Loading...
HomeMy WebLinkAboutNCC240782_ESC Approval Submitted_20240408 ROY COOPER I Governor 1/44 _ C ELIZABETH S.BISER ,',:;:�_ ___ _�- Secretary ° AM WILLIAM E.TOBY VINSON,JR NORTH CAROLINA Interim Director Environmental Quality 03-13-2024 LETTER OF APPROVAL Steve Hubrich 4321 Medical Park Drive RE: Project Name: Riverside Leadership School Project ID: CRAVE-2024-0111 Acres Approved: 17 County: Craven City: New Bern Address: 1905 Old Airport Road River Basin: Neuse Stream Classification: C: Aquatic Life, Secondary Contact Recreation, Fresh water; SW: Swamp Waters; NSW: Nutrient Sensitive Waters Submitted By: Matt Sides Plan Type: New Plan Dear Steve Hubrich, This office has reviewed the subject erosion and sedimentation control plan. We hereby issue this Letter of Approval. Any modifications required for approval are listed in the body of the email that accompanied this attached letter. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land- disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities not explicitly exempt are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions for the annual permit fee. After the fee is processed,you will receive the COC. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. D E�„. Department Quality , al d !�/J/� 512 NorthNorthCarolina Salisbury Street 11612of Mail Environmental Service Center I RaleighDivision,Northof CarolinaEnergyMiner 27699-16an 12Land Resources NORTH CAROLINA oaoann,am m eaao-oan,amai uaanry 919.707.9200 Letter of Approval Steve Hubrich 03-13-2024 Page 2 of 2 Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form and on the plan, which you provided. You are requested to file an amended form if there is any change in the information included on the form. Your cooperation is appreciated. Sincerely, Jerr4 Jô &s Land Quality Section