Loading...
HomeMy WebLinkAboutSW4231202_Supplement-EZ Form_20240408 SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name The Townes at Bermuda Run-Phase 1 2 Project Area(ac) 21.60 3 Coastal Wetland Area(ac) 0 4 Surface Water Area(ac) 1.92 _ 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 30' 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 2 14 Stormwater Wetland 15 Permeable Pavement _ 16 Sand Filter 17 Rainwater Harvesting(RWH) 18 Green Roof • 19 Level Spreader-Filter Strip(LS-FS) 20 Disconnected Impervious Surface(DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Clark A.Fleming,P.E. 28 Organization: Evans Engineering,Inc. 29 Street address: 4609 Dundas Drive 30 City,State,Zip: Greensboro,NC 27407 31 Phone number(s): 336-854-8877 32 Email: caf@evans-eng.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer � ESS/ O`'t ) @ • • 9! ; SEAL _ Signature of Designer 035014 • • • • • 7��"ill f1Qtif110\\ Date DRAINAGE AREAS I 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs 2 3 Does this project have low density areas? No 4 If so,number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED 1DRAINAGE AREA INFORMATION Entire Site 1 1 2 4 Type of SCM Wet Pond#1 Wet Pond#2 5 Total drainage area(sq ft) 494,810 219,121 275,689 6 Onsite drainage area(sq ft) I 491,389 218,289 273,100 7 Offsite drainage area(sq ft) 3,421 832 2,589 8 Total BUA in project(sq ft) 265174 sf 123449 sf 141725 sf New BUA on subdivided lots(subject to permitting) 9 (sq ft) 159618 sf 71212 sf 88406 sf New BUA not on subdivided lots(subject to 10 permitting)(sf) 102135 sf I 51405 sf 50730 sf 11 Offsite BUA(sq ft) 3421 sf 832 sf 2589 sf 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft) I 6605 sf 3330 sf 3275 sf -Sidewalk(sq ft) 13700 sf 7238 sf 6462 sf -Roof(sq ft) N/A N/A N/A -Roadway(sq ft) 81830 sf 40837 sf 40993 sf -Future(sq ft) N/A N/A N/A -Other,please specify in the comment box I below(sq ft) N/A I N/A N/A New infiltrating permeable pavement on 13 subdivided lots(sq ft) N/A N/A N/A New infiltrating permeable pavement not on 14 subdivided lots(sq ft) N/A N/A N/A Existing BUA that will remain(not subject to 15 permitting)(sq ft) N/A N/A N/A 16 Existing BUA that is already permitted(sq ft) _ II N/A N/A N/A 17 Existing BUA that will be removed(sq ft) N/A N/A N/A Percent BUA 53.56% 56.33% 51.40% 19 Design storm(inches) N/A 1.0 in 1.0 in 20 Design volume of SCM(cu ft) N/A 10300 cf 11903 cf 21 Calculation method for design volume N/A _ Simple Method Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): WET POND 1 Drainage area number 1 2 2 Minimum required treatment volume(cu ft) I 10300 cf I 11903 cf GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slopes of the SCM(H:V)? 3:1 3:1 Does the SCM have retaining walls,gabion walls or other engineered 6 side slopes? No No 7 Are the inlets,outlets,and receiving stream protected from erosion Yes Yes (10-year storm)? 8 Is there an overflow or bypass for inflow volume in excess of the No No design volume? 9 What is the method for dewatering the SCM for maintenance? Pump(preferred) Pump(preferred) 10 If applicable,will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC(8)? Yes Yes 12 Does the drainage easement comply with General MDC(9)? Yes Yes 13 If the SCM is on a single family lot,does(will?)the plat comply with N/A N/A General MDC(10)? 14 Is there an O&M Agreement that complies with General MDC(11)? Yes Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes Yes 16 Does the SCM follow the device specific MDC? Yes Yes 17 Was the SCM designed by an NC licensed professional? Yes Yes WET POND MDC FROM 02H.1053 18 Sizing method used SA/DA SA/DA 19 Has a stage/storage table been provided in the calculations? Yes Yes 20 Elevation of the excavated main pool depth(bottom of sediment 739.00 722.00 removal)(fmsl) 21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 739.50 722.50 22 Elevation of the bottom of the vegetated shelf(fmsl) 744.50 726.50 23 Elevation of the permanent pool(fmsl) 745.00 727.00 24 Elevation of the top of the vegetated shelf(fmsl) 745.50 727.50 25 Elevation of the temporary pool(fmsl) 747.50 730.00 26 Surface area of the main permanent pool(square feet) 6,480 SF 5,911 SF 27 Volume of the main permanent pool(cubic feet) 22209 cf 17327 cf 28 Average depth of the main pool(feet) 3.83 ft 3.29 ft 29 Average depth equation used Equation 3 Equation 3 30 If using equation 3,main pool perimeter(feet) 250.0 ft 243.0 ft 31 If using equation 3,width of submerged veg.shelf(feet) 3.0 ft 3.0 ft 32 Volume of the forebay(cubic feet) 4154 cf 3309 cf 33 Is this 15-20%of the volume in the main pool? Yes Yes 34 Clean-out depth for forebay(inches) 42 in. 42 in. 35 Design volume of SCM(cu ft) 26709 cf 29650 cf 36 Is the outlet an orifice or a weir? Orifice Orifice 37 If orifice,orifice diameter(inches) 1.75 in. 1.75 in. 38 If weir,weir height(inches) N/A N/A 39 If weir,weir length(inches) N/A N/A 40 Drawdown time for the temporary pool(days) 4.12 4.19 Are the inlet(s)and outlet located in a manner that avoids short- 41 circuiting? Yes Yes 42 Are berms or baffles provided to improve the flow path? No No 43 Depth of forebay at entrance(inches) 48 in 48 in 44 Depth of forebay at exit(inches) 36 in 36 in 45 Does water flow out of the forebay in a non-erosive manner? Yes Yes 46 Width of the vegetated shelf(feet) 6 ft 6 ft 47 Slope of vegetated shelf(H:V) 6:1 6:1 Does the orifice drawdown from below the top surface of the 48 permanent pool? No No Does the pond minimize impacts to the receiving channel from the 1- 49 yr,24-hr storm? Yes Yes Are fountains proposed?(If Y,please provide documentation that 50 MDC(9)is met.) No No 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes 52 Are the dam and embankment planted in non-clumping turf grass? Yes Yes 53 Species of turf that will be used on the dam and embankment Fescue Fescue 54 Has a planting plan been provided for the vegetated shelf? Yes Yes ADDITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): Wet Pond 1. 8:01 AM 4/8/2024