Loading...
HomeMy WebLinkAboutWQCS00081_Remission Request (DV-2024-0034)_20240408RECEIVED JUSTIFICATION FOR REMISSION REQUEST AP{ Case Number: DV-2024-0034 cN@DEQMWR/NPDES Assessed Party: City of Mebane Permit No.: WQCS00081 Amount Assessed: $893.98 Please use this form when requesting remission of this civil penalty. You must also complete the "Request For Remission, Waiver of Right to an Administrative Hearing, and Stipulation of Facts" form to request remission of this civil penalty. You should attach any documents that you believe support your request and are necessary for the Director to consider in evaluating your request for remission. Please be aware that a request for remission is limited to consideration of the five factors listed below as they may relate to the reasonableness of the amount of the civil penalty assessed. Requesting remission is not the proper procedure for contesting whether the violation(s) occurred or the accuracy of any of the factual statements contained in the civil penalty assessment document. Pursuant to N.C.G.S. § 143B-282.1(c), remission of a civil penalty may be granted only when one or more of the following five factors apply. Please check each factor that you believe applies to your case and provide a detailed explanation, including copies of supporting documents, as to why the factor applies (attach additional pages as needed). (a) one or more of the civil penalty assessment factors in N.C.G.S. 143B-282.1(b) were wrongfully applied to the detriment of the petitioner (the assessment factors are listed in the civil penalty assessment document); (b) the violator promptly abated continuing environmental damage resulting from the violation (i.e., explain the steps that you took to correct the violation and prevent future occurrences); (c) the violation was inadvertent 'or a result of an accident (i.e., explain why the violation was unavoidable or something you could not prevent or prepare for); V (d) the violator had not been assessed civil penalties for any previous violations; (e) payment of the civil penalty will prevent payment for the remaining necessary remedial actions (i.e., explain how payment of the civil penalty will prevent you from performing the activities necessary to achieve compliance). EXPLANATION: Swe ATW-4 NL#M STATE OF NORTH CAROLINA COUNTY OF ALAMANCE IN THE MATTER OF ASSESSMENT OF CIVIL PENALTIES AGAINST City of Mebane Mebane Collection System PERMIT NO. WQCS00081 DEPARTMENT OF ENVIRONMENTAL QUALITY WAIVER OF RIGHT TO AN ADMINISTRATIVE HEARING AND STIPULATION OF FACTS CASE NO. DV-2024-0034 Having been assessed civil penalties totaling $893.98 for violation(s) as set forth in the assessment document of the Division of Water Resources dated March 06, 2024, the undersigned, desiring to seek remission of the civil penalty, does hereby waive the right to an administrative hearing in the above -stated matter and does stipulate that the facts are as alleged in the assessment document. The undersigned further understands that all evidence presented in support of remission of this civil penalty must be submitted to the Director of the Division of Water Resources within thirty (30) days of receipt of the notice of assessment. No new evidence in support of a remission request will be allowed after (30) days from the receipt of the notice of assessment. This the 2Ab day of Ape& , 20� SIGNATURE ADDRESS / v •. TELEPHONE ATTACHMENT A City of Mebane CASE NUMBER: DV-2024-0034 PERMIT NO: WQCS00081 REGION: Winston-Salem FACILITY: Mebane Collection System COUNTY: Alamance Other Violations INCIDENT VIOLATION TOTAL VOLUME PENALTY NUMBER DATE VIOLATION TYPE VIOLATION DESCRIPTION (GALLONS) AMOUNT 202301623 12/11/2023 CSO/SSO(Sewer Overflow) Discharge without valid permit 17,400 $750.00 Ae6alte Positively Charming April 1, 2024 PERCS Branch Division of Water Resources 1617 Mail Service Center Raleigh, NC 27699-1617 Subject: Response to Notice of Violation and Assessment of Civil Penalty DV-2024-DV-0034 Dear PERCS Branch: This letter is in response to the Notice of Violation and assessment of civil penalty dated March 8, 2024, that the City of Mebane received on March 11, 2024, in regard to sewer overflow case number DV-2024-0034. The sanitary sewer overflow that occurred on the morning of December 11, 2023 was accidental. The cause of the overflow was due to an exercising generator surging back into the panel when switching back over to utility power that blew a fuse in the low voltage transformer dropping one leg of the three-phase power. The loss of one phase eliminated all pump controls and caused a communication fail alarm through SCADA. The City was onsite within 33 minutes responding to the communication fail alarm. At the time of arrival, the pump station wet well was nearing capacity, and it was noted that the control panel was out of service. The City immediately mobilized the bypass pump to the site and contacted an electrician to diagnose the problem with the control panel. The electrician found the blown fuse within the low voltage transformer and replaced it putting the station back online within one hour. The City had replacement fuses in stock for this scenario but unfortunately the overflow was already occurring by the time the repair had been made. Since this incident, it has come to our attention that these particular fuses are hard to get and diagnose with the naked eye. We have discussed with our contractors and engineers alternatives to the fuses that can be easily diagnosed and are readily available. The City has taken an inventory of all of our existing pump station that have this same fuse configuration. This inventory reveled that we have 70 of these fuse configurations in 16 of our pump stations. An alternative to these fuses is a breaker with a visual indicator of a trip that can be easily diagnosed. We have already replaced the fuses at the Fieldstone Pump Station with breakers where this incident occurred and are working with a contractor to replace the remaining fuses within the next few weeks. The City hopes you find this response as an acceptable justification for remission by the City promptly abating continuing environmental damage, this incident being an accident, and that the city had not been assessed civil penalties for previous violations. Attached is the invoice for the fuse to breaker change out at the Fieldstone Pump Station. Sincerely, Kyle Smith, P.E. Public Utilities Director Cc — Lon T. Snider, Regional Supervisor Water Quality Regional Operations Section Winston-Salem Regional Office CONTRACTOR'S APPLICATION for PAYMENT PAGE 1 OF 2 PAGES CAP702 SUMMARY PAGE TO: CITY OF MEBANE APPLICATION NO: 1 106 E. WASHINGTON ST. APPLICATION DATE: 4/01/2024 MEBANE, NC 27302 PERIOD TO: 4/01/2024 CONTRACT DATE: 4/01/2024 FROM: ARCHITECT PROJECT#: KING ELECTRIC CO., INC P.O. BOX 197 Distribution to: BURLINGTON, NC 27215 PROJECT: VIA ARCHITECT: 191827 191827 CHANGE FUSES TO BREAKERS CHANGE FUSES TO BREAKERS 1. Original Contract Sum CONTRACT FOR: GREG 376.00 ----------- - -- --- 2. Change Order Summary ADDITIONS DEDUCTIONS Total changes approved in previous months by Owner 0.00 0.00 Total approved this Month 0.00 0.00 TOTALS 0.00 0.00 Net Change by Change Orders 0.00 3. CONTRACT SUM TO DATE (Line 1+ - 2) 376.00 4. TOTAL COMPLETED & STORED TO DATE (Column G on CAP703) 376.00 5. RETAINAGE: a. 0.00 % of Completed Work 0.00 (Columns D + E on CAP703) b. 0.00 % of Stored Material 0.00 (Column F on CAP703) Total Retainage (Line 5a + 5b or Total in Column I of CAP703) 6. TOTAL EARNED LESS RETAINAGE (Line 4 less Line 5 Total) 7. LESS PREVIOUS CERTIFICATES FOR PAYMENT (Line 6 from prior Certificate) 8. CURRENT PAYMENT DUE 9. BALANCE TO FINISH, INCLUDING RETAINAGE (Line 3 less Line 6) Architect's Certification: Amount Certified: Architect: Contractor Certification: Signature: Date: 4/01/2024 State of: NC County of: Form by: PEM Software Systems, Ltd. 1-800-803-1315 Date: Subscribed and sworn to before me this day of Notary Public: My Commission expires:_/_/ ,1 1 1; 376.00 0.00 376.00 0.00 CAP703 DETAIL PAGE(S) TO: CITY OF MEBANE 106 E. WASHINGTON ST. MEBANE, NC 27302 A B ITEM ITE DESCRIPTION OF WORK 1 I CONTRACT AMOUNT 2 APPLICATION FOR PAYMENT FROM: KING ELECTRIC CO., INC P.O. BOX 197 808 CHAPEL HILL RD. BURLINGTON, NC 27215 C D E WORK COMPLETED SCHEDULED FROM PREVIOUS VALUE APPLICATION THIS PERIOD (D + E) 376.00 0.00 0.0C 0.00 0.00 376.0C PAGE 2 OF 2 PAGES PROJECT APPLICATION#: APPLICATION DATE: 4/01/2024 191827 PERIOD TO: 4/01/2024 CONTRACT DATE: 4/01/2024 ARCHITECTS PROJECT#: F - G--- MATERIALS TOTAL BALANCE RETAINAGE PRESENTLY COMPLETED % O STORED AND STORED (G / C) FINISH (IF VARIABLE (NOT IN TO DATE (C _ G) RATE) D OR E) (D+E+F) 0.00 0 376.00 0.00 0.001 376.00 0 376.00-, -- 0.00 1 376.001 0.001 376.001 0.001 376.00 ( 100 1 0.001 0.00 Form by: PEM Software Systems, Ltd. 1-800-803-1315 I kt 0 Ilk - Conte a sew Ob" am 0, It. 0 1011* Ism," UML-