Loading...
HomeMy WebLinkAbout20070924 Ver 2_Tarin Woods II PCN Attachments (1)_20240403SOUTHERN ENVIRONMENTAL GRO Tarin Woods II 5741 Carolina Beach Road, Wilmington, NC 28409 (34.13099, - 77.88971) Pre -Construction Notification Attachments Applicant. Hoosier Daddy, LLC 6025 Tarin Road Wilmington, NC 28409 (910) 443-3060 Consultant. Southern Environmental Group, Inc. 5315 South College Road, Suite E Wilmington, NC 28412 (910)228-1841 Meganksegi.us Date: 3/21/2024 Tarin Woods II PCN Attachments SEGi AppendixA: Parcel Infonnation.................................................................................................................................................. 3 Appendix B: DWR Water Classification..................................................................................................................................... 7 Appendix C: Notification of Jurisdictional Determination 05/01/2023..................................................................................... 10 11 .................................................................................................................................................................................................... Appendix D: Previous Pen -nits Issued........................................................................................................................................ 20 .................................................................................................................................................................................................... 21 AppendixE: Site Map and Impacts............................................................................................................................................ 41 AppendixF: Agent Authorization.............................................................................................................................................. 42 Appendix G: Post -Construction Stonnwater Management Pen -nit No. SW8230410............................................................... 43 AppendixH: Species List........................................................................................................................................................... 73 .................................................................................................................................................................................................... 74 Appendix K: NOAA Fisheries Essential Fish Habitat Report .................................................................................................105 AppendixL: FRIS NC Flood Map...........................................................................................................................................106 AppendixM: NC SHPO HPOWEB2.0 Map............................................................................................................................107 0: Tarin Woods II PCN Attachments Appendix A: Parcel Information SEGOO �� Tarin Woods II PCN Attachments ■ i 4 Tarin Woods II PCN Attachments Ownership Information PID: R07600-004-052-000 MAPI D: 313419.50.9128.000 ETAX Link CJwnershrp HOOSIER DADDY LLC 8620 RIVER RD GWILMINGTON, INC 28412 Description FUTURE DEVELOPMENT TAR IN WOODS Municipal Area: FD Acres: 46 Zoning: R-15 Class: RES Sn Ft I ivinn: n Zoom to ■ SEW 5 Tarin Woods II PCN Attachments S E G i Tarin Woods II PCN Attachments Appendix B: DWR Water Classification SEGOO �� Tarin Woods II PCN Attachments SEG' l� F -- rvY1 m.. t% art, Norm., id CI d S _ ,, a. Ne 70 ft . raG Tarin Woods II PCN Attachments Coastal Christian High Schaal Liliput Creek -Cape Fear River © x qzoom to Watershed Name Liliput Creek -Cape Fear River 10-Digit HUC 0303000507 t River Basin Cape Fear Acres 57,112.9 rw,.r°ie e Area {sq. mi.) 89 zsn ti 9 Tarin Woods II PCN Attachments SEGOO �� Appendix C: Notification of Jurisdictional Determination 05/01 /2023 10 Tarin Woods II PCN Attachments ,SEPJ�* Electronically Transmitted U.S. ARMY CORPS OF ENGINEERS WILMING,rON DISTRICT Action Id_ SAV1-2021-01661 County: New llanaver U.S.G_S_ Quad: I1C-31Amirtgtnn NOTIFICATION OF JURISDICTIONAL DETERMINATION Requesrar HD LLC Jack Carl sir Adthiss= 025 Tarin Road Wilnain+ ton. 'tit' ?N409 Ermail: i ac hear rl iSl r to hcJ lso u I h_n rt Site (acres) 164 Nearest Town Wilmineton Nearest Waterway Mott Creek River Basin CAM Fear USGS HUIC 03030005Coordinates Latitude: 34.13099 Longitude:-77.88971 Location description_ The undrN cluoc'd rrr+mer1% is lucated along the northern rdtw<of Tarin'Woods near the mapoed terminus of Ruxa Parkz Lanr wuth of Pinrr Rimd in southern 1rn IiHnoser County, Indicate 1 Vhieh of the I'ollowirka Anph A. Preliminary Determination ® There appear to be waters, includin;; i%rtlandt on the abov'c described project arca�property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC x 1344) and+or Section 10 of the Rivers and, f larbor5 Act (R1IA) (33 USC $ 403I_ The waters, including wetlands have beear delineated, and the delineation has been Verified by the Corps to be sufficiently accurate and reliable. The approximate buund:Ynes of these waters are shown on the enclosed delineation map dated 81412022. Therefore this preliminary jurisdiction determinaLion may be used in the permit evaluation process_ including determining, compensatory mitigaliun. For purposes of computation of impacts, compensatory mitigation requirements_ and other rc.soun:e prutection measures, a pcnmit derision made on [he basis of a preliminary JD Will treat all waters and wrtlands that would be affected in any way by the.. prrmiucd activity on [he site as if they arejurisdictional Waters of the U.5_ This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 330_ 1lowe.ver_ you may request an approved JD. which is an appealable action, by contacting the Corps district for further instruction. ❑ Thor appear to be waters, including wetlands on she above described project arcarpruperty, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC 1344) andlor Section 10 of the Rivers and Ilarbors Act (R1iA) (33 USC § 403y Ilowev'er, since the waters, including wedands have not been properly delineated. this preliminary jurisdiction determinatiun may not be used in the permit et-aluarion process_ Without a verified wetland delineation, this preliminar+ drtecmhration is merely an t:fftmtil-c presumption ofCWA.'RI IA jurisdiction over all of the waters, Including wetlands aL the project area, which is not sufficiently accurate and reliable to support an enforceable. permit derision- We recommend [hat you have the wsterY including wetlands on your project area^properry delineated_ As the Corps may not be able to accomplish this Wetland delineation in a time]y manner. you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. B. Approved Determination ❑ There are Navi�zable Waters of the United Stales within the abo'v'c described projmi arewproperty subject to the permit requirements of Section 14 of the Rivers and Harbors Av((R1IA) (33 USC § 4C3) and. Section 404 of the Clean IN' ater Act (CWAX33 USC ¢ 1344)_ Unless there is a clunty=e in Yaw or our published regulations, this determination may be relied upon for a period, not to exceed five years from the date of this notification. ❑ There are haters, including w•etlaadson the above described pruj ecl arcal`prupray subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC i 1344j_ Unless there is a change in the law or our published regulations. this determination may be relied upon for a period not to exceed five years from the dale of this notification_ ❑We recommend you have the watem including, ""lands on your project arratpruperty delineated. As the Corps may not be able to acLorrp] ish this wetland delineation in a [i rnely manner, you may wish to obtain a consultant to conduct a delineation that can be �-cr&Lcd by the Corps. ❑The waters, including wetlands on your project arearproperty have been delineated and the delineation has been 'v'criFed by the Curps. The approximate boundaries of these. waters arc shown on the enclosed, delineation map dated DATE. We strongly 11 Tarin Woods II PCN Attachments SAY-2021-01661 suggest you have this delineation sur'a'eyed. Upon completion, this surrey should be mviewed and Verified by the Corps. Once verified, this survey will provide an accohrate depiction of all arras subject to CV4'A junsdictiun on your property which, prov ded there is no change in the law or our published regulalions_ may be relicd upon for a period not to exceed fivt: years. ❑The %aters, includiag wetlands. have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on[1ATE- Unless thorn is a change in the law or our published regulations, this determination may be relied upon four a period not to exceed fate years from the dale of this notification.. Q There arc no waters of the U_S.- to include w'ctiancis, present on the above described project area�propirty which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations. this determination may be relied upon for a period not to cxoced five years from the dale of this notification. Q The properly is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (LAMA). You should contact the Division of Coastal Management in MOM-16nd C'itr,, NC, at (252) 5011-2808 to determine their requirements. Placement of dredged or fill material w i thin waters of -the US, including wetlands_ w ithout a Department of the Army permit may constitute a violation of Section 301 of the Clean Waler Act (33 USC 4 13 t ] ). Placement of dredged or fill material, uunslruction ur p]ac:cment of sCrucrures, or work Within navii ble waters of the United Statcs without a Department of the Army permit may constitute a violation of Sections 9 and^ur 10 of the Rivers and Ilarbors Act (33 USC § 401 and/or 403). If you have any queslions regarding this determination anchor the Corps regulatory grogram, please conlact ]grad Shaver at (9101 251461I ter hraJ.e.�h�aYer,`a u�c�ate.9rms.rnil. C. Basis For Delerminalimi; Basis For Determination: See the nreliminar% iurkdietional determination form Bated 05lOIJ2023. D. Remarks: The site wasfield wrrfed an mullipfe oteasions and in oaths ofground water well gauge data was also used to make This deiermination. E. Attention IISDA, Program Participants This dclineatiow'determination has been conducted to idenlify the limits of Corps' Clews Water Act jurisdictiun for the particular site identi feed in this request_ The. delineation determination may not be v'al id for the wetland conservation provisions of the Food Smurity Act of ] 9R3. If -you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work- F. Appeals Information jThis iuftvrmatian applies only to approved jurisdietianaIdeterminatiwks as indieated is B. above) If you object to this determination, you mac request an administrative appeal under Corps regulations at 33 CFR Purl 331. Enclosed you will find a Nwifocation of Appeal Process (NAP) fact sheet and. Request fur Appeal (RFA) form_ lfyuu reques'C to appeal this determination you must submit a completed RFA form to the following address_ US Army Corps of Engineers South Atlantic Division Attn: Mr. Philip A_ Shannin Administrative Appeal Review Offiioer 60 Forsyth Street SW_ Floor M9 Atlanta, Georgia 303034803 AND PH IL I P_A_SI IANNIN{d!USACEEAR-'vIY Al IL 12 Tarin Woods II PCN Attachments SAW-2021-01"I i� EAlI1HERN ENVIRONMENiRLORO In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the o itcria for appeal under 33 CFR part 331.5. and that it has been received by the Division Oflicc %ti,ahin 60 days of Lhe dattc of the NAP. Should you &Lidc to submit an RFA form_ it must be received at the abovc address by Not aunlitaltk. "It is nut necessary to submit an RFA form to the Division Office if you do not object to the determination in this contapondence.'" Corps Rogulatory Official: t7opuffy signed by Brad Brad Shaver�rzozaosrarrtaa3s �'W Date of JD: 01MI/2023 Expiration Date ofJD: Not an»litable The Wilmington District is costmtitted to providing the highest level of support to the public. To help us erasure we continue to do so, please complete our Customer Satisfaction Survey, locate online at �I�t rs rLy�lau�r�.ui�..usa.t.annv.nail �usturtrcr-�crvice-sur+t� . Copy Furnished4c1cctrunic): SEC] attn_ David Scibctta 13 Tarin Woods II PCN Attachments SEGi:t 14 Tarin Woods II PCN Attachments NOTIFICATION OF ADM1N1.S1F1:XF1 N: APPEAL [ll°'I10:NS AND PROCESS 1Nla REQUEST FOR A PPLA L _i plicuitt: 111) I_L `. lick Cktrij%le FLIC Number: S.-AW-21r?1-01(pip I D) Iic: 05. U 1.241 3 Attached «: See Section below ] INITIAL PROFFERED PERNII r{;Standard Permit or Letter ofpermission) A ] PROFFERED PERMIT (Standard Permit or Lcuerofpermission) 13 ] PER -MIT DENIAL C ] APPROVED JURISDICTIONAL DETERNil N-VIION D PRELIMINARY JURISDICI-10NAL DE-1 ERN11%ATION E SECTION 1- The following identifies your rights and options regan:Bg an administrative appeal of the above tl: t: i si 0tm. Additional information maybe found at or htttm_a;rw�trur.tisar e_arrny-rniJ']4lissioaxs+CiutlWforl:s?Rcd�ulatorlFru_:..;. or the Corps regulations at 33 CFR Part 331_ A: UsI HAL PROFFERED 1'EP-MIT: You may acceptor object to the permit. • ACCEPT: if you received, a Standard, Pen -nit, you may sign the permit document and return it to the district engineer for final authorization_ 1f you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized_ Your signature on Elie Standard Permit or acceptance of the LOP means that you accept the permit in its entirety- and, waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: if you object to the permit ( Standard or LOP) because of certain terms and, conditions therein, you may request that the permit be modified accordingly_ You must complete Section 11 of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to addre ss all of your concerns, (b) modi fy the permit to address some of your objections, or (c) not modify the permit having determined that the permit should, be issued as previously written. After evaluating your obj ections- the district engineer will send you a proffered, permit for your reconsideration, as indicated in Section B below. 13: PROFFERED PERMi-F You may accept or appeal the permit • ACCEPT: if you received a Standard Permit, you may sign the permit document and vetum it to the district engineer for final authorization_ if you received a Letter of Permission ( LOP), you may accept the LOP and your work is authorized_ Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety- and waive all rights to appeal time permit, including its terms and conditions, and, approved jurisdictional determinations associated with the permit. • APPEAL: 1f you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section 11 of this form and sending the farm to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice_ C: PERMIT DENIAL: You may appeal the denial of permit under the Corps of Engineers Administrative Appeal Process by completing Section I I of this form and sending the form to the di vision engineer. This form must be received by the divi sion engineer within 60 days of the date of thty nuttee_ D: APPROVEDJIJRISDit--riONALDE7'ERM1NA7-ION: You may acceptor appeal die approved JDorprovide nev% information_ • ACCEPT: You do not need, to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of LILL date of this notice, meatms that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: 1f you disagree with the approved JD. you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by campletmn4 Section I of this form and sending the form to the district engineer_ This f'oi ii. must be received, by the division engineer within 60 days of the date of this notice. 1s Tarin Woods II PCN Attachments : I FR LUMINARY .IR RISDlf'7'1Ck�AL DE7-ERh11VA1'J()N: You do not need to respond to the Corps regarding the ou�lisminar}' J[J. The h lIrninasy JD is not appealable. if you wish, you may request an approved, JD (which may be appealed). I c.ontartsnL� IIIC CLAPS district for further instructiom. Also you may provide new information for further consideration by the Corps to reQC dlLid. 1: Lh, JD. SEC'MN 11- REQUEST FOR APPEAL or 013.JIE EONS To AN INITIAL 11RO1-FERED Pp:fCMrr REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasunb fur appealing the decision or your objections to an nuual proffered permit in clear concise statements. You may attach additional i nformation to this foam to clarify where your reasons or objections are addressed in the adrninistwive record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the admministrative record, the Corps sntisnurandum for t1s. record of the appeal conference or meeting, and any supplemental information that the review officer has dete rmined is needed to clarify the administrative record_ Neither the appellant not the Corps may add new information or analyses to the record,. However, you may provide additional information to clarify the location of information that is already in the administrative record. Pt]11N'T OF CONTACT FOR WMITIONS OR INMRMATION if you have questions revar&ng this decision andlor the If you only have questions regarding the appeal process you may - appeal process you may coiLtucL: also contact: Distriet Engineer, 11'ilmin�,tun Regulators Division MR_ PHILIP A_ SHANNIN Alin: Brad Sharer ADMINISTRATIVE APPEAL RE'vIEW OFFICER Wilmington Regulmhorn Offwe CESAD-PDS-O U.S Arm} Curlps of Fri,inners 60 FORSYTII STREET SOUTIIwEST, FLOOR M9 69 Darlinktsm .11 rnue ATLANTA, GEORGIA 30303-8803 Wilminktun, North Carolinsi 294113 PIIONE: (404) 562-5136; FAX (404) 562-5138 EMAIL: PIIILIP.A.SIIANNINO USAC'E.ARMY_NIIL RI(.iHT OF ENI-RY: Your signature below grants the right ofentry to Corps of Engineers personnel_ and any govesmmtent consultants, to conduct investigations ofthe project site during the course ofthe appeal process. You will be provided a 15-dui notice ofany site investigation, and will have the opportuni to participate in all site in1�� Dale: number: Signature of a llent or a*esrt. For appeals on Initial Proffered Permits send this form to: Distriet Engineer, Wilmington Revulstorp Divisions. Attn: brad Shaver, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits end Approved JurAdicttonal Determinations send this form to: Division Engineer, C'ommaadcr, U.S. Army Engineer Division, South Atlantic, AttnL Mr. Phihls Shannin. Adminislrati%e Appeal Officer, CESAD-PDO, 60 Forsviii Street, Rasm 104115, Atlanta, C corgis 30303-88111 Phone: (404) 562-5137 16 Tarin Woods 11 PCN Attachments PRELI UNARY JURISDICTIONAL DETERMINATION (P,ID) FORM BAC'KC:I{OUND INFORMATION A. REPOR"F COMPLE"FION DA"I'E: FORPJQ: 5E1l2023 i� EAlI1HERN ENVIRONMENiRLORO B. NAN1EAND ADDRESS OF PERSON REQUESTING PJD: Iluosimrl}:rddy LLC, l:xk CaTlisle, &620 Rivt!rRuud. Wilmington . ltiC 294t2 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington District, Tarin 1ivoudi. SAW-2021-0166 i D. PRCME:C'T LOCA'i1ON(S) AND BACKGROUND INFORMAl'ION: 5831 Carolina 13racla [toad (USE: THE: TABLE BELOW 7'0 DOCUMENT- MIJL11PLE AQtJA7'IC RES01IRC ES ANWOR AQUA11C RESOURCES Al- DtFFEREN'l- s1TEs) Slate' NC County, New Hanover City- Wilmington Center C-003dusateS of site (latllong in degree decimal format)- Latitude: 34.11104 Longitude:-77.98976 Universal l'tansverse Mercator,. Dame of nearest waterlrodv: Everett Creek E. REVIEW PERFORMED FORSI-I'E EVALI:A-UION(CHECK ALL THAT APPLY)- * Office (Desk) Deierininahon. Late_ 5r'If2023 * rieLd Determination. Date(s), Multiple site x iwiis 7-A.BLE OF AQUATIC RE:SOURULS IN REVIEW AREA WHICH `MAY BE" SUBJECT 1-0 RE GULA7-ORY JURISDICTION. Site Number Latitude (decimal degrees) Longitude (decimal degrees) Estlmated amount of aquatic resources in review area (acreage arad linear feet, if applicable Type of aquatic resources (i.e., wetland vs. non. wetland waters} Geographic authority to which the aquatic resource "rnayr be" subject (i.e., Section 404 or Section 10/404) PNWWLUS 1 14.11140 77.81NM 745.12 LF Nori-w tlan(1 Section 404 PNWWUS 2 34.11001 T2.8g020 Sf: c.. '• Noo-wetlan[i Section 404 1) The Carps of Engineers believes that there may hie jurisdielional rdicyuritic resources irl the review 17 Tarin Woods II PCN Attachments SEGi4C area, and the requester of this PJD is hereby advised of his or her option to request and ubtain an approved JD (AJD) for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they, may be appropriate. 2) In any CirUUn7s1311ce where a permit applicant obtains an individual permit, or a Nationwide General Permit (P+1WP) or other general permit verification requiring "pre- construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit_ and the permit applicant has not requested an AJD for the activity, the permit applicant is hereby made aware than (1) the permit applicant has elected to seek a permit authorization based on a PJ D. which does not matte an official determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an AJD could possibly result in less compensatory mitigation bednk required or different special conditions; (3) the applicant has the right to request an individual permit rather 111an accepting the terms and conditions of the NW? or other general permit authorization-, (4) the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) undertaking any activity in reliance upon the subject permit authorization without requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g,, signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way by that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) Whether the applicant elects to use either an AJD or a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.FR Part 331. If., during an administrative appeal, it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area, or to provide an official delineation nfjurisdictional aquatic resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that there "ingy het" waters of the U.S. andior that there "rncu, sae" na6gable waters of the US, on the subject review area, and identifies all ;aquatic features in the rcx icvwr area that could be affected by the proposed activity, based on the following information_ 18 Tarin Woods II PCN Attachments S M03MESSMEEM4 tiIIPPOIUI'IVG DATA. Data reviewed for PJD (check all than apply) Checked items should be included in sub*i file. Appropriately rel,irerlcc sources below where indicated For all checked items: ® Maps. plans. plots or plat submitted by or on behalf of the PM requestor: Field Sketch :Nap: ® Data shorty preparexl'submitted by try on behalf of the PJD requestow. 001li4c i on,�ur with data sheet*+'delineation report. ❑ Office does not concur with data sheetwdclineation report. Rationale: ❑ Data sheets prepared by the Corm: ❑ Corps navigable waters' study: ❑ U.S. Geological Suney Hydrologic Atlas: ❑ USGS NFID data. ❑ USGS S and 12 digit FIUC maps. ® U.S. Geological Survey msp(s). Cite scale; & quad name: 1:24k Wilmington Natural Resources Conservation Sen ice Soil Survey. Citation: Soil Sto-vey of Ncw I lano cC Couyty ❑ National wetlands inventory map(s). Cite name: ❑Statell al wetland in►entory map(s): ❑ F EMA'F IRM maps: ❑ 100-year Fhxrdplain Elevation is: (National Geodetic Vertical Datum of 1929) Eg Photograph%: SAerial (Name & Date): 2020 NC CG1A CMhoima6iry or ❑Other (Name & Date): ❑ Pro -ions detcrmination(s). File no. and date of response letter:- 0 Other information (please specify):6 months plus of well data, I%lPORI .tN I' SQ IT: The informadon recorded on this furtn has not necemarily been trrifud he the• ( oros attd should not be relied upon for later iurisdictional determinations. Ugaally signed by Brad Brad Shaver 2033MM1120-36 .04,00" Signature and date of Regulatory staff member completing PJD 5.�1i2023 Signature and Jule of person requesting PJD (REQU IRED. unless obtaining the signature is impracticable)' t visa ,i- _ :. I..I _.i.- tvs rc.+ester to return sifwd PJD forms. tfthe requester dui not ropond Wiehiu dbc establi.l : ;„urn. dw riiyur.t ma) prrwtne cooLurran:c nevi nor additional fo m up is ucsxauir� pciam to f naliaing an O:titm 19 Tarin Woods II PCN Attachments Appendix D: Previous Permits Issued SEGOO �� 20 Tarin Woods II PCN Attachments U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2007-02953 County? New Hanover U.S.G.S. Quad: Wilmington - NC GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: Jack Carlisle Hoosier Daddy. LLC 6025 Tarin Road Wilmington. North Carolina 28409 Agent: Dana Lutheran Southern Environmental Group, Inc. 5315 South College Road, Suite E Wilmington, North Carolina 28412 Size (acres) approximately 47 acres Nearest Waterway Everette Creek USGS HUC 03030302 Nearest Town Wilmington River Basin White Oak Coordinates Latitude: 34.1240 N Longitude:-77.8941 W Location description: The Dice[ area is hrcoled un p"F Fin of 58 Pl ('a ndi na Beach Road] Pa; reel R0760(1404-052-000), near the City of Wit ininetnn. New ILum\'er County. North Carolina. lice Ilie attached survey titled "Heglar Tract; 404 Wetlands Location Map" dated Decem her 1, 2016, which depicts the review area associated with this date run inatinn. Description ofprojects area and activity: The proposed project involves the temporary placement of fill material in 0.39 acres of Lrri„licri.,nal„LI€.md, liar Ihr burp—, i.li mlalliows fur -main-rorl Lra, i 1,.C,t rr liu r.uCiated ,r ith a residcind ,nb,fi, pion. Al I,i irmAl.ltir-n t3 , 0, „ill be rc.tra ul o slcs,te nr „ill, the Mlai hrd rr,l„ranutl plpil i, fled 111 I It t rnrl; 9.Mq (. rrul,inlll„;I.h ltn.id.ly nnEI I'I:emu_. Irt,'.I la,llll lu'v 31.2111� Illi,rrs l,l ti ill .0 1 11:r.d-, Iaped l„odd--a Lori. ml,itin.,pccilicalh Iticd"h_�,I fill r l gA irr jurisdictional ,rla nJ.. rihul flit rurrcol pr,.itcl :ir-. Applicable Law: Ll Section 404 (Clean W ater Act, 33 USC 1344) Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization- Nationwide Permit Number: 12 — Utility Line Activities SEE ATTACHED RGP or NWP GENERAL, REGIONAL AND SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted application and attached plans titled "Heglar Tract; 404 Wetlands Location Map", dated December 1., 2017. Any violation urine attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class 1 administrative penalty, and/or appropriate legal action. This veriftcation will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/tic modified, ibis verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorizatjon. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919.807-6300) to determine Section 401 requirements. 21 Tarin Woods II PCN Attachments For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CA MA), prior to beginning work you must contact the N.C. Division of Coastal Management in Wilmington, NC, at (910) 796-7215. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Kyle Dahl at k le..dal l0usace.arru.mll or 9101251-4469, Carps Regulatory Official: Date: Seotembcr 7, 201T Expiration Date of Verification: h 17 2022 Determination of Jurisdiction: A. El There are waters, including wetlands, on the above described project area that may be subject to Section 404 of the Clean Water Act (CWA) (33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by conractin�, the Corps district for further instruction. Please note, if work is authorized by either a general or nationwide permit, and you wish to request an appeal of an approved JD, the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any work in waters ofthe United States and prior to any work that Could alter the hydrology of waters of the United States. B. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. C. ® There are wetlands within the above described project area that are subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 C'SC j 1344). Unless there is a change in the laic or ocr pr:bl Ishod ,ugulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. D. © The jurisdictional areas within the above described project area have been identified under a previous action. Please reforence jurisdictlnnnl dcterml nation issued . Action ID: SAW - Basis For Determination: Pleave see the attached 4pproved Juriv licrional Dek rndmition I ram. The euclmed nrwr titled "He>;lar Tract; 404 Wetlands Location 11 p" dated December 1. 207 dared December 1, 2017. uccurateh, depicts the extent of iurisdictional Watery el tire L.S. Remarks: Attention USDA Program Participants 'Phis delineatien:'d�tern:icari�rn has been conducted to identify the liniiis (ACorl�s' Clean Water Act jurisdiction forthe particular site identified in this rcquc,r. Ilrc dclineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1995. If you Cr )OUT :ena,et are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local off ice of the Natural Resources Conservation Service, prior to starting work. 22 Tarin Woods II PCN Attachments F. Appeals Information (This information applies only to approved jurisdiction determinations as indicated in B and C above). This correspondence constitutes an approved jurisdiction determination for the above described site. Ifyou object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. if you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room I OM15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date ofihe NAP. Should you decide to submit an RFA form, it must be received at the above address by i i nizci 7 . **It is not necessary to submit an RFA for ivi 1 Office if you do not object to the determination in this correspondence. I Corps Regulatory Official: Kyle Rill, Date of JD: September 7, 2017 / Expiration Date of JD: September 7, 2022 SEGi�. 23 Tarin Woods II PCN Attachments RAW'-2007-02953 SPACIAL CONDITIONS Heglar Tract, Tarin Woods 11 1. Restoration of the site subsequcnt to installation of the force main and sewer lines will be subject to the criteria described in the attached restoration plan titled "1leglar Tract; 9819 Carolina Beach Road; Wetland Restoration Plan", dated January 31, 2017. This restoration plan was developed to address a previous violation, specifically the discharge of fill material in jurisdictional wetlands, within the current project area. C � Kyle Da SEGi�. 24 Tarin Woods II PCN Attachments Action ID Number; SAW-2007-02953 County: N"v Hanover Permittee: Jack Carlisle, Hoosier Daddy Project Name: Heglar Tract Date Verification Issued: September 7, 2017 Project Manager: Kyle Dahl Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WiLMINGTON DISTRICT Attn: Kyle Dahl 69 Darlington Avenue, Wilmington, NC 28403 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I. administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date SEGi** 25 Tarin Woods II PCN Attachments I � f- SEGi E I F '* BASE LINE SURVEY, PLLC =NSE P-1091 PO Bnx 15966, WIlminpt—, NC 30408 \ 5910) 338-1 R60 www t—llnesurveync.c°m YYY fffL "HEGLAR TRACT" OWNER (N/F); HOOSIER DADDY, LLC PARCEL IQ; R0780o-004-0.52-006 (D8 5836\1392) 404 WETLANDS LOCATION MAPS 26 Tarin Woods II PCN Attachments U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT U Action Id: SAW-2007-02953-065 County: New Hanover U.S.G.S. Quad: Wiiminston GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: Hoosier Daddy, LLC clo .lack Carlisle 6025 Turin Road Wilmiogtos, forth Carolina 28409 Agent: Dana Lutheran Southern Environmental Group, Inc. 5315 South Colleec Road, Suite E Wilmington, North Carolina 28412 Size (acres) 54.95-acres Nearest TownWilmineton Nearest Waterway Everett Creek River Basin White Oak USGS IIUC 03030001 Coordinates Latitude: 34.12338 N Longitude:-77.89294 W [_;w�nir•u rl�•seri p6ion� 'I'ht nr'rr'ect sitr is loratrd ai SA19 Carolina Beach Road (Parcel Nos. R07600-004-052-0010, 1611'"GIIIF-1111�-I)yG-II{III. ]{I1�{,fill-0f1 {-RIG I-Gull,RII'ddlll-IIII�-Iur'-I111t1, Itfl)Uts-1101-1i1i1-OEIII.IM-1116-001-017-0110. 79u6i-i)01-01 000, R0" 906-001-01 a-It00, R07906-01)1-013-00u. 1211790f-00_2-001-1100, H u"'U0b-Iri11-01(_00t1. RIl _ _ _ R(171)06-11112-11112-1100, rtll"40( 412 0113-11110, R)7906-1102.-0114-110i1, ItllT}I]t+-1102-IIfL-411111. P{I}�t10(,-011-'-11u6-1100, itU?rH14 1111�-IHf" SIIIII, Ri17Nl16-11112-11113-IIIYO, I21)?r)IIh-60?-l)IP)-IHIO, 1611''41)Irull?-Illfl-illtll, R11- 0o-t)114-061-000, R()7(,1}t-11112-01)1 00o, & R0761 H-002-u02-1100,), in 1'ilmin tolr, Netic Ilanaver (ouiM. North Carolina. The proieet ,itr cotl.ist, of lnule•r cloned land hordcrin� residi,ntint development to the east. Carolina Reach Road to the west. and commercial;lieht industrial development to the north and south. Description of project are» anti activity: The project is the construction of three road crossings to serve a residential development 1%ith :lssuciAkd internal rnotlrt ;ics. ufirilics, I:rndvrn pink, :rod sim nmaler nuumiL men/ f;wdilics. Perimrnent 111-oded Impacts %sill occur 11: .1511 lin tr rec11 12R0 sgou lie 1 u1). nlI 611 i'dirliou:ll trihntnr i,r.. The � j tt ut.I wp, suhirct to an al.rprnvcd in kdicti nal (it IL milt:/Gl:n IC orpr I rI jccl _Nu_',%A 2110--411253-0651 issued on December 10. 2015, Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344) Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Regional General Permit Number or Nationwide Permit Number: NWP 29 — Residential Development SEE ATTACHED NWP GENERAL and REGIONAL SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached condition(s) and your submitted application, specifically, the enclosed four sheets of drawings titled, "Preliminary Plan for Tarin Woods II, Performance Residential Development", dated February 10, 2016; "Impact Area C, Ditch Impacts for Heglar Tract', dated October 20, 2015; "Impact Area B, Wetlands Impacts for Heglar Tract", dated October 20, 2015; and, "Impact Area A, Wetlands Impacts for Heglar Tract", dated October 20, 2015. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is 27 Tarin Woods II PCN Attachments suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-907-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management in Morehead City, NC, at (252)908-2808. This Department of the Army verification does not relieve the pennittee of the responsibility to obtain any other required Federal, State or local approvalsipermits. if there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact John N. Policarpo at (910) 251-4487, Corps Regulatory Official Date: February 26.2016 Expiration Date of Verilicatic March 18, 2017 28 Tarin Woods II PCN Attachments Determination of Jurisdiction: A. ❑ Based on preliminary information, there appear to be waters ofthe US including wetlands within the above described project area. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). B. ❑ There are Navigable Waters ofthe United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 ofthe Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. C. ❑ There are waters of the US and/or wetlands within the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § I344), Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification, D. ® The jurisdictional areas within the above described project area have been identified under a previous action. Piease reference jurisdictional determination issued on A,tion ID: SAW-2007-02953-065 Basis For Determination: This site exhibits rrctland criteria as described in the 1987 Corps Wetland Delineation Manual and -.._ .. ......._..—..--- the Atlantic and Gulf Coastal P] am lict;'ui.o I " oprir lull, a I. The tuoµ'ct nni sassubicl[ _�ggi..rrl j- determination (Corns Protect VE . S.AW-2007-02953-0651 issued on December 10. 2015. Remarks: E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions ofthe Food Security Act of ] 985. If youor your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office ofthe Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B and C above). This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal. under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room IOM115 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete; that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days ofthe date ofthe NAP. Should you decide to submit an RFA form, it must be received at the above address by Nr'A. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.** If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact me at 910-251-4487 or iohn.n.nolicarno(a)usace.armv.mtl. 29 Tarin Woods II PCN Attachments Corps Regulatory Official: ,.�C.«. _ Date: February 26,201 Expiration. Date: 1)eavmber 10, 21120 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our customer Satisfaction Survey online at httn://ner2.nwp.uswe.army.miL'survey.hlnt1 . SEG�� 30 Tarin Woods II PCN Attachments -2007-029; ;-Q6i SPECIAL CONDITIONS Heglar Tract; New Hanover County 1. This permit does not authorize any additional fill material in waters of the U.S., including jurisdictional wetlands, than what is stated in the permit. This permit authorizes permanent impacts to 350 linear feet (1,280 square feet) of jurisdictional tributaries for three road crossings. 2. All waters of the U.S., including jurisdictional wetlands, subject to temporary impact must be restored to pre -construction conditions, including grade and vegetation, immediately after construction activities are complete. 3. All Till material used within waters of the U.S., including jurisdictional wetlands, must be clean and free of toxins and must come from an upland source. Dredging for fill material within waters of the U.S., in eluding jurisdictional wetlands, is not permitted by this authorization. 4. Any utility crossings of waters of the U.S., including jurisdictional wetlands, must be done utilizing jack and bore methods as indicated in the pre -construction notice. Any deviation from this may require re -verification of this Nationwide Permit. Jo N. Policarpo SEW* 31 Tarin Woods II PCN Attachments c `ter !� a ZZ- ! d it t�� A = tk �dt d 134 E I d i6 y�, r a#!z!r gel adk& j' �Bg,A i ! �!r - !� r {+i.�l'�ta ad R�..�il�Btl� afBlg;f�� ra 6 bf.�rflBkrE aa'-1°sail� . 'a i s' .f 9 k R 7 k'11, 1 k ; �rRFI ,I1! , ! S !: e f {�dr r ,kA lifr Ar �' ig sly, ` I �rd''ai 32 Tarin Woods 11 PCN Attachments C� SEGi* IMPACTAREAV RCPS 5 25 0 5 10 15 5.1 IN raE.- 1 51 w 25 0 — W w FaT. W' N I 33 Tarin Woods II PCN Attachments IMPACT AREA y �y 4 1 5 �y a'ra�w��yie�rarH —~y 5 5 y 1 7 5 ll}l 1 y 5 wo � �;aJ az rf.�• ors 4 5 r` �l VA�O 110 V.1 IA. NIOM . ]111}--�(&-AC) 5 2,5 s Al rn r s aewazcwral sCA- rN r¢r. r"- 5V SEGi�. caasi... S 1TL �BESIGh, PA�IL,, ,a i ter-' 34 Tarin Woods II PCN Attachments IMPACT AREA 'A l J M1M1 � Y l 4 wa,'.ER MM INPACF A 120 LF 6 4 FT AC, RDTH =120X4=45D-7(0..017 AC) SEGO� COASTF_ TE 7=S7 GN. PC s Ilia J E_ 5 2.5 0 'v 10 15 I I"1 HOAfZAY i:iL SCAlE NW FE(T� f'= jp' �t �(L 35 Tarin Woods II PCN Attachments NEW HANOVER COUNTY Engineering Department 230 Government Center Drive • Suite 160 Beth E. Wetherill, C.P.E.S.C. Soli L'o—Specialist Wilmington, North Carolina 28403 TELEPHONE (910)-798.7139 _ .rf Fax (910) 798-7051 March 10, 2016 Hoosier Daddy LLC 6025 Tarin Road, Wilmington, North Carolina 28409 RE. Grading Permit # 57-15, Tarin Woods Il Dear Mr. James Yopp: This office has reviewed the revised subject sedimentation and erosion control plan. We find the plan to be acceptable. PIease read the permit conditions carefuiIy and return the signed blue original to our office and keep the copy for your records. The land disturbing fee of $16,650 is due to be paid to New Hanover County, to my attention, prior to issuance any Plat Recordation. A preconstruction meeting is required prior to any land disturbing activity on site. Please contact us at (910) 798-7139 to set this up with us. Please be advised that a copy of the approved soil erosion plan, a copy of the grading permit, a rain gauge and the Combined Inspection Reports must be available at all times at the site. New Hanover County's Erosion and Sedimentation Control Program is performance oriented requiring protection of the natural resources and adjoining properties. If following the commencement of the project, it is determined that the plan is inadequate to meet the requirements of the New Hanover County's Erosion and Sedimentation Control Ordinance, this office may require revisions in the plan and its implementation to insure compliance with the ordinance. This permit will not preclude any other permits or approvals necessary for beginning or completing this development. It is the owner's responsibility to have all the approvals or permits that are required prior to beginning construction. Approval of an erosion control plan is conditioned on the applicant's compliance with Federal and State Water Quality laws, regulations and rules. SEGi�. 36 Tarin Woods II PCN Attachments Respectfully yours, Beth Easley Wetherill NHC Soil Erosion Specialist cc: Howard Resnik PE, Coastal Site Design, PC Linda Painter, NHC Zoning Brad Schuler, NHC Planning SEGi:* 37 Tarin Woods II PCN Attachments Permit# GP 57-15 ` Permit for a Land Disturbing Activity New Hanover County Department of Engineering 230 Government Center Drive - Suite 160 Wilmington, North Carolina 28403 (910) 798-7139 As authorized by the New Hanover County Erosion and Sedimentation Control Ordinance This permit issued to Hoosier Daddy LLC authorizes the development of 50.54 acres of land at 5831 Carolina Beach Road for Tarin Woods 11 in New Hanover County. This permit issued on March I0, 2016 is subject to compliance with the application and site drawings, all applicable regulations and special conditions and notes set forth below. Any plan modifications must be approved by this office prior to field changes It is understood by the applicant that a representative of New Hanover County's Engineering Department may inspect the site at any time following the issuance of this Permit. A copy of the approved Soil Erosion Control Plan, this permit, a rain gauge and copies of the Combined Self -Monitoring and Self Inspection Reports must be available at all times at the site. Failure to execute the provisions of this permit and the approved Soil Erosion Plan, or any other provisions of the New Hanover County Soil Erosion and Sedimentation Control Ordinance, shall result in immediate legal action by the County to the limits prescribed by the Ordinance. If the measures outlined on the approved Soil Erosion Control Plan and this Permit prove insufficient, additional Erosion Control measures can and will be required which in hum will be considered provisions of this Permit. This Permit does not preclude any other permits or approvals necessary for beginning or completing this development. Approval of an erosion control plan is conditioned on the applicant's compliance with Federal and State laws, regulations and rules. It is the Permittee's responsibility to obtain all necessary permits and approvals. SPECIAL CONDITIONS (THESE CONDITIONS MUST BE FOLLOWED IN ADDITION TO THE PLANS AND SPECIFICATIONS) "All the soil erosion control measures will be installed as the site is cleared and maintained throughout construction. These include 3 construction entrances, silt fences, inlet and outlet protection, 2lined temporary diversion swales, 10 3:1 lined swales and immediate construction and stabilization of 4 sediment basins with custom skimmers and coir baffles. The skimmer in Basin #1 will be installed to the outlet structure and will be an 8 inch Custom Skimmer with a 2.6 inch orifice, Basin #2, #3 & #4 will have Custom Skimmers installed thru the earthen embankments. Basin #2 will have an 8 inch skimmer with a 3 inch orifice, Basin #3 will have a 8 inch skimmer with a 2.4 inch orifice and Basin #4 will have a 8 inch skimmer with a 2 inch orifice. Lots 52 - 95 and the Commercial property will be rough graded only and stabilized at this time. Revised plans will be submitted later for these Iots. If Berms exist adjacent to streams silt fences may not be required. No activity is allowed in the flow line of these jurisdictional streams. *Tree Removal Permits must be acquired from the City of Wilrnington and/or New Hanover County prior to issuance of this permit and clearing the site. *Silt fence stakes must be metal and will be placed six feet apart without wire reinforcement or eight feet apart with wire reinforcement. Silt fence is not allowed as inlet protection. `This permit does not preclude any permits or approvals which may be necessary such as City of Wilmington or New Hanover County Stormwater, NCDENR Water Quality, C.A.M.A., and the US Army Corps. of Engineers, DEM Solid Waste or any other agencies. *No sediment shall leave the site. SEGi:* 38 Tarin Woods II PCN Attachments (Continued) -Page Two Permit # GP 57-15 *If plan revisions are necessary you must submit a copy to this office for approval prior to any field changes. *If soil is removed from the site, it must be taken to an approved or permitted site to he identified to this office prior to removal from the site. *All City and/or County and State drainage and Stormwater requirements will be adhered to. *If these measures fail to adequately control erosion, more restrictive measures will be required. *If any phase of grading ceases for more than 15 working days, the site will be temporarily stabilized. *All slopes must be stabilized within 21 calendar days of any phase of activity. The approval of an erosion control plan is conditioned on the applicant's compliance with Federal and State Water Quality laws, regulations and rules. *Note the required rates for seed, lime, fertilizer and mulch in your seeding specifications. *Note the NPDES information from the State for sites disturbing 1 acre or more and the reporting requirements. All NEW projects permitted after August 3, 2011 must include the following surface water withdrawal locations and stabilization requirement designations on the plan in order to qualify for coverage under the most recent NPDES Construction General Permit. All settling basins must have outlet structures that withdraw water from the surface, with the exception of basins or traps that have a drainage area of less than 1 acre. The NPDES permit requires ground cover within 14 calendar days on disturbed flat areas and ground cover within 7 calendar days on all areas within HQW Zones, perimeter dikes, swales, ditches, perimeter slopes and all slopes steeper than 3:1. Exceptions include slopes that are 10 feet or less in length and not steeper than 2:1 which must be stabilized within 14 calendar days and slopes greater than 50 feet which must be stabilized within 7 calendar days. Thfs permit also includes other new requirements which are listed in the text of the NPDES Stormwater Discharge Permit for Construction Activities. Inspections of all erosion control measures and reports are required every 7 days and within 24 hours of every 1/2 inch rain event in a 24 hour period. *Note the Land Resources Self Inspection Program Requirements. This program is separate from the NPDES reporting and requires inspection and documentation after each phase of construction. These phases include: Installation of perimeter erosion control measures, Clearing and Grubbing of existing ground cover, Completion of any phase of grading of slopes or fills, Installation of storm drainage facilities, Completion of construction or development, Establishment of permanent ground cover sufficient to restrain erosion and any Deviation from the approved plan. Enclosed is a Combined Self -Monitoring and Self -Inspection Form that meets the requirements of both the NPDES Stormwater Permit for Construction Activities, NCG 0100M reporting and the Land Resources Self Inspection Program that satisfies the requirements of the Sedimentation Pollution Control Act. This report is the responsibility of the property owner. It requires a rain gauge onsite and inspections and reporting every 7 calendar days and within 24 hours of every l/z inch rain per 24 hour period and at specific phases of construction. Additional copies of this Combined Construction Inspection Report can be found at htt ' ortal.ncdenr.or web erosion . Reports must be available onsite at all times. If you have questions please contact New Hanover County Engineering (910) 798-7139 or the Land Quality Section at the NCDENR Regional office at (910) 796-721.5. *A pre -construction meeting is required prior to any activity on site. Please contact Beth E. Wetherill at (910) 798-7139 to set up this meeting. SEG4 39 Tarin Woods II PCN Attachments (Continued) - Page Three This Permit will expire one year from date of issue if no construction activity begins on site. This permit may not be amended or transferred to another party without approval of this office. `$ey{.k �WL+Flu,u� Beth E.'Wetherill, C.P.E.S.C.. Soil. Erosion Specialist/New Hanover County Permit # GP 57-15 Acknowledgment of receipt of Permit Owner By (please print) Signature SEGOO �� 40 Tarin Woods II PCN Attachments Appendix E: Site Map and Impacts l r Fx�snMr, rzFrulnrFn n�Tcer SEGiOZEMMECCEREWO 1 C9 CSD ENGIµEER[NG �ar 1� 1 i i Z" i f ...:........ 41 Tarin Woods II PCN Attachments Appendix F: Agent Authorization ff-i A UNT AUTII ORI ATION FORM FR PELT LEGAL, DESCRJPTi6N,, f ,(),I, No. PLAN NO. PARCEL IM. 4.3 4W - 006t U* � Ea 74 as "4 2:;1,ti: -.);,,y j u r,,b�-sQ f-d� _r�¢ tip-ovw-414 z�-aa s,rRFFT ADP)RFSS: Prrrr)MV()%s,ner(9aleas print): Ili_ regis(cred pruExrty owner of the above nntcd p operty, cues heTeby authorize Snulhurn Envitonmental Group.nlnc_ r',I Gil 10 ac.t on their behalf in matters rcgazding areas of unvzormen:al cvrtccrn. Property Owner's Addr (if different than property above): €r 7- Yip. Telephone: q+I-013-)c7 We beA cerrjfrlhc'above info"tiortsubjnirt,ed in tits apuiiLati*rl is true mid accurate to the best of our kn witdge{f X- (�Vj x� L�L r/Prop" Owncr Authori:ced Signature SEGI Authorized Signature David ci berta Print Iti amr print Name 0 Date . ZI/ -L Date 42 Tarin Woods II PCN Attachments SEGOO �� Appendix G: Post -Construction Stormwater Management Permit No. SW8230410 ROY COOPER �d EL17ABEI'HS.BISER Secrwwy DOUGL.AS R. ANSEL NORTH CAROLINA fnhran Din m &rdM__,WfQaaary June 81,2023 River Road Construction Company, LLC Attn: James Yopp, Manager 7150 River Road Wilmington, NC, 29412 AND Hoosier Daddy, LLC, a.k.a HD, LLC, Property Owner Attn: James Yopp (by authority given by lack Carlisle, member) 8620 River Road Wilmington, NC, 29412 Subject: Post -Construction Stormwater Management Permit No. SW8230410 Nixon Connection High Density Project New Hanover County Dear Mr. Yopp: The Division of Energy, Mineral and Land Resources received a complete Post -Construction Stormwater Management Permit Application for the subject project on June 1 u, 2023. Staff review of the plans and ssppeeccifications has determined that the project, as proposed, complies with the Stomtwater Regulations set forth in Title 15A NCAC 2H.1000 amended on January 1, 2017 (2017 Rules). We are hereby forwarding Permit No. SW8 230410 dated June 814, 2023, for the construction, operation and maintenance of the built -upon areas (DUA) and stormwater control measures (SCMs) associated with the subject project. This permit shall be effective from the date of issuance until June 86, 2031 and does not supersede any other agency permit that may be required. The project shall be subject to the conditions and limitations as specked therein. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. Please be aware that it is the responsibility of the permit holders, River Road Construction Company, LLC ("Developer") and Hoosier Daddy, LLC, a.k.a HD, LLC ("Property Owner"), to notify the Division of any changes in ownership and request an ownership/name change for the stormwater permit However, if the development agreement between the Developer and the Property Owner is dissolved, cancelled or defaults, and the Division is not notified by the Developer to transfer the permit, then the responsibility for permit compliance reverts back to the Property Owner. A complete transfer request must be submitted to the Division within 90 days as described below otherwise the Developer and Property Owner will be operating a stormwater treatment facility without a valid permit which is a violation of NC General Statue 143-215.1. Failure to transfer the permit may result in appropriate enforcement action in accordance with North Carolina General Statute § 143-215.6A through § 143-215.6C being taken against the Property Owner. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAK). The written petition must conform to Chapter 150E of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this perm it. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919431.3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. Ifyou have any questions concerning this permit, please contact Kellie Beth Norris in the Wilmington Regional Office, at (910) 796-7215 or kellic.nGrris@deq.nc.gov. .-- D � � Noah Carorna Dqp nem ofrmlronm W Qoallty I DIAslan. afEMVy. Kneral and Land trsaurres WAmdngran ""I Office 1127 Csidh,al Drtre E.tmlon I WaaNmgrom N.1d, rAoIm. 25405 910.7%.7215 43 Tarin Woods II PCN Attachments State Stormwater Permit No, SW 8 230410 Page 2 of 2 Sincerely, r r""( Douglas R. Ansel, Interim Director Division of Energy, Mineral and Land Resources Enclosures: Attachment A - Designer's Certification Form Application D—ments DESlklrn: %\\StormwaterTr-nits & Prujects12023UM410 HD52023 06 permit 230410 cc: Howard Resnik PE; CSD Engineering New Hanover County Engheering NCDOT District Engineer Wilmington Regional Office Stormwater File North Carntlna ptpartment OEVM menial Quality I DivPAcnoFEnergy.KnmtaMLand Bes vmm Mrnfngran Reglanal OtAce i IACardlnal Drive Extension 1NIlmtngton. North Carolina 28405 M.7%.726 SEG O. 44 Tarin Woods II PCN Attachments Post -Construction Stormwater Management Permit No SW9 230410 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In compliance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations promulgated and adopted by the North Carolina Environmental Management Commission, including 15A NCAC 02H.1000 amended on January 1, 2017 (2017 Rules) (the "stormwater rules"), PERMISSION IS HEREBY GRANTED TO River Road Construction Company, LLC and Hoosier Daddy, LLC, a.k.a HD, LLC Nixon Connection 5669 Carolina Beach Road, Wilmington, New Hanover County FOR THE construction, management, operation and maintenance of built-upan area (BUA) draining to three (3) wet detention ponds ("stormwater control measures" or 'SCMs') as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications') as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR" )_ The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until June 81', 2031 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee, files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et. al. 1. BUA REQUIREMENTS. The maximum amount of BUA allowed for the entire project is 170,074 square feet. The runoff from all BUA within the permitted high density drainage areas of this project must be directed into the permitted SCMi The BUA requirements and allocations for this project are as follows: a. SCM BUA LIMITS. The SCMs labeled DA 1, DA 2, and DA 3 have been designed to handle the runoff from 54,339, 53,735, and 62,000 square feet of BUA, respectively, within the delineated drainage areas. The BIJA for future development within the drainage areas to the SCMs labeled DA 1, DA 2, and DA 3 is limited to 27,000, 35,000, and 62,000 square feet, respectively. 2. PERVIOUS AREA IMPROVEMENTS. At this time, none of the pervious area improvements listed in G.S. 143-214.7(b2) or the Stormwater Design Manual have been proposed for this project. Pervious area improvements will be allowed in this project if documentation is provided demonstrating those improvements meet the requirements of the stormwater rule. Page 1 at 5 SEGi�. 45 Tarin Woods II PCN Attachments Post -Construction Stormwater Management Permit No, SW8 230410 3. SCM REQUIREMENTS. The SCM requirements for this project are as follows: a. SCM DESIGN. The SCMs are permitted based on the design criteria presented in the seated, signed and dated supplement and as shown in the approved plans and specifications. These SCMs must be provided and maintained at the design condition. b. PLANTING PLAN. The SCM landscape planting plan shown in the approved plans shall be followed in its entirety during construction. After the plants are established, the operation and maintenance agreement must be followed, c. FOUNTAINS. At this time, a decorative spray fountain has not been proposed within the wet pond- Decorative spray fountains will be allowed in the wet pond if documentation is provided demonstrating that the proposed fountain will not cause resuspension of sediment within the pond or cause erosion of the pond side slopes. d. IRRIGATION, If the wet pond is to be used for irrigation, it is recommended that some water be maintained in the permanent pool, the vegetated shelf is planted with appropriate species that can handle fluctuating conditions, and human health issues are addressed. 4. STORMWATER OUTLETS, The peak flow from the 10-year storm event shall not cause erosion downslope of the discharge point. 5. VEGETATED SETBACKS. A 50•foot wide vegetative setback must be provided and maintained in grass or other vegetation adjacent to all surface waters as shown on the approved plans. The setback is measured horizontally from the normal pool elevation of impounded structures, from the top of bank of each side of streams or rivers, and from the mean high waterline of tidal waters, perpendicular to the shoreline. a. BUA IN THE VEGETATED SETBACK. BUA may not be added to the vegetated setback except as shown on the approved plans. b. RELEASE OF STORMWATER NOT TREATED IN AN SCM, Stormwater that is not treated in an SCM must be released at the edge of the vegetated setback and allowed to flow through the setback as dispersed flow. 6. RECORDED DOCUMENT REQUIREMENTS. The stormwater rules require the following documents to be recorded with the Office of the Register of Deeds: a. EASEMENTS. All SCMs, stormwater collection systems, vegetated conveyances, and maintenance access located on property owned by other persons or entities must be located in permanent recorded easements or drainage easements as shown on the approved plans, b. OPERATION AND MAINTENANCE AGREEMENT. The operation and maintenance agreement must be recorded with the Office of the Register of Deeds. c. FINAL PLATS. If a final plat is recorded, it must reference the operation and maintenance agreement and must also show all public rights -of -way, dedicated common areas, and/or permanent drainage easements, in accordance with the approved plans. d. DEED RESTRICTIONS AND PROTECTIVE COVENANTS. The permittee shall record deed restrictions and protective covenants prior to the issuance of a certificate of occupancy to ensure the permit conditions and the approved plans and specifications are maintained in perpetuity. T CONSTRUCTION. During construction, erosion shall be kept to a minimum and any eroded areas of the on -site stormwater system will be repaired immediately. a. PROJECT CONSTRUCTION, OPERATION AND MAINTENANCE. During construction, all operation and maintenance for the project shall follow the Erosion Control Plan requirements until the Sediment -Erosion Control devices are converted to SCMs or no longer needed. Once the device is converted to a SCM, the permittee shall provide and perform the operation and maintenance as outlined in the applicable section below. Page 2 of 5 46 Tarin Woods II PCN Attachments Post -Construction Stormwwer Management Permit No. SM 230410 b. SCM RESTORATION. If one or more of the SCI are used as an Erosion Control device and/or removed or destroyed during construction, it must be restored to the approved design condition poor to close-out of the erosion control plan and/or project completion and/or transfer of the permit. Upon restoration, a new or updated certification will be required for the SCM(s) and a copy must be submitted to the appropriate DEQ regional office. 8, MODIFICATIONS. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. c. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any infiltrating permeable pavement, #57 stone area, public trails, or landscaping material to be considered a pervious surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. 9. DESIGNER'S CERTIFICATION. Upon completion of the project, the permittee shall determine if the project is in compliance with the approved plans and take the necessary following actions: a. If the permittee determines that the project is in compliance with the approved plans, then within 45 days of completion, the permittee shall submit to the Division one hard copy and one electronic copy of the following: i. The completed and signed Designer's Certification provided in Attachment A noting any deviations from the approved plans and specifications. Deviations may require approval from the Division, ii. A copy of the recorded operation and maintenance agreement; iiL Unless already provided, a copy of the recorded deed restrictions and protective covenants; and iv. A copy of the recorded plat delineating the public tights -of -way, dedicated common areas and/or permanent recorded easements, when applicable. b. If the permittee determines that the project is not in compliance with the approved plans, the permittee shall submit an application to modifyr the permit within 30 days of completion of the project or provide a plan of action, with a timeline, to bring the site into compliance, 10, OPERATION AND MAINTENANCE. The permittee shall provide and perform the operation and maintenance necessary, as listed in the signed operation and maintenance agreement, to assure that all components of the permitted on -site stormwater system are maintained at the approved design condition. The approved operation and maintenance agreement must be followed in its entirety and maintenance must occur at the scheduled intervals. a. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by the Division and the stormwater rules such as the construction of additional or replacement on - site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. b. MAINTENANCE RECORDS. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division The records will indicate the date, activity, name of person performing the work and what actions were taken 11. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H 1045(3). Page 3 of 5 SEGi�. 47 Tarin Woods II PCN Attachments Post -Construction Stormwater Management Permit No. SW8 230410 12. CHANGES TO THE PROJECT NAME, PERMITTFF NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes. 13. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. DEVELOPER AGREEMENT. It is the responsibility of the permit holders, River Road Construction Company, LLC ("Developer) and Hoosier Daddy, LLC, a.k.a HD, LLC ("Property Owner"), to notify the Division of any changes in ownership and request an ownership/name change for the stormwater permit. However, if the development agreement between the Developer and Property Owner is dissolved, cancelled or defaults, and the Division is not notified by the Developer to transfer the permit, then the responsibility for permit compliance reverts back to the Property Owner. A complete transfer request must be submitted to the Division within 90 days as described below otherwise the Developer and Property Owner will be operating a stormwater treatment facility without a valid permit which is a violation of NC General Statue 143-215.1. Failure to transfer the permit may result in appropriate enforcement action in accordance with North Carolina General Statute §143- 215.6A through §143-215,6C being taken against the Property Owner b. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following: i. A natural person who is deceased; ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved; iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur, V. The assignment of declarant rights to another individual or entity; vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2); b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 14. COMPLIANCE. The permittee is responsible for complying with the terms and conditions of this permit and the approved plans and specifications until the Division approves the transfer request. a. REVIEWING AND MONITORING FOR COMPLIANCE. The permittee is responsible for verifying that the proposed SUA within each drainage area and for the entire project does not exceed the maximum amount allowed by this permit. The permittee shall review and routinely monitor the project to ensure continued compliance with the conditions of the permit, the approved plans and specifications. b. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. c. MAINTENANCE ACCESS. SCMs, stormwater collection systems, and vegetated conveyances must be accessible for inspection, operation, maintenance and repair as shown on the approved plans. d. DIVISION ACCESS- The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. Page 4 of 5 i� EAlI1HERN ENVIRONMENiRLORO 48 Tarin Woods II PCN Attachments Post -Construction Slormwater Management Permit No, SW'8 230410 e ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stonnwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. f ANNUAL CERTIFICATION The permittee shall electronically submit to the Division an annual certification completed Lv eith the permittee or their designee confirming the projects conformance with permit conditions- g, OBTAINING COMPLIANCE, The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made, h. OTHER PERMITS. The issuance of this permit does not preclude the permittee from obtaining and complying with any and all other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which are imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit issued this the 81 day of June 2023. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION H Douglas R. Ansel, Interim Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number 5W8 23041a Page 5 of 5 SEGi�. 49 Tarin Woods II PCN Attachments Post -Construction Starmwater Management Permit No SW8 234410 hment A GcrSirlcaticn forms The following blank Designer Certification forms are included and specific for this project: • As -Built Permittee Certification • As -Built Designer's Certification General MDC • As -Built Designer's Certification for Wet Detention Pond Project A separate certirrcation is required for each SCM. These bleak certification forms may be copied and used, as needed, for each SCM and/or as a partial certification to address a section orphase of the project, Page 1 of 1 LZA i� EAlI1HERN ENVIRONMENiRLORO s0 Tarin Woods II PCN Attachments Post -Construction Stcrmwater Management Permit No SW8 230410 AS -BUILT PERMITTEE CERTIFICATION 'zereby state that I am the current permittee for the project named above, and I certify by my .r ature below, that the project meets the below listed Final Submittal Requirements found in NCAC 02H.1042(4) and the terms, conditions and provisions listed in the permit documents, plans and specifications on file with or provided to the Division Check here if this is a partial certification Sectionlphase/SCM #? Check here if this is part of a Fast Track As -built Package Submittal. Printed Name Signature County of personally appeared before me this a Notary Public in the State of do hereby certify that day of , 20 and acknowledge the due execution of this as -built certification. (SEAL) Witness my hand and official seal My commission expires PerntaBeeNlir G -t PYouided f ,s l 042( 4 ) 'NIA A- nii REwnmr'loNiS I Bi REomm 1. The deed restrictions and protective covenants have been recorded Y or N and contain the necessary language to ensure that the project is maintained consistent with the stonmwater regulations and with the permit conditions - 2. A copy of the recorded deed restrictions and protectve-covenants Y or N has been provAed to the Division- 3. Records which track the BUA on each lot are being kept. (See Note Y or N 1 EL IWNTENANCEACCESS, 1. The SCMs are accessible for inspection, maintenance and repair. Y or N _ Y or N Y or N _ 1 2 The access is a minimum of 10 feet wide, 3- The access extends to the nearest public right-of-way- C. .u. 1 The SCMs and the components of the runoff collection 1 conveyance Y or N system are located in recorded drainage easements 2 A copy of the recorded plats) is provided Y or N D. SINGIk:E FARLY RESI�H MAL.LIM-Pbftlbrresile+tffat hats#W Y or N va ham -an St`:AA dudetha ! 1. The specific location of the SCM on the lot- Y or N 2. Atypical detail for the SCM. Y or N A 3. hate thatthSCM is required to meet stormwater regulations and that the lot owner is subject to enforcement action as set forth in Y or N NCGS 143 Article 21 if the SCM is removed, relocated or altered without oriwa proval. OPERAATCH AID IFAtlr'FEfLiANCE 11 k*1[I' ` . , 'r '. ' u° Y oc ;N' 1. The O&M Agreement is referenced on the final recorded plat Y or N ._-- - 2. The O&M Agreement is recorded with the Register of Deeds and Y or N appears in the chain of title. F. tecari�4 are brim& Mpt ui a into rh lur�mi cr eaich SETA atttdwiia ie for review_ 'Y tx <N 1 1 of 6 51 Tarin Woods II PCN Attachments Post -Construction Stormwater Management Permit No SW8 230410 Provide an explanation for every requirement that was not met, and for every "N/A" below. Attach additional sheets as needed. Pace 2 of 6 SEGi* 52 Tarin Woods II PCN Attachments Post -Construction Stormwater Management Permit No. SWS 230410 AS -BUILT DESIGNER'S CERTIFICATION GENERAL MDC I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets the below listed General MDC found in N'CAC 02H.1050 in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS -BUILT' drawings, such that the 'intent of the stormwater rules and statutes has been preserved. Check here if this is a partial certification. SectionlphaseiSCM #? Check here if this is a part of a Fast -Track As -Built Package Submittal per .1044(3). Check here if the designer did not observe the construction but is certifying the project. Check here if pictures of the SCM are provided Printed Name Signature NC Registration Number DatR Consultant's Mailing Address: City/Stale/ZIP Phone Number Consultant's Emait address. m Circle N if the as -built value differs from the Plan If N is circled, provide an explanation on Page 2 QUE = not evaluated (provide exolanalion on page 21 J�N A - not applicable to this SCM or protect Cotes GertificaHon Nt � _1003((3) &O low MIA14i ONE ®hWA A. REllU1RE1°` 1 The SCM achieves runoff treatment.__ Y or N 2. The SCM achieves runoff volume match Y or N 3. Runoff from areas and/or existing 8UA is Y or N bypassed Y or N 4. Runoff from offsite areas and/or existing SUA is directed into the permitted SCM and is accounted for at the full build -out otential. 5 The project controls runoff through an offsite permitted Y or N SCM that meets the re uiremenIs of the MDC. 6_ The net area of new BUA increase for an existing project Y or N has been accounted for at the appropriate design storm level. 7. The SCM(s) meets at the specific minimum design Y or N criteria. Br 1fE�3EiJr.7E�:'$ET$AC1C81131�/C 1. The width hofthe vegetated setback has been measured Y or N from the normal pool of impounded waters, the MHW line of tidal waters, or the top of bank of each side of rivers or streams. 2. Thehe vegetated setback is maintained in grass or other Y or N Vegetation 3. BUA that meets the requirements of NCGS 143-214.7 Y or N b( 2)(2) is located in the setback, Pace 3 of 6 SEGi�. 53 Tarin Woods II PCN Attachments Post -Construction Stormwater Management Permit No SW823041Q M W41E 0 4. B that does not meet the requiremerts at NCGS i43- Y or N c , I. i k—jkt j w w,.a— u„ i =1 I ,a enuicu to' a. Publicly funded linear projects (road, greenway sidewalk) b. Water -dependent structures c. Minimal footprint uses (utility poles, signs, security lighting and appurtenances) f 5. Stormwater that is not treated in an 9N is released at Y or N the edge of the setback and allowed to now through the setback as Is ersed flow_ - - Ftandles � peak, ikmvfrom the 10 3 ipr gll id erasion. Y 'ix N A VAF-U&TH7NS 1 _ A variation (alternative) from the stormwater r'le Y N provisions has been implemented. or Y or N 2. The variation provides equal or better stormwater control and a gal or better_rotection of surface waters. E COUPLMNCE Yam OT"m REGUENTOWY has been met or M>r M "x F. - i$�IlN0 -the va ume of thagC A takes -the, nurvfffiomi si.irfaces ado account and is sidiaaent to handle the required Y ar N storm dep. _. _ _ - CIOU A@tmNXMb St 3 LA - irnItu tnmg 8=9 are not Y dr N located in or on areaswiM contamuaated soak. _ tl $WE SLOBM 1. Vegetated side slopes are no steeper than 31-1 1 V Y or N 2. Side slopes include retaining walls, gabion walls, or Y or N other surfaces that are steeper than 3H:1 V. 3. Vegetated side slopes are steeper than 3H:1 (provide Y or N suisorting documents for soils and vegetation) „L IFUNIM PROTECTION° 1. The inlets do not cause erosion in the SCM. Y or N 2. The outlet does not cause erosion downslope of the Y or N discharge point during the peak flow from the 16 year storm, vvii Y or 'N providleli K F -A areU tn'drw&down standing iw8iir t� Y or Nbeen " .. provided to f icRale and -MWMtw'ftON - NCW i the SCM has begin Y or N leaned out and converted to its approved dE--*p state - A 11kIN1 ENANCEACCESS 1 The SCM is accessible for ma+nteriance and repair. Y or N 2 The access does riot rclude Lateral or incline slopes Y or N >3 1AL _ l5IESllG#dERQUAUFlCATKiN5(FA j Cfia d?si4ner is ricer—d under Ghapfets Nk NC. 59F, or Y or ' N 8JF ofthe General StahA s. Provide an explanation for every MSC that was not met„ and for every item marked "NIA" or WE", below. Attach additional pages as needed: Page 4 of 6 SEGi�. 54 Tarin Woods II PCN Attachments Post•Conslruction Stormwater Management Permit No. SW8 230410 AS -BUILT DESIGNFR'S CERTIFICATION FOR WET DETENTION POND PROJECT I hereby state that I am a licensed professional and I certify by my signature and seal betow, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets all of the MDC found in NCAC 02H.1053, in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS -BUILT` drawings, such that the intent of the stonmwater rules and the general statutes has been preserved Check here if this is a partial certification. Sectionlphase/SCM #? Cheek here if this is part of a Fast -Track As -Built Package Submittal per. 1 ll Check here if the Designer did not observe the construction, but is certifying the project, Check here if pictures of the SC are provided. Printed Name, Signature NC Registration Number Date SEAL: Consultant's Malting Address. Gity''Stete'Zlp Phone Number Consultant's Email address: 0) Circle N if the as -built value differs from the Planlpermil. If N is circled, provide an explanation on page 2 ON1E = not evaluated (provide explanation on page 2) MNlA = nvl applicable to this project or SCM This Certification must be comDleted in comunction with the General MDC certification under NCAC 02H 1050 Cs ar<rt+s PIN i,(1N7C ,9M) ll 6WIA A For6bW ! Oupdomil FOURTH I 1 The available Sediment storage is consistent with the a roved plan and is a minimum Df 6 in. Y or N -- -- 2. Water Flaw over the Forebay berm into the main pond Y or N occurs at a non -erosive velgCity. _�� 3. The provided Forebay Volume is 15%-20% of the main Y or N pool volume 4. The Forebay entrance elevation is deeper than the exit Y or N elevation into the pond. 5. The Average Design Depth of the main pond below the permanent pool elevation is consistent with the permitted Y or N value? 6. Fountain documentation is provided. Y or IN E Side I Banks I VagaMed Shsilf - ? 1. The width of the Vegetated Shelf is consistent with the Y N a roved plans and is a minimum of 6 feet, or 2. The slope of the Vegetated Shelf is consistent with the Y N or approved plans and is no steeper than 6 1 IC. AwbuR No& Pool F/6nas[Valurr a I E 1. The permanent pool surface area provided is consistent Y or N with the permitted value 2. The Temporary Pool Volume provided is consistent with Y N the permitted value or 3. The permanent pool elevabon is consistent with the Y N �_- .permitted _yalue._ or Paae 5 of 6 SEGO C 55 Tarin Woods II PCN Attachments Post -Construction Stormwater Management Permit No. SWH 230410 4 The temporary pool elevation is COnsisient With the Y or N permitted value Q. te1WFl 0utffat_l f}rawdbwn _ 1. The design voiume dr"> 5 down in 2-5 days Y or N 2 The size of the Orifice is consistent with the parm!tted Y or N i value. 3. A trash rack is provided on the outlet structure Y or N W __ __ l 4. Hydrologic impacts to the receiving channel are minimized t y or N from the 1 yr 24 hr storm drscharge7 f 5. a inlets and the outlet location are situated per the Y or N aooroved clan and avoid short-circuitina a minimum of 3 1Y or N approved plans and is no less than 50 plants per 200 sf or Y or N no less than 24 inches on center_ Provide an explanation for every MDC that was not met, and for every item marked "NIA" or'NIF below_ Attach additional pages as needed: Paqe 6 of 6 56 Tarin Woods II PCN Attachments OEMLR USE ONLY Date Rea ived, I Fee Paid I Permit Number J Applicable Rules: f ❑Coastal SW -1995 ❑ Coastat SW - 2008 0 Ph IT - Post Construction {select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan State of North Carolina Department of Environment and NaturaI Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an origural 1. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Nixon Connection 2. LacationofProject (streetaddress): 5669 Carolina Beach Road City:Wilmington _ County:New Hanover zip:284AAQ 3. Directions to project (from nearest major intersection): Intersection of Sanders Road and US 421. Travel North on US 421approximately 0.49 miles. Site is located 4. Latitude:34' 07' 57" N Longitude:77° 53' 43" W of the main entrance to the project. II. IERMIT INFORMATION: 1. a. Specify whether project is (check one): ZNew ❑Modification ❑ Renewal w/ Modificationt IRenroals meth modifications also requires SIM1-102 - Renewal Application Farm b.lf this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: ®Not Started ❑Partially Completed' ❑ Completed' 'provide a designer's cerhfrcation 2. Specify the type of project (check one); ❑Low Density ®High Density []Drains to an Olfsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state slormwater management permit application, List the storm water project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks, information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748). ❑LAMA Major ®Sedimentation/Erosion Control: 9 ac of Disturbed Area ❑NPD£Blndustrial Stermwater []404/401 Permit Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: 5. Is the project located within Smiles of a public airport? ®No ❑yes, - ifyes,seeS,L.2022.200,PartVI htc Form SWU-101 Version Oct. 31, 2013 Page l of6 SEGu� 57 Tarin Woods II PCN Attachments III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc, who owns the amiecti: Applicant/Organization:River Road Cc nstruction,LLC Signing Official & Title:lames Y000, Managing: Member b.Contact information for person listed in item la above: Street Address.715.0 River Road City:lVilminpton State:NC Zip:28412 Mailing Address (f f applicable): State: Zip: Phone: (910 1 443-3060 Fax: EmaU:iames@rockfardpartners.net c. Please check the appropriate box. The applicant listed above is: ❑ The property owner (Skip to Contact Information, item 3a) Lessee" (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) Purchaser' (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ® Developer` (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization:HD LLC Signing Official & Title:)ames Yopp, (by authority Oven by lack Carlisle, Member, form included) b.Contact information for person listed in item 2a above: Street Address:8620 River Road City:WilminQton State:NC Zip:28412 Mailing Address (( applicable): City: State: Phone: (910 ) 443-3060 Fax: ( ) Email:iames@rockfordRartners.net, 3. a. (Optional) Print the name and title of another contact such as the projects construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & Title: b. Contact irdormation for person listed in item 3a above: Mailing Address: City: State: Zip: Phone: ( 1 Fax: ( 1 Local jurisdiction for building permits: New Hanover County Paint of Contact: Phone k: Fonn SWU-101 Version Oct. 31, 2013 Page 2 of6 SEGi* 58 Tarin Woods II PCN Attachments III. CONTACT INFORMATION I. a. Print Applicant / 5igming Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization: River Road Construction J hC Signing Official & Title: amen YoRp, Managing Member b.Contact information for person listed in item la above: Street Address:7150 River Road City:Wiimington State:NC Zip:28412 Mailing Address (if applicable): City: State: Zip: Phone: (910 ) 443-3060 Fax: Emailiames@rockfordpartners.net artners.net c. Please check the appropriate box. The applicant listed above is: ❑ The property owner (Skip to Contact Information, item 3a) ❑ Lessee" (Attach a copy of the lease agreement and complete. Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ® Developer" (Complete Contact Information, item 2a and 2b below.) 2, a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization:Housier Daddy LLC ., Signing Official & Tideaames Y000. (by authority given by lack Carlisle' Member. form included) b.Contact information for person listed in item 2a above: Street Address:8620 River Road City Wilmington State:NC ZiP 28412 Mailing Address (tfapplicable): City; State: Zip: Phone; (910 ) 4433060 Fax: ( ) Email:iames@rockfordpartners.net 3. a. (Optional) Print the name and title of another contact such as the ptojecNs construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & Title: b.Contact information for person listed in item 3a above: Mailing Address: Phone: State: Fax: t ) 4. Local jurisdiction for building permits: New Hanover Count Point of Contact Phone #: ( ) Form S WU-101 Version Oct. 31, 2013 Page 2 of 6 SEGi* 59 Tarin Woods II PCN Attachments IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Runoff will be directed into three wet basins. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUT) Approval Date: Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW - 1995 ❑ Ph Il - Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4, Total Property Area 9,05 acres 5. Total Coastal Wetlands Area- n/a acres 6. Total Surface Water Area: n/a acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area':9.05 acres Total project area shall be calculated to exclude f8e followin the normal pool of ern ended structures, the area between the banks ofstreams and nvers, the area below the Normal High Water fN line or Mean High Water (MHM line, and coastal wetlands landward from the NHW for MHI49 line. 'Die resultant project area is used to calculate overall percent built upon area (B LM), Non -coastal wetlands landward of the NHW (or MFIM line may be included in the total project area. B. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 - 43,1 % 9. How many drainage areas does the project have73 (For high densihj, count 1 for each proposed engineered stormwater SMP. For low densihj and other projects, use l for the whole properly area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. US 4211M RROVEIVIENTS Basin Information Draina a Area 1 _ Draina a Area 2 Draina Area 3 Draina a Area Receiving Stream Name Masonboro Sound Masonboro Sound Masonboro Sound MasonbnTo Sound Stream Class' SA;ORW SA;ORW SA,ORW SA;ORW Stream Index Number" 19-87-25,7 18-87.25-7 19-87-25-7 18-87-25.7 Total. Drainage Area (sf) 100,377 122,551 105,572 3,451 On -site Drainage Area (sf) 100,377 ]22,551 105,572 3,451 Off -site Drainage Area (sf) Proposed Impervious Area" (so 54,339 53,735 62,000 % Im ervious Area` total 54.1 43.8 58.7 100 Im rvious ' Surface Area Drainage Area _ Drainage Area Drainage Area Drainage Area _ On -site Buildings/Lots (so On -site Streets (so 22,939 13,435 3,451 On -site Parkin (so On -site Sidewalks (sf) 4.900 5,300 Other un-site (so Future (sf) 27,000 35,000 62,900 Off -site (sf) Existing BUA"" (sf) Total {sf); 59,339 53,i35 62,000 3451 Stream Class and Index Number can be determined at: r; �,r n/ :r ar . •;: I area is defined as the built upon area mcludin�; but nutlirfneea ly"bifit. s, roads, parking areas, sideroalks, gravel areas, etc r_ MAY 15 2021 Farm SVAJ-101 Version Oct. 31, 2013 Page 3 otfl iw. 60 Tarin Woods II PCN Attachments —Report only drat am:;unl of emsting BUA that will remain after development. Do not report any existing BUA that is to be removedand which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? provide documentation. Projects in Union County: Contact DEAfLR Central tO9ice staffia check ifthe project is located within a Threateened & Endangered Species watershed rhai may be subject to morestringent stormwater requirements as per 15A NCAC 02B .0600. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project The latest versions of the forms can be downloaded from httl.' r�! o�oi tt;a:.ncdeni or¢/nreb/+cn/ms/su/bmp-lna nual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMI.R). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from IIttp_//r7,art,1l,,C,ie.It.art*�!I%+,a/++s/s.i/I.-111-1.V/torms does. The complete application package should be submitted to the appropriate DFMLR Office. (The appropriate office may be found by locating project on the interactive online map at Ir1r,:/;"1"'rta.l-ncdenr.urn�/+cei+/+IQi w's/pU'C= ads.) Please indicate that the following required information have been provided by initialin in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from lvttt+:i/vortalnc&nr,,nrvi,re':'l,gL}s'su/sLltes+/tornrs 6C"'. Initials 1. Original anti one oFy of the stormwater Management Permit Application Form. 4 2. Original and om, ofy of the signed and notarized Deed Restrictions & Protective Covenants /Y, Form, (f req:amd as per Part VfI below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to htty://w+ ,.envhelp,org/pages/onestopexnress hhrrl for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within t/r mile of the site boundary, include the 'A mile radius on the map. 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MEW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NEW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. in. Wetlands delineated, or a note on the plans that none exist (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). Form S WU-101 Version Oct. 31, 2013 Page 4 of 6 for 61 Tarin Woods II PCN Attachments p- Vegetated buffers (where required) 9- Copy of any applicable soils report with the associated SHWT elevations (Please identify /yam elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. include an 9.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the methodof determining the infiltration rate. (InfiltrationDevices submitted to WiRO: Schedule a site visit for DEMLR to venfy the SI fVVI' prior to submittal, (970) 7 96-7378.) 10. A copy of the most current property deed. Deed book: 6500 Page No: 7159 11. For corporations and limited liability corporations (LLC), Provide documentation from the NCB Secretary of State or other official documentation, which supports the tides and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 214.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. h www.secretarv.st3te.ni-us Cor orations CSearch.as x VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table fisting each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from � i.— ,orta 1.mAciir.orAfweb/Ir,' tmto- stormiv, orrtorni, doc�. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. Vill. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting EngineerFloward Resnik, PE Consulting Firm: CSD Engineering Mailing Address:PO BOX 4041 City:Wilmin ton State:NC Zip_2f3406 Phone: (910 1 791-Ml _ Fax: (910 1 791-1501 Ernail:howard@csd-en �eeriri .com IX. PROPERTY OWNER AUTHORIZATION (rf Contact frtforneahon, rfem Z has been felled out, compiete this section) 1, (pnut or hjpe name of person listed nr Con tact Information, item 2a) lamees YOPP certify that I own the property identified in this permit application, and thus give permission to (print or hjpe name of person tided in Contact 6rfornurhair, item la) Lames Yo with (print or hype name oforganization listed in Contact Information, item Ia) Hoosier DaddiLLC to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version Oct. 31, 2013 Page 5 of SEGi�. 62 Tarin Woods II PCN Attachments As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Storenwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to S25,000 per day, pursuant to NCGS 143-215.6. Signature: �/ '{ i7 � '— Date: C. 4 -1 J / I a Notary Public for the .1 to of _awmacounty of do her by certify that �3 personally appeared before me this JMy of T{ (Y.l.t Sand owledge ttyq due�g e y h n of a application for AI �l! n 7 a stormwater permit. Witness my hand t \`0��p ��. HqR�/q��� Al�� %1. o�. 'OUBUG :r2 y� NOVEt\AtiGo`���` X. APPLICANT'S CERTIFICATION SEAL My commission expires. 1, (print or type name of person listed in Contact Information, item la) fames Yopp, Member certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed res'u ictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H .1000 and any other applicable state stormwater requirements. Signature: �' / _' pt�C (�t)- Date: C' -( - ! I - -) '�, I, U�tGf�t 4 J a Notary Public for the State of County of dohereby certify that Ti ! personally appeared before me this ay of rl l 060 and aAmowledge thq due gftpcution of t�e Mpbcation for a stormwater permit Witness my hand and official sea], f y �NO VER G1���` Form S\VU-101 Version Oct. 31, 2013 SEAL My commission expires 0 �LfJ cti(O Page 6 of 6 63 Tarin Woods II PCN Attachments As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid pe=t is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $Z5,0W per day, pursuant to NCGS 143-215.6. SNos,an,ra, / / , f Z-✓, ,n —t-� — A 4 , '7 — 77 I ' ' a Notary Public for the State of IWKW I L-em" .c' ('.`County of do hereby ceertify that 3Qmes L'. yopp- g2v personally appeared before me thi — day of rl l and arr��JJJ/gqfj �t�owle,yd�e th du/gt)f/P,xecuLyt�io��n of the application for a stormwater permit. Witness my hand and official seal, G!/..UUG(i P" 11) HRRr���i` TABLI igy�r X. APPLICANT'S CERTIFICATION IyA-14 My Commission expires 25 I, (print or type name of person listed in Contact Information, item Ia) larttes Yopp Member certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H .1000 and any other applicable state stormwater requirements. Date: () Lf - ..)•: -- 1i I ' Li- I t F 4 a No_ t Public for the State of 1391 TrIU—UL11 f iKwCounty of l�Sy1,6( do hereby cer if that �`dfcFlirr t� J� personally appeared fl before me thi ay of tAT I and ac wledge the u ee c tian oI tth%e /p�lication for a stormwater permit. Witness my hand and official seal, D ? _ Y AUSUG .'2. .f���'ighOVER GQ�x� Form SWU•101 Version Oct- 31, 2013 SEAL My commission expires `-r4/lxl otL.e'fl/ Page 6 of 6 64 Tarin Woods II PCN Attachments SUPPLEMENT-EZ COVER PAGE PROJECT INFORMATION 1 Pnlent Name NIXON CONNEC11ON 2 Project Area ac _ 905 3 Cc Stat Niel! Area ac _ 4 SWrface water Area aU 5 Is [his ro'en High or Low D.nsitv7 H' h 6 Does th[s p�ajec! use an ofl-sale SCM7 No. COMPLIANCE 4VRH 041H .1003(4I T WOO oP,e ewted setbacks orovided 1e tl NIA B W41 the ve elated 5elback reman ve eb41ed7 NIA B If BUA is pra used in the setback, tloes it meal NCAC 02H 1CD3 4. co 7 NIA 10 Is stmembank stabilization pmrowd on ih s project? I No NUMBER AND TYPE OF $CMS' t 1 fnf ltraban S sdem _ 12 MoTtenbon Cell 13 WeI Pond 3 14 Stmmwaler Wetrane 15 permeahfe Pe .nt to Sand Filter 17 Rainwater Ha sb, R'sJFI' 18 Green Roof I 19 !Level Spreader -Filer Sin LS FS 20 Discameaed Irn rvlous Sunace MIS) 21 'Tre.tmen° Swat. 22 23 la Pand SlarmFilter 24 Silva Gell 25 9a filter 26 Filters FCItr.,>'.OADEO DESIGNER CERTIFICATION - 27 Name antl Title Hawed Resnik. PE 2B 22 D anizetion SlnsetaddMSS G50 En irwe P�60A 4041 30 Ci State 2r wlmin tan NC 28401 3t Php wmber8 9t0.T91<441 32 Ema,I Havard®csd-angincerinq.corn cenifrnJlkln SwemeH- f 2ni1y, under penury rA law !`M Mi. SOPlamenl-EZ I— and ii i sLPP..'V InPom[ .. were Prepared under my dinI ar supervr - th the intmm W, p—detl in the Iwm Is, to the het pf my tvww!etlpe -d bd.4, I— am and C.TO le ano IhN the engh-rIN Plans, .Pc r'� e, ppme:Orel m 11n_ 09a�emsntf nM other S PPptinjf lldernl 00 ere Wn i3leM will the inidrr ,; ;-,de here. `,',,%k YCAR o ��0�'FESSl� SEAL i a 025483 n ��'•. tf4, ��4.. S. gnatua of bete SEGi�. 65 Tarin Woods II PCN Attachments DRAINAGE AREAS I :Is this a K h dens! 0 011 Yes 2 If so, number of drama a hAISCfas 3 3 Pces this o+oiect have low dens! y —as? NO a II so, numllar of low densrN drainage areas 0 s alllpan of IN5 projecl sunje�ct to prev4cus mle 5 versions? No Oa"_ WA' ❑ DRAINAGE AREA INFORMATION Entire Sft 1 2 3 4 ITyp,.ISCM vvel basin Wet Basin Wet Basin 5 drama a area RI 328,500 100 37 122.551 105.572 6Oa iTo 328,500 100377 122551 105,572 7 POffsge drainage area (so ftl 8 Total BUA In sects R 170074 sf 54339 sf 53735 sf 52000 sf 9 New UUA on subdivided loll (subject lo 'pe'm,lRin(sg R) sf 10 New BUAg)noI on subdivided lots (subject to e, ttin s C 17007491 54329 sf 53735 $1 62000 sf 11 Offwte BUA (so 11 12 Ureakdown of new 9UA not on_subdMded lots Parkin fl - Sidewalk s fl 4400 sf 5300 s1 - ROOP s ft - ROadwa s fl 22939 sf 13435 sf - Future R 27000 sf 35000 sf 6400 sf - Other, please speuH In fne oommenl box bak�w ft T3 _ New inflTraling permeable pavement on subdivided loll R 14 Mew .1dr4tmg permeable pavemerel not on subd•vided 101s s ft of 15 EXisirng BUA that will remain (nol subject to permit�1154,_.__. 16 Existing BUA that is alre melded R 17 jErilling BUA that will be removed R 18 Percent BUA 54.T 438 587 19 Oes n storm inches) 1.5 in 1.5 in 1 51n 1 5 In 20 joesign volume of SCM(Cu 111 18041 d 21767 of 19096 of 21 ADDITIONAL Calculation method for design volume INFORMATION simple s1m simple 22 Wease use Ihis space to provide any additional information about the drainage area(sp SEGi�. 66 Tarin Woods II PCN Attachments WET POND ��Craina a area number 1 2 3 Z _ Minimurc ned Irealmem vn ume rcv h s1a0 cr ' 6611 ct 7635 Cf ENERAIM FROM 0311 .1050 3f Is the SCM szed to area: the SW from all Surfaces at *Vd-Q,l' I Yes ails the SCM located —y from acnfarhtrated 5Dis' Ves Yes Yes 5 Yvnat are sit the e slo s of the SCM H. 7 3.1 3 1 3. i 6 Dee51"e SCM nave lemming wails. gabion walls or Other eared sine sic es7 No NO No 7 Are 'he ;hi O01I and recervrng abeam pmle yed from e.si ' 10 ear srmto? Yes Yes Yes 3-Is there an overflow dr bypass Far meow volume in esce55 rthe Ides nvglUme7 Yes Yes Yes 91 What is the method Ia dewalenn the 5CM for maintenance? P fe"¢dl Pura I re'emed Pum f roMiYed 1011 a liCdbie, wi!i the 5CM be rlean¢tl put a`ter —trprtdn7 Yes Yes Yes 11 0DeS the alar"len ante access am I with (,eneraI MDC a f7 Yes Y¢5 Yes 12 Does the, dr&nel>E easement tarn I wrth General MDC 9 7 Yes Yes Yes 13 If the SCM is on a 5ingk family df. does (wiII71 the plat mm i wrth Genera! MOC fS0 �A N/A MU 14 Is Iher¢ an O8M Agmer-int Thal domplie5 with General MDC (11)7 Yes Yes Yes 15 Is them an O&M Plan 1ha1 ran res wrth General MDC 12 7 Yes Yes Yes 16 Does the SCM to.I w the device -Sc MDC? Yes Yes Yes 17 Was the SCM di by an NC Ilcensed Dn]f¢55rofla? Yes Yes Yes WET PCND MOC FROM D214 A051 t 8151vn methodesed SAI'D,q WOlA ydDA 19iHasa sta e5tpa tabl¢p¢en r0yidM in the Cakulal;enST Yes Yes Yes 20�.IEfevatwn of the excavated main peel depth (poti of sedlment m51' f lam 17 00 19 DOremoval 21 Eleva01 of the main pool txntom (top Of sedimenl renl0yaf) (rm51) 19 CC 1000 20 CO 22 Elevation of the hoi cr the r elared'nelf ffl 23,00 2250 7300 23 Cievalion o11he ne0rene"I )?mall 2250 2300 23 5C 24 Elevaucn OI It of the ve etatetl Shelf imsl 24.00 2360 24 09 25 Elevaucn cl the tem fors') 25.30 2470 2430 26 5udace a2a Or [h¢ morn o¢rmanertl s ualx f¢el 5052 8359 17515 27 Volume of the main rmanem ocl Tublc feel) 15289 of 24455 cf 49424 of 2e Avera a tle ut of the main ,00l ree0 3 00 R 3 W fl 3 DO d 29 Avera a de M Uahpn used Ueboh 3 E ua- 3 E uafwn 3 31 II usrn uauon 3, hum "meter fee[ 358 0 0 425 0 R 511 Do 'I Il usin a Uali0n3, wOth of Sub T4 L-0y .'hell (ez11 3.0n �305 3eh 32, Volume al the Ipr¢ba CudlG fee{ 3004 cl 4017 of 8751 of 3335 1ha 15-2O% of th¢ vglUme n the mainpi Yes Yes Yes 34,Clean—I tle to for letthd inures 12 ht 12 ,i 12in T 35 Desi n voume of SCM' cu fl I t6041 cf 21767 CI 1 M95 of 35 Is the oupel an on - Dr a we117 I Onf— OMlte Onf 37 if orrice, wrfl- d-ster lnches 1.25 t 25 a in 39 �} welt, welt hei 11l inch¢' . tf11u weir;e Ih Inches' 40 Drawdovmtlme for the tem oma' pool a s 246 255 213 41 Are tha inleif5} and date" IDCatetl IT, a manner dhal avoids short- Yes Yes Yes 42 Are pemis Dr Sables mvidetl ID +m rove the. flr>w in7 No No No 43 Deoth of loreha at enVance ruches! 54 in 361n 54 to 44 Depth Of fxebay at exit hnCOest� 00 017 00 45 Does water flow out 01 me f0reba in nner+ es Y Yes Yes 46 Widlh of the v eFlshelf Peep 0 fl 6 ft 811 q7 il Slo of v tatehelf H. 6 1 51 at 48 Dots the Ol drawdown from below the top —face Of the h,lanent 7 yes Yes Yes 49 Does the pond mi ha— impapls to the receiving Channel fmm the I. . 24.nr storm? Ves Wes Yes 56 _ Am tounta:ns P opO5¢d7 (lf Y. prease provide doCWllenldtiDn that MDC 8 is mel..l No NO Pitt 51 fs a hash fork or other device p'ovrdsd to plclect the outlet system? Yes Yes Yes 52 53 Am The dam and embarlkmenl planted do—dtumping turf grass? SptCle' DI turf that will be used nn the dam and err•Oanitmenl Yes ctnu a Yes anti ¢ Ves ten' 5a uDD ' Hasa plant" an been rovioQO for the v etudd shelf? IN NA QN Yes - Yes Yes Pka't u'e thi3 spate ID P-10 any add,lbo al ,ttl—ti0n anow 55 the wet Ilnndl5}. 411110�i 3 36 PMsl1012e23 SEGi�. 67 Tarin Woods II PCN Attachments Operation & Maintenance Aareement iect name: INixon Connection Sul �i3d `� ID Project Location: �5669 Carolina Beach Load Maintenance records shall be kept an the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). The SCM(s) an this project include (check ail that apply & comes o ondin O&M sheets will b Infiltration Basin Quantity: Looation(s): Infiltration Trench Quantity: Locafion(s): Bioretention Cell Quantity: Location(s): Wet Pond Quantity: 3 Location(s): Stormwater Wetland Quantity: Locafion(s): Permeable Pavement Quantity: Location(s): Sand Finer Quantity: Locaf€on(s): Rainwater Harvesting Quantity: Localion(s): Green Roof Quantity: Locadon(s): Level Spreader - Filter Strip Quantity: Location(s): Proprietary System Quantity: Location(s): Treatment Swale Quantity: Location(s): Dry Pond Quantity: Location(s): Disconnected Impervious Surfaoe Present: No Location(s): User Defined SCM Present: No Location(s): Low Density Present: No Type: I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached 08M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: River Read Construc0on Company, LLC James Yapp, Manager 7160 River Road Wilmington NC 28412 910-443-3060 james@rockfordparbiers.net Signature: - - D te:-- 1, Notary Public for the Slate of County of do herebynertlfy that personally appeared before me this day of rl and acknowledge the due execution of the erations , nd M Agre�me�� iin�� Witness my hand and official seal, STORM-EZ Version 1.5 ly commission expires 3l2912923 OSMAgreemenl page 1 of 1 SEW* 68 Tarin Woods II Pill Attachments wet Pond Maintenar;ce Requirements Important operation and maintenance procedures: Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become estabfshed (commonly six weeks). No portion of the wet pond should be fertilized after the initial fertilization that is required to establish the plants on the vegetated shelf. Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wet pond. If the pond must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain will be minimized as much as possible_ At least once annually, a dam safety expert will inspect the embankment. Any problems that are found will be repaired immediately. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. After the wet pond is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches for 1.5 inches if in a Coastal County) . Records of operation and maintenance shall be kept in a known set location and shall be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remed late the problem: The entire wet pond Trash/debris is present. Remove the trashFdebris. The perimeter of the Areas of bare soil andlor Regrade the soil if necessary to remove the gully, plant group wet pond erosive gullies have cover and water until it is established. Provide time and a on formed. time fertilizer application. The inlet pipe is clogged (if applicable). Unclog the pipe. Dispose of the sediment off -site.., _ The inlet pipe is cracked or otherwise damaged (if Repair or replace the pipe. The inlet device applicable). Regrade the Swale if necessary and provide erosion c�rol Erosion is occurring in the devices such as reinforced turf matting or riprap to avoid Swale (if applicable}. future problems with erosion. Sediment has accumulated to a depth Search for the source of the sediment and remedy the problerr greater than the original if possible. Remove the sediment and dispose of it in a design depth for sediment location where it will not cause impacts to streams or the SCM storage. The forebay Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If pesticide is used, Weeds are present. wipe it on the piants rather than spraying. SEGi�. 69 Tarin Woods II PCN Attachments c Pond Maintenance Requirements (Continued) SCM element: I I ,w 'ial problem: How to remediate the problem: Se&ment has accumulated to a depth Search for the source of the sediment and remedy the problem greater than the original if possible- Remove the sediment and dispose of it in a design sediment storage location where it will not cause impacts to streams or the SCM depth. The main treatment Algal growth covers over area 561/. of the area. Consult a professional to remove and control the algal growth. Cattails, phragmites or other invasive plants Remove the plants by wiping them with pesticide (do not cover 50 of the basin spray). surface. Best professional practices show that pruning is needed to Prune according to best professional practices. maintain optimal plant health. The vegetated shelf Determine the source of the problem: soils, hydrology, Plants are dead, diseased disease, etc. Remedy the problem and replace plants. Provid or dying, a une-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Shrubs have started to Remove shrubs immediately. grow on the embankment - Evidence of muskrat or Consult a professional to remove muskrats or beavers and beaver activity is present. repair any holes or erosion. A tree has started to Consult a dam safety specialist to remove the tree. The embankment grow on the embankment. An annual inspection by an appropriate professional shows that Make all needed repairs immediately. the embankment needs repair. Clogging has occurred. 89 g Clean out the outlet device and dispose of any sediment in a location where it will not cause impacts to streams or the SCM The outlet device The outlet device's damaged. Repair or replace the outlet device. Weeds or volunteer trees are growing an the mat. Remove the weeds or trees. Floating wetland island The anchor cable is (if applicable) damaged, disconnected Restore the anchor cable to its design state. or missing. SEG�� 70 Tarin Woods II PCN Attachments ... ............ante Requirements (Continued) S ' .?men— : W problem: Wow to remediate the problem: Erosion or other signs of damage have occurred at Repair the damage and improve the flow dissipation structure. the outlet. The receiving water Discharges from the wet pond are causing erosion sedimentation in the Contact the local NCDED Regional Office.or receiving water. SEGi* 71 Tarin Woods II PCN Attachments __WET POND 0 1 Pretreament Na other Elan Has Veq_ Filter? No rr WET POND it) E -- 2 Pretreatment other than No Has Veg. Filter-7 NO Pretreatment No other than Has Vag Filter? No Wet Detention Pond Design Summary FOREBAY Permanent Pool EI.R19 Temporary Pool iE Clean Out Depth Sediment Removal E Bottom Elevation FORESAY Permanent Pool Et 23 Temporary Pool EI Clean Out Depth Mig Sediment Removal E Bottom Elevation. FORESAY Permanent Pool ELM19 Temporary Pool El Clean Out Depth Sediment Removal E Bottom Elevation ATTACH AnnlTlr]NAI SHFFTC IF MAIN POND Permanent Pool EI.Mla Temporary Pool EI Clean Out Depth. Sediment Removal E Bottom Elevation IAIN POND Permanent Pool EI 23 Temporary Pool EI 24.7 Clean Out Depth 5 Sediment Removal E t n Bottom Elevation 17 Permanent Pool EI. 23.5 Temporary Poal EI 24 3 Clean Out Depth 3.5 Sediment Removal E 20 Bottom Elevation 79 SEGi� 72 Tarin Woods II PCN Attachments Appendix H: Species List SEGOO �� 73 Tarin Woods II PCN Attachments == United States Department of the Interior 41 FISH AND WILDLIFE SERVICE 4'?£b.3•'®�® Raleigh Ecological Services Field Office 3916SunsetRidpRd Raleigh, NC 27607 Phone: (919) 856-4520 Fax: (919) 8564556 In Reply Refer To: 03/28/202417:11:30 UTC Project Code: 2024-0069668 Project Name: Tarin Woods II Subject: List of threatened and endangered species that may occur in your proposed project location or may be affected by your proposed project To Whom It May Concern: The enclosed species list Identifies threatened, endangered, proposed and candidate species, as well as proposed and final designated critical habitat, that may occur within the boundary of your proposed project and/or may be affected by your proposed project. The species list fulfills the requirements of the U.S. Fish and Wildlife Service (Service) under section 7(c) of the Endangered Species Act (Act) of 1973, as amended (16 U.S.C. 1531 erseq.). If your project area contains suitable habitat for any of the federally -listed species on this species list, the proposed action has the potential to adversely affect those species. If suitable habitat is present, surveys Should be conducted to determine the species' presence or absence within the project area. The use of this species list and/or North Carolina Natural Heritage program data should not be substituted for actual field surveys. New information based on updated surveys, changes in the abundance and distributloo of species, changed habitat conditions, or other factors could change this list. Please feel free to contact us if you need more current information or assistance regarding the potential impacts to federally proposed, listed, and candidate species and federally designated and proposed critical habitat. Please note that under 50 CFR402.12(e) of the regulations implementing section 7 of the Act, the accuracy of this species list should be verified after 90 days. This verification can be completed formally or informally as desired. The Service recommends that verification be completed by visiting the IPaC website at regular intervals during project planning and implementation for updates to species lists and information. An updated list may be requested through the IPaC system by completing the same process used to receive the enclosed list. The purpose of the Act is to provide a means whereby threatened and endangered species and the ecosystems upon which they depend may be conserved. Under sections 7(a)(1) and 7(a)(2) of the Act and its implementing regulations (50 CFR 402 erseq.), Federal agencies are required to utIII7e their authorities to carry out programs forthe conservation of threatened and endangered SEGO� 74 Tarin Woods II PCN Attachments Project code: 2024-00b9666 03128F2024 17:11:30 uTC species and to determine whether projects may affect threatened and endangered species and/or designated critical habitat. A Biological Assessment is required for construction projects (or other undertakings having similar physical impacts) that are major Federal actions significantly affecting the quality of the human CM LonmcnL us dclined in the \ational Environmental Policy Act (42 U.S.C. 4332(2) (c)). I or project, other than itrjor cousr action activities, the Service suggests that a biological evaluation similar to a Biological Assessment be prepared to determine whether the project may affect listed or proposed species and/or designated or proposed critical habitat. Recommended contents of a Biological Assessment are described at 50 CFR 402.12. If a Federal agency determines, based on the Biological Assessment or biological evaluation, that listed species and;or designated critical habitat may be affected by the proposed project, the agency is requited ur consult N, uti the Service lairsuaut to 50 CFR 402. In addition, the Service recommends their c,,ndidatc species, proposed sp_cies and p oposcd critical habitat be addressed within the consultation_ N-1urc information ou thr regulations and procedures forsection 7 consultation; indrdin:r the role of permit or license applicants, can be found in the "Endangered Speci: s Consiik,mo t I kmdbook" at: https www.fws.gov/sites/default/files/documents/endangered-species-consultation- handbook.pdf Migratory Birds: In addition to responsibilities to protect threatened and endani;cred species under the Endangered Species Act (ESA),there are additiniudic. pnnsihiliticsunderthe Migratory Bird Treaty .Act (VBT1A) and the Bald and Golden I qglp 11 wucnon Act (D(1FPA) to protect native birds from project -related impacts. AmIcti%ity, Intentinnal or unintoni'utnal, resulting in take of migratory! hirds, inducting eagles, is prohibited unless other%, ise permitted by the U.S. Fish and Wildlife Service (50 C.I .R, Sec. i0. 12 and 16 U.S.(:. Sec. 668(a)). For more information regarding these Acts, sec hops: +v: t,.hvs.govprogram. migratory-bird-permitlwhat- we-do. The MBTA has no provision for allowinL,, take w migratnry birds that maybe unintentionally killed or injured by otherwise lawful activities. It is the responsibility of the project proponent to comply with these Acts by identifying potential impacts to migratory birds and eagles within applicable NEPA documents (when there is a federal nexus) or a Bird1agle Conservation Plan (when there is no federal nexus). Proponents should implement conservation measures to avoid or minimize the production of project -related stressors or minimize the exposure of birds and their resources to the project -related stressors. For more mtni ji ation on av ion stressors and recommended conservation measures, see https:llwww.fws.gov, I ihrary/collections/threats-birds. In addition to MBTA and BGEPA, Executive Order 13186: Responsibilities of rederoI Agencies to Protect Migratory Birds, obligates all Federal agencies that engage in or authorize activities that might affect migratory hirds, to minimize those effects and encourage conservation measures that will improve bird populations. Executive Order 13186 provides for the protection of both migratory birds and migratory bird habitat. For information regarding the implementation of I %ecrtM Order 13186, please visit https://www.fws.gov/partner/council-conservation- mi ratory-birds. 20`16 SE OW 75 Tarin Woods II PCN Attachments Project code: 2024-0069666 03128f2024 17:11:30 UTC We appreciate your concern for threatened and endangered species. The Service encourages Federal agencies to include conservation of threatened and endangered species into their project planning to further the purposes of the Act. Please include the Consultation Code in the header of this letter with any request for consultation or correspondence about your project that you submit to our office. Attachment(s): • Official Species List • USFWS National Wildlife Refuges and Fish Hatcheries • Bald & Golden Eagles • Migratory Birds OFFICIAL SPECIES LIST This list is provided pursuant to Section 7 of the Endangered Species Act, and fulfills the requirement for I ederal agencies to "request of the Secretary of the Interior information whether any species which is listed or proposed to be listed may be present in the area of a proposed action". This species list is provided by: Raleigh Ecological Services Field Office 3916 Sunset Ridge Rd Raleigh, NC 27607 (919)856-4520 30`16 SEW* 76 Tarin Woods II PCN Attachments Proiectcode: 2024-0069669 OWW202417'11:30 UTC PROJECT SUMMARY Project Code; 2024-0069668 Project Name: Tarin Woods Il Project Type: New Constr - Above Ground Project Description: The proposed project aims to facilitate the development of a large residential project within the designated area. Its primary goal is to provide necessary housing infrastructure to meet the growing demand within the Wilmington, NC area. Project Location: The approximate location of the project can be viewed in Google Maps: httos;l/ www.google.com/maps/a 34.1284919.-77.8913192fi356296,14z Counties: New Hanover County, North Carolina 4ry 4 of 16 SEW* 77 Tarin Woods II PCN Attachments Projectcode: 2024-00- : 0WW202417'11:30 UTC ENDANGERED SPECIES ACT SPECIES There is a total of 14 threatened, endangered, or candidate species on this species list. Species on this list should be considered in an effects analysis for your project and could include species that exist in another geographic area. For example, certain fish may appear on the species list because a project could affect downstream species. IPaC does not display listed species or critical habitats under the sole jurisdiction of NOAA Fisheries', as U SF WS does not have the authority to speak on behalf of NOAA and the Department of Commerce. See the "Critical habitats" section below for those critical habitats that lie wholly or partially within eour project area under this office's jurisdiction. Please contact the designated FWS office if you have questions. 1. NOAA Fisheriesalso known as the National Marine Fisheries Service (NMFS), is an office of the National Oceanic and Atmospheric Administration within the Department of Commerce. 5 of 16 SE OW 78 Tarin Woods II PCN Attachments Project code: 2024-0069669 0312af202417'11:30 UTC MAMMALS K r1 M F, STATUS \orthern Long-eared Bat Myotis septentrionalis Endangered '.tj -lid[ has been designated for this species. 7�„ � �: •, i,lilc- ht salecos fws.gavfecplsnccies,/0.M15 @`lcolarad 13atPerimyotissubffavus Proposed \.) L iiit( dhabitat has been designated for this species. Endangered Species profile: https:/lecos.fws.g Jecp/speries/10515 BIRDS NAME STATUS Piping Plover Charadrius meiodus Threatened Population [Atlantic Coast and Northern Great Plains populations] - Wherever found, except those areas where listed as endangered There is final critical habitat for this species. Your location does not overlap the critical habitat. Species profile: https:l/ecos.fws.govlecp/sl)ecies/6039 Red -cockaded Woodpecker Picoides borealis Endangered No crillcal habitat has been designated for this species. Species profile: httos�iiecos fivs.gav/ecpfsnecies/7614 Rufa Red Knot Caikiris canutus ru fu Threatened There is proposed critical habitat for this species. Species profile: https:l/ecos.fws.gov/ecp/species/1864 REPTILES NAME STATUS American Alligator Alligator mississippiensis Similarity of No critical habitat has been designated for this species. Appearance Species profile: lutes://ecos.fws gov/ecplspeciesR76 (Threatened) Green Sea Turtle Chelonia mydas Threatened Population North Atlantic DPS There is final critical habitat for this species. Your location does not overlap the critical habitat. Species profile: baps:llecos.fws.gov/ecp/species/6199 Kemp's Ridley Sea Turtle hepidochelys kempii Endangered There is proposed criuvJI ha'.ntat [air flvs species. Species profile: hftp5 gcos.fws_gnvrerp�species15523 Leatherback Sea Turtle Dermochelys coriacea Endangered There is final critical habitat for Airs speries. Your Iocarion does not overlap the critical habitat. Species profile: httpsa/ecos.fws.¢av/ecplspecies11493 Loggerhead Sea Turtle Carerta caretta Threatened Populatiom Northwest Atlantic Ocean DPS There is final critical habitat for this species. Your location does not overlap the critical habitat. 6 of 16 SE OW 79 Tarin Woods II PCN Attachments Project code: 2024-0069669 0312af202417'11:30 UTC NAME STATUS Species profile: https:/?ecos.fws.gov/eco/species/1110 SNAILS NAME STATUS Magnificent Ramsborn Planorbella magnifica Endangered There is final critical habitat for this species. Your location does not overlap the critical habitat. Species profile: Imps://ecos.fws.gov/ecplspecies/6216 INSECTS NAME STATUS Monarch Butterfly Danaus plexippus Candidate No critical habitat has been designated for this species. Species profile: hops:/lecos.fwa.govlecplspeciesr37g3 FLOWERING PLANTS NAME STATUS Cooley's Meadowrue Thahctrum cooleyi Endangered No critical habitat has been designated for this species. Species profile: hMs://ecps.fws.gov/ecpfspecies/3281 Rough -leaved Loosestrife Lysimachia asperulae(olia Endangered No critical habitat has been designated for this species. Species profile: baps:llecos.fws.gavlecp/speciesl2747 CRITICAL HABITATS THERE ARE NO CRITICAL HABITATS WITHIN YOUR PROJECT AREA UNDER THIS OFFICE'S JURISDICTION. YOU ARE STILL REQUIRED TO DETERMINE IF YOUR PROJECT(S) MAY I IAVE EFFECTS ON ALL ABOVE LISTED SPECIES. USFWS NATIONAL WILDLIFE REFUGE LANDS AND FISH HATCHERIES Any activity proposed on lands managed by the National Wildlife Refuge system must undergo a 'Compatibility Determination' conducted by the Refuge. Please contact the individual Refuges to discuss any questions or concerns. THERE ARE NO REFUGE LANDS OR FISH HATCHERIES WITHIN YOUR PROJECT AREA. 7 of 16 SEW* $o Tarin Woods II PCN Attachments Project code: 2024-0069665 0392a1202417'11:30 UTC BALD & GOLDEN EAGLES Bald and golden eagles are protected under the Bald and Golden Eagle Protection Act' and the Migratory Bird Ireaty Act2. Any person or organization who plans or conducts activities that may result in impacts to bald or golden eagles, or their habitats', should follow appropriate regulations and consider implementing appropriate conservation measures, as described in the links below. Specifically, please review the "Supplemental Information on Migratory Birds and Eagles". 1. The Bald and Golden Eagle Protection Act of 1940, 2. The Migratory Birds Treaty Act of 1918. 3. 50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a) There am likely bald eagles present in your project area. For additional information on bald eagles, refer to Bald Eagle Nesting and Sensitivity to Human Activity For guidance on when to schedule activities or implement avoidance and minimization measures to reduce impacts to migratory birds on your list, see the PROBABILITY OF PRESENCE SUMMARY below to see when these birds are most likely to be present and breeding in your project area. NAME BREEDING SEASON Bald Eagle Halioeetus leucocephalus Breeds Sep 1 to This is not a Bird of Conservation Concern (BCC) in this area, but warrants attention Jul 31 because of the Eagle Act or for potential susceptibilities in offshore areas from cerrain types of development or activities. hto J/ecos. fw s. g ov?cc pis p eci es! 1626 PROBABILITY OF PRESENCE SUMMARY The graphs below provide our best understanding of when birds of concern are most likely to be present in your project area. This information can be used to tailor and schedule your project activities to avoid or minimize impacts to binds. Please make sure you read "Supplemental Information on Migratory Birds and Eagles", specifically the FAQ section titled "Proper Interpretation and Use of Your Migratory Bird Report' belOre Usm,, rrr altempting to inte-port this report. Probability of Presence () Green bars; the bird's relative probability of presence in the 10kru grid cell(s) your project overlaps during that week of the year. Breeding Season ( ) Yellow bars; liberal estimate of the timeframe inside which the bird breeds across its entire range. a of 16 SEW* 81 Tarin Woods II PCN Attachments Project code: 2024-0069669 OWW202417'11:30 UTC Survey Effort (1) Vertical black lines; the number of surveys performed for that species in the 10km grid cell(s) your project area overlaps. No Data (—) A week is marked as having no data if there were no survey events for that week. a probability of presence breeding season I surrey effort —no data SPECIES JAN FEB MAR APR MAY TUN JUL AUG SEP OCT NOV DEC n--Baste 1111 IIIl lilt lilt Jill ]w 1111 I111 mi Im lilt III Vulnerable Additional information can be found using the following links: Eagle Management httns:iiwww.fws.gov/programreagle-management Measures for avoiding and minimizing impacts to birds hLtps://www.fws.izov/library/ collectionslavoiding-and-minimizing-incidental- take -migratory -birds Nationwide conservation measures for birds https:l/www.fws.gov/sites/default/files/ documents,' nationwide-s tandard-c onse rvation-measures. pdf Supplemental Information for Migratory Birds and Eagles in IPaC https://www.fws.go rnediaisupplemental-information-migratory-birds-and-bald-and-golden-eagles-may-occur- proiect-action MIGRATORY BIRDS Certain birds are protected under the Migratory Bird Treaty Act' and the Bald and Golden Eagle Protection Act'. Any person or organization who plans or conducts activities that may result in impacts to migratory birds, eagles, and their habitats' should follow appropriate regulations and consider implementing appropriate conservation measures, as described in the links below. Specifically, please review the "Supplemental Information on Migratory Birds and Eagles". 1. The Migratory Birds Treaty Act of 1918. 2. The Bald and Golden Eagle Protection Act of 1940, 1 50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a) 9 of 16 SEW* 82 Tarin Woods II PCN Attachments Project code: 2024-0069669 03f281202417'11:30 UTC For guidance on when to schedule activities or implement avoidance and minimization measures to reduce impacts to migratory birds on your list, see the PROBABILITY OF PRESENCE SUMMARY below to see when these birds are most likely to be present and breeding in your project area. BREEDING NAME SEASON American Oystercatcher Hoematopus palliates Breeds Apr 15 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Aug 31 and Alaska. humi/ecus.M.gov/ecopecies/8935 I;ald I[ wle llulmeetus 4,w or enhah+s Breeds Sep 1 to i. ,, t ,,i i, fi n (BCC) in ibis area, but warrants attention Jul 31 uttheEigi, 1:, ,o­aie.r...-c:T,didc,inoffshore areas from certdfnrypes cif development or activities. httLts: i /ecos.fws.2ovi ec nls aecieslL626 RhIck Skim:ne, R"'rtchops wyer Breeds May 20 I nis 1s a Bird ut CUnsclV'lion CVnCern (13C(:) Ltff ghout its range in the continental USA to Sep 15 and Alaska. tu4zs:!/ecos.fws.gov/ec lsspeciesl5234 Brown -headed Nuthatch Sitta pusilla Breeds Mar 1 to This is a Bird of Conservation Concern (BCC) only in particular Bird Conservation Regions Jul 15 (BCRs) in the continental USA bttos:l/ecos.fws. g ov/ecopecies19427 Chimney Swift Chaetura pelagica Breeds Mar 15 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Aug 25 and Alaska. bUtps:i/ecos.tws.gov/ecDspmesi'340G Chuck-will's-widow Antrostomus carohnensis Breeds May 10 This is a Bird of Conservation Concem (BCC) only in particular Bird Conservation Regions to Jul 10 (BCRs) in the continental USA bMt ://ecos.fw5.g0v/ecR15yeciesFJ604 Coastal (waynes) Black -throated Green Warbler Setophaga virens waynei Breeds May I This is a Bird of Conservation Concern (BCC) only in particular Bird Conservation Regions to Aug 15 (BCRs) in the conrinental USA Iv:tos:l/ecos.fws.eovlec s ecesl11879 Eastern Whip -poor -will Antrostomus vociferus Breeds May I This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Aug 20 and Alaska. lnNs://ecos.fws.g ov/ecpls pecies/L0678 Gull -billed Tern Gelocheiidon nilotica Breeds May I This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Jul K and Alaska. htios:/lecos.fws.gov/ec sspecies19561 10 of 16 SE OW 83 Tarin Woods II PCN Attachments Project code: 2024-0069669 03f281202417'11:30 UTC BREEDING NAME SEASON King Rail Rallus elegans Breeds May 1 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Sep 5 and Alaska. ll os://ecos.fws.gov/ec[vspeciesl8936 Lesser Yellowlegs Tringa flavipes Breeds This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA elsewhere and Alaska. litps:liecos.fws.gov/ecWspecies/967 Marbled Godwin Limosa fedoa Breeds This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA elsewhere and Alaska. bUlLs:liecos.fws.gov/ecpLs.pecies/9481 Painted Bunting Passerina ciris Breeds Apr 25 This is a Bird of Conservation Concern (BCC) only in particular Bird Conservation Regions (a Aug 15 (BCRs) in the continental USA leaps:/)ecm.fws.gov/e Wspecies/9511 Pectoral Sandpiper Calidris melanotos Breeds 11tis is a Bird of Conservation Concem (BCC) throughout its range in the continental USA elsewhere and Alaska. httris:f /ecos.fws.gov/ecrWsrierAm/9%1 Prothonotary Warbler Protonotaria citrea Breeds Apr 1 to This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA Jul 31 and Alaska. 110://ecos.fws.gov/ec isspeciesN3439 Purple Sandpiper Calidris maritima Breeds This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA elsewhere and Alaska. https:l/ecos.fws.g ovlecD�speciesi9574 Red-headed Woodpecker Melanerpes erythrocephalus Breeds May 10 This is a Bird of Conservation Concern (BCC) throughaut its range in the con4neml USA to Sep 10 and Alaska. lno:l/ecos.fws.g ovlec�speciesAJ39B Ruddy Turnstone Arenaria interpres morinella Breeds This is a Bird of Cnnseivafion Concern (BCC) only in partimlm Bird Conservation Regions elsewhere (BCRs) in the continental USA baps:Yiecos.tws.gov/ecWspeciesIL063 Rusty Blackbird Euphagus carohnus Breeds 'ibis is a Bird of Conseivation Concem (BCC) only in par[imlar Bird Conservation Regions elsewhere (BCRs) in the mttinental USA httus.i/ecas.iws. ovrecprp-pe ies/9478 11 of 16 SE OW 84 Tarin Woods II PCN Attachments Project code: 2024-NY OWW202417'11:30 UTC BREEDING NAME SEASON Short billed Dokvitcher Lirnriodromus griseas Breeds '; ius is a Blid of Conscnauon t.:nnrria Y'st._C I throughout its range in the continental USA elsewhere and Alaska. https://ecos. fws.g ov/ec[vspecies/9480 Southeastern American Kestrel Falco sparverius paulus Breeds Apr 1 to This is a Bird of Conservation Concern (BCC) only in particular Bird Conservation Regions Aug 31 (BCRs) in the continental USA litps:liecos.fws.gov/ecWspecies]407 Swallow-tailed Kite Elanoides forficatus Breeds Mar 10 .-:r. i.:i �u(d (:­:,eiyation Concern (BCC) throughout its range in the continental USA to Jun 30 and Alaska. bulLs:liecos.fws.gov/ecpLs.pecies]89 Willet Tringa semipalmata Breeds Apr 20 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Aug 5 and Alaska. litps://ecm.fws.gov/e Wspecies/L0669 Wilson's Plover Charadrius wilsonia Breeds Apr 1 to This is a Bird of Conservation Concem (BCC) throughout its range in the continental USA Aug 20 and Alaska. httris://ecos. fw s.g ov/ecp/s pecies/9722 Wood Thrush Hylocichla mustelina Breeds May 10 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Aug 31 and Alaska. llo://ecos.fws.gov/ec iplspeciesNJ i PROBABILITY OF PRESENCE SUMMARY The graphs below provide our best understanding nl kd hen hirck of arnce n arc Hurst likel,; to he present in your project area. This information can be used rn Y:ulm <uul ,chedule your project activities to avoid or minimize impacts to birds. Please make 5t " l I:u read "Supplemental Information on Migratory Birds and Eagles", specifically the Fr\Q s01 lion titled "Proper Interpretation and Use of Your Migratory Bird Report" before using •) r attempting to interpret this report. Probability of Presence () Green bars; the bird's relative probability of presence in the 10km grid cell(s) your project overlaps during that week of the year. Breeding Season ( ) Yellow bars; liberal estimate of the timeframe inside which the bird breeds across its entire range. Survey Effort (1) 12 of 16 SE OW 85 Tarin Woods II PCN Attachments Project code: 2024-0069669 03f231202417'11:30 UTC Vertical black lines; the number of surveys performed for that species in the 10km grid cell(s) your project area overlaps. No Data (—) A week is marked as having no data if there were no survey events for that week. probability of presence breeding season l survey effort — no data SPECIES 1AN FES MAR APR MAY JUN JUL AUG SEP OCT NOV DEC American Oystercatcher Jill 111 1111 1411 1111 Jill 1111 1111 1111 1111 11 I I IIII III BCC Rangewide (CON) Bald Eagl Nm-BCC Jill d k 11 11 111 1 11 1 l 1 w 11 11 IIII kill 111 G 1111 III Non Vulnerable Black Skimmer BCC Rangew;ae I I I 1 l I l l l l l l l I l l l l l V l l l 1 111 1 1111 14 I I I +1 l l l l (CON) -headed N.hah Nirthatc Jill! 114 1111 111 I Jill IIII IIII IIII 1111 1114 IIII I I I I BCC-BCR B�� Ren�ewide BCC P g-i }}++ }++-I 11 1 1 1 11 1 1 1 I 1 11 11 1111 1 1 1 1 1 1 i "'I"J I` 1 ++++++* (CON Chn[�,-tt:;lls-""do"' .�...�+-E 1111 1 I I I I I I I I 1 1 IIIIIIII 1 111...1_+++-I-++++++++++-E HCC . rte:x { .} .I.1+0 4+4 *+ I I I III I III I I I I I I I I I[ I H4 -I- 4+ ++F} Grue, %l.: r* i BCC-k' R Ells'-,�'��'�'""'r- i 111 I-1--1--i III-1-1-1--F-1 1 1 11 IIII I I I I III-1-++++++++++++++++ BCC 1L:ngcwioi (CON) GU -billed g Tern HCC Rangewide }+} 1*4 ++++ 141 11 11 111 1 I I I I I I I I I ,t, I-+ ++44 ++++ 444 (CON) King Rau BCC Rangewide (CON) lessee Yellowlegs ,�:I 11 6111 1 I 1 1 1 I I I I 1 11 I I I 1 11 1 1 1 11 1 11 11 111 1 1 111 1 1 1 I.. BCC Rangewide (CON) Marbled Godudl �}+} }}}-1. I I I I I,: I . -F+++++++ 1 01 1It I t 114.,1' 14 I I. +..1_4....1- *.1-11 13 3f 16 SEGi� 86 Tarin Woods II PCN Attachments Project coda: 2024-0nfllfiuS 039231202417'11:30 UTC BCC Rangewide (CON) SPECIES JAN FEB MAR APR MAY TUN JUL AUG SEP OCT NOV DEC Painted R BCC-BCR 141-1 i 1 i I 4,11 JillI Jill Jill 1111 1111 1111 I I I I I 1 t 1} 1 t* Pectoral Sandpiper 11t I I t��11 I I I I 111T TTT I TTTT 144 "I I I I- TTTT 4 111 e BCCRangewldTT (CON) Prawarble, mbonorary1111 11 111 1 1111 1111 114+ 011.-1..-I...-+-1� �_..+-I-F war BCC Rangewide (CON) Purple sandpiper 00 + l+, 4.4- .I .+.} ++ 4-1 t f.-h l.,+..I M 1111 1111 .l..I -l..+ ++++ +7.* BCC Rangewide (CON) Red-headed Woodpecker 1111 I III 11 I I 1 I I I Jill I I 1 I Jill 1111 Jill I I I V Jill I III BCC Rangewide (CON) Ruddy 7Vrnsrate +�,+ *++* Oct +0+0 ow *+-1- -I ++l I I I I I I I I I I I I I I I I I ,.:b*0 BCC-BCR Rusty Blackbird �TT,1 T f+* 44 +f+.T f+++ ++T4 +++T T'+T+ ++++ Off44[., 1 1 ,Ii 4 BCC-BCR Dwitcher I I I I I I lilt Duwltcher HCC Rangewide (CON) mericate An Kestrel �f++ +-1 11 11 111111 1111 111 1 1 1 1 1111 1 i 1 f I I I I I P#+ America BCC -aCR BCC R gcwi Kite I++++ ++++ BCC Rangewide (CON) w RangewideR� BCC I I I I I I -I 1 11 11 1 11 1 11 1 1111 11 11 1 1 I} .11 �IIMN ��� (CON) [,:dsoiisl'lo��er +++F++++-I-111 I l i l l l 11 111 1111 111 ISCC Hai;ir..rde LUU1 SPL(Alls JAN FEB MAR APR MAY JUN JUL. AUG SEP OCT NOV DEC WoDdThrmh HCC Rangeangewide (CON) Additional information can he found using the following links: • Eagle Management htips:rlwww.fws.gov/pmgram/eagle-management 14 Of 16 SE OW 87 Tarin Woods II PCN Attachments Proiectcode: 2024-0069668 03f281202417'11:30 UTC • Measures for avoiding and minimizing impacts to birds https://www.fws,gov/library/ collections/avoiding-and-minimizing-incidental- take -migratory -birds • Nationwide conservation measures for birds https:l/www.fws.gov/sitestdefault/files/ documentslnationwide-standard-conservation-measures.pdf • Supplemental Information for Migratory Birds and Eagles in IFaC https://www.fws.gov/ media/supplemental- inf ormation-migratory-birds-and-bald-and-Bolden-eagles-may-occur- proiect-action 15 of 16 SE OW 88 Tarin Woods II PCN Attachments Project code: 2024-0069666 03128F2024 17:11:30 u7C IPAC USER CONTACT INFORMATION Agency: Private Entity Name: Megan Dean Address: 5315 South College Road Address Line 2: Suite E City: Wilmington State: NC Zip: 28412 Email megan@segi.us Phone: 9102281841 16 cf 16 SEGi* 89 Tarin Woods II PCN Attachments Appendix I: NLAA Consistency NLEB_RW SEGi� 90 Tarin Woods II PCN Attachments oo United States Department of the Interior R FISH AND WILDLIFE SERVICE Raleigh Ecological Services Field office 3916 S unset R i dge R d Raleigh, NC 27607 Phone: (919) 856-4520 Fax: (919) 8564556 In Reply Refer To: 03/28/2024 17:25:47 UTC Project code: 2024-0069668 Project Name: Tarin Woods II Federal Nexus: no Federal Action Agency (if applicable): Subject: Technical assistance for Tarin Woods II' Dear Megan Dean: This letter records your determination using the Information for Planning and Consultation (IPaC) system provided to the U.S. Fish and Wildlife Service (Service) on March 28, 2024, for 'Tarin Woods II' (here forward, Proj ect). Th I s project has been assigned Project Code 2024-0069668 and all future correspondence should clearly reference this number. Please c ar efully r eview thi s letter. Your Endangered SpeciesAct (Act) r equir em ents ar e n ot complete. Ensouring Accurate Determinations When Using IPaC The Service developed the IPaC system and associated species' determination keys in accordance with the Endangered Species Act of 1973 (ESA; 87 Stat. 884, as amended; 16 U.S.C. 1531 et seq.) and based on a standing analysis. All information submitted by the Project proponent into IPaC must accurately represent the full scope and details of the Project. Failure to accurately represent or implement the Project as detailed in IPaC or the Northern Long-eared Bat Ran gewide Determination Key (Dkey), invalidates this I etter. Answers to certain questions in the D Key commit the project proponent to Implementation of conservation measures that must be followed for the ESA determination to remain valid. Determination for the North ern Long -Eared Bat Based upon your IPaC submission and a standing analysis, your project is not reasonably certain to cause incidental take of the northern long-eared bat. Unless the Service advises you within 15 days of the date of this letter that your IPaC-assisted determination was 'incorrect, this letter verifies that the Action is not likely to result in unauthorised take of the northern long-eared bat. SEGi:�' 91 Tarin Woods II PCN Attachments Projectcode: 2024-0ob9666 IPac Record Locator: 832-140866494 03i28i202417:25:47 uTC Other Species and Critical Habitat that May be Present in the Action Area The IPaC-assisted determination for the northern long-eared bat does not apply to the following ESA -protected species and/or critical habitat that also may occur in your Action area: • American Alligator Alligator mississippiensis Similarity of Appearance (Threatened) • Cooley's Meadowrue Thalictrum cooleyi Endangered • Green Sea Turtle Chelonia mydas Threatened • Kemp's Ridley Sea Turtle Lepidochelys kempii Endangered • Leatherback Sea Turtle Dermochelys coriaeea Endangered • Loggerhead Sea Turtle Caretta caretta Threatened • Magnificent Ramshorn Planorbella magnifica Endangered • Monarch Butterfly Danaus pleAppus Candidate • Piping Plover Charadrius melodus Threatened • Red -cockaded Woodpecker Picoides borealis Endangered • Rough -leaved Loosestrife Lysimachia asperulaefolia Endangered • Rufa Red Knot Calidris conutus rufa Threatened • Tricolored Bat Perimyotis subflavus Proposed Endangered You may coordinate with our Office to determine whether the Action may cause prohibited take of the animal species and/or critical habitat listed above. Note that if a new species is listed that may be affected by the identified action before it is complete, additional review is recommended to ensure compliance with the Endangered Species Act. Next Steps Coordination with the Service is complete. This letter serves as technical assistance. All conservation measures should be implemented as proposed. Thank you for considering federally listed species during your project planning. We are uncertain where the northern long-eared bat occur~ on the landscape outside of known locations. Because of the steep declines in the species and vast amount of available and suitable forest habitat, the presence of suitable forest habitat alone is a far less reliable predictor of their presence. Based on the best available information, most suitable habitat is now expected to be unoccupied. Du. in the interim period, while we are working on potential methods to address this uncert€ 11i) %cc conclude take is not reasonably certain to occur in areas of suitable habitat where pjc.wnue has not been documented. If no changes occur with the Project or there are no updates on listed species, no further consulWtian coordination for this project is required for the northern long-eared bat. However, the Service recommends that project proponents re-evaluate the Project in IPaC if: 1) the scope, timing, duration, or location of the Project changes (includes any project changes or amendments), 2) new information reveals the Project may impact (positively or negatively) DKey Version Publish Date: 02126f2024 2 of 8 SE OW 92 Tarin Woods II PCN Attachments Projectcode: 2024-0069666 IPac Record Locator: 832-140866494 03i28i202417:25:47 u7C federally listed species or designated critical habitat; or 3) a new species is listed, or critical habitat designated. If any of the above conditions occurs, additional coordination with the Service should take place before project implements any changes which are final or commits additional resources. If you have any questions regarding this letter or need further assistance, please contact the Raleigh Ecological Services Field Office and reference Project Code 2024-0069668 associated with this Project. DKey Version Pu hush Date: 02126f2024 3 of SE OW 93 Tarin Woods II PCN Attachments Project code: 2024-0069668 IPaC Record Locator: 832-140866494 03M12024 17:25:47 UTC Action Description You provided to IPaC the following name and description for the subject Action. 1. Name Tarin Woods II 2. Description The following description was provided for the project'Tarin Woods II': The proposed project aims to facilitate the development of a large residential project within the designated area. Its primary goal is to provide necessary housing infrastructure to meet the growing demand within the Wilmington, NC area. The approximate location of the project can be viewed in Google Maps: llttns:l/ www.gooele.catnlmapsr&34.1284919,-77.89131926356296.14z DKey Version Publish Date: NiM 2024 SEGi* 94 Tarin Woods II PCN Attachments arojectcode:2024-oob966a IPac Record Locator:832-140866494 03i28i202417:25:47 uTC DETERMINATION KEY RESULT Based on the answers provided, the proposed Action is consistent with a determination of "may affect, but not likely to adversely affect" for the Endangered northern long-eared bat (Myotis septentrionallis). QUALIFICATION INTERVIEW 1. Does the proposed project include, or is it reasonably certain to cause, intentional take of the northern long-eared bat or any other listed species? Note: Intentioral take is defined as take that is the inter ded result of a project. firte:II:, -.al lake cnvld refer to research, direct species management, surveys, andioi St xlie, .Im in _. �,: inir:,ii�,n;i- hmJ t „ , n( h III W tint. harassment, collection, or capturing of any individual of a federaiIy listed thieatened, endangered or prolx sed species? No 2. Your project overlaps with an area where northern long-eared bats may be present year- round. Time -of -year restrictions may not be appropriate for your project due to bats being active all year. Do you understand that your project may impact bats at any time during the year and time - of -year restrictions may not apply to your project? Yes I The action area does not overlap with an area for which U.S. Fish and Wildlife Service currently has data to support the presumption that the northern long-eared bat is present. Are you aware of other data that indicates that northern long-eared bats (NLEB) are likely to be present in the action area? Bat occurrence data may include identification of NLEBs in hibemacula, capture of NLEBs. tracking of '.ALEBs to ,cost trees, or confirmed NLEB acoustic detections. Data on captures, raost Coe use, and IL tustic detectinns should post-date the year when white - nose syndrome w es dccccted in dir rcleV,int ,t,ttc With this question, we are looking for data that, for some reason, may ha%c nut ei hcen made available to U.S. Fish and Wildlife Service. No 4. Does any component of the action involve construction or operation of wind turbines? Note: For federal actions, answer `yes' if the construction or operation of wind power facilities is either (1) pan of the federal action or (2) would not occur but for a federal agency action (federal permit, funding, etc.). No DKey Version Pu hush Date: 02126f2024 5 of 8 SEGi* 95 Tarin Woods II PCN Attachments Projectcode: 2024-0069666 IPac Record Locator: 832-140866494 03i28i202417:25:47 u7C 5. Is the proposed action authorized, permitted, licensed, funded, or being carried out by a Federal agency in whole or in part? No DKey Version Pu hush Date: 02126f2024 6 of SE OW 96 Tarin Woods II PCN Attachments Projectcode: 2024-0069666 IPac Record Locator: 832-140866494 03i28i202417:25:47 u7C PROJECT QUESTIONNAIRE DKey Version Pu hush Date: 02126f2024 7 of 97 Tarin Woods II PCN Attachments Projectcode: 2024-0069666 IPac Record Locator: 832-140866494 03i28i202417:25:47 u7C IPAC USER CONTACT INFORMATION Agency: Private Entity Name: Megan Dean Address: 5315 South College Road Address Line 2: Suite E City: Wilmington State: NC Zip: 28412 Email megan@segi.us Phone: 9102281841 DKey Version Pu hush Date: 02126f2024 aot8 SEGi* 98 Tarin Woods II PCN Attachments Appendix J: RCW SLOPES SEGOO �� �; Tarin Woods 11 PCN Attachments RCW SLOPES Manual --North Carolina March 2022 AppenalK A He(I-00CKaGeQ VVOOaPeCKer Lonsultatio I Area 4:. ;2= % Source; USFWS, 2020 A ch--6lJe pw­ 7CmWiilbnMCA LU SEW* 100 Tarin Woods II PCN Attachments RCW SLOPES Manual — North Carolina March 2022 US Mmy Corps O/ enplmers, Appendix R — Red -cockaded Woodpecker Effects Determination Key ORM2 No.: Date ()311.8I dy USFWS Reference No. (if applicable):�},l( 4 9 t 1) Is the action areal located within the RCW consultation area (see Appendix A and project -specific IIts from a project -specific IPaC or internal USAC€ GIS review)? Yes..... ...... ......._............................................................... .................................................................. Bo to 2 b) No...................................................................................................................................................No effect' 2) Is the action area' located in the northeastern coastal plain (see Appendix A)? Yes_ .............. go to 3 ............................................................................................................................. b) No (the project is located in piedmont, sandhills, or otutheastern coastal plain)..................go to 4 3) Is the action area' located in a forested area with pine trees present in northeast North Carolina (e.g., high pocosin, Atlantic white cedar, nonriverine swamp forests, pond pine woodland, coastal fringe evergreen forest, wet successional pine/pine-hardwood forest, or pine plantation or uplands)? If yes, are the pine trees greater than 30 years of age (if stand age Is not readily determined, refer to Table 1 for a description of the minimum dbh of 30-year-old pines associated with each community type). If the answer to both of these questions is yes, choose Yes below. If the answer to one or bath questions is no, then choose No below. a) Yes ................................................ ............ ........................................................... _. ....... ................... gotog b) No...................................................................................................................................................No effect' 4) Is the action area' located within suitable RCW foraging or nesting habitat (pine or pine/hardwood stands in which 50% or more of the dominant trees are pines and the dominant pine trees are 30 years of age or older or a -inches dbh)? Yes.......................................................................................................................................................go to 5 �b No ......................... _................ ....................................... ....................... .......................................... No effect' 5) Will any activity in the action area' remove trees equal to or greater than g inches dbh; or will any activity occur within 200 feet of known RCW cavity trees? If unable to determine the location of a cavity tree with confidence, contact the USFWS Raleigh Ecological Services Field Office. a) Yes (to one or both).........................................................................................................................go to 6 b) No ........................................ .................... ......................................................................................... ....NLAA3 SEGi� 101 Tarin Woods II PCN Attachments RCW SLOPES Manual — North Carolina March 2022 61 Ie The artion area` located in suitable RCW nesting habitat (in the sandhills and piedmont: pine or pane/ha,dwood stands that contain pines 50 years in age or older or 210 inches dbh; in the southeo,tern coastal plain: pine or pine/hardwood stands that contain pines'eg inches dbh, including but not limited to pine flatwoods, pocosin, pine savannah, upland pine/hardwood)? a) Yes..........................................................................................................................................................go to 9 b) No.........................................................................................................................................................go to 7 7) does suitable nesting habitat occur within 0.5 miles of suitable foraging habitat that would be impacted by any activity in the action area'? a) Yes........................................_...................................... .............................go to 9 hJ No ...................... 3 9) Refer to Table 1 in the SLOPES for the northeastern North Carolina habitat type in the action area'. Are pine trees with a dbh equal to or greater than that shown in Table 1 proposed to be removed in the action area', or is the action area' within 200 feet of a cavity tree? If the answer to either of these questions is yes, choose Yes below. If unable to determine the location of a cavity tree with confidence, then contact the USFWS Raleigh Field Office. a) Yes ........................ .............. ... ....._..............................................................---....................................go to 9 .. b) No........................................................................ ......_..............................................................................NtAA3 .. 9) Contact the appropriate USACE representative for a pre -application meeting to determine if a survey is necessary (for a list of USACE representatives please see the contact list at htt saw- reg.usace.army.rnil/FO/PMList.pdfl. Nate that project -specific information, such as a delineation of waters of the U.S., project plans, and details concerning certain activities on disturbances that would occur in the action area' (e.g. percussive activities, forest management, cr similar disturbarces), may be needed far the USACE to determine the actior area(s)' of the project It a survey is required and agreed to by the applicant, all suitable RCW nesting habitat within 0.5 miles of :he acLU❑ area'should be surveyed according to USFWS protocol for the presence of RCW cavity trees'. If :he applicant is unwilling or unable to conduct the survey, standard consultation with the USFWS should begin. Such surveys are conducted by running line traneects through stands and visually inspecting all medium- sized and large pines for evidence of cavity excavation by RCWs. Transects must be spaced so that all trees are inspected and are run north -south. Was a survey performed? a) Yes, a survey was performed, and RCW cavity trees were observed.......................................go to 10 b) Yes, the survey was submitted to the USFWS for concurrence, and the USFWS concurred with the results no RCW cavity trees were observed 3 c) No, the USACE determined that a survey was not required and the USFWS concurred.................................................................................................... 3 d) No, a survey was not performed..........................................................................Consultation requlreds 10) Does the project involve activities or disturbances in the action area' (e.g., percussive activities, forest management, or similar disturbances) within the 200-foot cavity tree buffer, and/or cause removal or damage to RCW cavity trees (e.g., via root compaction, soil compaction)? If yes to either or bath then consultation is required. a) yes............................................................................................................................Consultation required' b) No .................... ...................... ........................ ..._........... ..................................................... ...............go to 11 13 SEGi�. 102 Tarin Woods II PCN Attachments RCW SLOPES Manual —North Carolina March 2022 11) Hasa fef!•p I-abitat analysis (FHA)' been conducted to del rrmine whether enocvi• 'rr•=li;.rng habitat would rrr••,rlr• tnr each RCW group Post -project? For inFn iii lionon howto conduct ,rrl c i'A', referto the "protc;,ufe.s for Determining Foraging Habitat Awllabdily" and the Private Land C- r:r•lines.t ap Wes theFHA'hasbeen submitted tothe USFWS frrtorct,rrortr, ,xv;tFeUtiiWSanrcurred th,,i! adequate amounts of foraging habitat would remain posr µroject... . _NLAP.a b} I r,, and review of the FHA' by the USACE along with concurrence from l,•SI'li5 ret,r r,rrl inadequate amounts of foraging habitat would remain post -project....,, Consultation reoulreds cj No, an FHA' has not been conducted.................................................... C nnsultation regi, red' 'Action A,ea--ah -I 'Cal tobeaHecteddlrecfyor=ndv Is by l he Fcder:d and ,or mrrelvth--i'l n.o r r = , - Wc. ,It act the appropriate USACF repre en[ata t , ,,t• 1 ..'. ,t rt-->c= at•r,r s: of ..sac representatives, please see tFe contact list at; 1-i ,dt N. eft rq t - rl, proposed project would resull in no !felt to this 5penes andlo' fece j, dt=sip, eted critical habitat (if appli,ji%C ;.rrcr cunsuRation with the USFWS Raleigh and Asheville Ecological Sr ­ices field ulI c s r, fnr the project as aesnbed }NLAA-The proposed project may affect but is not %cly to adversely affect this species and/or hs designated car -1, 4,. brat (if applicable). NLAA determinations for promcts made pursuant to this key require no further consultation with •.ho SF.bS Q, :vigh and Ashemlle Fto:og¢al Senricesheld ot`ices.therefnre,mnscltanor, s considered completeforthr spec ks IC' I PI is submittal of a Pre Construction Notification to the USACF will be required for all Nl_4Adeterminahons Follow irk to USFWS RCW Recovery Plan, Appendix 4 for additional information on nesting and foraging habitats, and survey Protocol (httos-//wwwfwsaov/rcwrecoypgdFles/RecovervPla /survev o of d odil sConsultatoon required - Contact the USACE to begin this consultation process. For a list of USACF representatives please see the contact list at http!/haw-rea: usace armv mltlFo/pMLla ndf. Further consultatron with the USFWS Raleigh and Asheville Ecological Services field offices is necessary to dlsrPm if the activity would result in a "no effect," "not likely to adversely affect," or "likely to adversely affect" determination. i'Follow links for additional Information on conducting FHA ihttosr//svww.fws,eov/rcwrecoverv/matrix.htmll and for determining foraging habitat availability ihttpsr//v .fws.gcv/msandhills/files/tha data collection procedures odf3. 'Follow link for additional information regarding determination for adequate amount of foraging habitat Ihttos,//www.fws.eov/rmmcover /files/RecovervPlan/orivaie lands euidelines.odn c FHA - W hen an FHA. is conducted, the USAGE must provide the FHA to USFWS for review and concurrence Additional Information SEGi�. 103 Tarin Woods II PCN Attachments RCW SLOPES Manual - North Carolina March 2022 Appendix C — Conservation Recommendations These recommendations are optional and, if Implemented, would support the agency's goals toward recovery. These recommendations are to be used at the discretion of the permittee, but any measures that avoid and minimize effects to the species are highly encouraged by the USFWS. 1. Minimize project impacts within clusters and foraging habitat whenever possible (i.e., conduct large pine removal outside of nesting season [April 1 to July 311, trim branches instead of complete tree removal, switch building plans to retain large pines). 2. The USFWS strongly recorri that occupied habitats be avoided and preserved, The first Measure is to modify the project footprint to avoid direct impacts to RCW habitat. This habitat could be designated a, on sensitive area and set aside by deed restriction, easement, or anoth, protective caper ant. If the occupied habitat on the property exceeds S acres (2 hectares), then a habitat management plan is also recommended. Incorporating these recommendations into the proinct design and documenting them in the habitat management plan might result in the project being net li,tiely ;e adversely affect the RCW. on -site habitat enhancements are recommended by the USFWS in situations where a project proposes to impact occupied RCW habitat. If the site has been physically altered by exotic species invasion, lack of fire, or other anthropcgenic actions, these alterations have produced on -site habitat Conditions that have resulted in marginally suitable habitats for RCW's survival and propagation. The planned action, through project redesign, has avoided impacting a substantial portion of the habitat; however, some habitat loss will still occur. The project proposes on -site habitat enhancements and management actions that provide habitat quality improvements that balance losses of small amounts of marginally suitable habitats. Incorporating these recommendations into the project and documenting them in a habitat management plan can result in the project being not likely to adversely affect the RCW, 4. Remove vines and thick underbrush/mid-storyto improve site suitability. S. Provision starts and/or completed cavities In suitable large pines to provide additional housing opportunities to an RCW cluster. 15 LZA i� EAlI1HERN ENVIRONMENiRLORO 104 Tarin Woods II PCN Attachments SEGi:* Appendix K: NOAA Fisheries Essential Fish Habitat Report 105 Tarin Woods II PCN Attachments ,SEPJ�* Appendix L: FRIS NC Flood Map 106 Tarin Woods II PCN Attachments SEGi. Appendix M: NC SHPO HPOWEB2.0 Map NEW HANG VER .Vl 10 cta Dr E1 tn of Go Ambleside inassas Dr C., 107 Tarin Woods II PCN Attachments Appendix N: Other Resources SEGOO �� 108 Tarin Woods II PCN Attachments STATC ROY COOPER G.—or EU7ARETH S. SISER .k­,Y RICHARD E, ROGER5, JR. NORTH CAROLINA tN,e[ Egriffl nt wl Quaaty July 3, 2023 Cape Fear Public Utility Authority Attention: JeffTheberge, P.E., Engineering Manager 235 Government Center Drive Wilmington, North Carolina 28403 Re: Revised Engineering Plans Approval Distribution Extension Turin Woods 11: Phase 4 Water System: CFPUA-Wilmington Water System No.: NC0465010, New Hanover County Serial No.: 22-00925R] Dear Applicant: Enclosed please find one copy of the "Application for Approval..." together with one copy of the revised engineering plans bearing the Division of Water Resources stamp of approval for the referenced project. These engineering plans are approved under the Division of Water Resources Serial Number 22-00925R1, dated July 3, 2023. Please replace the previously approved plan sheets 1 and 3, approved under project serial number 22-00925, dated October 18, 2022, with these revised plan sheets. The previously approved project specifications remain unchanged. Please reference both serial numbers 22-00925 and 22-00925R1 on the project certifications. Revised engineering plans prepared by Howard S. Resnik, P.E., call for the installation of an additional approximately 330 feet of 12-inch water main (total of 1,360 feet), 450 feet of 8-inch water main (total of 2,810 feet), valves, and associated appurtenances along Ironwood Drive, Rosa Parks Extension, Road D Extension, and Nixon Connection to serve proposed 141-unit townhome complex within Phase 4 of Tarin Woods II located off Ironwood Drive in New Hanover County. The proposed 12-inch water main will connect to an existing 8-inch water main along Ironwood Drive. Please note that in accordance with 15A NCAC 18C .0309(a), no construction, alteration, or expansion of a water system shall be placed into service or trade available for human consumption until the Public Water Supply Section has issued Final Approval. Final Approval will be issued and mailed to the applicant upon receipt of both an Engineer's Certification and an Applicant's Certification submitted in accordance with I5A NCAC 18C .0303 (a) and (c). These plans in the foregoing application are approved insofar as the protection of public health is concerned as provided in the rules, standards and criteria adopted under the authority of Chapter 130A-317 of the 312 North S.I bwy gt egi 1 1634 Mail Sm c, C9 1 I R k S of'mh Rneurt[, SIR No�[S S[1sM�ry Shee4 I I63i FL11 Smk[ Crnt[r I R+k,yA, Nanh Camlio[ 27649-1676 419.707.9109 109 Tarin Woods II PCN Attachments Cape Fear Public Utility Authority Attention: Jeff Theberge, P.E., Engineering Manager Page 2 of 2 July 3, 2023 General Statutes. This approval does not constitute a warranty of the design, construction, or future operation of the water system. One copy of the "Application for Approval..." and a copy of the revised plans with a seal of approval from the Department are enclosed. One copy of the approved documents in a digital format (CD) is being forwarded to our Wilmington Regional Office. The second copy of the CD is being retained in our office. If the Public Water Supply Section can be of further service, please call (919) 707-9100. Sincerely, Afo*&,l,- Rebecca Sadosky, Ph.D., Chief Public Water Supply Section Division of Water Resources, NCDEQ RS/MH Enclosures: Approval Documents cc: Heidi Cox, Wilmington Regional Office New Hanover County Health Department CSD Engineering 11"Nonhwh sau Pep 5" 1 1 10, oW S—"C t I Rv kkn . Waln aes .27 r�j 51] Nfgld SallYbwy SRae< 11614 Mail Sovkc Cann I ILkigll, North Grolioa 27699-1534 919.707 9100 SEGi:* 110 Tarin Woods II PCN Attachments ROY COOPER Gera an, EUMBEfH S. BISER 5"reml'y RICHARO E ROGERS, JIL Aklc w CEPUA ATTN: JEFF THEBERGE, PE, ENGINEERING MGR 235 GOVERNMENT CENTER DRIVE W'ILIVIMTON. NC 2g403 NORTH CAROLINA fntrlitameeim Quaflry July 03. 2023 Re Aulherinenes to Condr irl ("fhh m nm a Final Approval) Issas Date. July 03, 7023 TARIN WO0D5 fl PHASE 4 Serial Na.: 22-009:5 R) Wale, Syslam No NC0463M Nine Henovc, Courtly Deep Applicant: This hen a.6— that a mmpine Engineer's Rnpoa and a Water System Maregen -I Plan have been mcrived, and that eaginernrry plans and nor.ficat—s have been approved by the D,panmcm far TARIN HOODS II: PHASE 4, Serial No.: 2249925R1. The "Auth.-Iion to Cunsamet` is valid far 3a months from the issue dale, Amafira htian w ca ism , c s, may bsiendcd if the Reties Govrming Public Wmcr bupplics and aim conditions hnva not changed (xr. R.ulr .U105y. The "Aulharivrian m Canstmci" and the engineering plans and specificaaiorw appravmi letter 'hall be posted or the primary enmenee arch, jab site before and during cenatruclion. Upon compleheaof the oanstrueiion or mudification, and pd., ie placing the new camtra,ilnn or studifleadon Ina service, the uPplicain muss submit an Enginerr's CemiF anon and Applizarsh Cenifttalion to the Public Water Supply S,crmn. • Engineer's CenlfleaHnn: an ascordance. with Rule 03031u1. the applicant shall submit a ccraificmim smtemenl signed and sealed by a my'sierad ptnfcasi—I engineer storing Lit, e—mention was completed inaecardanec corm approved cnginsenrig plans and speeificaliesm. including any prue on supamted e, the Depstrmetu f ongi.—ni; plan ant speeifieotwn app—1 Itc., • Appllnal', CeriViced— in —dance with Rule .0303 (e), due applicant shalt submit a signed cmifteatian smiemani indicating that she requirements for an Ope, aI- and Maintenance Plan cad Emergency Manag,nrenl Pinta have been satisfied in accordance with Ride .0307 (d)ond(c) and Ihst the syamm has a ccn4ficd operator in emelanee with Ruk 1300_ The ^Apphonr's Cenirimiian" farm is mailable nl ban J— ncwste,.ord{click an Public Water Supply Ssshw, Non Review, Plan Retie— Fora.). Cent R,arioRs an be at by moil, fax (919-71 SA374). or auadmsmn la be email message m PWSSxrfon.PlanReviewCnedea r per. If'his 'Auihonatlon to Construct' is fora paw pubhs wear aynmm, the aumc, muss submit a completed appllntiaa for on Operating Permh and the spprupnmtc F. For n copy fthe tippheation fro an Op-11eE Permit please all (919) 707-9095, Once the cemftcarioas and permit application and fee (ifapplicable) am ,rceised and detcnnincd rdrquntc, he P,pa—rn will i—, a Final Approval leue, Ice the ppls.-ant In accordance wah Rule 0309 (a), no poriloa of this projeci shall be placed ince astir, will the Dep cane, t het, Issued Final App-1. Please comict as at (919) 707.9100 ifyaa lnvc any quc,aiues at rnced additional tafmmaleon. V Rebecca. Sodaslry, Pat),ChfnP Public Water Supply section Division of Wain Resauaca, NCDEQ cc HEIDI COX Regional Engineer CSD ENGINEERNG Il�[ North CarWhn Deparemerrcam l[ivanmMAQWky 1 Divlsienef Wrist Rewtaeca 512 North Salisbury Street 11634 Man smher crnur I RAW^ North Carolina 27699 KU a.ey 919.7P7.91PP SE OW 111 Tarin Woods II Pi Attachments North Carolina Department of Environmental Quality Division of Water Resources Project Applicant: Public Water System Name and Water System No.: Project Name: Serial No.: Issue Date: Expiration Date: Authorization to Construct CEPUA CFPUA•WILMINGTON NC0465010 TARIN WOODS II: PHASE 4 22-06S25RI July 12023 36 Months aHer Issue date In accordance with NCAC 18C .0305, this Authorization to Construct must be posted at the primary entrance to the job site during construction. SEGi* 112 Tarin Woods II PCN Attachments DocuSign Envelope ID: 14F12291-644E-4aA5-9R6F-03470FD31A30 ROY COOPER €LI7ARETH RISER RICHARD E. ROGERS, JR. NOR-H CAROLINA rrn.nanmenm1400rlh n�.a�mr November 9, 2022 leffTheberge, Engineering Manager CFPUA Sent via email to: sewer. permltsPcfpua.or Subject: Permit No. WQ0038376 MODIFICATION CFPUA Tarin Woods II Subdivision Wastewater Collection System Extension New Hanover County Dear Mr. Theberge: In accordance with your application received September 23, 2022, and revised application received on November 2, 2022, we are forwarding herewith Permit No. WQ0038376 dated November 9, 2022 to the CFPUA (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, shall void Permit No. WQ0038376 issued December 9, 2019, and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. The purpose of this modification is to install approximately 3,562 LF of 8-inch gravity sewer to serve 141 three -bedroom townhome residences (50,760 gallons per day). Please pay particular attention to the following conditions contained within this permit: Special Conditions: Condition U: A variance is hereby granted to allow Manhole A10 in Phase 2 to be located within the 50-foot wetland setback provided it meets the conditions below. Please note that anti - seep collars may be necessary on the line based on a review of the location. [15A NCAC 02T .0105(n)] Condition U: Each pump station shall be clearly and conspicuously posted using a weatherproof sign with the address, a pump station identifying name/number, 24-Hour Emergency telephone number, and name of the owner/operator of the sewer system/pump station and instructions to call the number in the event of alarm activation or other emergency. Simplex pump stations or vacuum sewer pits serving a single-family residence may have a placard or sticker without the address placed on the control panel in lieu of a sign. [15A NCAC 02T .0305(h)(2)] oivisinn or water He —rces-Wilmington Regional office 127 Cardinal give retensin,, Wilmington. North Carolina 29405 Phone: 910-7%-7215� Internet: w den, nc.Roy SEGO� 113 Tarin Woods II PCN Attachments DocuSign Envelope ID: 14F12291-644E-46A5-986F-0B470FD31A30 Standard Conditions: Condition 11.1: This permit shall not be automatically transferable; a request must be made and approved. Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. Condition II.7: Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form with checklist attached to this permit shall be submitted with the required supporting documents to the address provided on the form. Permit modifications are required for any changes resulting in non-compliance with this permit, regulations, or the Minimum Design Criteria. (15A NCAC 02T.0116] Condition 11.13: If the Permittee/Applicant holds a system -side collection system operation, maintenance and management permit (WQCS-prefix) from the Division, then the following applies: For all newly constructed, modified and rehabilitated pump stations, all equipment and components shall be sealed within a corrosion -resistant coating or encasement to the extent practicable and equivalent to the minimum design criteria unless the permittee can demonstrate it is not practicable or another farm of corrosion resistance is employed. (15A NCAC 02T .0108 (b)] It shall be responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding.. If you need additional information concerning this matter, please contact Tyler Benson at (910] 796-7215 or via e-mail at Tyler. Benson@ncdenr.eov. Sincerely, b Dac�5lGrveE " Et If r _ _« � Morelia Sanchez -King, Regional Supervisor Water Quality Regional Operations Section Wilmington Regional Office Division of Water Resources, NCDEQ Cc: Howard Resnik, Coastal Site Design (Laserfiche info via email) Upload to Laserfiche Permit No. WQ0038376 November 9, 2022 Page 2 of 11 SEGi�. 114 Tarin Woods II PCN Attachments DocuSign Envelope ID: 14F12291-644E-46A5-956F-03470FD31A30 In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the CFPUA NEw HANOVER COUNTY for the construction and operation upon certification of approximately 3,562 linear feet of 8-inch gravity sewer to serve 141 three-hedroom townhome residences as part of the Tarin Woods II Subdivision project, and the discharge of 50,760 gallons per day of collected domestic wastewater into the CFPUA's existing sewerage system, pursuant to the application received September 23, 2022, and revised application received on November 2, 2022, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum. Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting data subsequently filed and approved by the Department of Fnvironmental Quality and considered a part of this permit. December 9, 2019 MODIFICATION Version 1.4 For the continued construction and operation upon certification of approximately 1,993 linear feet of 8- inch gravity serve 38 three -bedroom homes as part of the Tarin Woods II Phase 3-6 project, and the discharge of 13,680 gallons per day of collected domestic wastewater into the CFPUA's existing sewerage system, pursuant to the application received November 12, 2019. December 18, 2017 MODIFICATION Version 1.3 For the continued operation of approximately 1,547 linear feet of 8-inch gravity sewer serve 40 three - bedroom residences as part of the Tarin Woods II Phase 3-A project, and the discharge of 14,400 gallons per day of collected domestic wastewater into the CFPUA's existing sewerage system, pursuant to the application received November 17, 2017, and additional information received on December 14" and 1811, 2017. This system certified complete on December 18, 2018. AND For the continued construction and operation upon certification of approximately 4,241 linear feet of 8- inch gravity sewer to serve 90 three -bedroom residences as part of the Tall Woods II Phase 2 project and the discharge of 32,400 gallons per day of collected domestic wastewater into the CFPUA's existing sewerage system, pursuant to the application originally received July 20, 2017 and additional information received on August 41" and August 23'a, 2017. August 24, 2017 MODIFICATION Version 1.2 (VOIDED) Permit No. WQ0038376 November 9, 2022 Page 3 of 11 SEGi�. 115 Tarin Woods II PCN Attachments DocuSign Envelope ID: 14F12291-644E-46A5-956F-03470FD31A30 January 24, 2017 MODIFICATION Version 1.1 (Description Updated 12-14-2017) For the continued construction and operation upon certification of approximately 2,657 (increased from 2,082 on 1-24-17) linear feet of 8-inch gravity sewer to serve 51 three -bedroom single-family homes as part of the Tarin Woods 11 Phase 1 project, and the discharge of 19,360 gallons per day of collected domestic wastewater into the CFPUA's existing sewerage system, pursuant to the modification application received January 5, 2017 for the permit originally issued May 5, 2016. And from WOW38159, the continued operation of a 617-gallon per minute (reduced from 720-Rpm) pump station with duplex pumps, on -site audible and visual high water alarms, telemetry, and a permanent generator with automatic transfer switch as well as approximately 1,866 linear feet of 8-inch force main to serve a future residential development of unapproved density on approximately 136 acres as part of the Tarin Woods II Pump Station project with no discharge of collected domestic wastewater into the CFPUA's existing sewerage system pursuant to the application received November 24, 2015 with additional information received on December 2"d and January 1211, 2016 and the permit subsequently issued January 15, 2016. Certified complete on November 6, 2017. This permit shall be effective from the date of issuance until rescinded and steal I be subject to the specified conditions and limitations contained therein. Permit Number: WQ0038376 Issued Today: November 9, 2022 Eoo••sre••a'C'n`'r_�''L7_' P czocax. Tom Tharrington, Assistant Regional Supervisor Wilmington Regional Office Water Quality Regional Operations Section Division of Water Resources, NCDEQ By Authority of the Director and The Environmental Monagement Commission Permit No. WQ0038376 November 9, 2022 Page 4 of 11 SEGi* 116 Tarin Woods II PCN Attachments DocuSign Envelope ID: 14F12291-644E-46A5-956F-03470FD31A30 SUPPLEMENT TO PERMIT COVER SHEET CFPUA is hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the Wilmington Southside Wastewater Treatment Facility in accordance with Permit Number NC0023973. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 2T; the Division of Water Resources' (Division) Gravity5ewer Minimum Design Criteria adopted February 12, 1996 as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as - constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below. I. SPECIAL CONDITIONS 1. Per 15A NCAC 02T.0305(g), segments where the gravity sewer does not meet separation requirements, materials, testing methods, and acceptability standards meeting water main standards (15A NCAC 18C) shall be specified. A variance is herebygranted to allow Manhole 410 in Phase 2 to be located within the 50-foot wetland setback provided it meets the conditions below. Please note that anti -seep collars maybe necessary on the line based on a review of the location. [15A NCAC 02T .0105(n)] i) Seams shall be externallytaped/sealed ii) Structures shall be provided with a full waterproof interior coating/lining ill) Watertight pipe connections shall be provided consisting of a flexible watertight rubber boot or compression type connector iv) Structures shall be tested in accordance with ASTM C1244 v) All structures not included as part of a tlSACCE 404 Permit or Division 401 Certification shall maintain a separation of no less than 10 feet from wetlands vi) Testing results (per the project specifications) shah be provided with the project certification and record drawings. This includes gravity main testing results and manhole vacuum testing results for the identified concrete structures. 2. Each pump station shall be clearly and conspicuously posted using a weatherproof sign with the address, a pump station identifying name/number, 24-Hour Emergency telephone number, and name of the owner/operator of the sewer system/pump station and instructions to call the number in the event of alarm activation or other emergency. Simplex pump stations or vacuum sewer pits serving a single-family residence may have a placard or sticker without the address placed on the control panel in lieu of a sign. [15A NCAC 02T .0305(h)(2)j Permit No. WQ0038376 November 9, 2022 Page 5 of 11 SEGi* 117 Tarin Woods II PCN Attachments DocuSign Envelope ID: 14F12291-644E-4aA5-956F-03470FD31A30 II. STANDARD CONDITIONS 1. This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. [15A NCAC 02T.0104; G.5143-215.1(d3)] 2. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials unless specifically mentioned herein. [15A NCAC 02T.0110] 3. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [15A NCAC 02T .0110] 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met: [15A NCAC 02T .0108(b)] a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected t0 a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six -months and inspections are documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g. overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 20 .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. h. A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. Permit No. WQW38376 November 9, 2022 Page 6 of 11 SEGi�. 118 Tarin Woods II PCN Attachments DocuSign Envelope ID: 14F12291-644E-46A5-986F-03470FD31A30 2. For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. T. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. j. Documentation shall be kept far Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. 5. Noncompliance Notification: The Permittee shall report by telephone to a water resources staff member at the Wilmington Regional Office, telephone number (910) 796-7215, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spillover 1,000 gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 859-0369 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part I of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part 11 of Form CS-5SO (or the most current Division approved form) can also be completed to show that the S50 was beyond control. ]G.5. 143-215.1C(al)] 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 115A NCAC 02T.0108(b)] 7. Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form with checklist attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Perm ittee to appropriate enforcement actions. If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. Permit No. WQ0038376 November 9, 2022 Page 7 of 11 119 Tarin Woods II PCN Attachments DocuSign Envelope ID: 14F12291-644E-46A5-9a6F-03470FD31A30 A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or In accepted electronic format and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable powersource or pump, include travel timeframes, shall be provided. c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Priorto Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (Including pipe length changes of 10% or greater by type & size, Increased flow, pump station design capacity- design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [15A NCAC 02T .01161 8. Gravity sewers installed greater than ten percent below the minimum required slope perthe Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case by -case basis. Resolution of such request shall be evident priorto completing and submitting the construction certification. [ 15A NCAC 02T.0105(n)] 9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .0116] 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12,1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. 115A NCAC 02T .0104; 15A NCAC 02T .0108(b-c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation cf nuisance conditions, the Permittee shall take immediate corrective action, including those Permit No. WQ0038376 November 9, 2022 Page 8 of 11 SEW* 120 Tarin Woods II PCN Attachments DocuSign Envelope ID: 14F12291-644E-46A5-956F-03470FD31A30 as may be required by this Division, such as the construction of additional or replacement facilities. [15A NCAC 02T .0110; 1SA NCAC 021.0108]b)] 12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that maybe imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which may be required by the Division or any other Federal, State, of Local government agencies. [G.S. 143-215.1(b)] 13. If the Permittee/Applicant holds a system -side collection system operation, maintenance and management permit (WQCS-prefix) from the Division, then the following applies: For all newly constructed, modified and rehabilitated pump stations, all equipment and components shall be sealed within a corrosion -resistant coating or encasement to the extent practicable and equivalent to the minimum design criteria unless the permittee can demonstrate it is not practicable or another form of corrosion resistance is employed. [15A NCAC 02T.0108 (b)] Permit No. WQ9038376 November 9, 2022 Page 9 of 11 121 Tarin Woods II PCN Attachments DocuSign Envelope ID: 14F12291-644E-46A5-986F-09470FD31A30 FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: CFPUA PERMIT N: WQ0038376 PROJECT: Tarin Woods II Subdivision ISSUE DATE: November 9, 2022 COUNTY: New Hanover This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. Consequently, it should be submitted in a manner that documents the Division's receipt. Send the required documentation to the Wilmington Regional Supervisor, Water Quality Section at the address at the bottom. The Permittee is responsible for tracking all partial certifications up until a final certification is received. Certifications shall include Phase/Section covered, line size & lengths installed, and listing of lots/connections to be served and pump station design if applicable. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature Date ENGINE ERAS CERTIFICATION I, as a duly re Istered Professional Engineer in the State of North Carolina, having been authorized to ( periodically, ❑ weekly, full time) observe the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: approximately 3,.S62linear feet of8-inch gravity sewer to serve 141 three -bedroom townhome residences as part of the Torin Woods /I Subdivision project. and the dischorae of 50.760 gallons per day., such that the construction was observed to be built in compliance of this permit; 15A NCAC 2T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date ❑ Final ❑ Partial (include description) Certification Comments/Qualifiers (attach if necessary): NC DWR- Water Quality Regional Operations Section Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 29405 Phone: 910-796-7215 FAX: 910-350-2004 SEGi* 122 Tarin Woods II PCN Attachments DocuSign Envelope ID: 14F12291-644E-46A5-986F-O3470FD31A30 SEWER ENGINEERING CERTIFICATION CHECKLIST To be completed by the certifying engineer prior to operation of the permitted sewers, per 15A NCAC 02T.0116. Certifying Engineer: Certification Review Date: Project Name: WQ00 Project County: 1) Has permittee information changed since the permit was issued (or last modified): change of mailing address, change of ownership, transfer from developer to HOA/POA, etc. ❑ Yes ❑ No • If yes, please provide either a change of ownership form or new contact information. Note that transfer of permits from the developer to the HOA/POA must occur with the first certification. 2) Have the as -built drawings have been signed, sealed, and dated by an N.C. PE? ❑ Yes ❑ No 3) Final Engineering certification? ❑ Yes ❑ No • If Partial Engineering certification, provide detailed narrative including what is being certified in the current phase, what was previously certified {if applicable), and what is left to be certified. 4) Adequate information related to sewer lines: ❑ Yes ❑ No ❑ N/A • Three feet minimum cover has been provided for all sewers unless ferrous pipe was installed. • Minimum diameters for gravity sewers are 8-inches for public lines and 6-inches for private lines. • Manholes have been installed: At the end of each line, at all changes in grade, size, or alignment, at all intersections, and at distances not greater than 425 feet; minimum diameter shall be 4 feet (48-inches). 5) Adequate information related to pump stations: ❑ Yes ❑ No ❑ N/A • Ensure power reliability option was selected per 15A NCAC 02T.0305(h). 6) Was project construction completed in accordance with all of the following: ❑ Yes ❑ No ❑ N/A • 15A NCAC 02T, Minimum Design Criteria (MDCi for the permitting of Gravity Sewers (latest version), and MDC for the Permittiri of Pump Stations and Force Mains (latest version)? If not, a variance approval is required in accordance with 15A NCAC 02T.0105(b), prior to certification and operation. • Contact the Central Office to discuss the variance to determine a course of action. • Applicant must submit two copies of the variance request form, plans, specifications, calculations, and any other pertinent information to the Central Office (one hard copy, one digital copy). • The central office will review the variance request, and if approvable, specific language regarding the variance will be incorporated into the permit, either via a special condition or a supplementary letter. A copy of the reissued permit with variance language or the variance letter must be maintained with the original documents. 7) Does the project contains high priority fines (15A NCAC 02T .0402(2))? ❑ Yes ❑ No • If yes, ensure that the permit already contains the necessary condition related to high priority lines 15A NCAC 02T.0403 (aj(5). If the permit does not include this language, the Fast Track reviewer will reissue the permit with the appropriate language. 8) Are Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length difference of 10%or greater, change in flow, pump station design capacity design change of 5% or greater, and change in the number/type of connections)? ❑ Yes ❑ No • If yes, a permit modification request must be submitted to the appropriate Regional Office, and a modified permit with revised certification must be issued prior to certification and operation. 123