed Elevation atural Natural r6'uD Groun ` 1 $, ` Tuck Geotextile a Minimum of* ` \ Geotextile* ` (TYP) END CONSTRUCTION -L7 - ST A 18 +21.07 TIE TO EXISTING q0 +c -L7- PT Sto.19+I3J5 ` Chan (VariabBed !pilace Geotextile Under Riprap �+ �` Q ` Lenbt`i i �i5\Ft. Locations Directed by Engineer -Y7 PC .Jta 10+23e58 i Type of Liner=` CAL-1 Rip —Rap —Keyed—In ` ETF ETF ��TF -L7 - POC Sta 17 +73.69 1&00 TPH -Y7 - POT Sto. 10+00.00 O423.80' / INV OUT=411,54' i ` --- --- � 55 43 22.6 E v - . ETF ETF --_ ETF — _ ETF ETF ETF ETF �� • ' / • ' / /- 55 a• P� C RETAIN EXIST SYSTEM �' - - - - - • _ _ _ _ _ _ - _ ��! / �I �' , -' / -� / P TOP=419.4 �i S (Al NV IN=407,77 / / � INV OUT=407.70'.R�'Q/i - — — m EXIST G \ \ `�.5' - _ %- w ^ _ _ tcol- - EXIST / �l 6X` t\ 2 TYPE / � -1 � 19 �� S% O1 �' ! —� _ _ _ -, - --�� ,- - - _ -' pvC WRVS \1 C 5'=%_SAT&T Corp. \ , L, / - _ _ _ _ _ 4,5 - 8� / / ' PVC/ STUB ; - - sR /0// f�E-M E EXISTING _ _ ,/ 3• �\ �\ 1301SLOPF / ; 1 ;c� ® -- �_��� _cA/h GU_ -�---"�------ - - - - -- 18,5' EXIST s j// TYPE l l 20,R F 'fir I ❑/ fir- �0_C.$c0 RErq/N _ _ - _ O0� n /4.5' - - ' - - - REMOV cR OVE - _ �`- C&G c c - - - - - - - - 30' R • R I i 20 �q ' �,� `�►�� �� -REMOVE-C VERT- - L.5 \ _ . ` io ;' _ - _ - - _ _��' - - - - '=`�-_ _ - - AND END L - �RETan�C&G- '- : 25, /0' DETAIL 2 , - - ,h , , - / G — --��& - INV IN 42t ' INV �N=420 ' RETA�N , LATERAL 96SE .[}ITCH �a`� ' � ' / , - -� - - _ _ - - - _� - � - ' = `�`��+� �-�- � _ _ ���- - - �'�, ; � cR INV oU -G�.,_ _ _ - - - - ` ` Not to ' �Q I ,' .--------------- - - _-_ _ ` ETF - I /� , / - ti / / �' - ----------- 'SW[�,S — --_ _ `-rtfiF __-- / TYPE l /_ I /i� 15.,RCP-IV '� 8 .D TLE IRON, I, ' \ ---- - - - _ ____ _________ W�Si1l __ \1� _ _ _ - -/ I2 Natural .' ,, i0 I 1 CARY `/ / / -% ( , _ _ _ _ _ _ 41 5_ - _ _ _4�'� A.T&DRAINAGE _ _ - - J I 'iN - W - - lbll �W _ _ - -G L �' / ' 15 Q /❑ P / ,SPECIAL -MIN DEPTH�.Cg_F - ' / / ——FASEAIEtuT-- �''i 11 --- ----- _ - ---� / `' Ground ` / 1 1'%Ft. `� Slope / , - - - - - _ �- - - - - - - _ ❑ 2 .' , . / ,_ - - —CUL INS 4�8 / �: I_ I� ?. D ' , ' - - - (SEE NOTE) �/ €. I / \ d ♦ % ? , _ _ _- _ _ - TOP III - _ \ \ , Iur$�neotextl / ,-' �,' _ / /'30'SLpPE ' ,' �r - - --_- - - -_C 7LTN = Ir6T - _ , ' -' ' /� ' \ / ,' /' ,' �/ / i - - - - - - - ` �mwwlmum of Itt ' \ GeoteAtile - B _ - ' / �E ' (SEE A r` ' - - - - I , I I / - \ \ (, (TYP . / /NOTES , ' - 4, _ _ 1 �V / '� / / L 67' / I I When B is < b. ' n, / /,- - ,' // ,/ -,- - _ � �. ` 1 , I �• 1 , �,� - -Q � / � / /� 'I I Detail Applies. M, D = 1.5 -Ft. , - / /- - - _ _ _ BEG7ID CONSTRUCT ION fo Class I and II Ria-Rap _ - - �o - - _ - / ' / / ' Tr And All Widths for Class B Ri'p-Rap 'l B= 2.0 Ft. /, ' / '' ' ' -'TO ,', / ' � I ` I I \ , \ I / ' ,r J a L7- -SSTA 14+7�:91" S / TCE F • . / TCE LQ / I TCE 6PECIAL 2 SASE T'CH TlE/ TO EXISTING ��� C y 1`CE� �' WCL. BI RIP -RAP \ Type of Liner = CL. B Rip -Rap b= 5.0 Ft. , I , / _ _ - - \ yh,y . \ \ FROM -L7- S'TA. 16 + 21 TO STA. 17 + 3�. , - I , / ��J ,CE E , T CE \ \ \\ `�EE DE�AIOL 2 1' / 6 r, AC, TOWN OF CARY \ - I / 0' �8" DIP STAIN ��WER PIPE \ \ ►� / / I t 1 O , ' , ' . ' . ' I �p� •Q - ; �,' 20' CULVE - E ENSION ' I RIPRAP,,AT C VE T C►1�TLET \o �.p \ NEW MANHOLE CL.,I RIP- EST. 1jS TONS`` I 11 // ,� /� '� / ,'•', -' -' ' 'lp� /� 1 ^ �/ '\ SEE 15 .LOCA�;ON ly SIT 2� /�\ /30'-16"f CASEMENT PIPE-o���-- 1- 1 / / / \ NEiGv MAN LE -/ (330 PREPARED IN THE OFFICE OFo PROJECT-. ■ PROJECT G CONNECTING CARY INC LICENSE VILLE2 WETLAND AND STREAM SIDEWALKS REV. No.e REVISION° BATE: DRAWN BY: CHECKED Bv: INCOMPLETE PLANS 421 FAYETTEVILLE STREET, SUITE 600 uo xor USE F®ua aw nunmsu�°�oN NOT T T � SCALE R E E This document, together with the concepts and designs RALEIGH, NORTH CAROLINA 27601 g p g presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper Horn PHONE: (919)677.2000 PERMIT DRAWINGS reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. ©2023 shall be without liability to Kimley-Horn and Associates, Inc. JOB NUMBER° SHEET NUMBER° Copyright Kimley-Horn and Associates, Inc., 2023 01775066 PERMANENT IMPACTS ZONE 1 O O IC �! -Z �/ /� a�"�an 1 Al NA MAI L/ _/-/-/ / G TEMPORARY IMPACTS ZONE 1 PERMANENT IMPACTS ZONE 2 TEMPORARY IMPACTS ZONE 2 DETAIL 1 - \ PIPE OUTLET CHANNEL STABILIZATION OO atta Scale) —L7— PT Sto. /9+/3./5 E Natural Bed END CONSTRUCTION Alatural Natura 52` r u ElevationNot l —L7 — ST A 18 +2/.07 , 32 - o �O TIE TO EXISTING N 2 ` 1 5' ` Tuck Geotextile a Minimum of 1ft ` \ Geotextile* ' \ (NP) �/ �+ Q \b Chan Bed �Yace Geotextile Under Engineer —/ 7 PC StO. /0+23.5U rap i Len t�i — 1�Ft. ariabe Qcations Directed by Engineer i � Type of Liner=` QL—I Rip —Rap —Keyed—In ` ` ETF � ETF � ` Fr —L7 — POC Sto. 17 +73.69 = ` . ELF � � SSMH \ - `� / INV OUT=411.54' —Y7— POT StO. l�l+00.00 � / TOP=423.80' 1 . , F ° 43' 22.6" E �: 55, , /' - ss ETF� ETF/� / PVC TFtI) i ETF r=+— ETF � ETF O . ' / . ' S5 a� i RETAIN EXIST SYSTEM ETF,—_ - - - -ETF _ , _ - - TOP-419.4 INV IN=407.77 , - I z� INV OUT=407.70' EXIST `�:5' - %- w - ter — — " - ' ♦ EXIST / / �� , EX` N� 2 HAT ^,, —I , / , � - _ _ �Vy/ T m - - _ - _ ♦ C WRVS / \' 25� 0 5' �►�E AT&T Corp. TYPE l, - / ` -1 3.� — /9 _5� � � - _ � �4.5' � � a' P j ✓ 1 � / 3- PVC/ STUB 3 ` - - - - ' ,' ; I _ — 1C11(W CHATH REM E EXISTING Z _ _ - EXIST / TYPE l l 2� R F / t \ \ \o'S�op / 1 I� / - =__ -c- GU DRAIL - - - — -� ---'-` - _---\DW - 18.5' NfgsJ 1 1 / -Cg�T L,&-'�- _ - a'o� 14.5' _ - - 3 p� R REMOV E o`�-_- C--REMOERTc - - - - ,�GL'Jtt ,/� - _ _ ------___ ��� AND L TAIN C&G '--- �22.33¢¢ 5 IO P=y y ' ` \ \ DETAIL 2 _ - , - -1 ,yo - - - - _ --- - - - _ _ RE - _ _ _ _ - VV IN 420.£�{�' ' INV �N=420 ' RETAIN ` LATERAL, BASE DITCH y�a1� �� ' / � �- _ _ _ �R- - �r _ - _ _ _ - - _ _ _ _ _ _ _ �-'` _ _ \ --��& - � �1� - � � cR v ou=G2,13.1_ - � ouT�42o.45�/ �/ _ � ` \ �. (Not to Scale) �Q \ ------ - S -� - -ETf TYPE l -- - - -- \ ------- - - - -- -- I� - ---- --- _ _--iF_ - ---- ' I CB�FIrn 1 ♦, 15,RCP-IV 8'.D TLE IRON �\ .'/ /'---------_ -- - - [- -% _ ;� ��l 12'R , ♦,' Natura \ /' I - CARY ./ / / /' ! , \ - -' �. 41 5- - _ _ �5' _ litq E-D -'` _ �\/ ! ` _ > - _ ,N _- W�-G-RtLTW C-� , �''/ / / - '' ,5 RCw /❑ F / ,SPECIAL --MI DE TH,'CB-F _ _ j BIN I _ N P Ground ` , Ft. ����<v Slope 4 �'- '�i/� 11.E - - /- - - ' -,- /r /' ` - ' / / LL 2 / ♦' ,' ,' , / \ d ?. J D ; 20 / _ - - _ - ♦ - v+ , _ E r�LdTE)_/- T-0 tµ-� 5' - ' / -� — / - / / / ❑ ♦ / / , I 30' SLOP / ' - - l - / - - 11tl - 1:6 _ / - \ / / VM►R1Imum of 1ft . , , . , E "�q ♦ / ` _ - ,. \ Geotetdile _ B - / / _ _ _ - . / E (SEE h - �(T (TAP ' `I ' _ !/ / / / / / �— NOTEI ; ` V ♦ / J ' / 8 - _ / / 1 1\ L V 7' % ' `" c Detail Applies' -When B is < 6.0' _ _ M_ iA. D = 1.5 / , - / B 'G/N CONST RUCT ION'' /' ♦' / \ , _ / I` / I \/ t ' / - ! / IF'`�!— fo Class I and II Riga --Rap_ _ . d = T.0 -Ft. - /' / ' !' ' ' - / ' / ' ' ���� - / ' And All Widths for Class B Rip -Rap —L7— rSTA /4+7�:g/ �, �� W ODS \\ / ; / I —TCE / , I LQ B= 2.0 Ft. ! / SPECIAL 2 `SASE pl'TCH / TIE TO EXISTING ,' \ �� I ' �T CE—� , 1 Type of�Liner = CL. B Rip -Rap b= 5.0 Ft. I , ! _ _ _ _ \ ��ti - \ / E T\C- \ \ IIW/CL. B' RIP -RAP/ \\ 1 i / / ,' , `"' c�� ` \ \` `\ \ \ 'EST. 50 TONS / ,' / 6 r, AC, TOWN OF CARY FROM -L7- TrA. 16 + 21 TO STA. 17 + 3�. , ! , / , ' �PJ ,' ' '� \ $EE DE�AIL 2 RETAIN EWER PIPE-42 ' ►� / ' ' / ! 1 1 \ - ' ' • ' O ' ' ' ' ' - ' ' ' 1 A • Q - ; /,' / /' 20' CULVER E ENSION \ \ ,� \ \ \ \ \� ` ` / j ♦' /' ' ' / C, p RIPRAP AT C� T OJJTLET � \ NEW MANHOLE CL. I RIP-RAP%E 16 TON'& /� ��.��: �\ \. LOCA`T\ION 1 i �/ , ♦ / , . - , ' Q ♦ 1-' /' / 1 TST. 15 S.Y. Br I 1 , , , �♦ .' ,' .' '1° / ' ' / ' ' SEE DETAIL 1 ,' 3O`16'� CASEMENT PIPE �- - - - - - - - ' SIT 2 ' N,5GV MAN LE 1\ /'`i' 1 1 / 1 f' ♦' / 410- ♦ /If 7 PREPARED IN THE OFFICE OFo PROJECT-. PROJECT G CONNECTING CARY REV. No.e REVISION: BATE° DRAWN BYe CHECKED BY: NC LICENSE #F-0102 BUFFER INCOMPLETE PLANS N O T TO SCALE SIDEWALKS 421 FAYETTEVILLE STREET, SUITE 600 DO NOT USE FORRW ACaUISITV®N This document, together with the concepts and designs presented herein, as an instrument of service, is RALEIGH, NORTH CAROLINA 27601 intended only for the specific purpose and client for which it was prepared. Reuse of and improper im >)) Horn PHONE: (919) 677-2000 PERMIT DRAWINGS reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. ©2023 shall be without liability to Kimley-Horn and Associates, Inca JOB NUMBER° SHEET NUMBER° Copyright Kimley-Horn and Associates, Inc., 2023 0 1775066 O O CID CT n N O N N INDEX OF SHEETS SHEET NO. DESCRIPTION 1 TITLE SHEET 1 B CONVENTIONAL PLAN SHEET SYMBOLS 2A-1 THRU 2A-3 TYPICAL SECTIONS, PAVEMENT SCHEDULE AND MISCELLANEOUS DETAILS 213-1 AND 213-8 ROADWAY DETAILS 213-9 CURVE DATA SHEET 3A THRU 3G DRAINAGE SUMMARY SHEETS 4A AND 5A PROJECT A - ROADWAY PLANS AND PROFILES 4B THRU 6B PROJECT B - ROADWAY PLANS AND PROFILES 4C THRU 6C PROJECT C - ROADWAY PLANS AND PROFILES 4D THRU 7D PROJECT D - ROADWAY PLANS AND PROFILES 4E THRU 6E PROJECT E - ROADWAY PLANS AND PROFILES 4F AND 5F PROJECT F - ROADWAY PLANS AND PROFILES 4G AND 5G PROJECT G - ROADWAY PLANS AND PROFILES 4AS PROJECT A - SURVEY SHEET 4BS AND 513S PROJECT B - SURVEY SHEETS 4CS AND 5CS PROJECT C - SURVEY SHEETS 4DS AND 5DS PROJECT D - SURVEY SHEETS 4ES AND 5ES PROJECT E - SURVEY SHEETS 4FS PROJECT F - SURVEY SHEET 4GS PROJECT G - SURVEY SHEET TMP-1 THRU TMP-2 TRAFFIC MANAGEMENT PLANS TITLE SHEET AND DETAILS TMP-3A PROJECT A & B - PEDESTRIAN DETOUR PLAN SHEET TMP-313 PROJECT C - PEDESTRIAN DETOUR PLAN SHEET TMP-3C AND TMP-3D PROJECT D - PEDESTRIAN DETOUR PLAN SHEETS TMP-3E AND TMP-3F PROJECT F - PEDESTRIAN DETOUR PLAN SHEETS TMP-4A PROJECT A - TRAFFIC MANAGEMENT PLAN SHEET TMP-4B AND TMP-5B PROJECT B - TRAFFIC MANAGEMENT PLAN SHEETS TMP-4C AND TMP-5C PROJECT C - TRAFFIC MANAGEMENT PLAN SHEETS TMP-4D AND 5D PROJECT D - TRAFFIC MANAGEMENT PLAN SHEETS TMP-4E AND TMP-5E PROJECT E - TRAFFIC MANAGEMENT PLAN SHEETS TMP-4F PROJECT F - TRAFFIC MANAGEMENT PLAN SHEET TMP-4G PROJECT G - TRAFFIC MANAGEMENT PLAN SHEET PSP-1 PAVEMENT MARKING & SIGNING TITLE SHEET PSP-2 AND PSP-3 PAVEMENT MARKING & SIGNING DETAILS PSP-1A PROJECT A - PAVEMENT MARKING AND SIGNING SHEET PSP-1 B AND PSP-2B PROJECT B - PAVEMENT MARKING AND SIGNING SHEETS PSP-1C AND PSP-2C PROJECT C - PAVEMENT MARKING AND SIGNING SHEETS PSP-1 D AND PSP-2D PROJECT D - PAVEMENT MARKING AND SIGNING SHEETS PSP-1 E AND PSP-2E PROJECT E - PAVEMENT MARKING AND SIGNING SHEETS PSP-1 F PROJECT F - PAVEMENT MARKING AND SIGNING SHEET PSP-1G PROJECT G - PAVEMENT MARKING AND SIGNING SHEET EC-1 EROSION CONTROL TITLE SHEET EC-2A THRU EC-313 EROSION CONTROL DETAILS EC-4A AND EC-5A PROJECT A - EROSION CONTROL PLAN SHEETS EC-413 THRU EC-713 PROJECT B - EROSION CONTROL PLAN SHEETS EC-4C THRU EC-7C PROJECT C - EROSION CONTROL PLAN SHEETS EC-4D THRU EC-7D PROJECT D - EROSION CONTROL PLAN SHEETS EC-4E THRU EC-7E PROJECT E - EROSION CONTROL PLAN SHEETS EC-4F AND EC-5F PROJECT F - EROSION CONTROL PLAN SHEETS EC-4G AND EC-5G PROJECT G - EROSION CONTROL PLAN SHEETS UO-1A PROJECT A- UTILITIES BY OTHERS PLAN SHEET UO-1 B AND UO-213 PROJECT B - UTILITIES BY OTHERS PLAN SHEETS UO-1C AND UO-2C PROJECT C - UTILITIES BY OTHERS PLAN SHEETS UO-1 D AND UO-2D PROJECT D - UTILITIES BY OTHERS PLAN SHEETS UO-1 E AND UO-2E PROJECT E - UTILITIES BY OTHERS PLAN SHEETS UO-1 F PROJECT F - UTILITIES BY OTHERS PLAN SHEET UO-1G PROJECT G - UTILITIES BY OTHERS PLAN SHEET X-0 CROSS SECTION SHEET INDEX X-1A AND X-2A PROJECT A - CROSS SECTION SHEETS X-3B THRU X-713 PROJECT B - CROSS SECTION SHEETS X-8C THRU X-10C PROJECT C - CROSS SECTION SHEETS X-11 D THRU X-14D PROJECT D - CROSS SECTION SHEETS X-15E THRU X-17E PROJECT E - CROSS SECTION SHEETS X-18F THRU X-19F PROJECT F - CROSS SECTION SHEETS X-20G THRU X-21 G PROJECT G - CROSS SECTION SHEETS 2018 SPECIFICATIONS GRADE LINE: GRADING AND SURFACING: CLEARING: EFFECTIVE: 01-16-2018 REVISED: THE GRADE LINES SHOWN DENOTE THE FINISHED ELEVATION OF THE PROPOSED SURFACING AT GRADE POINTS SHOWN ON THE TYPICAL SECTIONS. GRADE LINES MAY BE ADJUSTED AT THEIR BEGINNING AND ENDING AND AT STRUCTURES AS DIRECTED BY THE ENGINEER IN ORDER TO SECURE A PROPER TIE-IN. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II. SHOULDER CONSTRUCTION: ASPHALT, EARTH, AND CONCRETE SHOULDER CONSTRUCTION ON THE HIGH SIDE OF SUPERELEVATED CURVES SHALL BE IN ACCORDANCE WITH STD. NO. 560.01 SIDE ROADS: GUARDRAIL: END BENTS: UTILITIES: THE CONTRACTOR WILL BE REQUIRED TO DO ALL NECESSARY WORK TO PROVIDE SUITABLE CONNECTIONS WITH ALL ROADS, STREETS, AND DRIVES ENTERING THIS PROJECT. THIS WORK WILL BE PAID FOR AT THE CONTRACT UNIT PRICE FOR THE PARTICULAR ITEMS INVOLVED. THE GUARDRAIL LOCATIONS SHOWN ON THE PLANS MAY BE ADJUSTED DURING CONSTRUCTION AS DIRECTED BY THE ENGINEER. THE CONTRACTOR SHOULD CONSULT WITH THE ENGINEER PRIOR TO ORDERING GUARDRAIL MATERIAL. THE ENGINEER SHALL CHECK THE STRUCTURE END BENT PLANS, DETAILS, AND CROSS- SECTION PRIOR TO SETTING OF THE SLOPE STAKES FOR THE EMBANKMENT OR EXCAVATION APPROACHING A BRIDGE. UTILITY OWNERS ON THIS PROJECT ARE DUKE ENERGY PROGRESS DOMINION ENERGY AT&T CHARTER -SPECTRUM GOOGLE FIBER MCI COMMINUNICAT IONS SERVICES TOWN OF CARY ANY RELOCATION OF EXISTING UTILITIES WILL BE ACCOMPLISHED BY OTHERS, EXCEPT AS SHOWN ON THE PLANS. CURB RAMPS CURB RAMPS ARE SHOWN ON THE PLANS AT APPROXIMATE LOCATIONS. CONSTRUCT ALL CURB RAMPS ACCORDANCE WITH STD 848.05, 848.06, AND/OR DETAILS IN THE PLANS. EFF. C REV. The following Roadway Standards as appear in "Roadway Standar N. C. Department of Transportation - Raleigh, N. C., Dated January and by reference hereby are considered a part of these plan STD.NO. TITLE DIVISION 2 - EARTHWORK Kimley))Horn ©2022 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NC 27601 PROJECT REFERENCE NO. SHEET NO. 0/775066 /A 1-16-2018 d Drawings" Highway , 2018 are applicable 5: Design Branch - to this project DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 200.02 Method of Clearing - Method II 225.02 Guide for Grading Subgrade - Secondary and Local DIVISION 3 - PIPE CULVERTS 300.01 Method of Pipe Installation DIVISION 4 - MAJOR STRUCTURES 422.02 Bridge Approach Fills - Type II Modiefied Approach Fill DIVISION 5 - SUBGRADE, BASES AND SHOULDERS 560.01 Method of Shoulder Construction - High Side of Superelevated Curve - Method I DIVISION 7 - CONCRETE PAVEMENTS AND SHOULDERS 700.05 Tying Proposed Pavement to Existing DIVISION 8 - INCIDENTALS 840.00 Concrete Base Pad for Drainage Structures 840.01 Brick Catch Basin - 12' thru 54" Pipe 840.02 Concrete Catch Basin - 12" thru 54" Pipe 840.03 Frame, Grates and Hood - for Use on Standard Catch Basin 840.14 Concrete Drop Inlet - 12" thru 30" Pipe 840.15 Brick Drop Inlet - 12' thru 30" Pipe 840.18 Concrete Grated Drop Inlet Type 'B' - 12" thru 36" Pipe 840.22 Frames and Wide Slot Sag Grates 840.24 Frames and Narrow Slot Sag Grates 840.32 Brick Junction Box - 12" thru 66" Pipe 840.51 Brick Manhole - 12' thru 36" Pipe 840.52 Precast Manhole - 4', 5', and 6' Diameter 840.53 Precast Manhole with Masonry Base - 12" thru 42" Pipe 840.54 Manhole Frame and Cover 840.66 Drainage Structure Steps 840.72 Pipe Collar 846.01 Concrete Curb,Gutter and Curb & Gutter 848.01 Concrete Sidewalk 848.05 Curb Ramp - Proposed Curb & Gutter 862.01 Guardrail Placement 862.02 Guardrail installation 862.03 Structure Anchor Units 876.02 Guide for Rip Rap at Pipe Outlets Note: Not to Scale PROJECT REFERENCE NO. SHEET NO. 01775066 /B O O o, a 0 ti O Q_ 5, Qz- 0 V) -114 ci C 0 v 1 0 L0 0 a a J CC N 0 N N BOUNDARIES AND PROPERTY.- State Line ----- ----- County Line --- ---- Township Line -- -- City Line - - Reservation Line Property Line Existing Iron Pin (EIP) O Computed Property Corner X Existing Concrete Monument (ECM) El ECM Parcel/Sequence Number @ Existing Fence Line —x x x— Proposed Woven Wire Fence Proposed Chain Link Fence Proposed Barbed Wire Fence Existing Wetland Boundary - - - -WLB- - - - Proposed Wetland Boundary WLB Existing Endangered Animal Boundary EAB Existing Endangered Plant Boundary EPB Existing Historic Property Boundary HPB Known Contamination Area: Soil55 Potential Contamination Area: Soil_5 Known Contamination Area: Water'"'" Potential Contamination Area: Water Contaminated Site: Known or Potential '•' BUILDINGS AND OTHER CULTURE: Gas Pump Vent or U/G Tank Cap O Sign O Well W w Small Mine 'SZ Foundation 0 Area Outline Cemetery r fi Building School Church Dam HYDROLOGY.- Stream or Body of Water .. ... Hydro, Pool or Reservoir Jurisdictional Stream ,S — Buffer Zone 1 Bz I Buffer Zone 2 Bz 2 Flow Arrow .. ... Disappearing Stream Spring Wetland Proposed Lateral, Tail, Head Ditch F" False Sump RAILROADS: Standard Gauge - RR Signal Milepost Switch RR Abandoned — RR Dismantled — CSX TRANSPORTATION MILEPOST 35 SWITCH RIGHT OF WAY & PROJECT CONTROL: Primary Horiz Control Point Primary Horiz and Vert Control Point Secondary Horiz and Vert Control Point Vertical Benchmark m Existing Right of Way Monument 0 Proposed Right of Way Monument (Rebar and Cap) Proposed Right of Way Monument (Concrete) Existing Permanent Easement Monument Proposed Permanent Easement Monument (Rebar and Cap) Existing C/A Monument Proposed C/A Monument (Rebar and Cap) Proposed C/A Monument (Concrete) Existing Right of Way Line Proposed Right of Way Line Existing Control of Access Line Proposed Control of Access Line Proposed ROW and CA Line Existing Easement Line Proposed Temporary Construction Easement - Proposed Temporary Drainage Easement Proposed Permanent Drainage Easement Proposed Permanent Drainage/Utility Easement Proposed Permanent Utility Easement Proposed Temporary Utility Easement Proposed Aerial Utility Easement Proposed Permanent Greenway Easement Proposed Permanent Sidewalk Easement Proposed Permanent Greenway and Drainage Easement -E- TCE TDE - PDE DUE PUE- TUE - AUE- PGE- SWE- PGDE ROADS AND RELATED FEATURES: Existing Edge of Pavement — Existing Curb — Proposed Slope Stakes Cut - - - C - - - Proposed Slope Stakes Fill - - - F - - - Proposed Curb Ramp CR Existing Metal Guardrail T T T Proposed Guardrail T T T T Existing Cable Guiderail n n n Proposed Cable Guiderail n n n n Equality Symbol Pavement Removal VEGETATION - Single Tree Single Shrub Woods Line Orchard 0 0 0 0 Vineyard F Vineyard EXISTING STRUCTURES: MAJOR: Bridge, Tunnel or Box Culvert cONc Bridge Wing Wall, Head Wall and End Wall - CONc ww MINOR: Head and End Wall cON_CH —w Pipe Culvert Footbridge >--------- Drainage Box: Catch Basin, DI or JB ❑CB Paved Ditch Gutter Storm Sewer Manhole OO Storm Sewer 5 UTILITIES: * SUE - Subsurface Utility Engineering LOS - Level of Service - A,B,C or D (Accuracy) POWER: Existing Power Pole Proposed Power Pole b Existing Joint Use Pole -� Proposed Joint Use Pole Power Manhole Power Line Tower Power Transformer U/G Power Cable Hand Hole H-Frame Pole U/G Power Line Test Hole (SUE - LOS A)* — m U/G Power Line (SUE - LOS B)* - - - -P- - - U/G Power Line (SUE - LOS C)* - -P- - U/G Power Line (SUE - LOS D)* P TELEPHONE: Existing Telephone Pole -♦ Proposed Telephone Pole -0- Telephone Manhole O Telephone Pedestal ❑T Telephone Cell Tower U/G Telephone Cable Hand Hole "H U/G Telephone Test Hole (SUE - LOS A)* — m U/G Telephone Cable (SUE - LOS B)* - - - -T- - - U/G Telephone Cable (SUE - LOS C)* - -T- - - U/G Telephone Cable (SUE - LOS D)* T U/G Telephone Conduit (SUE - LOS B)* - - - -TC- - - U/G Telephone Conduit (SUE - LOS C)* - -TC- - U/G Telephone Conduit (SUE - LOS D)* TC U/G Fiber Optics Cable (SUE - LOS B)* - - - -T FO— - - U/G Fiber Optics Cable (SUE - LOS C)* U/G Fiber Optics Cable (SUE - LOS D)* WATER: Water Manhole Water Meter Water Valve Water Hydrant U/G Water Line Test Hole (SUE - LOS A)* — U/G Water Line (SUE - LOS B)* U/G Water Line (SUE - LOS C)* U/G Water Line (SUE - LOS D)* Above Ground Water Line TV: TV Pedestal T / T 1 V 1 uWt:f U/G TV Cable Hand Hole U/G TV Test Hole (SUE - LOS A)* U/G TV Cable (SUE - LOS B)* U/G TV Cable (SUE - LOS C)* U/G TV Cable (SUE - LOS D)* U/G Fiber Optic Cable (SUE - LOS B)* U/G Fiber Optic Cable (SUE - LOS C)* U/G Fiber Optic Cable (SUE - LOS D)* GAS: Gas Valve Gas Meter U/G Gas Line Test Hole (SUE - LOS A)* U/G Gas Line (SUE - LOS B)* U/G Gas Line (SUE - LOS C)* U/G Gas Line (SUE - LOS D)* Above Ground Gas Line SANITARY SEWER: Sanitary Sewer Manhole Sanitary Sewer Cleanout U/G Sanitary Sewer Line Above Ground Sanitary Sewer SS Force Main Line Test Hole (SUE - LOS A)* SS Force Main Line (SUE - LOS B)* SS Force Main Line (SUE - LOS C)* SS Force Main Line (SUE - LOS D)* MISCELLANEOUS: Utility Pole Utility Pole with Base Utility Located Object Utility Traffic Signal Box Utility Unknown U/G Line (SUE - LOS B)* — U/G Tank; Water, Gas, Oil Underground Storage Tank, Approx. Loc. A/'G Tank; Water, Gas, Oil Geoenvironmental Boring Abandoned According to Utility Records End of Information - - T FO- - T FO 0 - - - -W- - - -W- - W A/G Water -TV- - - -TV- - TV -TV FO- - -TV FO- TV FO- -G- A/G Gas O SS A/G Sanitary Sewer m — — — —FSS— — — — —FSS— — FSS - 7UTL 0 UST 0 AATU R E.O.I. PAVEMENT SCHEDULE Cl PROPOSED APPROX l.5" ASPHALT CONCRETE SURFACE COURSE TYPE S9.5C, AT AN AVERAGE RATE OF 168 LBS. PER SO. YD. O O N N \ N PROJECT G (W -L7- I EXIST VARIES 16' - 20' I EXIST EXIST 2.5' i VARIES VARIES 4' - 6' 12' - 14' I I I EXIST _ r- - -- CHATHAM ST) /3.5' 5' T ) (S/ EXISTING SEE NOTE 7 GROUND TYPICAL SECTION NO. 13 S / A 14 f /6-9/ / U S / A l / +4y.JJ PROJECT -L7- i EXIST G (W CHATHAM ST) /4.5' I EXIST EXIST i VARIES 12' 0' - 2.5' I I i DCC/ EXIST _ (RI 13.5' 5' 5' SIDEWALK /. 0.02 D01 611(T s/ VAR 2.75' 3.9' EXISTING SEE NOTE 7 GROUND 49 , k, — — E/ v TYPICAL SECTION NO. 15 —L7 — ST A 29 f46.58 TO ST A 30 f41.41 REV. No.e REVISION: DATE° DRAWN BYe CHECKED BY: This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. Copyright Kimley-Horn and Associates, Inc., 2023 PREPARED IN THE OFFICE OFo C2 I PROPOSED APPROX.2" ASPHALT CONCRETE SURFACE COURSE TYPE S9.5B, AT AN AVERAGE RATE OF 224 LBS. PER SO. YD. IN EACH OF TWO LAYERS C3 I PROPOSED APPROX.3" ASPHALT CONCRETE SURFACE COURSE TYPE S9.5C, AT AN AVERAGE RATE OF 168 LBS. PER SO. YD. IN EACH OF TWO LAYERS PROPOSED APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE TYPE II9.00, DI AT AN AVERAGE RATE OF 456 LBS. PER SO. YD. E/ I PROPOSED APPROX. 5' ASPHALT CONCRETE BASE COURSE TYPE B25.00, AT AN AVERAGE RATE OF 456 LBS. PER SO. YD. J/ I PROPOSED APPROX. 6" AGGREGATE BASE COURSE RI I PROPOSED 2'-6" CONCRETE CURB & GUTTER S1 I PROPOSED 4" CONCRETE SIDEWALK S2 I PROPOSED 6" CONCRETE SIDEWALK T I EARTH MATERIAL PROJECT G (W CHATHAM ST) V 1 MILLING ASPHALT PAVEMENT, l.5" DEPTH -L7- U EXISTING PAVEMENT I EXIST VARIES 15.4' - 16.2' I EXIST EXIST VARIES 14' /.5' - 2' I t I i DCC/ EXIST _ (RI DI) I 116"(T SIDEW S/ /' EXISTING SEE NOTE 7 GROUND E/ TYPICAL SECTION NO. 14 —L7 — ST A 28 -�66.00 TO ST A 29 *18.69 • INC LICENSE #F-0102 Kimley))Horn 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NORTH CAROLINA 27601 PHONE: (919) 677-2000 ©2023 NOTES: I. REFER TO PLAN SHEETS FOR VARIABLE WIDTHS 2. REFER TO PLAN SHEETS FOR SPECIFIC SIDEWALK LOCATIONS. 3.REFER TO PLAN SHEETS FOR SAFETY FENCE LOCATIONS 4.SAWCUT AND REMOVE EXIST ASPHALT PAVEMENT TO PROVIDE 2' MINIMUM WIDTH 5.MILL EXISTING ASPHALT PAVEMENT TO A DEPTH THAT ALLOWS THE MINIMUM SURFACE COURSE DEPTH. & PAVEMENT EDGE SLOPES ARE l:l UNLESS OTHERWISE INDICATED. 7.PROVIDE MATTING FOR SOIL STABALIZATION WHEN SLOPES ARE 2.1. GENERAL GREENWAY NOTES: I. l0' MINIMUM VERTICAL CLEARANCE TO TREES 2.5' MINIMUM HORIZONTAL CLEARANCE FROM EDGE OF GREENWAY TO TREES OR SIGNS 3. PROVIDE A STANDARD METAL SAFETY FENCE FOR THE FOLLOWING CIRCUMSTANCES: SLOPE > 3:1AND DROP OF 6' OR GREATER SLOPE > 2:l AND DROP OF 4' OR GREATER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PROJECT-. CONNECTING CARY TYPICAL SECTIONS INCOMPLETE PLANS NOT TO SCALE SIDEWALKS m® NOT USE FORRW ACRUISITV®N JOB NUMBER° SHEET NUMBER° 01775066 2A-3 O O N N \ N STANDARD CURB TYPE 2'6„ JOINT FILLER: MAINTAIN 50FT MAX. BETWEEN 2'0" 6" 1 /2" RADIUS JOINTS OR AT ALL RIGID OBJECTS 3" RADIUS I TOP OF CURB /8" BAD 3" RADIUS � L 1 N o ZI - CD L`2 " w co a 0floaoa a° a0fle�o0a0ao0o0a °C) ao 0a apgaao 0 a0CaI aaaafla oOo{a�o°OaS'o{}}aa°oa ppflp agti 4 aao©Oofl0a a a OflOvCao0. 00 '306 0"00-0aas MINp 0 aOa0000��oO�ao a Cab STANDARD 30$$ CURB & GUTTER AGGREGATE BASE COURSE (A B.0 ) UNDER THE CURB & GUTTER SIDE VIEW 2" A U T PAVEMEN 12 INCH CURB SIDE VIEW 8,iL EFFECTIVE: 07/01/22 ALTERNATE CURB TYPES /R" R A D MEDIAN CURB & GUTTER SIDE VIEW 1 /8" RADIUS (TYPICAL) °ao aoav �0ao auo# va Ooa�oU°00 aVa V° u�a OCsl � OG700 Q, CI flo a 0 0 aka fl fl a�v� Voaa ba0�oaa0 oDO�O�oaaaOoflaa�� a ;00000 FRONT VIEW TRANSVERSE EXPANSION JOINT 2' 6' 15" RADIUS 6 5 " 30" g ° RADIUS SLOPE= 4,,/FT ° -D ° a s° ROLLED CURB 2'6' a sa -D ° CONCRETE BORDER CURB SIDE VIEW SIDE VIEW NOTES: 1 CONCRETE SHALL BE 3,000 P.S.I. 2, CONTRACTION JOINTS SHALL BE SPACED AT 10 FOOT INTERVALS. (A 15 FOOT SPACING WILL BE ALLOWED WHEN A MACHINE IS USED) 3. FINISH ALL CONCRETE WITH CURING COMPOUND, 4, REFER TO HCCDDOOM GET, 846,01 FOR CURB & GUTTER SUPERELEVATION RATES, DETAIL No. CONCRETE CURB AND GUTTER TYPES 01 00.01 BACK OF CURB SCORE FULL WIDTH OF CURB AND GUTTER z w m EDGE OF PAVEMENT w Q EL U PLAN o 0 w o < w m 2'6„ 6„ 1' 6„ 2' 6,9 6„ FACE OF CURB FRONT END N " G DETAIL No. STANDARD METHOD OF ENDING CURB AND GUTTER EFFECTIVE: 07/01/22 3100,13 REV. No.e REVISION: DATE: DRAWN BYe CHECKED BY: This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. Copyright Kimley-Horn and Associates, Inc., 2023 PREPARED IN THE OFFICE OFo PLAN VIEW 00 8„ EFFECTIVE: 07/01/22 DISSIPATE CURB BETWEEN THESE LIMITS N " G EFFECTIVE: 07/01/22 • INC LICENSE #F-0102 Kimley >>Horn 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NORTH CAROLINA 27601 PHONE: (919) 677-2000 ©2023 PLAN VIEW VARIES GRASSED UTILITY STRIP EXISTING 2'6" CURB AND GUTTER L 0.02' AFT PROPOSED SIDEWALK (CONCRETE 3000 P.S.I.) COMPACTED TO A DENSITY OF NO LESS THAN 95% TYPICAL SECTION JOINT FILLER /4"SIDEWALK SURFACE TRANSVERSE EXPANSION JOINT NOTES: 1. TRANSVERSE EXPANSION JOINTS TO BE A MAXIMUM OF 50 FEET, 2, ALL CONCRETE TO BE FINISHED WITH CURING COMPOUND. 3, A 6 INCH DEPTH IS REQUIRED AT LOCATIONS OF DRIVEWAY CROSSINGS, AT STREET INTERSECTIONS (ALONG THE LENGTH OF RADIUS CURB RETURNS), AND IN THE HANDICAP RAMPS. STANDARD CONCRETE SIDEWALK CONCRETE DRIVEWAY APRON WITH 6" MINIMUM THICKNESS EXISTING PAVEMENT DETAIL No. 3100,08 DRIVEWAY BY OTHERS WITH MAXIMUM RECOMMENDED GRADES 112" EXPANSION 55" JOINTS / COMPACTED BACKFIEE O 0 In ___4 - EXISTING CURB & GUTTER (TYPICAL) CONCRETE SIDEWALK W/ 6" MIN, THICKNESS TYPICAL SECTION NOTES: 1. CURB SHALL BE TAPERED TO FINISH FLUSH WITH SIDEWALK, 2, BEGINNING RADIUS SHALL NOT ENCROACH ON ADJACENT PROPERTIES BASED ON A PROJECTION OF THE PROPERTY LINE FROM THE RIGHT OF WAY TO THE CURB LINE. 3. SIDEWALK SECTION SHALL BE REQUIRED ALONG ALL STREETS, 4, CARY IS NOT RESPONSIBLE FOR VEHICLES THAT DRAG DUE TO GRADE OF DRIVEWAY, THE DRIVEWAY IS PRIVATELY MAINTAINED, 5, ALL CONCRETE SHALL BE 3,000 PSI, DRIVEWAY APRON - TYPE I & II DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 0 0 20 DETAILS INCOMPLETE PLANS m® NOT USE FOR RW ACD?UISITV®N DETAIL No. 220001 PROJECT-. CONNECTING CARY SIDEWALKS JOB NUMBER° SHEET NUMBER° 0 1 1775066 2B- I O O N N N ROADWAY PAVEMENT G EFFECTIVE: 07/01/22 BERM DESIRABLE DRIVEWAY GRADES BERM 6" 5' 0' 5' 0" 5' 0" 5' 0' +2W GRADE WHEN +2% GRADE WHENTHIS IS SIDEWALK THIS IS SIDEWALK LOCATION LOCATION +2% +160 5' 099 MAXIMUM DRIVEWAY GRADES DRIVEWAY APRON - TYPE I & II DETAIL No. DRIVEWAY GRADES 3200,02 PAVEMENT SHALL BE SAWN TO PROVIDE A CLEAN EDGE, CONCRETE PATCH SCORED JOINT WITH BITUMINOUS JOINT SEALANT. (TYPICAL) 3,000 P.S. EXISTING PAVEMENT PATCH SHALL BE 7" BINDER COURSE OR 7" 3,000 P.S.I. CONCRETE PER NOTE 2- 00 8, EFFECTIVE: 07/01 /22 DO NOT DISTURB EXISTING STCNE- -III:- -III SHALL BE GRANULAR MATERIAL OR FLOWABLE IL=III-���`<'''='-'�:-::;;-•::-:::�� ;:_: -_ =III _ _.'• IIIIII� DLL TO PREVENT SETTLEMENT (UNSUITABLE MATERIAL SHALL BE REPLACED) + 24 ASPHALT PAVEMENT SAWED PAVEMENT CUTS, REPLACE WITH 2" SURFACE COURSE. (TYPICAL) TUICTIM(- povTKKTnIT DO NOT DISTURB EXISTING STONE NOTES: 1. ALL PAVEMENT CUTS SHALL BE REPAIRED WITHIN A MAXIMUM OF THREE (3) DAYS FROM THE DATE THE CUT IS MADE, 2. CONCRETE TRENCH CAP ON ASPHALT STREETS SHALL BE USED ONLY DURING INCLEMENT WEATHER WHEN ASPHALT PLANTS ARE NOT OPERATING, 3. IN ALL OPEN TRENCHES, BACKCLL SHALL BE COMPACTED TO 95% MAXIMUM DRY DENSITY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING COMPACTION REQUIREMENTS BY SOILS TESTING CERTIFIED BY A LICENSED PROFESSIONAL GEOTECHNICAL ENGINEER. 4. BACKCLL WITH A HIGH CLAY CONTENT, HIGH SHRINK -SWELL POTENTIAL, OR HIGH MOISTURE CONTENT THAT CANNOT MEET COMPACTION REQUIREMENTS SHALL BE DEEMED UNSUITABLE AND SHALL BE REPLACED WITH SUITABLE BACKCLL MATERIAL, 5. ALL PAVEMENT PATCHES SHALL PROVIDE A UNIFORM AND SMOOTH DRIVING SURFACE, STANDARD TRENCH AND PAVEMENT REPAIR SECTIONS WATER, SEWER, RECLAIMED REV. No.e REVISION: DATE° DRAWN BYe CHECKED BY: This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. Copyright Kimley-Horn and Associates, Inc., 2023 PREPARED IN THE OFFICE OFo DETAIL No. 5000,M cn O cT i EOP 50" UTILITY STRIP 50" SIDEWALK CROSSWALK 50" MAXIMUM 50'� ................. ESIRED TTON LOCATION PUSHBUTTON LOCATION TWO CURB —CUT RAMPS EL O w w o W PUSHBUTTONS SHALL BE PLACED SO AS TO BE ACCESSIBLE AND CAPABLE OF PERMITTING THE INSTALLATION OF ACCESSIBLE PEDESTRIAN SIGNAL EQUIPMENT EFFECTIVE: 07/01 /22 LEGEND PEDESTRIAN PUSHBUTTON EOP EDGE OF PAVEMENT .... ..-..... DESIRED LOCATION �a 2„ MINIMUM COUNTDOWN PEDESTRIAN CROSSWALK SIGNAL WALK COUNTDOWN DON'T WALK T�_ i __T FLASHING SEQUENCE TYPICAL PEDESTRIAN SIGNAL INDICATIONS AND PUSHBUTTON LOCATIONS ASSE 1024 NO LEAD DUAL CHECK VALVE 1" METER NO LEAD BRASS EXPANSION CONNECTION TF ROADWAY :.,:. \//\//\//\//\//\// .., �._ .� - SIDEWALK'\\\\ \\ \\ \ XI I No LEAD FIR INLET WITH 1" No LEAD\i \\//\//\//\//\//\\//\\//\\ M P BY COMPRESSION JOINT 4 5° BEN D " TYPE "K" SOFT COPPER TUBING, WITH NO JOINTS OR COUPLINGS o AND COMPRESSION CONNECTIONS III I �``•" r'" NOTE: BURIED NO LEAD CURB STOP SHALL BE 't•Q�' •,.; 7W MARKING TAPE SHALL HAVE LOCATED WITHIN 2—FT OF METER BOX l.c " !?< z DETECTABLE MARKERS I11-111-1»-"c' roc EMBEDDED IN THE TAPE AND o SPACED ADEQUATELY TO III—III-1I1=1F PROVIDE CONTINUOUS ,III —III —III —I I I` DETECTION ALONG THE TAPE F 4—FT MINIMUM FROM ABOVE THE BURIED DEPTH. BEGIN III III„ I—III—III-1I1— I - PIPE AT FINAL GRADE TRANSITION AT EFFECTIVE: 07/01 /22 • INC LICENSE #F-0102 421 FAYETTEVILLE STREET, SUITE 600 im RALEIGH, NORTH CAROLINA 27601 PHONE: (919) 677-2000 © 2023 SIGNAL COLOR LEGEND PERSON WHITE HAND PORTLAND ORANGE NUMBERS PORTLAND ORANGE BACKGROUND BLACK DETAIL No. 3500,03 z€z o€w 2" READER �w n HOLE EXISTING GRADE NO LEAD\\%\\%\\%\\�\\��\���• Ttf BALL VALVE �`/ (2) LOCK NUT (2) o �� CAP OR OTHERWISE �► ®� PROTECT OUTLET 1" NO LEAD DP OUTLET "". (CARY MAINTENANCE ENDS AT OUTLET CONNECTION) I lz_ 2" .,-u''�-" II —III #57 t .cyt-„s�-jam ��t'r'"' NOTE: I— CONTRACTOR TO VERIFY WASHED STONE +✓'� ��I EXISTING SERVICE MATERIAL r ,c3t "-rr .N--III—I ON CUSTOMER SIDE AND -_y r'" I!a I�� �r �,�1=�r`f=�3—III—III=REPORT — RESULTS TO -111=1 11=1 I, ,III-1 11=1 11=1 11=111-111=111=1 I I-1 I I-1 I I-1 I I-1 I I-1 CARY PUBLIC WORKS, 45° III- I I_ 1127" TOP VIEW TO 11— —I� 32 LOCKING —I I —I 1= LID 6 0 ° 11—I 11—I 10 1I=I:, 1�1'1' —I=11 1�-- I• E N D II—II=II—I11= R12" VIEW bMEER OOPENING 2 8 1I— NO LEAD CORPORATION STOP o NOTES: 1 WATER METER SHALL NOT BE LOCATED IN AREAS SUBJECT TO VEHICULAR TRAFFIC. 2 ALL METER BOXES AND LIDS SHALL BE APPROVED BY CARY,188 OPENING 3 ALL SERVICE LINES, VALVES AND FITTINGS SHALL COMPLY WITH AWWA C800, 4. FOR NON—RESIDENTIAL APPLICATIONS THAT REQUIRE AN ABOVE —GROUND BACKFLOW PREVENTER, THE DUAL CHECK ASSEMBLY MAY BE OMITTED, 5 BOX AND LID SHALL BE CAST GRAY IRON, ASTM A48, CLASS 25 OR ASTM A126 CLASS B SIDE 6 ALL BRASS COMPONENTS SHALL BE 'NO LEAD' BRASS MEETING UNS C89833 AS PER ASTM B584 VIEW 9 7, ONE 2 OR 6 INCH GRADE ADJUSTER MAY BE UTILIZED WHEN NEEDED TO MEET FINAL GRADE (NO GRADE ADJUSTERS MAY BE USED ON NEW CONSTRUCTION PROJECTS), GRADE ADJUSTER AND BOX SHALL BE BY THE SAME MANUFACTURER.------.._ 8 APPROVED MARKING TAPE SHALL BE INSTALLED FOR ALL SERVICE CONNECTIONS FROM MAIN LINE TO METER FOR ALL NEW CONSTRUCTION OR RETROFIT INSTALLATIONS USING OPEN TRENCH METHODS. 29 9. WITHIN TOWNHOUSE DEVELOPMENTS, WATER SERVICES SHALL BE LOCATED WITHIN 4 FEET OF 2632 DRIVEWAYS IN ORDER TO MINIMIZE CONFLICTS BETWEEN SERVICE LINES AND TREES, STANDARD 1" WATER SERVICE & METER BOX INSTALLATION DETAIL No. FOR ROADWAY WITH CURB & GUTTER 6000,01 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 0 0 20 DETAILS INCOMPLETE PLANS 0)O NOT USE FOR RW ACQUISITV®N PROJECT-. CONNECTING CARY SIDEWALKS JOB NUMBER° SHEET NUMBER° 0 1 1775066 2B-2 O O c o, I L I O O ti 0 �o Q_ O 0 Qz- -114 N i Ci N c O v I 0 L0 ti O Q QZ O O I J Cc Y N N N 3, 2'0" o'o„ GRASSED SHOULDER 2" SUPERPAVE ASPHALT CONCRETE TYPE S9.5B PER HCDDo00 STANDARDS -0" 2% MAX. CROSS SLOPE TYP.) (2'-0" SHOULDERS CROSS SLOPED IN SAME DIRECTION AS TRAIL) 2'0" GRASSED SHOULDER CLEAN BACKFILL SEED AS SPECIFIED GEOTEXTILE FABRIC (SPEC. 9002) r'ie��S` -�= IIIIIIIIIIIII III COMPACTED PUBGRADE �6" AGGREGATE BASE COURSE UNDERLINED 100% COMPACTION WITH GEOTEXTILE FABRIC (SPEC 9002) TYPICAL SECTION 5 C' I 0 GD C' DLIGHT C) "// POLE o � I' 5' 0" MIN, PLAN VIEW NOTES: 1, NO ABOVE GROUND UTILITIES OR UTILITY SURFACE COVERS/PLATES/MANHOLES SHALL BE LOCATED WITHIN TRAIL AND SHALL BE MINIMUM 2 FEET FROM THE EDGE OF TRAIL. 2 TRAILS WILL MEANDER BUT SHALL BE LOCATED MINIMUM 5 FEET FROM THE BACK OF CURB, SIDE SLOPES SHALL NOT EXCEED 3:1, CUT U FILL SLOPES SHALL TIE INTO EXISTING SLOPES TO CREATE AN EVEN TRANSITION. µ u EFFECTIVE: 07/01 /22 A 0O'K STANDARD ASPHALT STREET -SIDE TRAIL LJ V T�� Aso A ISOMETRIC VIEW NOTES: 1, CONSTRUCT THE RAMP SURFACE TO BE STABLE, FIRM, AND SLIP RESISTANT. 2, LOCATE CURB RAMPS AND PLACE PEDESTRIAN CROSSWALK MARKINGS AS SHOWN IN THE PAVEMENT MARKING PLANS, CURB RAMP 2 0 DROP CURB DETECTABLE (EXISTING CURB & GUTTER SHOWN) WARNING DOMES 0 % MIN. 50FT RADIUS t ' n" TP A I I i 10'-0" GREENWAY GD F, F, n Go tu m 0 m MINIMUM 50" BETWEEN TRAIL AND PLANTINGS (SEE ADDITIONAL NOTES ON LANDSCAPING SHEETS) DETAIL No. 91 00, 04 2% MAXIMUM CROSS SLOPE 12:1 MAX. RAMP SECTION B—B GRASS STRIP 5-0" 10'-0" MINIMUM 5'-0" GRASS STRIP CURB DROP CURB CURB TRANSITION TRANSITION 10:1 to.t DETECTABLE TOP OF CURB -EXISTING VAR. LENGTH TO 12'-6" WARNING DOMES GREENWAY WITH VARIABLE SLOPE SECTION A -A GUTTER ELEVATION 5'-0" CURB GRASS EXISTING SIDEWALK STRIP —1 3. ALLOWABLE CROSS SLOPE ON SIDEWALKS AND CURB RAMPS WILL BE 2% MAXIMUM, EXPANSION JOINT (TYP.) 4. SMALL CHANNELIZATION ISLANDS THAT CAN NOT PROVIDE A 5'x10' LANDING AT THE TOP OF RAMPS, WILL BE CUT THROUGH LEVEL WITH THE SURFACE STREET, DETECTABLE WARNING DOMES E RAMP WIDTH AREA < y NOTES: y c DETECTABLE WARNING DOMES WILL COVER z O O O O O O BASE DIAMETER 2 FEET OF LENGTH AND FULL WIDTH OF 0.90"R TO 1.40"R THE RAMP FLOOR AS SHOWN ON THE z 0 0 0 0 0 d y �E) DETAILS w o 2. DETECTABLE WARNING DOMES WILL o Do @ @ @ @ @CONTRAST TOP DIAMETER OF VISIBILITY WITH ADJOINING NO LESS THEN SURFACE, EITHER LIGHT -ON -DARK, OR O O O O O 50% TO NO MORE w DARK -ON -LIGHT SEQUENCE COVERING THE THAN 65% OF THE ENTIRE RAMP, 0.9" BASE DIAMETER 6„ to 0,65" to NOT LESS THAN 2'-0" 1.4 MIN 2 4" FULL HEIGHT CURB �-----I " BETWEEN RAMPS NORi H R� 0 20 `.� THIS PORTION OF RAMP MUST oq 0 00 FALL WITHIN CROSSWALK LIMITS 1µ7 DETECTABLE WARNING DOMES EFFECTIVE: 07/01 /22 PLAN VIEW DUAL RAMPS ANY RADII (40" MIN. FLOOR WIDTH) NOTE: A PORTION OF ONE OR BOTH RAMPS MAY EXTEND OUTSIDE THE RETURN. 0- STANDARD GREENWAY CURB RAMP REV. No.e REVISION: DATE: DRAWN BYe CHECKED BY: This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. Copyright Kimley-Horn and Associates, Inc., 2023 10'-0" GREENWAY O',0 TRAIL , 5' 0" GRASS 10:1 STRIP CURB _f HI-VISIBILTY CROSSWALK DETAIL No. 920001 PREPARED IN THE OFFICE OFo ■ Klmley))Horn 2'0" GRASSED SHOULDER n (T /TT PROPOSED TRAIL (CONCRETE 3,000 P.S.I.) TYPICAL SECTION 2' 0' GRASSED SHOULDER COMPACTED TO A DENSITY OF NO LESS THAN 95% JOINT FILLER 4°' TRAIL SURFACE °-• ';:. 1 /8' RADIUS 1 2" TRANSVERSE EXPANSION JOINT µ H G� EFFECTIVE: 07/01 /22 €� 5 C' GDGj G­ C) o Fu W LIGHT 'f ' 0 C POLES ]j Fu C UP Fu 0 MIN. 50FT RADIUS 50' MIN. 10'0 TRAIL y.r PLAN VIEW NOTES: 1. TRANSVERSE EXPANSION JOINTS TO BE LOCATED AT JUNCTURE WITH STRUCTURES/BRIDGES/BOARDWALKS/UTILITY PLATES AND OTHER DIFFERENT TRAIL MATERIALS, 2 ALL CONCRETE TO BE FINISHED WITH CURING COMPOUND, 3. A 6 INCH DEPTH IS REQUIRED, 4, SAW CUT JOINTS TO WIDTH OF TRAIL. MAX "' SAW CUTS, 5. NO ABOVE GROUND UTILITIES OR UTILITY SURFACE COVERS/PLATES/MANHOLES SHALL BE LOCATED WITHIN TRAIL AND SHALL BE MINIMUM 2 FEET FROM THE EDGE OF TRAIL, 6, TRAILS WILL MEANDER BUT SHALL BE LOCATED MINIMUM 5 FEET FROM THE BACK OF CURB, 7, SIDE SLOPES SHALL NOT EXCEED 3:1, CUT & FILL SLOPES SHALL TIE INTO EXISTING SLOPES TO CREATE AN EVEN TRANSITION. n' STANDARD CONCRETE STREET -SIDE TRAIL MINIMUM 50" BETWEEN TRAIL AND PLANTINGS (SEE ADDITIONAL NOTES ON LANDSCAPING SHEETS) DETAIL No. 91 00, 05 RAMP WIDTH AREA 0.9" 6" CONCRETE TRAIL APRON EXPANSION JOINT EE Q @ @ @ @ @ BASE DIAMETER to 0,65" to WITH 6" MINIMUM w 0.90"R TO 1.40'R 4" MIN 2 4" THICKNESS 3,000 P S.I. 5'5" EXPANSION JOINT z O O O O O a ,..,. ;. 0.20„ 0 O O O O O O TOP DIAMETER OF 'a-.' SID �W%ALK TRAIL 5% MAX. O O O O O No LESS THEN EXISTING 1� 50% TO NO MORE �- PAVEMENT ' • ' THAN 65% OF THE — — — =III=III=III=. BASE DIAMETER -1 I I-1 I I-1 I I-1 I I=1 I I-1 I I-1 I L-1 I Ed I I-1 I" III-....III„�III�iIIIIIiIIII���III���I I, ,III ,III�iIIII„II1='' DETECTABLE WARNING DOMES COMPACTED BACKFILL DETECTABLE WARNING DOME NOTES: 1. DETECTABLE WARNING DOMES WILL COVER 2 FEET OF LENGTH TYPICAL SECTION AND FULL WIDTH OF THE RAMP FLOOR AS SHOWN ON THE DETAILS, 2. DETECTABLE WARNING DOMES WILL CONTRAST VISIBILITY WITH ADJOINING SURFACE, EITHER LIGHT -ON -DARK, OR DARK -ON -LIGHT SEQUENCE COVERING THE ENTIRE RAMP, 10 10.7% MAX RAMP SLOPE CROSS SLOPE: 2 00% 30 MAXIMUM CROSS SLOPE AND LONGITUDINAL SLOPE OF 2,00% TO DRAIN TO CURB, EFFECTIVE: 07/01/22 DETAIL MODIFIED BY KIMLEY-HORN INC LICENSE #F-0102 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NORTH CAROLINA 27601 PHONE: (919) 677-2000 ©2023 MIN. (TYPICAL) DETAILS 6" CONCRETE CURB 6" x 12" SIDEWALK WIDTH 50" MINIMUM UTILITY STRIP 50" MINIMUM J \\-- 2'6" CURB & GUTTER EXPANSION JOINT (TYPICAL) DETECTABLE WARNING SURFACE ISOMETRIC VIEW STANDARD GREENWAY DRIVEWAY APRON DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 10 0 20 INCOMPLETE PLANS m® NOT USE FOR RW ACQUISITV®N PROJECT-. DETAIL No. 9200,02 CONNECTING CARY SIDEWALKS JOB NUMBER° SHEET NUMBER° 0 1 1775066 2B-3 O 0 N N \ N 48" MIN. q 51/ " 13/4 „ MAX. 0 -I - 36" MIN. �IIII FOOTING DEPTH III - • •1 I'. • II_ �I I MINIMUM µ u EFFECTIVE: 07/01 /22 g5�2 33/" SPACING, EDGE TO EDGE STEEL FENCE INFORMATION MFG: AMERISTAR 1555 N. MINGO TULSA, OR, 74116 www, am eristarfen ce. com OR EQUIVALENT PHONE: 18883333422 TYPE: AEGIS PLUS STYLE: MAJESTIC 48", 3—RAIL x 8' NOMINAL PANEL COLOR: BLACK U 21/"sq. x 12ga. POST — 112"sq. FORERUNNER RAIL 3/4"sq. x 17ga. PICKET RAIL FLUSH WITH BOTTOM OF PICKETS "' FINISHED GROUND EXISTING SOIL CONCRETE FOOTING NOTE. MINIMUM 2 FEET CLEAR BETWEEN RAIL & TRAIL EDGE, STANDARD METAL SAFETY RAIL WITH VERTICAL PICKETS RIP PRRAP " APRON I �~ COMPACTED TO A DENSITY OF NO LESS THAN 95% GREENWAY TRAIL @ 20 SLOPE MKO C. V 0" MIN. COVER RCP @ 2% SLOPE (0.5W MIN_ 3% MAX.) LENGTH VARIES DETAIL No. 940001 SAFETY RAIL REQUIRED IF VERTICAL DROP AT HEADWALL OR FLARED END SECTION IS 30" OR GREATER, OR IF INDICATED ON PLANS SEE DETAIL 9400,01, \-- CLASS III REINFORCED CONCRETE PIPE (SIZED FILTER FABRIC PER CALCULATIONS BUT MINIMUM 15" DIAMETER) PROFILE VIEW NOTES: 1. PIPE SHALL BE SIZED BY ENGINEER WITH CALCULATIONS INCLUDED IN PLANS, BUT SHALL BE MINIMUM CLASS III REINFORCED CONCRETE PIPE, 15 INCH DIAMETER, 2. HEADWALLS, ENDWALLS, OR FLARED END SECTIONS SHALL BE INSTALLED AT ENDS OF PIPE. 3. BACKFILL PIPE TRENCH TO 95% COMPACTION PER AASHTO METHOD T99 AND TOC STANDARD 5020, 4. 2 FOOT GRASSED SHOULDERS AT MAXIMUM 2% CROSS SLOPE SHALL BE MAINTAINED. 5. MAXIMUM 3:1 SIDE SLOPES TO BE MAINTAINED BEYOND SHOULDERS. 3: f 2'0'' SHOULDER 2% CROSS SLOPE SAME DIRECTION AS TRAIL PLAN VIEW GREENWAY CULVERT REV. No.e REVISION: DATE° DRAWN BYe CHECKED BY: This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. Copyright Kimley-Horn and Associates, Inc., 2023 FLOW SEE NOTE 2 SAFETY RAIL SEE NOTE 6 PREPARED IN THE OFFICE OFo DETAIL No. 9600,01 POST END Fr' POST 4.5" 10 SLOT 4.5" SLOTS MINIMUM �, VIEW 00 8, EFFECTIVE: 07/01/22 NOTES: 1. ALL WOOD FOR SPOT RAIL FENCE TO BE PRESSURE TREATED, 2, END POST SHALL BE TERMINAL POST, 3, MINIMUM 2 FEET CLEAR BETWEEN FENCE & TRAIL EDGE, 1 0' 0" 10'x 3.5"x 1.5" RAILS WITH TAPERED TIPS TO MEET SLOTS POST (TYPICAL) EXISTING GRADE EXISTING SOIL 3.5" CONCRETE FOOTING FRONT VIEW STANDARD SPLIT -RAIL FENCE EXISTING CONCRETE DRIVEWAY �— VARIABLE WIDTH CONCRETE DRIVEEWAY4" C CONCRETE E -PATH SIDE -PATH SIDE -PATH VARIABLE WIDTH l0' CURB l0' CURB TRANSITION TRANSITION 6" VAR. 6'-0" TO l3'-0" +2X DETAIL 2 - BACK OF CURB DRIVEWAY DETAIL • INC LICENSE #F-0102 Klmley))Horn 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NORTH CAROLINA 27601 PHONE: (919) 677-2000 ©2023 CONCRETE 4" J� CONCRETE DRIVEWAY �A 4' MIN. 6" CONCRETE VAR. 10:1 , DRIVEWAY VAR. EDGE OF IDTH FULL PAVED SHOULDER (SEE TYPICAL) 2' PAVED SHOULDER DETAIL 1 - SHOWING STANDARD CURB & GUTTER FLAIR 6" 10" DETAIL No. 940002 NOTE: WORK ASSOCIATED WITH REINSTALLATION OF MAILBOXES AND CORE DRILLING IS INCIDENTAL TO THE SIDEWALK INSTALLATION. 4" Cl SIB )NCRETE EDGE OF IDTH FULL PAVED SHOULDER (SEE TYPICAL) 2' PAVED SHOULDER DETAIL 1 - SHOWING STANDARD CURB & GUTTER FLAIR 6" 10" DETAIL No. 940002 NOTE: WORK ASSOCIATED WITH REINSTALLATION OF MAILBOXES AND CORE DRILLING IS INCIDENTAL TO THE SIDEWALK INSTALLATION. 4" Cl SIB )NCRETE 4"CONCRETE E -PATH SIDE -PAT H l0:1 6" CONCRETE DRIVEWAY 6, l0 :1 COR HOL 8 MA12 r VARIABLE WIDTH 5' DETAIL 4 - PLACEMENT OF MAILBOX IN SIDEWALK DETAIL 3' MIN. MILLING LIMITS WHERE REOUIRED TO SMCUT AND MILL AOVERLAY p r EXISTING PAVEMENT TO INSTRI FULL DEPTH PAVEMENT. MILL P' TIE NEW PAVEMENT MIN MN BEYOND SAMIT LOCATION TO EXISTING I PRO R To SAwCUTriNs EXISTING �r,�� -- - - - - -- PAVEMENT AND INSTALLATOV OF NEW PAVEMENT AND/OR NEw CURB AND GIttER - - - NEW SECTION V / C / (SEE CORRESPONDING TYPICAL SECTIONS SAWCUT EXISTING FOR REQUIRED PAVEMENT STRUCTURE) PAVEMENT DETAIL 3 - MILLING AND SAWCUT DIMENSION DETAIL DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PROJECT-. E DRILLED FOR BOX POST 10 6 20 CONNECTING CARY DETAILS INCOMPLETE PLANS SIDEWALKS DO NOT USE FOR RW ACD?UISITV®N JOB NUMBER° SHEET NUMBER° 0 775066 2B-4 O O N N \ N coup �TLIrLralrr .r,IF CL� I 0 I S* ETFi I U w I EN h1}'GI- I _ KTDM %&i i:11I III RILL (dNV L� -0 _ LC Ir1 rF1 III rl r l Imo] rl I K r1 C LbW rill 14E 3F3111 C, TI I D r14.L 1. II IerEDTlxe 111sI'+1 II DDII 19 L L GO"l ■iT 4] 1 Carr+ Ml A3601111111 •w# F 111 13 Ill L:NT4A-3Iti'i{ . N [y4IkI.-�11111-L: Ill Mill M M II■a III a - CI■ IY+1! . •� rFLrr1 In In W Y¢� rHm Lr% rr i i r rhw r• 71 li' �1 R 'J ■ I _ 1 1' 1 11 ILI. WE ■t■ ■'J• �s I'. III Mff'W • FIIII 1l 1111711111111 ■ T=IIIII III E M Q9 Ili'G9 FIFJ■ � � II"'1■ III Qi ET'�1 �9•i'llvi'T■ ovill �� I I IIFI inill QLi E'er 1''1■ !'I'll [b■ G�?SI i'#�i � 1'I�II EIS �I FIICii E� ■ ■ r L14F� 1 ■ - � 1 rlwC� Isar � tp{r u: al 1 CL�4L � 11 4LII I Ir r 1■ I ft 11 I 1 i•Il 01-11 . r III 15F III DbmALF sIII III Ihe 1CIA LLL 01VACIII R IwfY, ■ ■ ISOM 13r r-1 L5L E QJ 1m 14• ■ 1 CTCSL.R I L- 7 r 1 , a EEC- I ON a -t 3ELTION *-A 1 I i' 2 1' C.L RM Q i7 Vil r■a1 Y111■ :INC •Ann III 1 �tC 1 IL I■]iY17 N IA: )A Il rr Ill YT rili � I 1 Yi I � Iti I li7 ■ 1 I 1L7IK 1IiliC iia• 111 10 MIN. 1111113111 '1-117 1 x I. 64-.05 1113TEi � -H } 1. X 74 1l T T H E RAW SURII TO 10 E STAI L E, F L Pill W:8 L I! R E I I STMT. err E DJ R E4 LW III E AS S 10" I N TIE PROM BIT Ill111'li. }L.1 ll 01h 49 03REl a n THE EW]NEER 2. mallrf OLIOR RAMPS uII} r. A0E PEOESTFITAll 007&ll W091 M l3 dWM 1Y THE I1•y4'IYENT MAMINO FLAIL • MEN FIELD 11 MLS'1'NEllTS FIEDIAIE ' � � �.-11= S. W M 0 R 04 P . � Ill � M R F+4'�'I'1, 4}MTMT �E � ] E+I I N MD ML 1 kWA-r )M 011 T OR L WATE 111 0; H Efl T E D BY T 1# E FQ M Ell XXM31 TE THE 0llRI RAMP AP40 THE PE0EaTP Ill GDXMMkLK I RKI*Ei& W A 4'X4' ELEM SPICE III- TM III OF THE UPREI• :IAF 03 LL FALL � � In � � Q NITIll TIE PEIEEITRIAN K LIME1.31 w 4. �ET MCK DIOTAII•GE :ROW IN83DE OF099ftll MR11111I TO NEAIE9T Ell DF Tk rEL LUE I9 4' Ii k:WLN. tk�; -W III tEll THE F WE k 11T ] NO P LAN N F DP Ull VA LDCNT DDIM S III S I GW I Z4 ] ■I T E I5 E G T[ 41l IF' A Pj6V E K 4 T P1LON 79 NUT N = NN: a ®, ODM III r E E 1 &ML O EI LI3M 1 E G T I FI =ffi -M Til HAI L-I)C#ITI OMS OF LO Cr T E j* DPI tEOTE1 ErY THE : N I M E EA. II rEFJM:14Lr1T E PAR KI M$ .k IE F11 gA OF N' ELIMC K OF A FrECIE" LlI 11 D R UMIll r. "MV'M%KT "I Rill -% RIM]N.■I 0 4' IIILl 1 u • X%i"IIIIJOT THE FlukkI.Ill III 8r II F F1Fif 6.99. ■%X]". Q. 1' ' EMILE THOUS ELF# ON $19F"l K6 AID DHAII WIMI RILL 9E F% NMWLl■.�III ' � ■ X%2 ' .JOT THE S I DE FL �F'E f t ,x IAJM �# 1�+. �t4 1JFI[a d 11� . J 41 . ' . -IRS-Ill THE C4aJMrEp &WE 111 11% !;L I I 19 T AT THE 5 E CC 1K III A0PI A WJ;XA Ia MIFTit f U*l T Fill I I I III . 'E. DMIErIll LAW I I III FOR 8I CE14L K A N I I I NLI DF LW E IT H A Nl I NLI R.OPE O F 2% : M +W DII1'E9F I M. C(M ER R III UlIk ):Iti IL{ I al null 1I iiFI[ill oF3'II:5 marl A Y0*111l lE EF MIN Iii'r'r' aI1I110Y. a. r'O 011E A Yl IS" AS A P EIIUM IJX RE L IDE AFMI N E I LU IBLNM MILL E E A It I M I Wli IN IF N] OE. C09 T R II NEE} I INN I S L N 09 O y ill HA lIk IM 1119 OA T1 AIL M T "H E MLO IO � r- 0 � ' i . Mill QW" Dl ISmO III " III FROY 1I IN V IV Lit i P IA -%T 71-R VP OF AIL FIAMW MILL *! OUT Ili RI L.I TI L NU-M 5 Ill REMADE 11TR E: ET. S. : Ill 141r111 PH 'l J:1 H R E r m l EIS aim Ill HE III #ill W-09 E F E 0 E 9 r R I Ike 11110 O W T 41 R 1116 LL 5' MIL K k,:�J T H E RAN . Tf Al AC ENT alA l E 12 F■ANT]NO OF GTFI=R KIN-MrIJ 16K EWRFIr.CE OR T}t 210E +LIPRII ZS &WI'A'MIALLr aOffTpLIC-Ea_ � • ' 9. n-A l A ) ' B P API SI DN JO 1 MT MH E F E THE C�,11I III :VW J 0{ M a THE C1.11% AS 434111 IN P OODIR I,Y 97IWI+Lq 0 0 RMI NO Mil 0 ' T. lJhl ALL P E D E 9 T R I ll Fl1 OUTTO E !M,C T LkT 0R5 AM CF_1g{j ] 43 GIEll Ir1E SKII114 TIE P ll OR AS S-K)W IN THE lilT'G}. � R■ -UM 41l T„FPUroH 11111111MIN JaUk1 I S;F1 E III AT PMAL CHOM I Ala I BITER FIN !§[T6L%■]t1a O-LL I!= MUIPLEP 11I ERE ] 41 m I -.r1 1;. 10'� Tt 0 THE G� "T E�4� 0S M a DEVE L mill MJN IT F 01 TH E DETA 1 1110 111 A IF E DIAL III III REV. No.e REVISION: DATE° DRAWN BYe CHECKED BY: This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. Copyright Kimley-Horn and Associates, Inc., 2023 W FT P or ■IDS PREPARED IN THE OFFICE OFo • INC LICENSE #F-0102 Klmley))Horn 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NORTH CAROLINA 27601 PHONE: (919) 677-2000 ©2023 �E E F j�TE i 1. _3E- lil [TYPE _jm �i#TL i M 1 1 III I III Will L IS I SE E h4 TE 1� 1111111 III L III WIFE I- —M 1 P FK}I(0 E a -11 0 FAA W L.rr'D] 09 PROVOED OR RnUFIE UMWLIf WN'Ii��i . l iT't'�I tz-�— i-M im- 5i T Fr LMTZII �_ _{w L[-III A" F 1146 CURB FFAMM AND E-kI G%NG S-I DEIIIALL WITH GRASS AT1JL111" 11 m1ki'll'I'llpri i' r r ej ~~� LI r ti W1' fli Z L 7 i �rw� s�_LrrlVl' E— III 1 (01.04 z 1IM •R■_�ILF 1 0 !J o - � 1 z � w �r .�, i ti5Y NUN 'I' ■ %L r z -fi� I-eiWil-,y x L. 1 { '• 1 r• r � TaMTRIC VIE1I� �'; 0 �ar .0 1 11 1 1 ���1 11 I 1 IYmr Will IN ■IFA :S OM1Rri r 0 D 111 4� III 10 V is 0 Q) 19 r *%M Lrr W r1 W iN. � 11IjC• [� 1- TI.1 } T.4 r r me- Orr'TUTAPIll 1M OINQ PDM 1 I FC -ti t- 1 II _ ti 1-.-4 - W1 q iC• 1 L WON • _ ll I I LI R 111 1 1 Ti }!■ IIt1 If -0- LIl R AM A. L L i I F7 L �V I F4 AAW C -WO ■J i DA ON I III 1111.1111. i. !W ■.C11 t'] I 011 CII 11171, M1Xn III to lilt 111 13 TKII L] 1■ T # III . [A III 120011�11! 13NI 4 Lei TR III x 1W EYM A III II M 4+ III %W11. w 11 411 IT I! IF Ill . ■,u 1 Rrl� ti rr r i1L • + - - ■ - L A414 V I K A L&I FriFF •4: b ti■ -A4 3111'111 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 10 0 20 DETAILS INCOMPLETE PLANS 0)O NOT USE FOR RW ACD?UISITV®N PROJECT-. 103 F 3- 1t06 t -jr Fjj �46 _- W� Ha~ LJ t r RL J III a 111 3 846 ■ ll 5 CY3 Kiz zi L W LL. T RIC III 3L1"1 I L CJ 3 -F -T II i 134a ■ 6 CONNECTING CARY SIDEWALKS JOB NUMBER° SHEET NUMBER° 0 1 1775066 2P-5 O O N N \ N L PR FIAMP5 hy0 EXI TIN I DEIVALIL j.a AENT TP CokjlREL { { ti Z L 96 L ti F , 1 or S ~ S r L IIN Ir Ir ~_ ' ~ ` ` ' 1 ' 1 % wAr Iti ti r Z yj MI% 1z irrr _ Pie 11 1! 1'lr id tiiMi 6EM 11W rim 4F6 h g %MR ub _! 11 .rL . 1 1_.a•F 33 lip L4 L{-11 -.F 1 Fi 14� ' K}YrT! r I•J I 31LI Ill -01.1 Qi••■ ■ I 1111 i - m _ ti • � mwmwi' '_rc 4 El Eau I nuamlll.l • r i1 TW a I'll CNI .1 UM III .M T3011231- r1 i L E.-Ill WMIM I 11 I I 11 I I 1 I_ I 1 I I TF-a RA" --A V— F!iil ML I1 rN1r � �— IT!! hKa! VI _ F % P-j f wrwpm W r r* Fes! a T4 III i ti �' mwni Am T PYI = a11 III " FAA r 11• UM J1a � 4F+ R U 101 F 1 �� ...,`J �r� . -1 1 36 �Til Y 71q im P crbn Lu r■ 1, s xL 0 s rM�� 1 r r 1 1• Fr,i!I I IM■MdTM �1111 CAN {■7iI =I LIL ! -:31iq= m s1ir1im Lw, DIETECIABL= WORM 111110 u• rr-r1 PLAN W I Fw III Fr 4 a1 ■ s r4 r1 {0■ ■1; F1 OM min", '6LI111 OAPIPE kNb EXITING $=aEWI IIII 1 1 I11 IIII 1I1 1u1 sir �ICTr •1 !I .7 F1 3 1 �IWALW _ •- r_ --- Nrr - ----■ N:1� 13 - s III (TYPI will 7� VaF' LINE2P ll 1 1� %■ 1 a_1u� • L'r P�1"C I0 BT*P LNE Ella �1 11 _,13' ITnI IN llil # � �V %% 1 1 [mT14e u4m-FIR -w-rill I YCAT:ll rr cI:R"� F X,21E . gDi !?Au {5 stir n-rr L 1 %rn R ES Ll FFAQ I NG PF!III M7S M"}q 0 FC8 E D UN PW R) LU X NO =M,i:%9 RE " FACI ND P WkEOT S - K C I T] 14Q lT Oran 1[ REV. No.e REVISION: DATE° DRAWN BYe CHECKED BY: This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. Copyright Kimley-Horn and Associates, Inc., 2023 JwJLAILlilIBLLE_1L�1��, .T1IM n u 1 PdiLY P RZ• 1 ] .. 1 1. 1 .. 1. ■ 1••�1 PREPARED IN THE OFFICE OFo 963 1- 3- n= _ j'g Q 1 W f7 1 � w it em ■ 06j 94D } Q pq �~ W w LL � O 111 !33 i 1C � � C H LM V3 7 Lei 1 , LLI 0 dc W FT L OF i Sa ■ RETR9FITT INCp CETECTJLELE N'AFtN1Nr, DQME!5 QMTQ EI15TI Kro FUFI EL NAMP r � � L LI < ar 11 -1 ?&i Y; ti f IIIi `� � ~ L Ir or .1r` IIIy L, LI Z L IL M;F6 ON IL QL _01 r L � ■ i L •',1a ti �2hL 11�� ti r � Ir IS ~ 4 YL 1 r J. - or ar IWRIETR IG VIA = Ill Lin -4 7 PUEN r III P1W er I FM11 5111, III W, 17 rre- n 1 r,ar rfw ■ 4S Y1 1 If ;aft i 1 r tiu _w 1.L9 L11O Cmht 16 maw k'-•d uovh N Y FLLL TLM I H& I Fh 1 W F LLM di iPbM ft L%M LL 7Js A. r_ l %LTF1il•11ii1iq ilI i R !II�111 4q�L� { 11I ql4 111! MT 11111 1 . UTECTAE LE WINS DOM • INC LICENSE #F-0102 Kimley))Horn 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NORTH CAROLINA 27601 PHONE: (919) 677-2000 ©2023 � r r L_ ----- r 6RT I M L-1 i J r YT"LL r ti ■■ swr I m A-.1 ilizuUmm f I 1 � I L L I� ti 1 S A z r ti ti � ti ti ti ti `1 L L ~ a yt Z 1 4 % f y r� �•.Ljr 7 7 _ i - ■ - - IL i L z y ~L, 1 rH1P mrvim GF y 64) 1 - .7 EL-IL.M M W 1 art IR' `= L- T 7 7 orIII P.P 1 PFI I P L PLAN %e I Ell 1IL 'TY OW Ill I ILe mm, r1pp wRq) n v 1.9; •1. -X tiI S T U C T T i E RW M rAl TD BE EI•" ABLF-■ F ] FN , AID BLIP R E [ STANT. CDN 91 R U.DT TFE X11I RAMP TYPE AS EI•LIMIl ] N THE PAVENE1 T WM 1 NE rLr.NS -iR AS DIRE;1E8 dW THE ENINEER. F. LWATE CURES ROARS AM RLABE PEHE T1 [1'I,■ 7i."LK PRFEN04 1%5 M I M TFE PhArIEPIll M'III III RLOI PKN FJELIP ADJOTPEITIF 1WAPE N' I MD CAI R B RAWO OFI NMKI MD•B 'S WWr OWWT -HE B[ OM W AM D E LI MEkTI D N Wn r DR Ul AB 0{ R E GTEEC} W THE E MD IN E E R 1 �. =R 0I ll I FE alB MUP U 0 1 H E P E DE ETA I AN O FI 19 MMk_ K WAR k [ NGS 80 A MI' K III V•L EAR fPII XT THE Ell OF THE CLM WN NI L L FALL NITNIN THE �EEA$TIB11i1u L EMS. jl•. SET Usk DIITAMM Fill I1EIDE ■ram3111d _0 kEXREST El l DF TRAMEL ukhE [IL V MINION. �. REFER -0 THE PAYaE 1T rARK I MD P Lfh L FOR M F RU LOT}! [ 0W AT $ ] &4L IZ E [ I M TER.EEGF I OM. IF Jk PX4 E WBhff Ufa{ ] M PLAN I9 MDT fIMIDED I C-)Wil TIC SINAL ENKM SW18N FOR "HE 9Iall &A LWATI NS CFI LNAT1E III 02RWED BY THE EP&IRFEA. I. TEF■11IILLTE PkRKINS r1 NINIUM DF 211 ELll 8f r1 PEDSTR I OA CRUMmK■ T. € 3MMICT CREW PM}a A N343NL1h 4F a' M:G=■ U. 04T9RCT TaE P�'A+IPG ALE �F THE RAW D. 1i1�'�;1 TUl■ D■ A L LOM U L E DWE18 furrtIE ON 9I0 E AUKS AM X11% RU P 11hI L _ BE 2. W 3 ■ 'D. C?Z43T9RCT TaE 'SOX FLARE PLOpE 1% MWLMA OF tin KEAMHED AJJNQ THE CURB LINE. --" %I TR IC T Ti E MMME4 :9 L91 E O F T H E GLITTJ3 OF aTIRE ET JILT THE Ell D F TH E DIJ R EI I1r1NP Ill SO MM D F Ei k AM ■1111 PITA Ilk! A 9il TRJk UT1ll #. OWSTRIIT L.khDIhM FM SIDE*ALK 1k 11NEWA 8F 41ll ill A MYIWLmi :RLDPE [F 2# EM! A' 82hEiCT:W , C6kffrWJCT LAW] N$9 FOR NEI I ISLill A MINIMA PF 0'0' 1ll A MXWLW 51 111 111 2% IN ANY 91-RE[TIN. X U U9E * MEICKN !hAM A& A PEDEILTLEAN UEFLI2E ANEill 1EUSM IK111 M tILL BE A MINCI M CF a' VIBE, m1'mT NEDw Ie.Lm0is Tr. Fes' I DE 3 A, QYM U1 THFDUSH17 TK 1!FLAW. 44. SULL CHANNEL 1ZFr10I 3:9L ANOB 1H-kT �M PI }IDW] BE 6 6 KEG' LAWIN AT THE TCP RF A :AM"* , MILL BE CUT THRUM LEVEL KITH TfE 90FACE STREE1 _ 'S. 84NI RkWPS M[TN PKTLMWEO CuRBC 111kY M LEM IS51LY WERE PEDMTh11w9 WiL.0 MDT NALK AMDU THE WW. THE iJ11 CENT fILT--ACr I PLAIT1NO W 91lo" MI-PLK I% WF1Q, O1 THE II0E vrRIII ;!S-SUSTAFTIIII III VWFI1111161I TE.Q. Al F L1l10E 1 1fi'' E XF18Y .,18I N T 41!'! N E' 'HE C5WA E T E CAB R kW 101 PA 'THE Dd R B AS SUL'mlllm 1 rr XMI& T 1kI1 MA C ORm ] rA 44d. [H -11 7. P LAI E .; L L P 2 DE SM I M F II RFT 1 i MI 11ffUill ITS 1M 7,1 $[ a 11 9 Will AS I tK" I k- HE IF_ ArA d R As $ H Wh I h THE h lid. 1 *6 D L R B Rol n+*11_r#I ME LAM I B•L.OJ)o- r 31 NGL E BAN Pik LT MAL CF0a9ftkL KS 0 R LJ 01 TED FM 1` r 91 Till 10 LEA, 19 LL BE HAMI97 E111tiL DETX ] L E. CFI TAM' THE =iVWM T 9 TAM 1' R D6 PJ'D DemELO PM E N T LI k I T F 20 The ipE'AI49 0 111 1k Irk!1 L ['E 9Ifl I . DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PROJECT-. 9 LL C u >r LIC Z P ~ Q P 1-I U u kiiT 84611,061 -aa1 . 1 1 11• 1 E.P�� ■ O 10 0 20 CONNECTING CARY DETAILS INCOMPLETE PLANS SIDEWALKS 0)® NOT USE FOR RW ACD?UISITV®N JOB NUMBER° SHEET NUMBER° 0 11775066 2B-6 O O N N \ N i Jl4i� iii� _ 1 1 mhllls%"® L - Lim SEEN L f■• LW A ii4= TYPE 2A rLL MULS' i lii0 J . _� P •', ■ ■ ■ EL J ■ moSCi3pm CEE d' ■ J' i SIC ME W .dd ii Lr -E ail rQ jmx.ti M JrSY 1 ■ - - � r rr _ _ . _ -Lr ■■■7� ■■� r r r . r rl 1 rr 1 r. r r ■r r■r r r }■ I I I I ■ ■■ err . p� L r ■... ■■ON 1 L' _ L 1 1. 11 1 r 11 I l r. . J I 1 rr L ■r ■rL 1 1 1 1 1 1 ■■ ■ Ir ■ ■L ■ ■ ■ ■r - r-- r rr r ', L i 6T A LQ MAP LLem Cc= Jim FIN �J ■ ■J+w �7"e i Ir r 1, JIC4a S Y !.J.tiif1 • Err,17J i i�i� r i7.G aS1■ JkG t d•�T�ii! a 71I ar aft I .4J07ad" nl RiY I dowc Jiirl RLrz % r - 1 ■'SJIi ■ ilin� � Or NINE W:r•M- ICE JiJlii !i w dll�l Moll I ■ ■ slr r1 mcw ■ � r I Pam" aAw L hill • 1 �r IWJ <W L it l• �Emb !I� ■Y �1,■1 rV 1 ■ ■� J 1 OWN RWS L F'i r L I r lc� PUN d MM RIII1i■1 01ev-:1 Lahr I P A PI1~Effl!4 T1W 411 T4W 4l§§� POW PPW 1 f a FROM NO P" NO IL RLr iii 1- M 1 1 ll A .ISLE • � 5 ac 6 _ lilllialSlao-"r _ r r rrr r — 50MaJ ■ilia _- iiiil�rW■. luuwl Ell" lai h6 &.Ii_ rl a•ll NEC r:nL T— IT-IE-11 W-11.0i3iF11:? % 10% ■■■■UNNEE 1 ■ 1 L r-L ■r ■■■■NE NONE ~ 5 ; - F _,r • J- % i � rx JJ ■ r JI J! JGi Clam ilam 3AM CO J JI�S�� tirl +� lido rr JF�IC�1 r] i REV. No.e REVISION: DATE° DRAWN BYe CHECKED BY: This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. Copyright Kimley-Horn and Associates, Inc., 2023 bmdmjbmmL— TV FFs PREPARED IN THE OFFICE OFo dr aomw I �RCiaw-- I � • r � r' �r � _ti _ ••rr~I• • =46 L % + 1 •� f ti IF jr it Sig � C� - � `!li ■ CO k � _ 1: r... ■JY 1:M d Lil 51ahzooh" EWMPM Lu ill P r No li, r fL f MqE fCS MINI —rams 1 r 1 J r l . L PCPMG r w M� — SII Ji7Y 7 ill ris S J i ! JY 11JS ■ra MON r■ 1 LU loso 1 CLT Jii MUW J17■C TYPE 2B C� �� J r 7 JlGlaiii J� 0 i C] a S! M r •ZIMUMn J I 1, i rA M i d i fA F OI - i LYE vair xam M3 DIY 33� am. � Uw a 1�1�■ � � ,ap,1 L - r ■� RI =.a • INC LICENSE #F-0102 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NORTH CAROLINA 27601 PHONE: (919) 677-2000 ©2023 s�z J l � 1 r} f r s L • tit a 11 •• 'J7 1 7�L. 11 � rl ■Yi. l J Fa NE JLJI 11 a CIE Ell LG+- W JUS A-LU U A L4LF:M 110 IMP FF3. 5 � fl i�kfr Ci W-bM rt rot AM r ' 1 ■ dIC I�i_S'It� 1 Lrrr � AM&" 1CrJIY77 III = rna LEI TYP E 7 iM RAM ' Jam- r■■1 � FM L OM FOR t OR A OM IW%■ 1'E 1 MM IIA RBI Al ilu OF TPI ■iI [L I T_j r MX �ICIL4LQi! "VIDati J Ea R A J rr M JLr l a i iimoq� ]1ID1 .4GIl Ql is r A %.D 1l CZZ TIW M5QN T7;PF,.a L.EA L A I I Q i LI&L �% � Am LLhr rsr JL1'L T 13E 0 ELII211 EUM JY■ILLI■J ■JJJ Lr! i i_ YL■-■ JON 1 1 • Qum Il r Ed Lm ar rum Lra h l ry , DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PROJECT-. 10 0 20 CONNECTING CARY DETAILS INCOMPLETE PLANS SIDEWALKS 0)® NOT USE FOR RW ACD?UISITRON JOB NUMBER° SHEET NUMBER° 0 1 1775066 2B-7 O O N N \ N C f r 10'N FFJI3-M 3dId ,airs nhia 11z i tv SAVIINDIN --M NOISIA M NI Ho1vo 313 H a No 0 N J A3 0 WnWI N I w AD 31VIG HD3 IDN:Ml I r''13G H31 I DPI 3 i LL r Ly" 9F Tr � * - r o � 16 1 , 1 I■ t i � I -30 NNI r. Y -rLLr 1� IV r 17r 1 1 1 •'■ •iyJ .- ■ % 1 1 i STAT r Or EMGLI &I I DETAIL DRAWING F049 CY H 1H CIHOL I HA MINIMUM DEPTH EEPT, OF TRANS Il'O lIk 1 A 1 t ON DIVISION OF HIGHWAYS CONCRETE CATCH NWIN RALEIW, N.C. 12" THRU 84" PIPE REV. No.e REVISION: DATE° DRAWN BYe CHECKED BY: This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. Copyright Kimley-Horn and Associates, Inc., 2023 PREPARED IN THE OFFICE OFo 03ON +HIDz31va 3dId „vs ndi'i 1Z l SAVMHD I H -�O N0131AIa N I GV9 H 31YO 313:13 N 0 3 J Q FJ� t l�1Hl���l�k�dl �� •1�3� � 1 � 3 � Wi1 W� I� � W "1� Q H11 ON 3� 31 1 bIOJ UFO I�'k�Q 11Y...30 H5 I �0N31 s J t 1 1 — W a Z �i ' H Z � W } LW ■J Y � o u ir1 y j ,n,. um r0 W 1 G L S Q L-1 or Q I � 25 i •1 I „" W o I 1Y z � +2 tiz I■■I LU i �a a�1*043mo ■ ■ 1 ■ ■ 1 ■ 01�� ■ ■ �q ■ CRa1 ■ ■ - ' � n W Y X 3 ■1 - 1� z Q. o o a o m a a `0 3rj ■ 1 1 - 1-� -11 r 11 .4 #; 1 T ■ r•1 C•1 ## 14 0 0 1p� F aCa 0 6 g1 0 - ■ —i5po C o 0 0 0 0C; o 0 0 ■ N 1 •1 IV" _ 1•_ F 1 •� i'IL L 1 r ■ i .0 rti X 1 I.. - r7 0 rt t ' I 14 rl PS x n {4 M n P% T -6 Y ..1 Q Y ■ ■ 1 I 1 - 1 ■: * 0 it FI F ■ 0 0 3 ' E - ■ ■ F■ k:, ■ - - A A 5G IA 0 4 {� 1 i f I J•- - - sm r fl ■zo r- ■ L i ■ ■ 1 ■ ■ 1 � 1 1 1 ■1 W 0 Q F ;L- W ■ 1-1 IN Y . ■a1 16 r . . � ■Iti a r11 - i w 0 i . . 1 ■ . 1 . 1 F 1 - 4114 Q a r 931� iti12.1-90 o�vr- rl' �D s ■ � I 1 U ■ 0 1 0 ■ F1 ■ ■ 1 r 0 1 r- 1 d 1 - .+ 14 ■ V 0 0 ■ r- O 0 2 Wr. 6 1 ■ ■ 1 . . 1 , 1 1 1 i t F JJ O ■ M 1 r d ■ r ■ ■ 0 1 ■ �5i ■ ■ ■ O 1 ■ N ■ r ■ ■ 0 1 ■ {M ■ 0 1 M 1 ■ M 1 11 A r•1 -x r11 41 r 1 A �51 41 M M ■ o ■ a r ■ o ■ 0 r ■ 0 ■ 0 r ■ 0 ■ o 0 ■ 0 { 1 ■ ■ 1 ■ ■ 1 ■ ■ 1 ■ 1 1 1 Q¢ 0 A C7 A 0 14 0 {r1 Cl F3 ill 111,1 144 ,h H F -fl F STATF OF r %ir I t SH DF-TAT L DRAWING FOR rQ NORTH GAR LINA MINIMUM IDE PT H 0 aEPt. OF ICI f11 P p r r ihl CONCRETE CATCH BASIN �' 0 DIVISION OF HIGIMMYSra TH RL� H '' I HE IALEIGHt N.C. r � • INC LICENSE #F-0102 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NORTH CAROLINA 27601 PHONE: (919) 677-2000 Klmley))Horn © 2023 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PROJECT-. FM9.0R17r C*row FP C•I40L • bb � A" . R�FLrTLirr L LQ rr:L M C 10 0 20 CONNECTING CARY INCOMPLETE PLANS I I ISIDEWALKS 0)® NOT USE FOR RW ACD?UISITV®N JOB NUMBER° SHEET NUMBER° 0 1 1775066 2B-8 O O N N N P1 Sto l0 +23.26 A = 27° 29' 14.5" (LT) D = 57° l7' 44.8' L = 47.97' T = 24.46' R = 100.00' Pl Sto 16+24.63 A = 36° 48' 05.5" (LT) D = 22° 55' 05.9" L = 160.58" T = 83.17' R = 250.00' P1 Sto 20+77.62 A = 17° 53' 59.7" (LT) D = 22° 55' 05.9" L = 78.10' T = 39.37' R = 250.00" -L4- CURVE DATA Pl Sto 23+22.15 A = 52° 4/' 34.5" (LT) D = X 54' 58.8" L = 1,345.47" T = 724.54" R = 1,463.00" -L2A- CURVE DATA Pl Sto 11+08.70 A = 27' 49' 24.5" (RT) D = 2Z 55' 05.9" L = 121.40' T = 61.92' R = 250.00' P1 Sto 17+32.91 A = 7° 03' 57.F (RT) D = li 27' 33.0" L = 61.66' T = 30.87' R = 500.00" Pl Sto 2/ +39.42 A = /0° 32' 32.0" (RT) D = 22° 55' 05.9' L = 46.00' T = 23.06' R = 250.00' Pl Sto 14+0/.0/ A = /9 37' 45.5" (LT) D = 7° 38' 22.0" L = 139.14" T = 69.77' R = 750.00" Pl Sto l5 +05.98 A = 8° 08' 42.r (RT) D = ll° 27' 33.0" L = 71.08' T = 35.60' R = 500.00" -Y2A- CURVE DATA P1 Sto l5 +65.40 A = 38° 49' 19.5" (LT) D = 8° 02' 29.4' L = 482.77" T = 251.07" R = 712.50" -L2B - CURVE DATA Pl Sto 10+21.66 A = 5/° 4/' 09.2" (RT) D = 143° l4' 22.0" L = 36.08' T = 19.37' R = 40.00' -Y2B- CURVE DATA Pl Sto 14 +14.79 A = 2° 33' 29.0" (LT) D = 3° 42' 13.0" L = 69.07' T = 34.54' R = 35.00' Pl Sto 18+36.77 Pl Sto 19+74.14 Pl Sto 10+52.52 A = ll° 55' 07.5" (LT) A = /4° 46' 30.2' (RT) A = l5° 59' 25.3' (LT ) D = 8° ll' 06.4' D = ll° 27' 33.0" D = 139° 36' 56.5' L = 145.62" L = 128.94' L = 11.45' T = 73.07' T = 64.83' T = 5.76' R = 700.00" R = 500.00' R = 41.04' Pl Sto 14+35.03 A = 40° 12' 35.r (LT) D = 6° 44' 55.0' L = 595.82' T = 3/0.77' R = 849.00' Pl Sto 3/ +75.90 A = 12° 30' 57.9" (LT ) D = 6° 10' 02.9" L = 202.94" T = 10/.87' R = 929.00' -L7 - CURVE DATA Pl Sto 16 +15.08 A = 67° 57' 44.4" (LT ) L = 690.35" T = 392.29" R=582.00' -Y7 - CURVE DATA Pl Sto 11+06.55 A = 54° 49' 13.9" (RT ) D = 35° 48' 35.5" L = 153.09" T = 82.97' R = 160.00' Pl Sto 29+67.30 A = 6° 58' 19.1" (RT) D = 6° 44' 26.4" L = 103.43' T = 51.78' R = 850.00" -Y5 - CURVE DATA Pl Sto 17 +62.03 A = i 36' 07.0' (RT) D = l° 54' 337 L = 83.90' T = 4/.95' R = 3,000.77" P1 Sto 22 +76.52 A = 33° 05' 55.4' (LT ) D = 5° 44' 07J" L = 577.10" T = 296.85" R = 999.00" REV. No.e REVISION: DATE° DRAWN BYe CHECKED BY: This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. Copyright Kimley-Horn and Associates, Inc., 2023 PREPARED IN THE OFFICE OFo P1 Sto 27 +58.65 A = i 18' 30.2' (RT) D = 0° 52' 52.8" L = 148.45" T = 74.23' R = 6,501.00" Pl Sto 11 +21.36 A = 9° l0' 56.4" (LT ) D = ll° 27' 33.0" L = 80.13' T = 40J5' R = 500.00" Pl Sto 14 +36.65 A = 32° 40' 03.6" (LT) D = 85° 30' 57.9" L = 38.20' T = 19.64' R = 67.00' Pl Sto 16 +93.84 A = 27° 29' 13.8' (RT ) D = 40° 38' 07J" L = 67.64' T = 34.49' R = 141.00' Pl Sto 19+96.21 A = X 5/' 47.5" (RT) D = 3° 00' 56.0' L = 128J1' T = 64.08' R = 1,900.00" P1 Sto 26 +09.27 A = l3° 17' 36.4" (LT ) D = 5° 43' 46.5" L = 232.01' T = 116.53' R = 1,000.00' Pl Sto 3/+79.15 A = X 54' 3/.3' (RT ) D = 19° 05' 54.9" L = 20.47' T = 10.24' R = 300.00" • INC LICENSE #F-0102 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NORTH CAROLINA 27601 PHONE: (919) 677-2000 Klmley))Horn © 2023 L3- CURVE DATA Pl Sto 18 +49.39 Pl Sto l5 +32.37 Pl Sto 2/ +53.53 Pl Sto 23 +78.37 A = 8° 56' 03.5" (LT) A = 33° 58' 30.2" (LT) A = 17° 20' 44.r (LT) A = 47° 32' 58.6' (RT ) D = 3° 05' 49.4" D = 9° 32' 57.5" D = 8° 48' 53.0' D = 3/° 49' 5/.6' L = 288.48" L = 355.79" L = 196.78" L = 149.38" T = 144.53' T = 183.30" T = 99.15' T = 79.29' R = 1,850.00" R = 600.00" R = 650.00" R = 180.00' -L5 - CURVE DATA Pl Sto 11+86.86 A = li 39' 26.9" (RT) D = 22° 55' 05.9" L = 50.87' T = 25.52' R = 250.00� Pl Sto l5 +03.88 A = 8° 58' 362' (RT) D = 9° 14' 28.5' L = 97.14' T = 48.67' R = 620.00" Pl Sto 17+91.81 A = 16° 25' 3/.5" (LT) D = 32° 44' 25.6' L = 50.17' T = 25.26' R = 175.00' Pl Sto 2/+18.93 A = 8° 08' 12.3' (LT) D = 6° 56' 38.6" L = 117J8' T = 58.69' R = 825J1' P1 Sto 27+54.88 A = 6' 53' 42.9" (RT) D = li 27' 33.0" L = 60.17' T = 30J2' R = 500.00" Pl Sto 12 +95.92 A = 6° 58' 58.8" (LT ) D = 16° 5/' 06.1' L = 41.44' T = 20.74' R = 340.00' Pl Sto 16 +00.87 A = 19° 59' 39J' (RT ) D = 38° ll' 49.9" L = 52.34' T = 26.44' R = 150.00' Pl Sto 18+69.11 A = 19° 2/' 42J" (RT) D = 45° 50' 11.8" L = 42.24' T = 21.32' R = 125.00" Pl Sto 23 +46.84 A = IF 47' 49.3" (LT) D=11*27'33.0" L = 164.04" T = 82.76' R=500.00' Pl Sto 28+72.55 A = 6° 34' 18.5" (RT) D = ll° 27' 33.0" L = 57.35' T = 28.7/' R = 500.00" CURVE DATA Pl Sto 13+86.39 A = 9° /5' 18.9" (RT ) D = l5° 04' 40.2' L = 61.38' T = 30.76' R = 380.00' Pl Sto 16+43.66 A = 37° 19' 57.9" (LT ) D = 114' 35' 29.6" L = 32.58' T = 16.89' R = 50.00' Pl Sto 19+11.51 A = 28° 03' 13.0" (LT ) D = 66° 37' 22.8' L = 42.1/' T = 21.48' R = 86.00' Pl Sto 24+60.61 A = 14° 48' 43.2" (RT) D = 22° 55' 05.9" L = 64.63' T = 32.50' R = 250.00' Pl Sto 29+99.50 A = 22° 14' 45.5" (LT) D = li 27' 33.0' L = 194.13" T = 98.30' R = 500.00" -L6 - CURVE DATA P1 Sto 20+18.81 A = 16° 16' 58.6" (LT) D = 8° ll' 06.4" L = 198.93" T = 100.14" R = 700.00" DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 10 0 20 INCOMPLETE PLANS m® NOT USE FOR RW ACQUISITV®N PROJECT-. JOB NUMBER° CONNECTING CARY SIDEWALKS 0 1 1775066 SHEET NUMBER° 2B-9 M.= MEMS Em- ■■- ■■- .._ ■■- ■■- ■■- ■■- .._ ■■- ■■- ■■- ■■- .._ ■■- ■■- ■■- ■■- .._ ■■- ■■- ■■- ■■- .._ ■■- ■■- ■■- ■■- .._ ■■- ■■- ■■- ■■- .._ ■■- ■■- ■■- ■■- .._ ■■- ■■- ■■- ■■- .._ ■■- ■■- ■■- .._ NONE MEMO ■ ■MO NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE ®■M■ ■M■ 0■ ■ ■ ..__- ■■__- ■.__- ■.__= ■.__® ..__- ■■__- ■.__- ■.__- ■.__- ..__- ■■__- ■.__- ■.__- ■.__- ..__- ■■__- ■.__- ■.__- ■.__- ..__- ■■__- ■.__- ■.__- ■.__- ..__- ■■__- ■.__- ■.__- ■.__- ..__- ■.__- ■.__- ■.__- ■.__- ..__- ■.__- ■.__- ■.__- ■.__- ..__- ■.__- ■.__- ■.__- ■.__- ..__- ■.__- ■.__- ■.__- ..__- --__® O O N N DETAIL 1 PIPE OUTLET CHANNEL STABILIZATION O ( Not to Scale) 0 levatio Bed -L7 - PT Sta. 19 +13.15 � END CONSTRUCTION Groun Natural , Ground ural Te 32 �� TIE TO EXISTING l7 2� 1.5' Tuck Geotextile N a Minimum of 1ft Geotextile* (NP) �/ �+ [` Channel Bed *Place Geotextile Under Riprap —/ 7 Pl,i .ita /0+23.58 Length = 15 Ft. (Variable) in Locations Directed by Engineer Type of Liner= CL—I Rip —Rap — Keyed —In -L7 - POC StG. 17 +73.69 = SSMH -Y7- POT Sta /0+00.00 TOP=423.80' �° / / INV OUT=411.54' Crown Castle Fiber I I / / AT&T Corp. (2) S 55° 43" 22.6" E 5 // Duke Energy Progress / / SS a,P14C / ��� / / Dominion Energy, 2:10 \ _ RETAIN EXIST SYSTEMDuke Progress CB A�$��T Energy /i \ ` \ TOP=419.4 R' // /i rn INV IN-407.77� • / 1 21 INV OUT=407.70 rri EXIST \ = — EXIS �� /�� ' 2 K Dominion Energy, 2 ��� �� _ HAT T —I a — — / m C SRVS Foy — $IOE%_ AT&T Corp. / TYPE 0� -1 /9' � T F1- O1 - P� — T — >r/ _ i L, l❑ - — — io�� E EXISTING 4,5 a' �_ — �,z a 20, / 3• PVC STue / 8' ` ��\� SR (W CHATH _ x Z EXIST SS ,'I -� l F p� _—G— ST —RAIL - _ � Z — /8,5 — — _ — — _� I= A ER ���P' ------Crown Castle Fiber �SEF Nf'SF� fNT I' / \/ / — 1 = C= '=�� F — — — — —mac— — — _I C �_ — — — — — — — T FO — — �4.5 — , �REMOV E eE l 20' R -�' / \ �� —REMOVE CULVERT— — — — — — — 54 !6� ~ G \ �` ,W �"�� — — — _ _ $i�� ENDW L= — — — — =1T — — — — — - 2.3¢'. 5 10' P=4, DETAIL 2 F G SfO -` — _ 3��& — — 1' IN 420.E(�' 1A =a2U _ RETAIN LATERAL BASE DITCH \ REU �_2 EWALK �----r �, �� -_ EM��E® ® u G2,1�•I ' OUT 40 ( Not to Scale) / / Duke �\ — — b LE IRON, _ -rgy �Qgr Ss� W�SWE�W W EWALK W W Wes, \ TYPE l \J 40 2 1 / 10 15" RCP -IV CARY Natural Fill 45'P IVATE DRAINAGE W W W�� �►► WE—SW��W` VKtuW L-2 _ �5� �Giv /❑ F SPECIAL MIN DEPTH CB-F EASEMENT RI R V Ground �•:� 1'�t. Slope � � (SEE NOTE) CUL NV 408 E� / � 4 d . ?'ITD aF� w ti TOP HW-42 05' - ❑ ¢ I BETHEL BAPTIS I „HURCH OF CARY Tuck Geotextile jti IIDB 77 30,S�oP Q� C ILIN = 11.67' 40 `\ I DB 820813PGG2097 a Minimum of 1ft — — Geotextile B (TYP) —EE OTE� T� _ — �, — — — Ljj _ _ L d 67'_ _ — DB 8896 PG 718 I � Detail Applies When B is < 6.0' Min. D = 1.5 Ft. BEGIN CONSTRUCTION S for Class I and II Ri Ra And All Widths for Class Rip-Rap; Rip-Rap d = 1.o Ft. -L7 - STA /4+76.9/ WOODS CE TCE F �T CE W B= 2.0 Ft. TIE TO EXISTING 1� ��� _ �TCE� SPECIAL 2' BASE DITCH I C, �� (' Q• Type of Liner= CL. B Ri -Ra b= 5.0 Ft. �y YP Rip -Rap pyti `� 1 = 3.6 E TCE S/T.50 TONS FROM -L7- STA. 16 + 21 TO STA. 17 + 38 �QJ� CF TCE ,� SEE DETAIL 2 6 •. AC, TOWN OF CARY � ISLAMIC ASSOCIATK,,. ,,, -- __ . _ _ INC y��r � TCE 30' - 8" DlP RETAIN SEWER PIPE � Dominion Energy, 2 DB 10405 PG 1889 Q� �QJ IJLMnRl%, AJJO IATION Or I,AR t rvt, INC CONSTRUCTION NOTES PB 1957 PG IIO �� / 20 CULVER E ENSION �� DB 10405 PG 1889 PB 1984 PG 888 yP -• p � PB '"-' "" 1258 RIPRAP AT C T OUTLET F`�p NEW MANHOLE PB 1957 PG 110 ' O� / CL. I RIP -RAP E 15 TONS ��LOCATION B 1984 PG 888 TIE PROPOSED 2'-6"CURB & GUTTER TO o S EST. 15 S.Y D o:44# B 19F` '- '258 ti � l EXISTING CURB &GUTTER 42 SEE DET ti� TIE PROPOSED SIDEWALK TO EXISTING 30'-16"ENCASEMENT PIPE � ` 4 3 DOCUMENT NOT CONSIDERED FINAL 2 SIDEWALK �� NEW MAN LE •�, � o UNLESS ALL SIGNATURES COMPLETED 425 425 424 424 423 423 422 422 421 421 420 420 4 - 419 418 -' 418 41 - - 417 - 41 41 415 415 414 414 - 41 41 412 412 411 411 41 41 409 409 i _� 408 14 15 16 17 18 19 PREPARED IN THE OFFICE OFo ))Horn NC LICENSE VILLE 2 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NORTH CAROLINA 27601 PHONE: (919)677-2000 ©2023 ROADWAY PLAN AND PROFILE SHEET H R Z �0 1 20 PROJECT-. CONNECTING CARY SIDEWALKS PROJECT G - W C H AT H AM S T REV. No.e REVISION: DA7Ee DRAWN BYe CHECKED BY: INCOMPLETE PLANS DO NOT USE FOR RW ACaUISITV®N VERT L1� This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. Copyright Kimley-Horn and Associates, Inc., 2023 JOB uMBERe 0 775066 SHEET uMgERe 4G O O 1 N N 12 % DUCTILE IRON, TOWN OF C� Y O Charter Commun'cation Dominion Energy, 6 Duke EnergyProgres� (2) 4 T. H. STEVENS W AT& Corp. x I I I O BETTY 2369 STEVENS -L7- PT Sto..30+18.96 PB 1986 PG 864 -L7- PC Sta. 29f15.52 SIGNAL POLE I� SIGN LE 2 % DUCTILE IRON. TOWN OF CARY -102 / �O �� — —FSS— — EXISTING I PER GIS I � � JUNCTION BOX J— EP D, CROSSING PEDESTALI 1 INVERTS INACCESSIBLE /S•RCP I /�I�— I SSMH I `� Ij TOP=467,58' I INV OUT=459,83' 1 TOP=463.65' I I I I — —L7— STA 28+66.00 INV OUT=460.95' I I I I ' TIE TO EXISTING I ADJUST MANHOLE N TO GRADE — — _ L7 W CHATHAM ST I I E— PAVED ROADWAY I N 27° 25,,4/.2,,E C THAM STJ _ SSMH 12,5' 14,5' TOP= 43,06 — /4,5' I r----FSS------ITS=454.06' — --w—_— I I I I NdV—OUf - 33.64' NV IIQ-4-27,7P,' — _ — — SR 10/1(W CHATHAM ST.) PAVED ROAd� � FSS— — — — — — — n INV OUT=447,71' — — — — — EXIST 2 ', DUCTILE IRON. TOWN OF CARP FSS— — — — — L — — I — — w I TOP=467.43' —� --- I ---SS--- —FSS----- INV 11=4593$ I N JMH /6' 10.5' _ _ 5R — --- -TYRE-RE—hFo --- ���_ �— !_RC_P----------- I--------Fss— _ '-- TOP=442.66' l0 R — — ® _ — _— _— — IN IN-437.17' _ I I I Ifs BUT=458.23' / 6" C& CR — — zo^ HRRow000 18 RCP •�/ SLAB T@P-IN C G — — _ — — — — RETAIN SYSTEM I INV OUT=435.05' 2 TYPE I 5 SIDEWALK 10' R I phi Fo_ _ _ — — _ TYPE l a° HARow000 / TOP=450.94' _ — — - - � 18' _ +- = INV ACCESSIBLE _ — � � � � � — — _ _ —15 RCP_ _- ,I 30' C&G 0' R �— —InF _18' RCP 5' R — — E — — — — — — — — — — — — — — — — — — - - ZMENT CE�TCE — — — ALP— — s — —RE S—r FO— B FORCE MAIN S WER E —TCE—T FO— —T@P' 9� \ �p TCE RETAIN BFP TOP=4598' EIP _ _ �PdV�U4§�3, ASPHA�. TCE I INV IN=44�.CB ,53' INV IN=459. 9' C,o \ EXISTING4 / _ Z INV OUT=446,48' WOODS Raw FIBER MARKERO r ��0. ING R� � — — I s HAR OP F TCE ARY DRAINAGE EASEMENT C —` A J METER WATER: g 11979 PG 26 30„ H� 000 GRADE TO ASPHALT DRAIN PERMANENT SLOPE EASEMENT PED. CROSS PEDESTAL\ \ — I —L7— STA 29+46,58 END CONSTRUCT ION DB 11979 PG 46 WOODS SIGNAL POLE —L7— STA 29+18.69 t� TIE TO EXISTING TIE TO EXISTING CONC E E •, �\ \ I I PED. CROSSING P /E T / TIE TO EXISTING CLEAN CB -L7- STA 30 *4/.4/ I � li �/=438•T9' \ (REPLACE 18" RCP REMOVE TREE DAYLIGHT PIPE OUTLET AS NECESSARY I I I I I I _ WOODS �Q CB a � BL ITMV CO •�RUCT ION L I_ — APPROXIMATE LOCATION OF 30' CP&L EASEMENT =� TOP=46T_40' -L7 - T A, 8 f58./O - CB P6 1985 PG 471 INV OU 60.80' CO TIE TO EXITINGINVERTS�N ACCESSIBLE MDC NO LP (FULL OF DEBRIS) DB 173?r, 1 2751 z CONSTRUCTION NOTES 45 3 3 3 p ZUHAIR INAYA p TIE PROPOSED 2'-6"CURB & GUTTER TO WESTERN BLVD INVESTMENTS OF RALEIGH LLC DB 17419 PG 512 EIP l EXISTING CURB &GUTTER � PB 2012 PG 1201 TIE PROPOSED SIDEWALK TO EXISTING N DOCUMENT NOT CONSIDERED FINAL 2 SIDEWALK � N UNLESS ALL SIGNATURES COMPLETED 458 00 57_ 456 000 455 454 53 5 4 1 451 4 450 44 44 44 448 44 447 1441 44 - 445 445 444 444 44 44 442 442 ti 441 itt 441 29 30 31 PREPARED IN THE OFFICE OFo INC LICENSE #F-0102 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NORTH CAROLINA 27601 ))HornPHONE: (919)677-2000 ©2023 ROADWAY PLAN AND PROFILE SHEET H R Z �0 0 20 PROJECT-. CONNECTING CARY SIDEWALKS PROJECT G - W C HAT HAM S T REV. No .e REVISION: BATE° DRAWN BYe CHECKED BY: INCOMPLETE PLANS 0)® NOT USE R®IR RW ACD?UISITV®N L1� VERT This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. Copyright Kimley-Horn and Associates, Inc., 2023 JOB NUMBER° 0 775066 SHEET NUMBER° 5G O O Te Crown Castle Fiber AT&T Corp, (2) Duke Energy Progress / C� Dominion Energy, 2 \ v `\13— o TOP=419.4 INV IN-407,7T4e zI INV OUT=407.70 r; TB _ I all _ Dominion Energy, 2 \ C� ATH ST1 p V — - X opt F trEgSFMf I "' / \/ 1 C� ED J?I @ L �ry�� D ke Ener - BL - 3 M I 0 8 ', D TILE IRON, PrOgr ss- Qg`� TO OF CARP `pQ�J`y� E30, SLOPE. SEE pA T WOODS ISLAMIC ASSOCIATION OF CARY NC INC DB 10405 PG 1889 PB 1957 PG 110 PB 1984 PG 888 PB 1984 PG 1258 45' P IVATE DRAINAGE EASEMENT CUL NV 408 (SEE NOTE) TOP HW-42 05 C ILIN = 11.67' ls� E H F � `y�4 i, ti 1 �A�O VO V�P 0 O �P SSMH TOP=423.80' INV OUT=4 54 i / SS pNC �Ftl) �i / �i Duke Energy Progress f;MT Corp. (3) i i pVC jRO/ Ftom/ CONS /SAT&T Corp, -t F8p ` / �3• PVC STUB MARKER / `-Crown Castle Fiber �— _ i5• RCP; — CB i • P DI 1- — — TOP=422.30'j I a TOP=423.24' INV IN=420.20' INV IN=420.50' INV OUT=4G2,03"' asI �� v INV OUT=420.45' � / Q INV=418,91' / I BETHEL BAPTIST CHURCH OF CARY DB 3013 PG 77 DB 8208 PG 2097 WOODS 30 SLOPE (SEE NOIEMENT �E ISLAMIC ASSOCIATION OF CARY NC INC DB 10405 PG 1889 PB 1957 PG 110 B 1984 PG 888 B 1984 PG 1258 DB 8896 PG 718 6 '. AC, TOWN OF CARY Dominion Energy, 2 ' 12 '.DUCTILE IRON, TOWNj0FCL I I I I i Chart r Commun'cotion Dominion Energy, 6 Duke EIProgres (2) AT& Corp, T. H. STEVENSBETTY V. STEVENSDB 2369 PG 114PB 1986 PG 864/ II IIU-6 SIGNAL POLE IF� a 2 DUCTILE IRON. TOWN OF CARP EXISTING R/W PER GI! — FS 1 �` JUNCTION BOX _ PED. CROSSING PEDESTAL INVERTS INACCESSIBLE (S RCP SSMH I `� TOP=467,58' I I � INV OUT=459,83'� 1 \ \ 7UTL —/ /LI — — — — — ——17UTL— — — — — — — — — — — — — I I- TOP=463.65' I I I I INV OUT=460.95' I I I I N to Q I I I I I I I I • SR l0n(w CHAT HAM STJ PAVED ROADWAY SSMH _ � � � _ CB TOP=443.0 �� I r — — —FSS— — — — — ��=g54,06' r w_ _ INV IIQ=4�i7 T'6' — — — — Fss — — SR l0/l (W CHATHAM ST.1 PAVED ROADWAY +fd�t-OCrf= 33.84' / 2 DUCTILE IRON. TOWN OF CARP I — W — — — — — — — — — — — — — -S / INV OUT=447,71' — — — — — — — — — — — — — — — �- — — — — — — —FSS— — — — — — — — — — — —FSS— — — — — L — — — — — —FSS— — — — TOP=467.43' INV 11�459.3$' — — �—S6MH ��� _TFO---—TFO�---—�_ —�— 15'RCP I I I--------FSS—I��UT=458.23' J TOP=442.66' / _ _ — — SO 18' RCP �Zi .30. C INV IN=437.17' -� _ — — 26" HARDWOOD �pj SLAB TOP-INL€TT C� INV OUT=435.05' �T p0— Ia° HARDWOOD I �/ TOP=450.94' FO—— _ !8' _ + = INVERTS INACCESSIBLE — — _ _ _ --- — ---- _ — — — _ _ — — —15• RCP_ PV — — _� _ �� �— — EXISTING R/W E _ — — ��• �— — I I G C&G �- - -f ���rr _ - - - - �j p 30 — R E�EM — —18= —ORCE MA SEWER EASEMENT I CB T F — — — — — — — — — — — — I I — _ G i �L — — S FORCE MAIN S�WE — — E TOP=45 98' —r Fo- ——T@P=29� \��P EIP INV IN=459. 9' -- — J ASPHALT I T INV V IT_44 .53' EXISTING R/W — —-NV-GU�459 44'— NG� / / FIBER MARKERO O. _ s HARowooD \ ASPHALT OU 44 ,48' WOODS r / \ / TOWN OF CARY DRAINAGE EASEMENT \(L /41\ / ASPHALT DB 11979 PG 26 ` \Zn 3C„ H OOD r _ 1 PERMANENT SLOPE EASEMENT PED. CROSSING PEDESTAL I / — / 1 DB 11979 PG 46 WOODS AAA� CONC SIGNAL POLE \a\ \ I I PED. CROSSING P /EIT l / CONC I I I F+,sJ III I — — — � � WV _43a•T9. � � WOODS c ,0 CB a Q I_ CB APPROXIMATE LDPBT1985 PG 34 ICP&L EASEMENT INV OUT=460.80' q, TOP=464,40' TOP=444,07' INVERTS INACCESSIBLE MDC NCI LP (FULL OF DEBRIS) DB 17325 PG 2751 z 3 3 3 BETHEL BAPTIST CHURCH OF CARY ZUHAIR INAYA p DB 3013 PG 77 WESTERN BLVD INVESTMENTS OF RALEIGH LLC DB 17419 PG 512 11 LJA m a� ILr' N PB 2012 PG 1201 IP DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PREPARED IN THE OFFICE OFo H R Z PROJECT-. ■ �0 0 20 CONNECTING CARY SIDEWALKS NC LICENSE VILLE 2 SURVEY SHEET INCOMPLETE PLANS PROJECT G - W C H AT H AM S T REV. No.e REVISION: DATE° DRAWN BYe CHECKED BY: #F-01 421 LICENSE STREET, SUITE 600 0)® NOT USE FORRW ACD?UISITV®N This document, together with the concepts and designs presented herein, as an instrument of service, is RALEIGH, NORTH CAROLINA 27601 VERT intended only for the specific purpose and client for which it was prepared. Reuse of and improperM ))Horn PHONE: (919)677-2000 Y L1� 0 2 reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. ©2023 shall be without liability to Kimley-Horn and Associates, Inca JOB NUMBER° SHEET NUMBER° Copyright Kimley-Horn and Associates, Inc., 2023 0 775066 PIGS O O N N \ N CONNECTING CARY SIDEWALKS CROSS SECTION INDEX -L 1- (BOUNDARY ST) -L2A- (GREEN LEVEL CHURCH RD) X-1A THRU X=2A X=3B THRU X=5B L2B= (HILL)RD FOREST PRIVATE io GREENIV CONNECTOR) X= 6B W11111B- (GREEN HOPE SCHOOL RD) -L3- (JENKS CARPENTER RD) -L4- (SE CARY PARKWAY) -YS- (PITTARD SEARS RD) -L6- (WELDON RIDGE BLVD) -L7- (W CHATHAM ST) REV. No.e REVISION: DATE° DRAWN BYe CHECKED BY-. This document, together with the concepts and designs presented herein, as on instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. Copyright Kimley-Horn and Associates, Inc., 2023 PREPARED IN THE OFFICE OFo ■ INC LICENSE #F-0102 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NORTH CAROLINA 27601 PHONE: (919) 677-2000 ©2023 X=7B X=8C THRU X-10C X-11D THRU X-14D X-15E THRU X-17E X-18F THRU X-19F X=20G THRU X=2 I G PROJECT-. CONNECTING CARY CROSS SECTION SHEET INCOMPLETE PLANS ° ° SIDEWALKS DO NOT USE FOR RW ACQUISITION JOB NUMBER° I SHEET NUMBER° 0 1 1775066 X-0 ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ill■����9 9.E\■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■IIGC7■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■N9!!■CJl:■Cai:■■■■■i!■■■11■\�\■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■1T,7�1■■■■IfCGa■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!'■7�■■■ L:J\[■I■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!■J■CIC�■:irir■■■■■■■■■■■■■■■■■■■■■■■■■\■11■■■\�\i!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L;T.111/■■■C:arll�l■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L;■►■�l■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■G■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■rim■■■■■\�\■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■lflm■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■Yd■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■i■■■■■■■\�_\■■■■■■■■■■■■■■■■■■■■■■■■■■■■■If'fa■■■■IfC>r'7■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!'■7L1■■■ ■m;//I]■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■[]■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■i■■■■l:ai�iom=liil6lo►ill■iiC�!!■■■■■■L;JI/►7■■■C:arll■1■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L;■►111J■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■Yi■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■IllwlA■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■3ili7ii'�17■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■lff�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!�I■I;■■■■■r�r'�■■r\r�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■If'*7■■■■IfGG■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■AA■■■I■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■lJi�■■■■■■■■■■■■■■■■1T,7�■■■ ■�;IlIIJ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■1 I!"I■■ I■■u\[ 1■ In Mill 1■!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L;JIDANNEL.J\Irl■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L•INME■■I■■■■■■■■■■■■■■■■■■■■■■■■■■■EMEMEN■■■■■■■■■■■■■■■■■■■cf,FAMO]■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■Ill■1J■■I■■mIJki■/E.■/JII■.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ig!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■11■■■■I■m!!■Cal=■L`J!N■■■■■■N■CM\■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■lil■■\■■r■■II■■r■\Ir■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!\■■■■■■■■■■■■■■■■■■■■■■■■■■■■N■A■L'7■i■■■■■■■■■■■■■■■■rill■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■;I/�7■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■[7■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L;JMII■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■Glr1■■7I■Gii1■Ii\m7■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■►::i■��!■�I■II■1■III■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�i��%■■i■-■ue��ArJ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■:TiT■r3rTali■■■±1■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■IIGG7■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■N■!N■�►J!■J■_!f'i■■■■fi,■■■11■\�\■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!'17�1■■■■IfC>r7■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!'■7�1■■■ L:i\[■>■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!9!!■CNi�■f-■i■■■■■■■■■■■■■■■■■■■■■■l�■■11■■■\�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L',T.111J■■■L:arl ■►111J■■■ ■ru�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■a■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■`a■■■■■■■��■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ara■■■■n��a■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■11■rr"a■Err~©■■■■■■■■■■■■■■■■■■■■■■■ ■�ai�■I■■■■■■■■■■■■l�a�■■■ ■r;/JIB■7■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■[]■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■i�■■■■■■■i•■■■■■■■■■■■■■■■■■■■■■■■■■■■L;Jlil►l■■■L:a\lr�l■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■LuJ■■■11■■n■■■■1111■■■■■■■■■■■■■■■■■■N■Ca\■■■■■■■■■■■■■■■■■■■L',T.%i■l■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■`Ji■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I.■■■■■■■��\■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■N■■■YCai�■i■■■■■■ii■■r■ras.■eJi�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■lff�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�■A■■■■\�\■■■■■■■■■■■■■■■■■■■If'*7■■■■IfGr7■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■C7ii■�■iii■ii\■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!'1r7L1■■■ ■L';//II/■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■\ill■Ca■■■■■r■ice■A■■■■■■■■L';JIDJ■■■La\l Sl111■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■ ■IfG'G■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■1iw,,Am■■I■■'I1iris in Is iris 1■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■l7.7m■■■■lmm■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■Gq■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■Mara■■■ L:ilJrl■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■0111 91 lii ii■, II Jl I■ ME II KIN JI■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L'illAD]NO■■L';I/■IEEEEE■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■C7■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L;JM►7■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■il■1r■■■i■■\i\�ii`i\r■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■o,ir,s i■11■i,l!'I■i,lrs7■■■■■■■lmlv ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■u�-■u■■u�-1■�uf,-■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■�1GGa■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■iiliii�IlYW■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!'!!77■■■■►1CG�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�z7�■■■ L:i\Ir�l■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I■L3►!7!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L',Sf�■l■■■L:arllril■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L',■►l�■l■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■lgs■lom■■I■■la:■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I■■■11■■I■■1i7■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I■■■illR-1!l1011!,■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■IfGf7■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■N■!!■C9lJ■CaC�■■■rrii■A■1■■■\'�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!'1'7�1■■■■IfC>r7■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!'■7�1■■■ L:i\[■>■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■N■J■!lChi:■riii\■■■■■■■■■■■■■■■■■■■■■■■■\i11■■■■\\■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L',T.111J■■■L:ar]l■1■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L',■►iIIJ■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L!!J■Giir■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■l�amo■■■\'�!!II•■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■Ly�Illu'1'li■■■■■■■■■■■■■■■■■■■■■■ ■�;//�■7■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■[7■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�■■■■■\\■■■■■■■■■■■■■■■■■■■■■■■■■■L';JN►l■■■L:i\Ir�l■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■11r.1J■■■■■■■I��?■■■©�!■■■■■■■■■■■■■■■■■■■■ ■■N■��Jii■■■■■■■■■■L',T.%i■l■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■G9■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L�■■■■■\'�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■Ili■■■■■■■■■■■■■IIi■■■■■■■■■■■■■■!9!G■fii■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■Ya■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■Illl■■■■■\'■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■11■■■■■■■I■N�■■■_lu�J■C■Cl■�iii■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■lff�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■rii■1■LiC�■!lL��■■■N■■■■■■■■'f'*7■■■■IfGf7■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!■!9■!!C!■�■Giii■r■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!'1r7L1■■■ ■L';IIIII■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L;�l�►J■■■L:i�l�'1■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L'SIIII■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■:l■:mom ■:1r:■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■G1f■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■IILIFb1!!I!p■:111■ on I1111■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!A■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■Il.'G■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■IIFWAEII■E!m,AL`!ll"olALI!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■17.7�■■■■lff�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I!N■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■Iffy■■■ L:i/Jrl■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L'i11J►�1■■■■L';11�■]■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■II�J■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L';JN►7■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■11lW'J■■IN■I1111■ 1■ Illll■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■llt6l]■■I■■LIFALIW.l%,'IFJLIF,MMM■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■ ■n��a■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■rll�lll■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■lraa■■■■n�sra■■■■■ ■��■■■ L:i\Ir�l■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I■'3�7■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L',S%i■l■■■L:ar]l■1■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L',■►iIIJ■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ilolmommoolimall■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I■■■■■■I■■ ill■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■Rm!!Ml!!Clmm:I::oI•■■II■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■IfGf7■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■N!!!■CJlm■Ciii■`iifi■■■■■■■■■m■I!1■■wl.-ROENEEN■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■rvo.9p.1■■■■IfGf■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!'1'7m■■■ L:i\l■'JI■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�!!J■mill■i■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I11■C!■\'V■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L''FAiflrimmMLw'J2Ml■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L',T.i■l■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■llimmoram\�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■N!■!Eemmmm■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■t'::1■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■\il��■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!■N9lN■N■!N■N!!■J■!�J19■!!C'fi■r■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■lflm■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■iH■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■Il!'J■CilJ■!■■■■■■■■■■■■■■■■■■■■■ara■■■■IfGf7■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■A■�►►JlJ■m■CliiiriNii■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!'1r7L1■■■ ■�;/I■7■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■isY■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■\■l■miL'J!!■N■■■■■■■■L';JN►l■■■L:i\l■1■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!:■L9!!■CJi=■`ii■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L'S"IIIJ■■■ ■lff�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■a*a■■■■Iffm■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!9■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■Mara■■■ ■L';/LIIJ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�I■�7■■■■r\!�■■r\!'1■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L';J11►J■■■■L';11�r]■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■G9■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L';JN►7■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■Ilr.f7■■I■■'IllrlElm Is iris m■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■N!■■1■■■■1`N■N■■N■■!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■01IrElliiii■,IFJII■BE IFAIIJI■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I I\rA■■1■■rArri■1■'.kIri■1■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ii\■■il■■`I\iii`I\i■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■llmrAmi:l=■I■llliomm■plll!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■lff�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■LIE.I■■LI■i��\�ii`J`:r■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■aura■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ............................................................................................................................................................................................................................................................................................................ ............................................................................................................................................................................................................................................................................................................ ............................................................................................................................................................................................................................................................................................................ ............................................................................................................................................................................................................................................................................................................ L:ar7l■I■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L',a►111/■■■L:ar7l■I■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L',a►111/■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■n��a■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■lr��■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■lraa■■■■n��a■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■r■■■■■l�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■lra�■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I■■■■■I■11■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■IIG*7■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!9!J■CaCm■Giil■iifii■iirii■i■riiii■■■■r■fiiC�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!'1'7�1■■■■IfGC7■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!�J■!!Cm■m■Giii■`i■\r■■■■■■■■■■!\■11■■\,�J■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!'1r7L1■■■ L:i\l■'I■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!lC�i:■rir■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■iC7■N■■■■■■■■■■■■■■■■■■■■■■L',T."ll1J■■■L:ill■I■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!!■CJim■Gilir■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■II■■■■\�\■■■■■■■■■■■■■■■■■■■■■Nrll�J■!!!9!!■■■L'S"111/■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■!I■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■mil■L■■■■■■■■■■■■■■■■■■■■■ ■■■■■■ ■lflm■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■i!>f■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■If'fa■■■■lffm■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■YN■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■If'fa■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■C7■II■■rI■C�7I.7■r�i7■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■iimvA■■1■■'I1irim infllrimmomm■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■lff�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ II.1 I■N�■!■I�■��1■fill 1■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■a*a■■■■Iffy■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■1 I■I/■iiii■,IPJLIN1■ IIJII■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■loll■■■ ■L';ILIA■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ I6:7■I■■■'A■.m►J!I■II■I 1■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L;J11►AMEN■W'FlivJ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■Llii■■i1■■`id\�wiii`i\■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■L;JII//■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■11■■■I■■■■■■■■■I,I■rI■■■■I.�\l■'I■II■�i�■I�■■'�■11■�i�■II■I�■■■■■�■�i■11■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■N!!■�I■■II■!!!g■■■■■'III■■■■■I■■I.��rl■II11■II■■I,��rI■II11■'ll!%I■■■■■�■■■II■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■r■■rI■■■■■■■■■I4III■■■■■■■■II■■MVM-RI■N■■I1■IMI!!II,II►III■■■■■■\NEMENE■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■II■NII■■■■■■■■■■I''I■'I■■■■\N�iII■I;■II■i■'a■■II■II■II■■I11!/i■■■■C■I■II■■I.7■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■r�r.■■■■■■■■r�r.■■■■■■■■nr.■■■■■■■■�r.■■■■■■■■�r.■■■■■■■■u�■■■■■■■■ram■■■■■■■u�■■■■■■■■�r.■■■■■■■■�r.■■■■■■■■nr.■■■■■■■■r�r.■■■■■■■■r�r.■■■■■■■■.-,r.■■■■■■■■■■■■■■■■■■r�r.■■■■■■■■r�r.■■■■■■■■nr.■■■■■■■■�r.■■■■■■■■��■■■■■■■■u:�■■■■■■■■ram■■■■■■■u�■■■■■■■■��■■■■■■■■�r.■■■■■■■■nr.■■■■■■■■r�r.■■■■■■■■r�r.■■■■■■■■.-,r.■■■■■■■■■ ■■■■■■■■■:Je■■■■■■■■�e■■■■■■■■��■■■■■■■■��■■■■■■■■��■■■■■■■■u�■■■■■■■■aa■■■■■■■■u�■■■■■■■■�►�a■■■■■■■�►�a■■■■■■■��■■■■■■■■�►�■■■■■■■■�►�■■■■■■■■u►�■■■■■■■■■■■■■■■■■■�►�■■■■■■■■��-■■■■■■■see■■■■■■■■�►:■■■■■■■■�e■■■■■■■■u�■■■■■■■■aa■■■■■■■■u�■■■■■■■■��■■■■■■■■��:■■■■■■■■��:■■■■■■■■-.�:■■■■■■■■se■■■■■■■■ue■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■ ■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■ ■■■■■■■■■■■■■■■ ■■■■■ ■■■■■■■ ------��------------------------------------------------------------��-------------------------------------------------------------------------------------------------------------------------------------------------------------------rJ�l-----l--------��------------ I J► ■ 0 O ' f ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■