HomeMy WebLinkAboutNCC241035_Site Plan or Location Map_20240408 PROJECT NARRATIVE THE PROPOSED METHOD-RALEIGH 115KV-REPLACE STRUCTURES PROJECT IS LOCATED IN WAKE ���� COUNTY,NORTH CAROLINA.THE PROJECT INCLUDES THE REPLACEMENT OF FOUR(4) Arieum.�r. �1�1',, STRUCTURES IN DOROTHEARUCE DIX SARK IGNED T ALONG LAKE ESUN ROAD WITH TWO R JE THE �� „� �� ���_� REPLACEMENT STRUCTURES DESIGNED TO APPEAR LIKE SUNFLOWERS.THE PROJECT IS rDu KE f,,„„„) Y LOCATED WITHIN DUKE ENERGY'S MOWED AND MAINTAINED RIGHT OF WAY.THE PRIOR USE OF �a� THIS SITE IS TRANSMISSION INFRASTRUCTURE AND THE PROJECT WILL NOT CHANGE THE EXISTING LAND USE.PRIOR TOL CONSTRUCTION,S A DUKE PENERGYTHE CONSTRUCTION STRCT �� h kil" ���� �� WILL TINSTALLEROSION CONTROL IONS WILL TOBE ENCOMPASS T THE WILL ECONSTRUCTIONILIZED �_ � �� 111141101016 �� / swir ! LIMITS.PREDEVELOPMENT CONDITIONS WILL BE RESTORED AND THE AREA WILL BE STABILIZED PRIOR TO COMPLETION OF CONSTRUCTION.AN AVOIDANCE AND MINIMIZATION OF DISTURBANCE �� � � � 4 APPROACH HAS BEEN INCORPORATED INTO THE DESIGN OF THE EROSION CONTROL MEASURES ,110‘11* BY UTILIZING EXISTING ACCESS POINTS AND STABILIZED RIGHT-OF-WAY ACCESS ROUTES, WHENEVER POSSIBLE.EROSION CONTROL MEASURES ARE INDICATED HEREIN FOR PERMITTING USE ONLY BY NCDEQ.THE INITIAL PROJECT DURATION IS ANTICIPATED TO START IN JUNE 2024 ENERGY® �,wektpArro ROJEICT AND END OCTOBER 2024. LOCAT PROGRESS f*I*, 'k METHOD-RALEIGH 115 KV - REPLACE STRUCTURES NORTH do SOUTH CAROLINA STATE MAP EROSION & SEDIMENT CONTROL & ACCESS PLAN WAKE COUNTY, NORTH CAROLINA GENERAL NOTES LATITUDE: 35.766906° SHEET LIST: 1. APPROXIMATE STRUCTURE LOCATIONS WERE PROVIDED BY DUKE ENERGY AND ARE FOR REFERENCE ONLY. LONGITUDE: -7 8.652367° COVER SHEET SHT 1 OF 8 THESE DRAWINGS SHALL NOT BE USED FOR LINE CONSTRUCTION. OVERALL PROJECT LAYOUT SHT 2 OF 8 2. BASE DRAWINGS WERE CREATED BY GIS DATA OBTAINED FROM VARIOUS SOURCES. AERIAL PHOTOGRAPHY EROSION CONTROL MEASURE QUANTITIES SHT 3 OF 8 WAS OBTAINED FROM STATE AGENCIES. - — EROSION&SEDIMENT CONTROL PLAN SHT 4 OF 8 " EROSION&SEDIMENT CONTROL DETAILS SHT 5 OF 8 3. NOT ALL EXISTING UTILITIES ARE SHOWN. LOCATIONS SHOWN ARE APPROXIMATE. IT IS THE CONTRACTOR'S tN'ste,, EROSION&SEDIMENT CONTROL DETAILS SHT 6 OF 8 CJ nawec St RESPONSIBILITY TO ACCURATELY LOCATE,BOTH VERTICAL AND HORIZONTAL,EXISTING UTILITIES PRIOR TO g Nash NCGO1 DETAIL 1 SHT 7 OF 8 THE START OF CONSTRUCTION.THE CONTRACTOR SHALL NOTIFY NC 811 PRIOR TO EXCAVATION. s ash NCGO1 DETAIL 2 SHT 8 OF 8 CONTRACTOR SHALL NOTIFY DUKE ENERGY IMMEDIATELY IN THE EVENT OF ENCOUNTERING ANY t t ' ✓r UNDERGROUND OBSTACLE REQUIRING DEVIATION FROM THE PLAN. COST TO REPAIR DAMAGED UTILITIES ...'.by st '6 l ar m,i_. SHALL BE BORNE BY THE CONTRACTOR. '' 9 4 .��� +'oo•��e si 4. ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. CONTRACTOR SHALL S' " z NOT DISTURB UTILITY POLES,GUYS WIRES,OR ANCHORS WITHOUT PERMISSION FROM DUKE ENERGY. s '"c.Toa«us St 1 5. PROJECT IS LOCATED IN THE NEUSE RIVER BASIN.PROJECT IS SUBJECT TO NEUSE RIVER RIPARIAN BUFFER '5t REQUIREMENTS WITHIN THE BUFFER AREA. ? 'vv Le",ot,st m m 6. SEE SHEET 5 FOR EROSION AND SEDIMENTATION CONTROL SEQUENCE AND SEEDING SCHEDULE. `.tt,kt,. 7. ACCESS TO EACH STRUCTURE IS THE RESPONSIBILITY OF THE CONTRACTOR. 1- oo'Sc', 8. ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY DEP SITING,PERMITTING o` DOROTHEA DIX Rocky B.c,e c' AND EMENT(SPE)PRIOR 9. CONSTRUCTION ENTRANCES ARE SHOWN FOR REFERENCE ONLY. HEAVY MATS MAY BE USED IN LIEU OF ROCK USE. e`a r�s�"°n PARK WESTERN BLVo %/ CONSTRUCTION ENTRANCES IF DEEMED SUFFICIENT BY DEP REPRESENTATIVE. I 5 P1h,,' "t'tt turner Ktrn 10. ACCESS LOCATIONS WITHIN THE TRANSMISSION LINE RIGHT-OF-WAY ARE APPROXIMATE. ACTUAL LOCATION ? - emu•s MAY VARY BASED ON THE FEASIBILITY AND WEATHER CONDITIONS. WHEN MATS ARE REQUIRED,2 ROWS OF s PROJECT AREA s MATS MAY BE INSTALLED IN PARALLEL TO COVER THE 28-FT WIDE ACCESS ROAD WITHIN THE TRANSMISSION 90 LINE RIGHT-OF-WAY. ACCESS OUTSIDE OF THE TRANSMISSION LINE ROW IS LIMITED TO 14 FT UNLESS y o Biggs,;, OTHERWISE PERMITTED AND APPROVED BY DEP SPE AND NCDEQ. - - tevlste` 11. NO OIL/FUEL-FILLED EQUIPMENT SHALL BE STORED OVERNIGHT WITHIN 50 FEET OF WETLANDS OR SURFACE ..LI 't'kr WATER WITHOUT CONTAINMENT. Mount - ,os,m St Hope 12. SITE SHOULD BE"STORM READY"AT THE END OF EACH WORK DAYNVEEK. ?: ° .. 0 Cemelery _ 13. SECURE WRITTEN ACCESS AGREEMENT IS REQUIRED FOR ALL 3RD PARTY ACCESS AND PRIVATE DRIVES NOT ,,- ' 3a9' - INCLUDED IN ROW DOCUMENTATION PRIOR TO BEGINNING CONSTRUCTION. - Prospect Ave r. 14. ALL DISTURBED AREAS SHALL BE RESTORED TO SAME OR BETTER CONDITION.PERMANENT GROUND COVER p na:rot"'st c v, �` e SHALL BE USED FOR STABILIZATION. 0����� rwaaaA„e i s �9 SPILL REPORTING HOTLINE 1� Caraleigh ' a IN ORDER TO ENSURE THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT,FEDERAL AND STATE LAWS ., �� Silber,P e REQUIRE THAT CERTAIN TYPES OF SPILLS AND UNPERMITTED RELEASES BE REPORTED TO THE PROPER E.., REGULATORY AGENCIES AS SOON AS POSSIBLE FOLLOWING IDENTIFICATION.IMMEDIATELY NOTIFY YOUR _4✓ w°i SUPERVISOR AND THE FIELD ENVIRONMENTAUEHS PROFESSIONAL WHEN A SPILL OR UNPERMITTED RELEASE IS 2 Panma woo,Woo.sk W en st Eo DISCOVERED.IF YOU ARE UNABLE TO REACH THE FIELD ENVIRONMENTAUEHS PROFESSIONAL,CONTACT ONE OF CC THE DUKE ENERGY SPILL REPORTING HOTLINES AT: D 1-40 to CAROLINAS&MIDWEST:800.527.3853 U ' B`" - FLORIDA:866.769.1266 7 �-�= walkers; I I— CONTACTS co K'rk,, Rp smilh Reno Rd Iz em a'ao@ a.F w b' N OWNER: ENGINEER: PARKS CONSTRUCTION SUPERINTENDENT: 0 ,wy DUKE ENERGY PROGRESS,LLC DEWBERRY ENGINEERS INC. BALFOUR BEATTY CONSTRUCTION MIGRATORY BIRD HOTLINE TUCKER PRIDGEN ZACHARY EULO,PE JENO COSSETTE 0_ 411 FAYETTEVILLE STREET 2610 WYCLIFF ROAD SUITE 410 GENERAL SUPERINTENDENT W STATE AND FEDERAL LAWS PROTECT ALL SPECIES OF NATIVE BIRDS FOUND THROUGHOUT THE DUKE ENERGY t'""`s AveRALEIGH,NC 27601 RALEIGH,NC 27607 PH:(919)291-1683 Et _tot," SERVICE AREA.INTERACTIONS OF BIRDS WITH GENERATING FACILITIES,TRANSMISSION AND DISTRIBUTIONS, PH: (252)813-1511 PH:(919)425-7610 JCOSSETTE@BALFOURBEATTYUS.COM SUBSTATIONS,OTHER STRUCTURES AND EQUIPMENT,AND OPERATIONS ARE POTENTIALLY HARMFUL OR FATAL TO BIRDS. DUKE ENERGY OPERATES THESE 24-HOUR MIGRATORY BIRD HOTLINES TO ASSIST EMPLOYEES AND MA TUCKER.PRIDGEN@DUKE-ENERGY.COM ZEULO@DEWBERRY.COM Lc)CONTRACTORS WITH RELATED INCIDENTS THAT OCCUR DURING WORK ACTIVITIES. VICINITY P SCALE: 1": 1200' I CAROLINAS:800.573.3853 FLORIDA:727.386.3084 MIDWEST:317.430.4497 0 W qJ 6 0 I CONTRACTOR SHALL NOTIFY"NORTH CAROLINA ONE CALL"(811)OR j j (1-800-632-4949)AT LEAST 48 HOURS PRIOR TO BEGINNING \\\��11N CA0/# M CONSTRUCTION CONTRACTORS ALL CONTACT ANY EXCAVATION O HAVE LOCAL UTILITIES S THATG IES PROVIIDEDED Z2o b�ESB)..-7� yYi THEIR OWN LOCATOR SERVICES INDEPENDENT OR"NORTH CAROLINA A,' •a- SEAL �• = o ONE CALL".REPORT ANY DISCREPANCIES TO THE ENGINEER '� = 055132 = DUKE — • • c ® METHOD-RALEIGH 115KV - REPLACE IMMEDIATELY. ^- 'r9�NGlN�� '3, coDewberry STRUCTURES E E23001801 03/06/2024 100%FOR PERMITTING-NCDEQ COMMENT RESPONSE ARB ZAE ZAE — i ���HA `�% D E23001801 02/26/2024 100%FOR PERMITTING ARB ZAE ZAE +� �,�RM �� Dewberry Engineers Inc. �`, EIER3'y'® C E23001801 01/16/2024 90%DESIGN FOR DEP REVIEW-DUKE COMMENTS UPDATE ARB FDR ZAE 3/6/�4 SUITE WEY ROAD RALEIGH, NC 27607 PROGRESS COVER SHEET B E23001801 01/04/2024 90%DESIGN FOR DEP REVIEW ARB FDR ZAE 100% FOR PERMITTING PHONE: 919.881.9939 A E23001801 11/10/2023 60%DESIGN FOR DEP REVIEW ARB FDR ZAE FAX: s1s0929 z3 411 FAYETTEVILLE 276010 St WING SHEETCBELS 1 OF 8 REV FILE NO. DATE REVISION DRAWN CHECKED APPROVED DO NOT USE FOR CONSTRUCTION Dewberry Pmjec[No.50130793 www.dewberry.00m TELEPHONE No.(919)546-2090